Loading...
HomeMy WebLinkAboutDOC_Storm Drain Report V1STORM DRAINAGE REPORT AND CALCULATIONS FOR SKYBREAK SUBDIVISION NO. 2 MERIDIAN, IDAHO ENSF� PREPARED BY: 16970 CORINNE M GRAHAM, PE 6-2-22 s� O June 2, 2022 \OF NE M . GFL csw CIVIL SIT E w o a is s PO BOX 6059 BOISE, ID 83707 (208)946-3874 cgraham@cswengineering.com INTRODUCTION The existing 11.12-acre site for the proposed Skybreak Subdivision No. 2 is currently agricultural row crop ground. The proposed development includes 62 single family residential lots, 10 landscape common lots, and associated public streets, landscaping, and utilities. HISTORIC DRAINAGE The existing project site sits southeast of the intersection of E. Lake Hazel Road and S. Eagle Road in Meridian. The eastern portion of the site that was developed in Phase 1 lies along Meridian's southern rim. Surficial soils are comprised of sandy silts and silty sands. At depths of 3-6 feet, free draining poorly graded gravel with sand was encountered during geotechnical exploration. Groundwater was not encountered at depths up to 15.2 feet and is not anticipated to reach levels higher than 20 feet below existing ground. Because of the presence of free draining materials and the depth to groundwater, the site is suitable for the use of infiltration facilities. PROPOSED DRAINAGE The storm drainage calculations and design for the proposed improvements are intended to meet the requirements of ACHD's storm water policy. Storm water facilities are designed to store and treat runoff from a 100-year storm event and to pretreat the water quality volume defined as the 80th percentile storm event. Storm water runoff from 40' behind the sidewalk, including residential driveways, will be conveyed to the public stormwater system to be owned and maintained by ACHD. Remaining lot drainage will be contained within individual lots. Stormwater runoff from the public streets is conveyed via curb and gutter to drain inlets within the roadway then piped to one of three underground seepage beds where it is treated, stored, and finally infiltrated. A sand and grease trap will be installed to provide pre-treatment for the water quality event. A high -flow bypass will be installed on Basin #1 for larger storm events. APPENDICES • Drainage Basin Map • Storm Drainage Calculations • Project Geotechnical Report 0 25 50 100 150 SCALE: 1" = 50' SKYBREAK SUBDIVISION NO. 2 DRAINAGE BASIN MAP CSW C I V I L S I T E Skybreak Subdivision No. 2 Storm Drainage Calculations Drainage Basin Characteristics C Values Impervious = 0.90 Landscape = 0.20 ACHD Basin #1 ACHD Basin #2 ACHD Basin #3 Total Area (SF) 157388 86334 83303 Roadway Area (SF) 44883 23842 21608 Sidewalk Area (SF) 14448 7521 7699 House/Driveway Area (SF) 52787 26579 25237 Landscape Area (SF) 45270 28392 28759 C Value: 0.70 0.67 0.66 Catch Basin Calculations Prepared By: Corinne Graham, PE CB #1A CB #113 CB #2A CB #213 CB #2C CB #3A CB #313 CB #3C Total Area (SF) 74453 82935 31153 40582 14599 45191 25645 12467 Roadway Area (SF) 17670 27213 8603 10698 4541 10003 6880 4725 Sidewalk Area (SF) 5772 8676 2604 3558 1359 3718 2399 1582 House/Driveway Area (SF) 30549 22238 9080 12501 4998 17722 7515 0 Landscape Area (SF) 20462 24808 10866 13825 3701 13748 8851 6160 C Value: 0.71 0.69 0.66 0.66 0.72 0.69 0.66 0.55 June 2, 2022 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post-developm ■ Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name ACHD Basin #1 2 Is area drainage basin map provided? (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User Calculate min 0 Min. 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i QPeak 2.58 6.51 2.58 in hr 6.51 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 8,724 8,724 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) Both 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V„ 3,090 3,090 ft, 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 872 ft' Primary Treatment/StorageBasin V 7,852 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 8,724 8,724 ft' YES rlir4 to Sh- 10-1-hh.6- I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 44,883 14,448 52,787 45,270 3.61 0.90 0.90 0.90 0.20 0.70 Estimated Runoff Coefficients for Various Surfac Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\22001 Skybreak Sub Ph2\Reports\Storm Drainage\ACHD_SD_CALCS_022322 Version 10.5, November 2018 6/2/2022, 6:23 PM ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name ACHD Basin #1 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? Yes 100 0.70 3.61 acres 0.00 cfs V 8,724 1 Link to: LQV QV TR55 8,724 ft' 0%Sediment 8 Set Total Design Width of All Drain Rock W 20.0 ft 9 Set Total Design Depth of All Drain Rock D 10.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs 12 in 14 Calculate Total Storage per Foot Spf 94.0 ft3/ft 15 Calculate Design Length L 93 93 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 93 93.0 ft 17 Variable Infiltration Window W SWW 20.0 20.0 ft 18 Time to Drain 6.3 hours 90% volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 93 93 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage Chambers 9r Note: This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft` 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90% volume in 48-hours minimum C:\Users\cgrah\Dropbox\Projects\22001 Skybreak Sub Ph2\Reports\Storm Drainage\ACHD_SD_CALCS_022322 6/2/2022, 6:24 PM Version 10.0, May 2018 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post-developm ■ Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name ACHD Basin #2 2 Is area drainage basin map provided? (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User Calculate min 0 Min. 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i QPeak 2.58 3,42 2.58 in hr 3,42 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 4,588 4,588 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) Both 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V„ 1,625 1,625 ft, 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 459 ft' Primary Treatment/StorageBasin V 4,129 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 4,588 4,588 ft' YES rlir4 to Sh- 10-1-hh.6- I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 23,842 7,521 26,579 28,392 1.98 0.90 0.90 0.90 0.20 0.67 Estimated Runoff Coefficients for Various Surfac Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.12 0. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\22001 Skybreak Sub Ph2\Reports\Storm Drainage\ACHD_SD_CALCS_022322 Version 10.5, November 2018 6/2/2022, 6:23 PM ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name ACHD Basin #2 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? Yes 100 0.67 1.98 acres 0.00 cfs V 4,588 Link to: L0,v QV TR55 4,588 ft' 0%Sediment 8 Set Total Design Width of All Drain Rock W 15.0 ft 9 Set Total Design Depth of All Drain Rock D 10.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 70.2 70.2 ft'/ft 15 Calculate Design Length L 65 65 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 65 65.0 ft 17 Variable Infiltration Window W SWW 15.0 15.0 ft 18 Time to Drain 6.4 hours 90% volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 65 65 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage Chambers 9r Note: This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90% volume in 48-hours minimum C:\Users\cgrah\Dropbox\Projects\22001 Skybreak Sub Ph2\Reports\Storm Drainage\ACHD_SD_CALCS_022322 6/2/2022, 6:24 PM Version 10.0, May 2018 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post-developm ■ Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name ACHD Basin #3 2 Is area drainage basin map provided? (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User Calculate min 0 Min. 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc 9 Calculate the Post -Development peak discharge (QPeak) i QPeak 2.58 3.25 2.58 in hr 3.25 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 4,351 4,351 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) Both 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V„ 1,541 1,541 ft, 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 435 ft' Primary Treatment/StorageBasin V 3,916 ft' Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 4,351 4,351 ft' YES rlir4 to Sh- 10-1-hh.6- I-1 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 21,608 7,699 25,237 28,759 1.91 0.90 0.90 0.90 0.20 0.66 Estimated Runoff Coefficients for Various Surfac Type of Surface Runoff Coefficients "I Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 0. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE C:\Users\cgrah\Dropbox\Projects\22001 Skybreak Sub Ph2\Reports\Storm Drainage\ACHD_SD_CALCS_022322 Version 10.5, November 2018 6/2/2022, 6:23 PM ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the "Peak QV" tab Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name ACHD Basin #3 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? Yes 100 0.66 1.91 acres 0.00 cfs V 4,351 Link to: L0,v QV TR55 4,351 ft' 0%Sediment 8 Set Total Design Width of All Drain Rock W 14.0 ft 9 Set Total Design Depth of All Drain Rock D 11.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Pert 180°) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360°), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 71.1 71.1 ft'/ft 15 Calculate Design Length L 61 62 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 62 62.0 ft 17 Variable Infiltration Window W SWW 14.0 14.0 ft 18 Time to Drain 6.8 hours 90% volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 62 62 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage Chambers 9r Note: This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90% volume in 48-hours minimum C:\Users\cgrah\Dropbox\Projects\22001 Skybreak Sub Ph2\Reports\Storm Drainage\ACHD_SD_CALCS_022322 6/2/2022, 6:24 PM Version 10.0, May 2018