HomeMy WebLinkAboutCC - Grading Plan0 w m 0 ct U 9 c�NSF� 60 � — — — / 16970 I / ABBREVIATIONS N 6-2-22 CL CENTERLINE O� �TFOF �P PAP EX EXISTING GROUND NNE M. G� FFE FINISHED FLOOR ELEVATION FG FINISHED GRADE FL FLOW LINE _ GRVL EDGE OF GRAVEL ,^ / / HP HIGH POINT 0 25 50 100 150 uJ 3"S O E BINGLEY DRIVE _ _ / / INV INVERT ME MATCH EXISTING - - � � / � RIM RIM ELEVATION J / \ TRC TOP BACK OF ROLLED CURB SCALE: 1" = 50W E TVC TOP BACK OF VERTICAL CURB O o TOA TOP OF ASPHALT >� TOC TOP OF CONCRETE TOIy 378• 3g ^ c ' 2T 55 j�0 c 2758 �� c 'iP� c- 207 s ��� / ��� / / / ^/ X Q .� v oo 2765 - - y0 S 0 / •� a / 16 r� ti� / 1p,c GRADING NOTES ED Lu i Tp 1sJ� 6L c s9 13 12 \ \ o• a61 �� �/ �• �y9 ��• l4 J 10 c / 1. CONTRACTOR SHALL OBTAIN ALL NECESSARY EROSION AND SEDIMENT CONTROL AND EPA NPDES PERMITS PRIOR a m E `✓ 2759 9 2> o- a TO STARTING WORK. 0 G \ e.o 15 O G G G \ 8 a�o 2. CLEARING AND GRUBBING SHALL CONFORM TO ISPWC SECTION 201 AND THE RECOMMENDATIONS OF THE o� PROJECT GEOTECHNICAL REPORT. II /t As• ^y99 O Os• FG ^'0h ^'9a �y�6 y°�0 FG G 7- — BLOCK 3. EXCAVATION AND EMBANKMENT SHALL CONFORM TO ISPWC SECTION 202 WITH CLASS B COMPACTION AND I _ yp0 " ry�6 g� V a FOLLOW THE RECOMMENDATIONS OF THE GEOTECHNICAL REPORT. 6 6o F 18 �6� 2j s ry — `L\ o6ry 2>S 2j O• a6 4. NO GRADING IS PERMITTEDON ADJACENT PROPERTY. MATCH INTO EXISTING GRADE 2' FROM PROPERTY 67 /\ate BOUNDARY.NO DRAINAGE SHALL BE ALLOWED TO PASS FROM THE PROJECT SITE ONTO ADJACENT PROPERTY. �G a a \ 1`�� FV 4 62/ j .� 5. ANY UNCONTROLLED FILL ENCOUNTERED BENEATH PROPOSED BUILDING PADS AND DRIVE AISLES SHALL BE w BLOCK 2 / ® : a ry // EXCAVATED TO SUFFICIENT DEPTHS TO EXPOSE COMPETENT NATIVE SOILS, REPLACED, AND RECOMPACTED. �®® T2>sS �G K .�2jE I 4 •� cA7`. c °a. O 'qO -� a \/a, B. PRIOR TO PLACEMENT OF ANY GENERAL FILL, THE SITE SUBGRADE SHALL BE PREPPED IN ACCORDANCE WITH O k O O o c b� �� 6 / yA o p / ) THE GEOTECHNICAL REPORT. THE PREPPED SUBGRADE SHALL BE OBSERVED AND APPROVED BY THE PROJECT _ 9> ry\ 90•' 275g BLOCK 4 2>s0 / �• �_ I \ FCFOq�y ry�6� /Fc�k N /�/.'/9 GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OF FILL MATERIALS. \ 1 2 3 4 / URST �6 /� / I 16� 9. FILL PLACED TO DEVELOP BUILDING PADS SHALL MEET THE REQUIREMENTS FOR GENERAL FILL. GENERAL FILL a / 1 Q a R > � - 7 F Z �> F �O 2760, �> 5 � �F. ry o ,�' - / FG s USED FOR SITE GRADING MAY BE OBTAINED FROM ON -SITE EXCAVATIONS OR APPROVED BORROW SOURCES. / TO sb') ry9 Vic, G� C� . G C� i �� �' /' Q '�� k6� GENERAL FILL MATERIAL SHALL HAVE A MAXIMUM PARTICLE SIZE LESS THAN 6 INCHES AND SHALL BE FREE OF a 6�• 0 \ ry�0 by 1 � k 6 � • / 6�. ,' � �\ �� / I OS 2� y� EXCESS MOISTURE, ORGANIC MATTER AND DEBRIS. REFER TO THE GEOTECHNICAL REPORT FOR ADDITIONAL � 275 ^ya �yo— 2760 REQUIREMENTS. z o 2) \ G 2 10. ALL AREAS OF CONSTRUCTION SHALL BE STRIPPED. STRIPPING SHALL CONSIST OF REMOVING THE TOPSOIL L CD ¢O Tp aj i k 21 T� s2 I ?> T 1g ` ^60 1 04 HUMUS. STRIPPED MATERIALS SHALL BE PLACED OR STOCKPILED BY THE CONTRACTOR ON THE SITE AS SHOWN ry sA bko �O 67>g G ry10 \ ry \\ / ON THE PLANS AND PER INSTRUCTION BY THE OWNER/DEVELOPER, OR HAULED OFF SITE TO AN APPROVED N U I ry1 15 FV 0 91 / \ ® FG LOCATION. o FG 0 2> 1 1 1 ® 6 oN 2762.26' o ® a 16ry 11. THE CONTRACTOR SHALL CLEAN ALL SPILLED DIRT, GRAVEL OR OTHER FOREIGN MATERIALS CAUSED BY THE 7 a N T?j0. I FG 22 6.y�2>s IIF O ¢ 6' 3g• F I ACHD SEEPAGE BED #1 \ `L w _ F o CONSTRUCTION OPERATIONS FROM ALL STREETS AND ROADS AT THE CONCLUSION OF EACH DAY OR OPERATION. ply B2 p ?> _.2j6 FG ) �2>6 `V / ,y6 CLEANING SHALL BE BY GRADER AND FRONT-END LOADER, SUPPLEMENTED BY POWER BRUSHING AND HAND Z O ry�6k O• -?>62 7`C 2 bp, �, c?62 i I :{{2) �� BLOCK 5 I \\ ,rl'IrO LABOR UNLESS OTHERWISE APPROVED BY THE CITY. THE CONTRACTOR SHALL FOLLOW CITY AND DEQ EROSION w U. 49• 6N ry^y >S II s2J TO �ry 06 ?) CONTROL PROCEDURES. ¢ 14'L� 2�03• — — —TO e2 T 2js I FV 23 �2>s 2>6 O .99; r U 12. AS SOON AS PRACTICAL AFTER COMPLETION OF ALL PAVING, THE CONTRACTOR SHALL REMOVE ALL DIRT, MUD, a ply 8)iii0 — yry0 — — 2765 c ��p' 7`c 2g8• I 0 E I I ROCK GRAVEL AND OTHER FOREIGN MATERIALS FROM THE PAVED SURFACE AND STORM DRAINAGE SYSTEM. z 6 ry� 2j F A,>w 13. CONTRACTOR SHALL RETAIN AN INDEPENDENT TESTING LABORATORY FOR FIELD QUALITY CONTROL OF ALL 6 BACKFILL AND ASPHALT. FIELD UALITY CONTROL SHALL BE IN ACCORDANCE WITH ISPWC SECTION 204.3.4 AND QJ2 / 6). G }, ; / 2j I G ti 2) R 6� �6 �, ti� SECTION 810.3.13. COPIES OF ALL TEST RESULTS SHALL BE PROVIDED TO THE CITY OF BOISE FOR REVIEW. DESIGNED: C. GRAHAM m T E F 4 .t� E f 2765 `L o p!y d. ky — - 2765 O- J9 .1, •y ¢ J1II .yh O 2�!�, I 2> k' DRAWN: L. HAASE S y O•= 2> 6 •y 0 6' T �6 i 14. ALL UNSUITABLE MATERIAL SUCH AS SOILS, TRASH, AND VEGETATION SHALL BECOME THE PROPERTY OF THE / ry�0 FO 63>s ry� z ry�0 y1 J�2 p tiKG I / CONTRACTOR AND PROPERLY DISPOSED OF OFF SITE. CHECKED: C. GRAHAM H 15. THE CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL SOILS REPORT PREPARED BY ATLAS DATED APPROVED: C. GRAHAM II IG 25 I 2j64 Fc �G ti c2j6R c2,6sr0 3 I ACHD SEEPAGE BED #2 \ SEPTEMBER 15, 2020, PROJECT NO. b201338g. ?> F 2> OS. BLOCK 4 k• �6• 6k' x• FG 2, TO`yb9,6, y66 ti16kC -sr FG\2> ^6 �^ �O 63 �> k6e \\ Z �6 ' o• e 0 12 �bk �e r s� T� ryA6 I PREPARED FOR: 8 6k `L\ ��. 3 FG 26S G20 LLC F_ R PO BOX 593 A 4 oti �o T� 6S?e• 1 6��9 c Res• FG �I a \\ U EAGLE, ID 83616 ^6k ..\ ry� kle T� e�� � \\ ry�G ryFv ry�G 11T2jk,BLOCK 5 ry�0 �6 O L^ G \\ s > 4 F 5' SIDEWALK 0 y4i '; �• s s FG Cn 2 I \ I r I z 6y' S \ BELLY LOTS 8" BELOW BACK OF w Q \� �6028 29 F Eby �' < \ ry�� C2jGS �2>sR 1 I 2, yL^ SIDEWALK (MEASURED AT CENTER OF LOT) °� U \ 6y' ry G yy ?765 / \2BLOCK 6 \ L^ BLOCK 2Lo ` ^by `• ® \ ACHD SEEPAGE BED #3 B� ry ry�G \ \ \ \ \\ N 3 D^byys p f fN 6 FG S \�/N C�fNART pRl� '' ' ��k�y �a\A�iAiA/A/A////���%�%�V��A�wA���A��A���V��V��i��iA�������A�/���%�%/%�i✓//�//�/i�/��/AiA �yA. W 32 6 y° 6 ry^6y. > Z N F TYPICAL LOT GRADING DETAIL 1 Q Z I _ _ �bk9 33 ryFV y:5ry� \; ® �-- SCALE: NOT TO SCALE C3.0 � Q J Z 34 2765 �F �6y. \ d 0 35 ryKG y�6 bk 6y`6 L ` C) W I FG G ry^� co g Z 36 FG I � W 3Z N > Q 7 38 "64 Q 2>66s�� L^6k �+ BLOCK 2 0 4 i i / W Q d V s� W lo lK ---- iLLJ /--------- l 16 — — — — — -2765 - - - ` -------------------------- - — — — H CSW PROJECT NO, 22001 O DRAWING DATE 06/02/2022 a C3.0