HomeMy WebLinkAboutCDHD Final Approval Letter CENTRAL
00 DISTRICT
IN
WMAIN OFFICE , -,��7 /,G t..'-STPONG PL 50;SF. !D83704-01E
DEPARTMENT l _
1: —�CC 7 C. ldahc.cjc,'
C-S'
17-0443
June 28, 2017
Christopher D. Rich
Ada County Recorder
200 West Front Street
Boise, ID 83702
RE: Hills Century Farm Commercial No. I
Dear Mr. Rich:
Central District Health Department has reviewed and does approve the final plat for this
subdivision for central water and central sewer facilities. Final approval was given June 28,
2017.
Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based
on a review by a Qualified Licensed Professional Engineer (QLPE) representing the City of
Meridian and the QLPE approval of the design plans and specifications and the conditions
imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is
cautioned that at the time of this approval, no drinking water extensions or sewer extensions
were constructed. Building construction can be allowed with appropriate building permits if
drinking water extensions or sewer extensions have since been constructed or if the developer
is simultaneously constructing those facilities. If the developer fails to construct facilities then
sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by
the issuance of a certificate of disapproval, and no construction of any building or shelter
requiring drinking water or sewer/septic facilities shall be allowed.
S E R,, t`G ADC_, DC',i S E. EL 0 R E A! D ',,/A�L E'Y COUNTIES
Ada 1 Boise County Office Eir-iore County Office Valley County Office
C, F -7 C� .
!D Z647
_�1,�t -tj'eC-t [CID j
E� 7-
-re (2 0 C 94 P h;,
If you have any questions, please call 327-8517.
Sincerely,
Lori Badigian, R.E.H.S.
Senior Environmental Health Specialist
cc: Brighton Development, Inc
KM Engineering
City of Meridian
LB-jh