Loading...
HomeMy WebLinkAboutT-Mobile Wireless DES, CZC A-2022-0145 V1Planning Division E I D I A N `(E IDIAti - Community Development Department D A H O 33 E. Broadway Avenue, Suite 102 APPROVED Meridian, Idaho 83642 DATE: 07/21/22 FILE NUMBER: a 0zaoias CERTIFICATE OF ZONING COMPLIANCE REPORT Project Number A-2022-0145 Project Name T-Mobile Wireless SL04250A DES, CZC Project Address 3735 N. Ten Mile Road Project Description Modification to an existing wireless communication facility. Installing (9) antennas (9) radios (4) trunk cables (1) collar mount (3) sector frames (2) cabinets (5) basebands (1) RBS6601 on 13.412 acres of land in the I-L zoning district. Applicant Lura Parker -McGlynn, Coal Creek Consulting, LLC Assigned Planner Julia Garofalo, Assistant Planner Expiration Date July 21, 2023 Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. I. DECISION The applicant's request for Certificate of Zoning Compliance and Design Review are approved with the conditions listed below. The director determined that the proposed structural and/or site designs conform to the standards and meet or exceed the intent of the "City of Meridian Architectural Standards Manual". Site Specific Conditions of Approval 1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and I1-3A-6B. 2. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 3. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 4. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 11 Page (E IDIAN — APPROVED DATE: 07/21 /22 FILE NUMBER:n-zozz U5 If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. General Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-313-5, UDC 11-313-13 and UDC 11-313-14. 2. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (AZ Ord.#855). 3. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 5. The applicant shall have an ongoing obligation to maintain all pathways. 6. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 7. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. 8. The applicant and/or assigns shall have the continuing obligation to meet the specific use standards for the proposed use as set forth in UDC 11-4-3-43, wireless communication facility. IL CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before August 5, 2022, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. 2 1 P a g e