Loading...
HomeMy WebLinkAboutPLN C2.01 G&D V1aY%IDIA y- APPROVED 0n0w22 w w - S s aCURB & (_I ITTl L i 91 TI GRATE = 2689.74'- Ps O55 NEW PIPE LF OS 7 LF NEW PIPE \ \k------------------ I \\ I 1 \ \\ -1 I \ \ TOC 88.33 / 8750 \ r 22 ^- - - - -.- I - - FIGIC 187.50 88.42 - F } - {- 86.50 _ \ TBC- ^ \FG 88 TBC 3 a } CURB CUT III I 90.53 TBC 188.44 III }' I L. \1.8% f P I �I \ RETENTION BASIN TRIB AREA #1 TOP OF BANK = 87.50 IN BTM BASIN =86.50 CAPACITY = 1,164 C.F. w L-� \ 2e} I 3 I sz.00 TBC II II ' g6.50 F 91.67 EXIST 2.0% I 2.0t\I% G i i I I I 1 II ----I I v 87.50 FIG 89.25 I-- 1 `_ I I \ ✓ III ■ I I I I / a EX ACCESS \ I -- ---- ----------- EASEMENT IIII, ■ a, �87.43----- 66.86 �ti------- 2 ^ �0 OA a IIII ■ ■ - iJl I 87.00 * I a B8J 1 XIST � ■ I .pk---88�.2\34. TBC. aas -_-TBC BC[9o] 90.34 89.55V ^ 88.9s so3s ��TBcy TBC B TOC ^ TB _______ -_- ,88.90 589 TBC 90_ aa l TBQ i ■I \ TOC - TOC \ 90.80 /.. TBC. IJ \19% 89.9 -1 0.5% TBC TBC 0.6%\\ 89.33 88.99 TBC _ ■ \ I ry. 88.89 88.94 \ EXIST I \TBC \ TBC \ \ 1 0.6% \ \ 88 \ T 2 PROPO ID 47 �8 / ' \ \ \ y✓fi x \ ��BMLDING 2.0FIFE = 2691.00' a \ \ a \ \ 2,365 SQ.FT. - \-------- - i \ 90.58 \ \ \ 91.5s 1.5% TBC \ \ T C ce TBC 1/ - RIDGE v v 89.01===� 91.00 I 3 \ \ \ \ \EXISTS TOA TOC°I \ ,V� TRANS RMER TBC TBC -� 2.0% / 2 90. 9 90.29 \ \ `R/pC \ . W Z \ Z ° I. 0. 90.57 ', TB �� TBC \ P �.' \ o U ul \ ■ �� I II{I I I 88.75 8% I TBC TBC 6 I \ \ - - - cri U Lu - - _ 90.90LITOC91.00 °� V / 90 .---_ 1� w �oae \\ \ N X Q._ 91.0 / 8C ---111 �, \\ \ W W \ i 89.98- RVpG6 TOC E 5' M) TOC I CURB CUT v 89.37 �v v 93.01 1\ TBC _ 90.89 91.00 90. 4- \ - 190.69 / TSC 1.2% \\ \ 0 TBC _TBC TBC TBC 89.37 89.65 93.01 IIII 31.1% TBC / TBC----_--- EXIST 0 \ o m e e\ \ LOT 1 OPEN SPAk�E : -n - Cn� CURB CUT89 - - \ PROVIDED: 2,004 SF. �� C �I G _ 3 _____ _ \ .65. I REQ: 1,957 S.F (5%)\ TBC G m W \I - 0 v 88.84 Z \ 90.42 89.91 \ �\ RETENTION BASIN TBC TBC --------------------------- - ------ - ���� TRIB AREA#2 _________________z 90.23 \ / \ /-9D.TQ____-T$C� \ �. Z_ (n II -� 1 �I TBC ° I --------' \ ----- RETENTION BASIN ------- ---- F�------ I ----______�----------13r __ I_ TOPOFBANK=89.25 L_ -----03 _\ f�'TRIB AREA#3 , 0 BTM BASIN = 88.75 O3 \ \ -- - TOP OF BANK = 88.75 0 Z ^ K \ '�� CAPACITY = 574 C.F. 88.75 FG \ 0.37 \ \ I �\ 9 1 N .34-------- - - - BTM BASIN=88.25 3 EXIST \ ---------------- - - 1� 92.66 S8__-- li 1901 - TOC TOC TO TOC = I \ 4.7% [92 -I93j 1 90.49 I° - roc -- - - - -- N 89.36'01 " W 227.73 - - ---- - - - ------------ f \ �4.45 T SIDEWALK 0 -93.68 o - - - - < 93.13 93.07 / � WALK CUT _ `EXIST=- - - - - - - - - - --- _ _ _ = Exls = - - - - - - - - - - - - - - = = = = =ExIST - - ExlsT � SIDEWALK - - - - EXI - i @xIST DRIVE CUT DRIVE CUT I II I I� I 21 d w w wow w w w w w -- -- -- --- ------ ------ ------ w w w w w - - - - - - - -- -- -- -- L- -- -- a----- -- ------- -- -- - - - -- - -- -- = -- - - -- -- -- -- -- ----------------------I'------- - $ ', �- sd sd sd sd sd sd sd sd - -- sd sd sd sd 1 � W W W cn �S s s s s s s E VICTORY RD -S S 5 m �u O O O > Fn * cz: (96.0' WIDE PAVED PUBLIC ROAD) = C/) m 2 _ CURB & NORTH as SCALE: 1" = 20' 0 10, 20' 40' 60' GENERAL NOTES: SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT (IF AVAILABLE). THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ALL SOFT, YIELDING OR UNSUITABLE MATERIALS AND REPLACING WITH SUITABLE MATERIALS AS SPECIFIED IN THE SOILS REPORT. ALL EXCAVATED OR FILLED AREAS SHALL BE COMPACTED TO 95%OF MODIFIED PROCTOR MAXIMUM DENSITY PER ASTM TEST D-1557 EXCEPT UNDER BUILDING FOUNDATION WHERE IT SHALL BE 98% MIN, OF MAXIMUM DENSITY. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL NOT EXCEED 2%ABOVE NOR 3%BELOW OPTIMUM. CONTRACTOR SHALL SUBMIT A COMPACTION REPORT PREPARED BY QUALIFIED REGISTERED SOILS ENGINEER, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED, HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT. THE CONTRACTOR IS TO USE BEST MANAGEMENT PRACTICES FOR PROVIDING EROSION CONTROL FOR CONSTRUCTION OF THIS PROJECT. SPECIFIC DETAILS SHOWN ON SHEET C2.10 SHALL BE USED IN COMBINATION WITH OTHER ACCEPTED LOCAL PRACTICES. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THOSE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF CONTRACTOR'S FAILURE TO VERIFY LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. ALL ELEVATIONS SHOWN AT TOP AND BOTTOM OF WALLIS), IF ANY, ARE ELEVATIONS AT FINISH GRADE, UNLESS OTHERWISE NOTED. KEYED NOTES: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED AND THE DETAILS NOTED AND AS SHOWN ON THE CONSTRUCTION DRAWINGS: O7 GRADE SITE TO ELEVATIONS AND CONTOURS SHOWN ON PLAN. OTEMPORARY RETENTION BASIN. CONTRACTOR TO CREATE BERM TO IMPOUND STORMWATER UNTIL TIME OF FUTURE LOT BUILDING PERMIT WHEN PERMANENT RETENTION FACILITY IS INSTALLED. ORETENTION BASIN TO RETAIN 100-YEAR 24-HOUR STORM. SEE INDIVIDUAL CALCULATION SHEETS ON SHEET C5.02 FOR BASIN SIZING. OINLET CATCH BASIN TYPE 1 PER ACHD STANDARD DRAWING'SD-601' INCLUDING BICYCLE SAFE GRATE PER ACHD'ST-609'. CONTRACTOR TO FIELD VERIFY EXISTING STORM DRAIN PIPE SIZE, MATERIAL, AND INVERT OELEVATION PRIOR TO CONSTRUCTION AND MATCH AND EXTEND PIPE AT A MINIMUM OF 0.30%TO THE NEW INLET CATCH BASIN TO THE EAST. CONTRACTOR TO USE SAME PIPE TO CONNECT THE (2) INLET CATCH BASINS TOGETHER. COMMON GRADING ABBREVIATIONS: SEE SHEET C0.01 FOR ADDITIONAL ABBREVIATIONS - BFE BASEMENT FLOOR ELEVATION - BW FINISH GRADE AT BOTTOM OF WALL - EX or EXIST EXISTING - EOA EDGE OF ASPHALT - EOC EDGE OF CONCRETE - FFE FINISH FLOOR ELEVATION - FG FINISH GRADE - FL FLOW LINE - GB GRADE BREAK - HP HIGH POINT - LP LOW POINT - I NATURAL GROUND - SDCB STORM DRAIN CATCH BASIN - SDCO STORM DRAIN CLEANOUT BOX - SDDB STORM DRAIN DRAIN BASIN - SDMH STORM DRAIN MANHOLE - TBC TOP BACK OF CURB - TOA TOP OF ASPHALT - TOC TOP OF CONCRETE - TOG TOP OF GRATE - TOW TOP OF WALL - TW FINISH GRADE AT TOP OF WALL - WW WATERWAY DI.GLI-EoN Call Be&u ?/feu Did. NOTICE, CALL 811 BEFORE YOU DIGI THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION, PROTECTION, AND RESTORATION OF ALL BURIED OR ABOVE GROUND UTILITIES, SHOWN OR NOT SHOWN ON THE PLANS. Zy ' y i � 7 41 u(A �m W� Y i W 0 o a ao r ^ O-'A o � 7 2 J C o o'tko J c Z��= o Lu :3 75 O J 0 o u C W� wL ro ,L W � Zu E b 'i is N i o VW Yo E-u a T to7 i N W�_ � o N 0 u Z O PROJECT NO: 21070 DRAWN BY: CCW CHECKED BY: RJP DATE: FEBRUARY 7, 2022 GRADING AND DRAINAGE PLAN C2.01 No