HomeMy WebLinkAboutApplicant Response V1CUEIDR IAN,--
APPROVED
Joshua Beach
o�izoizz
DATE
Thursday, May 26, 2022 3:26 PM
FILE NUMBER: FPS --1- 1
Sonya Allen (sallen@meridiancity.org)
u ject:
Apex NW #1
Attachments:
SKM_CSSOi220S2614S70.pdf
Sonya,
Projectdox is clunky, so before I resubmit all of the documents I wanted to make sure we are on the same page. I've
included a marked up copy of the revised landscape plans for Apex NW #1 as well as a marked up landscape plan for
Apex Commercial CZC. (It's one PDF, so scroll down to see both plans).
Here are your comments with my responses in red:
The landscape plan needs to be revised as follows:
1) landscaping along pathways and within required street buffers need to include a MIX of trees and shrubs per
UDC 11-313-7C.3 — A you can see highlighted in purple on the Apex NW #1 landscape plan, we have installed
trees and a mixture of shrubs AND grass along the internal pathway and along the street buffer along Lake Hazel
between Aspiration Avenue and Apex Avenue. As noted and highlighted in orange on the Apex NW #1 landscape
plan, the arterial street buffer landscaping was reviewed and approved through the Apex Commercial CZC
application (A-2022-0060)The pathway landscaping and street buffer landscaping meet the requirements of the
UDC.
2) 11-313-12C.2 - the buffers along the eastern portion of Lake Hazel & along Locust Grove need to include shrubs;
and the note for the cross -hatch symbol needs to be revised to say "shrubs AND perennials or grasses". — As you
can see on the above comment, the landscaping you mention has been approved through the CZC process. Also,
the note you reference has been revised.
3) 14' wide public pedestrian easements shall be submitted to the Planning Division for the 10-foot wide multi -use
pathways proposed within the site along E. Lake Hazel Rd. and S. Locust Grove Rd. that are not located within
right-of-way, prior to signature on the final plat by the City Engineer. — The pedestrian pathways along Lake
Hazel and Locust grove are entirely within the right-of-way and require no additional easements.
4) Please make sure to name the file the same name so that it versions. — I'll resubmit through projectdox once you
give me the go ahead.
Thank you
Josh Beach I Assistant Project Manager -Entitlement
BRIGHTON CORPORATION
Brighton — Creating Great Places
2929 W. Navigator Dr., Suite 400, Meridian, ID 83642
Mobile 208.871.3812
brightoncorp.com