Loading...
HomeMy WebLinkAboutCDHD Final Approval Letter CENTRAL 00 DISTRICT IN WMAIN OFFICE , -,��7 /,G t..'-STPONG PL 50;SF. !D83704-01E DEPARTMENT l _ 1: —�CC 7 C. ldahc.cjc,' C-S' 17-0443 June 28, 2017 Christopher D. Rich Ada County Recorder 200 West Front Street Boise, ID 83702 RE: Hills Century Farm Commercial No. I Dear Mr. Rich: Central District Health Department has reviewed and does approve the final plat for this subdivision for central water and central sewer facilities. Final approval was given June 28, 2017. Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based on a review by a Qualified Licensed Professional Engineer (QLPE) representing the City of Meridian and the QLPE approval of the design plans and specifications and the conditions imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is cautioned that at the time of this approval, no drinking water extensions or sewer extensions were constructed. Building construction can be allowed with appropriate building permits if drinking water extensions or sewer extensions have since been constructed or if the developer is simultaneously constructing those facilities. If the developer fails to construct facilities then sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by the issuance of a certificate of disapproval, and no construction of any building or shelter requiring drinking water or sewer/septic facilities shall be allowed. S E R,, t`G ADC_, DC',i S E. EL 0 R E A! D ',,/A�L E'Y COUNTIES Ada 1 Boise County Office Eir-iore County Office Valley County Office C, F -7 C� . !D Z647 _�1,�t -tj'eC-t [CID j E� 7- -re (2 0 C 94 P h;, If you have any questions, please call 327-8517. Sincerely, Lori Badigian, R.E.H.S. Senior Environmental Health Specialist cc: Brighton Development, Inc KM Engineering City of Meridian LB-jh