HomeMy WebLinkAboutPre-App Notes V1EILAND DEVELOPMENT
MEETING NOTES
Land Development Staff: Seth Oaks Date: 1/20/2022
Project Name and Location: Creek View Park, 2920 E. Freeway Dr
Is sanitary sewer available? Yes: x❑ No: ❑
Notes: Flow is committed
• When sewer line is deeper then 15 ft and is in parallel with water line a 35'
easement is needed. At less then 15 ft a 30' easement is needed.
• Ensure no permanent structures (trees, bushes, buildings, carports, trash receptacle
walls, fences, infiltration trenches, light poles, etc.) are built within the utility
easement.
• Ensure no sewer services cross infiltration trenches
Any unused sewer service lines must be abandoned per City Design Standards
Contact Tyson Glock with public works for more information on sewer connection
(208) 489-0358
Is domestic water available? Yes: x❑ No: ❑
Notes: Water will need to be constructed in Wells Street and tie in to existing system if prior
development has not already done it. Water plan and phasing must be coordinated
with development to east to ensure fire suppression requirements are met.
Any unused water mains and service lines must be abandoned per City Design
Standards
Individual condos must each have their own individual water meters
Wells that will not continue to be used must be properly abandoned, documentation
of abandonment will be required to be submitted to the City.
Contact Kyle Radek with public works for more information on water connection
(208) 489-0343
Easements Required? Yes: X❑ No: ❑
NOTE: easements may not overlap any permanent structure including but not limited to carports, trash enclosures,
trees, shrubs, buildings, etc. Service lines up to the meter pit must be in ROW or covered by an easement.
Notes: If any meters, hydrants, water main, or sewer main is proposed with development, a
20 foot wide easement is required over the mains. 30 foot easement required over
both water and sewer if parallel to each other.
Any carports, trash enclosures, etc. should not impede the easements. Make sure the
site is designed in such a manner that this is not an issue.
Is the project within 500 feet No Is this a commercial Yes
of a re -use main? project?
1 1 P a g e
E IDIAN�--
ot use q stions are ye provide the following information: Building use (manufacturer, carwash, etc.), hours of operation,
approximate busin at age and irrigable landscape area:
Floodplain or other hazards? Yes: x❑ No: ❑
Notes: Contact Jason Korn, Environmental Program Coordinator, (208) 489-0364 for
Floodplain requirements.
Irrigation District:
Notes:
Public streetlights required?
Notes
New York Irrigation District
Surface water must be used as the primary source of irrigation, when available. A
secondary connection for year-round irrigation is required — typically a well or City
water is used.
Yes: ❑ No: ❑
Verify streetlight requirements with Public Works, (208) 489-0352
Submittal of Civil Infrastructure requirements:
Water and sewer infrastructure will be reviewed outside of building permits. Submit
infrastructure for review with the final plat.
Additional Meeting Notes:
If multiple buildings will be
built on a single lot, then
applicant must submit signed
memo in regards to phasing
of the project if that is the
intent, with formal project
submittal.
2 1 P a g e