Loading...
HomeMy WebLinkAboutConcept Elevations V1APPROX. BLDG. HGHT. Q 23' -_ 2 17/32" TOP PLATE 11' - 1 1/8" 9CEILING _ - 11 19/32" MAIN LEVEL - 0" — — - FRONT ELEVATION PRESENTATION 1 /2" = 1'-0" PLAN CONFORMS TO OR REQUIRES: PRESCRIPTIVE ❑ CODE (IRC 2012 WALL BRACING) SPECIAL ENGINEERING ❑ ENGINEERING PERFORMED AND INDICATED ON DWG IF SPECIAL ENGINEERING IS REQUIRED, VERIFY ALL ENGINEERING IS INDICATED ON PLANS PRIOR TO CONSTRUCTION PRELEVIINARY DRAWINGS (NOT FOR CONSTRUCTION) CONTRACTOR TO REVIEW DRAWINGS PRIOR TO BIDDING AND CONSTRUCTION. ANY ERRORS AND OMISSIONS SHALL BE BROUGHT TO THE ATTENTION OF THE DRAFTER/DESIGNER FOR CORRECTION. FINAL DRAWINGS CURRENT REVISION: Date 4/6/2022 Drawn by Caloy Saliva Checked by Dustin Hadfield E 1.2 FRONT ELEVATION �1 Z O rTl R N N � 3 W rn APPROX. BLDG. HGHT. _ _ TOP PLT.— — --- _ _ 20�'-77/17/16" Z FINISH FLR. 11'-77/16" [� UPPER LEVEL � PLAN To 10' - 7 7/16" OR PRESCRIPTIVE ❑ CODE (IRC 2012 wALL BRACING) ❑ SPECIAL ENGINEERING ENGINEERING PERFORMED AND INDICATED ON DWG IF SPECIAL ENGINEERING IS REQUIRED, VERIFY ALL ENGINEERING IS INDICATED ON PLANS PRIOR TO CONSTRUCTION PRELEMI NARY DRAWINGS (NOT FOR CONSTRUCTION) LAjk MAIN /E6 EL _ _ CONTRACTOR TO REVIEW DRAWINGS PRIOR TO BIDDING AND CONSTRUCTION. ANY ERRORS AND OMISSIONS SHALL BE BROUGHT TO THE ATTENTION OF THE DRAFTER/DESIGNER FOR CORRECTION. FINAL DRAWINGS n FRONT ELEVATION PRESENTATION U 1/2" = 1'-0" CURRENT REVISION: Date 4/6/2022 Drawn by Caloy Saliva Checked by Dustin Hadfield El.Cn co N N N FRONT ELEVATION N a APPROX. BLDG. HGHT. Q TOP PLT. _ 19'-1-11%8" UPPER LEVEL 11' - 1 1/8" � CEILING v 10, - 1 1/8' rh MAIN LEVEL n FRONT ELEVATION PRESENTATION 1/2" = 1'-0" PLAN CONFORMS TO OR REQUIRES: PRESCRIPTIVE ❑ CODE (IRC 2012 WALL BRACING) ❑ SPECIAL ENGINEERING ❑ ENGINEERING PERFORMED AND INDICATED ON DWG IF SPECIAL ENGINEERING IS REQUIRED, VERIFY ALL ENGINEERING IS INDICATED ON PLANS PRIOR TO CONSTRUCTION PRELEMI NARY DRAWINGS (NOT FOR CONSTRUCTION) CONTRACTOR TO REVIEW DRAWINGS PRIOR TO BIDDING AND CONSTRUCTION. ANY ERRORS AND OMISSIONS SHALL BE BROUGHT TO THE ATTENTION OF THE DRAFTER/DESIGNER FOR CORRECTION. FINAL DRAWINGS CURRENT REVISION: Date 04/06/2022 Drawn by Caloy Saliva Checked by Dustin Hadfield E 1.2 FRONT ELEVATION a N N N N O N r