Loading...
HomeMy WebLinkAboutBienville Subdivision Access VAR-05-023 CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LA WAND DECISION & ORDER , ctre;;;¡ i iJ!4 \ , ILJ.\HO ~' \;?~f' /:l' ~:!/~:~~."'..'f~J'~"", ..' ,':,:,~,,~-'J"~~..,,' ,""-' 't9Þ) In the Matter of Variance request for access to SH 55/ Eagle Road, for Bienville Subdivision by Red Cliff Development. Case No(s). V AR-05-023 For the City Council Hearing Date of: March 14,2006 A. Findings of Fact 1. Hearing Facts (see attached Staff Report for the hearing date of March 14,2006 incorporated by reference) 2. Process Facts (see attached Staff Report for the hearing date of March 14,2006 incorporated by reference) 3. Application and Property Facts (see attached Staff Report for the hearing date of March 14,2006 incorporated by reference) 4. Required Findings per the Unified Development Code (see attached Staff Report for the hearing date of March 14, 2006 incorporated by reference) B. Conclusions of Law 1. The City of Meridian shall exercise the powers conferred upon it by the "Local Land Use Planning Act of 1975," codified at Chapter 65, Title 67, Idaho Code (I.C. §67-6503). 2. The Meridian City Council takes judicial notice of its Unified Development Code codified at Title 11 Meridian City Code, and all current zoning maps thereof. The City of - Meridian has, by ordinance, established the Impact Area and the Amended Comprehensive Plan of the City of Meridian, which was adopted August 6, 2002, Resolution No. 02-382 and Maps. 3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § II-SA. 4. Due consideration has been given to the comment(s) received from the governmental subdivisions providing services in the City of Meridian planning jurisdiction. CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). V AR-O5-023- PAGE 1 of 3 5. It is found public facilities and services required by the proposed development will impose expense upon the public if proposal is allowed. 6. That the City has granted an order of denial in accordance with this Decision, which shall be signed by the Mayor and City Clerk and then a copy served by the Clerk upon the applicant, the Planning Department, the Public Works Department and any affected party requesting notice. 7. That this denial is subject to the Legal Description, Site Plan, and the all in the attached findings in the Staff Report for the hearing date of March 14,2006 incorporated by reference. C. Decision and Order Pursuant to the City Council's authority as provided in Meridian City Code § II-SA and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby ordered that: 1. The applicant's Variance Request for access to SH 55/ Eagle road is hereby denied. D. Notice of Final Action and Right to Regulatory Takings Analysis 1. The Applicant is hereby notified that pursuant to Idaho Code 67-8003, a denial of a plat or conditional use permit entitles the Owner to request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. 2. Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code § 67-6521 an affected person being a person who has an interest in real property which may be adversely affected by the issuance or denial of the conditional use permit approval may within twenty-eight (28) days after the date of this decision and order seek a judicial review as provided by Chapter 52, Title 67, Idaho Code. E. Attached: Staff Report for the hearing date of March 14, 2006 By action of the City Council at its regular meeting held on the ;J ",d m~ ' 2006. day of CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). V AR-O5-023- PAGE 2 of 3 COUNCIL MEMBER SHAUNW ARDLE VOTED ~ VOTED ~ VOTED --11f¿r ~ VOTED ~ COUNCIL MEMBER JOE BORTON COUNCIL MEMBER CHARLIE ROUNTREE COUNCIL MEMBER KEITH BIRD TIE BREAKER MAYORTAMMYdeWEERD VOTED -- ATTEST: By' Dated: 5- I 0 -Of () CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). V AR-O5-023- PAGE 3 of 3 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 3/14/06 STAFF REPORT City Council Hearing Date: March 14, 2006 Mayor and City Council Joe Guenther, Associate City Planner Bienville Subdivision Variance J - of;&ri di ~n --,;\ A. I LJ.\}-I() ~ {~ /Ÿ ',[,!~~!_~-'t""!'~~:,!,)'#'~è!-'c~::~;~!' TO: FROM: SUBJECT: File No. V AR-05-023 Variance request to allow one access point onto Eagle Road, SH 55 by Red Cliff Development Company 1. SUMMARY DESCRIPTION OF APPLICANT'S REQUEST The applicant is requesting a variance from Section 11-3H-4 of the Unified Development Code (UDC) that prohibits new vehicle approaches to state highways. The Variance application proposes a new approach to Eagle Road, SH 55, one access driveways for right in, right out with a possible left in. On March 7, 2006, Idaho Transportation Department (ITD) staff submitted a response to the request for access to Eagle Road. ITD staff indicated that the proposed access point does not meet district policies. On February 16,2006, ITD's executive committee held a decision on the access permit application contingent on obtaining a Variance to Section 11-3H of the UDe. The main reasons the applicant believes a variance is justified are summarized in Section 3.h. on page 2 of this report. The Variance application pertains to the 27.3 acres proposed as a commercial/residential/multifamily mixed use development, the applicant has submitted development applications consecutively with the variance request. The City Council has final decision authority on the Variance application. 2. SUMMARY RECOMMENDATION Staff is recommending denial of the subject Variance application (V AR.05-023) for the reasons listed herein. We do not find that the application meets all of the findings required in the UDC in order for the City Council to grant a variance (see Exhibit C). Section 11-3H-3 of the UDC does state that the City Council may consider and apply modifications to the standards of Article H upon specific recommendation ofthe lTD. However, to staffs knowledge, no such specific recommendation has been provided to date. (See the analysis, beginning with Section 9 on page 5 of this report, for more details.) 3. APPLICATION AND PROPERTY FACTS a. Site Address/Location: SW corner of Us tick Road and Eagle Road/SH55 Township 3N, Range IE, Section 5 b. Owners Red Cliff Development, INC 2060 South Eagle Road Meridian Id 83624 John Ewing 1500 El Dorado Street, Suite 4 Boise Id 83704 c. Applicant: Red Cliff Development, INC 2060 South Eagle Road Meridian Id 83624 Bienville Subdivision Access V AR-O5-023 PAGE 1 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 3/14/06 d. Representative: e. Present Zoning: Ashley Ford, WRG Design, INC General Retail and Commercial (C-G), Meridian, RUT-RI-Ada County f. Present Comprehensive Plan Designation: Mixed Use-Regional- 2002 Comprehensive Future Land Use Map g. Description of Applicant's Request: 1. See Exhibit A (prepared by Red Cliff Development Company) for a copy of the overall conceptual site plan which depicts the proposed driveway location (dated Revised February 13, 2006. h. Applicant's Statement/Justification: The application lists the following key arguments for allowing the new access points to Eagle Road, SH 55: . There is no possibility of providing a frontage road as ITD policy claims; . ITD has already granted approach pennits for the project on the north side of Us tick Road; We believe we are grandfathered from the UDC based on discussions and annexation occurring before its adoption. 4. PROCESS FACTS . a. The subject application will in fact constitute a variance as detennined by City Ordinance. By reason of the provisions ofthe Meridian City Code Title 11, Chapter 5, Article A (Table 1I-5A-I), a public hearing is required before the City Council on this matter. b. Newspaper notifications published on: Council- December 19 and January 2,2005 c. Radius notices mailed to properties within 300 feet on: Council- December 19, 2005 d. 5. LAND USE Applicant posted notice on site by: December 26, 2005 a. Existing Land Use(s): Bare land, two single family residences. b. Description of Character of Surrounding Area: Large lot residential, highway-oriented services, rapidly urbanizing c. Adjacent Land Use and Zoning 1. North: Future pad sites within Sadie Creek Promenade proposal zoned C~G and Ada County RI. 2. West: Residential Subdivision zoned Meridian City R-2 and Ada County Rl 3. South: Residential Subdivision zoned Meridian City R-2 and Ada County RI 4. East: Road. d. History of Previous Actions: In April 2004, the owners and City entered into a Development Agreement for various High Density Commercial, Multi.family Residential, transitional, and office uses under File AZ-03-018. Some property was annexed and zoned to General Retail and Commercial (CwG) with a Development Agreement while other portions of the property were not included in the atU1exation leaving out parcels which were addressed with the original conceptual plan. The 18.43 acres site is the current annexation request and is not subject to the development agreement approved in 2004, the access to Eagle Road is located Future pad sites within the Kissler Annexation project zoned C-G, Eagle Bienville Subdivision Access V AR-05-023 PAGE 2 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 3/14/06 within the 18.43 acre site. e. Existing Constraints and Opportunities 1. Public Works Location of sewer: Location of water: Extension of mains in U stick Road/Sadie Creek Promenade Extension of mains in Ustick Road/Sadie Creek Promenade Issues or concerns: None 2. Vegetation: Agri cultural/Irrigated 3. Floodplain: N/A 4. Canals/Ditches Irrigation: The Finch Lateral courses the southern part of property and the Milk Lateral courses the northern part of the property 5. Hazards: None identified 6. Size of Property: 27.3 acres 7. Description of Use: Retail, Office, Commercial, and Restaurant uses and associated parking and landscape improvements along Eagle Road. Attached townhouse and single family residential, front accessed and alley accessed products. m. Summary of Proposed Streets and/or Access (private, public, common drive, etc.): The applicant is proposing one new access points to Eagle Road/SH55 at the following location (see Exhibit A): . Driveway #1 - approximately 1320 feet south of Us tick Road As noted above, ITD has not issued permits for these approaches. ITD has made these locations contingent on the City of Meridian granting a variance. In addition, the recorded DA between the applicant and the City shows the access points but was never recorded for this site. The Meridian Comprehensive plan for Gateway Corridors and ITD policy in place at the time of annexation does not allow access at the proposed location. For a detailed report on both ITD's and ACHD's actions and comments, please see the letters submitted with the variance application and the project applications AZ-05- 057/PP-05-059/CUP-05-052/RZ-05-0 19/PS-05-002. 6. AGENCY COMMENTS All agencies provided comments for the annexation application with. Please see the public record for the Variance file for any written comments that may have been submitted by other agencies. 7. COMPREHENSIVE PLAN POLICIES AND GOALS The subject site is designated 'Mixed Use-Regional' on the Future Land Use Map. In Chapter VII of the Comprehensive Plan, this designation is defined in part as an area that is situated in highly visible or transitioning parts of the City where innovative and flexible design opportunities are encouraged. The MU-R has no upper limit on the square footage of non-residential uses and is intended to allow a broad range of uses. Staff finds the following 2002 Comprehensive Plan text policies to be applicable to this application: . Chapter VII, Goal IV, Objective D, Action 2: Restrict curb cuts and access points on collectors and arterial streets. The ACHD evaluates access points in their analysis; no direct lot access is allowed to any of the Bienville Subdivision Access V AR-05-023 PAGE 3 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 3/14/06 arterial/collector roadways. The proposed access points to the arterial streets generally comply with ACHD 's standards. Please see the ACHD stajlreport and Exhibit B jor the conditions from ACHD. This site does notfront on an ACHD controlled arterial road although Sadie Creek Avenue provides a collector systemfor the internal circulation ofresidents. The Idaho Transportation Department (ITD) has a policy for access to a Type IV Principal Arterial will be at intersections only, and spaced at one-half mile intervals in urban areas. ITD allows approaches (other than intersections) in special cases and on a temporary basis. The Eagle Road access shall be eliminated from this project if the Meridian City Council does not grant a variance and/or if ITD does not approve an approachfor this site. . Chapter VII, Goal N, Objective D, Action 5: Require appropriate landscape and buffers along transportation corridor (setback, vegetation, low walls, benns, etc.). The applicant is proposing to construct appropriate bu.ffers along all of the adjacent arterial streets with the exception of the curb cut shown on the site plan.. By ordinance, a minimum 25- joot wide landscape buffer is required adjacent to residential uses and 35-foot wide landscape buffer to Gateway Corridors. The landscape plan shows the appropriate landscape buffèrs. . "The capacity of arterial. . .roadways can be greatly diminished by excessive driveway connections to the roadways. The City should cooperate with ACHD to minimize access points on arterial. . .roadways as development applications are reviewed." (Chapter VI, page 72) "Develop methods, such as cross-access agreements, frontage roads, to reduce the number of existing access points on to arterial streets." (Chapter VI, Goal II, Obj. A, #12, page 79). "Restrict curb cuts and access points on . . .arterial streets." (Chapter VII, Goal N, Obj. D, #5, page 107) "Require appropriate landscape and buffers along transportation corridors (setback, vegetation, low walls, benns, etc.)." (Chapter VII, Goal N, Objective D, Action item 4) "Require all commercial businesses to install and maintain landscaping." (Chapter V, Goal III, Objective D, Action item 5) . . . . 8. UNIFIED DEVELOPMENT CODE The following UDC sections are pertinent to this application: a. Development along Federal and State Highways: Unified Development Code (UDC) 11- 3H -1, Purpose. One of the three purpose statements is to "limit access points to state highways in order to maintain traffic flow and provide better circulation and safety within the community and for the traveling public." b. UDC 11 ~3H-4.B, Standards: Access to State Highway - "Use of existing approaches shall be allowed to continue provided that the following conditions are met: 1. The existing use is lawful and property pennitted effective September 15, 2005. 2. The nature of the use does not change (for example a residential use to a commercial use). 3. The intensity ofthe use does not increase (for example an increase in the number of residential dwelling units or an increase in the square footage of commercial space)." c. UDC 11 ~3H-4.B.2, Standards - "If an applicant proposes a change or increase in intensity of use, the owner shall develop or otherwise access to a street other than the state highway. The use of the existing approach shall cease and the approach shall be abandoned and removed. 1. No new approaches directly accessing a state highway shall be allowed. Bienville Subdivision Access V AR-05-023 PAGE 4 CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 3/14/06 2. Public street connections to the state highway shall only be allowed at: a. the section line road; and b. the half~mile mark between section line roads. These half-mile connecting streets shall be collector roads." d. UDC ll-3H-4.B.3, Standards - "The applicant shall construct a street, generally paralleling the state highway, be designed to accommodate future connectivity and access to all properties fronting the state highway that lie between the applicant's property and the nearest section line road and/or half mile collector road." 9. ANALYSIS 9a. Analysis of Facts Leading to Staff Recommendation for Denial Listed below are various documents in the public record pertaining to this application. The relevant points within each document and an analysis of those points follows (stafrs analysis in italics). For additional analysis, see the Variance Findings in Exhibit C. . Development Agreement There is no development agreement tied to the locations of Eagle Road access on the 18.43 acres that would specifically address access to Eagle Road/SH55: . Applicant Anrnments to Grant Variance The applicant's arguments to grant the variance were summarized in Section 3.h of this report (page 2). Please see the application for more details. Staff does not believe the applicant's arguments meet the "findings test" for granting a variance. The fact that the applicant had not begun the process of securing access to Eagle Road at this location before adoption of the UDC is not the right question. The question required by the UDC (11-3H-4.B.a) is, "Was there a lawful and properly pennitted existing use effective September 15, 2005?" The answer is "no," because the site was not annexed, did not have any specific uses approved, or grant any use pennits for the property. All properties being annexed into the City of Meridian require future uses to be upgraded to meet the City of Meridian Standards and required all future uses to comply with Comprehensive Policies and Ordinance Standards. ITD has not approved access pennits to this site. The fact that ITD has already granted approach pennits in the area is also not the issue at hand for the City Council. The City Council is charged with enforcing the terms ofthe City's ordinances - in this case Article H of the UDC and determining the variance based on the City's own findings. The applicant claims that due to physical constraints on the site that they will not be able to create a frontage road. However, the ITD policy states that a frontage "type" of connection may be utilized, which does not have to be with a public road connection. ACHD has approved three access points to Ustick Road, which will be upgraded at the controlled intersection. ACHD has also provided a public road connection (Sadie Creek Avenue), Planning Staff required multiple cross access points to the north which were to be designed as commercial collectors with appropriate widths and limited connections (Cajon Court, Pvt). Staff conditioned these road connections to serve as the frontage type roadways as required Bienville Subdivision Access V AR-05-023 PAGES CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 3114/06 by ITD for traffic circulation and no further connections would be required if properly designed and managed. These public access points are less than 1200 feet from any point on the site and when properly designed, staff feels that the size of the site does not constitute reason for a variance as it is common to drive less than 1/4 of a mile when accessing a public road system, especially for residential and office uses. Furthennore, the UDC includes a statement that an access "may" be granted, if approved by lTD. However, the UDC explicitly states there must be an "existing use that is lawful and properly permitted" prior to September 15, 2005. No such use has yet been approved and all uses existing on site are to increase the intensity of the use and change the nature of the area which are prohibited by City Ordinance. 9b. Staff Recommendation: Based on the Comprehensive Plan and UDC policies listed under Section 8 of this report as well as the analysis of findings shown in Exhibit C, staff finds there is a lack of evidence and grounds to grant new vehicular access points to Eagle Road/SH55. We find the letters received from ITD during the 2005-2006 annexation process make no guarantees that pennanent access points would be approved, that staff has required a frontage road with the project development which does meet ITD policies for interconnectivity, and this access is not shown in the Eagle Road COITidor Study. Finally, we do not believe the applicant's arguments meet the "findings test" for granting a variance. Therefore, staff recommends denial of the subject application. We have prepared findings consistent with this recommendation in Exhibit C. 10. EXHffiITS A. Project Plan (by Red Cliff Development Company) B. Legal Description C. Required Findings from UDC (Variance) Bienville Subdivision Access V AR-05-023 PAGE 6 CITY OF MERIDIAN PLANNrNG AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 3/14/06 Exhibit A: Overall Concept Plan (Red Cliff Development Company) Ii.' I ~ !II¡IWII:~ '~-Ir 'rll:l:~~l ~F~ I .,,~ ! J~ J1)f~ :q¡¡t iLj¡l ~-r 1 I ~~Ä 1'~:)'.J: ¡! J, Jr<"~ !!, ~~~-I'-I; ~ ~I; , ;' :, II." ~~I¡ I¡Hr-'lft ji~~I' :~ II' ::.t'l d J..r~! :il:t:rì~' 61~:th .J.. r !. I . r ,:_'I~~ I, ".~ -"~I ' ¡ j "----'-"------ . N ---...-:¡ó,ø..g; -'-'~----"- t r- .------<~:11-1'. '- ----..~- .~~_._-----:::-:,_..,_..-. , ,----'-':!.'S'-.--.--' '", ~"m w a::: -< :::> a In ~ :so z w iñ "- c: ~ ., ~~ r,¡ I'¡ " 6 """ , .,'"' ~ ""'t ' ~~¡¡~~.~ ~:~~s , ~:; '. ~"i : ::;j " ~ ~ ~ i , ,"- ¡, i - " -l -'-""'.'--' ':j If ,,' f If ~! <'II U ~ I, Ii I : Meridian Gateway Variance Application Exhibit A Page I CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 3/14/06 Exhibit B: Legal Description DESCRIPTION FOR BIENVILlE SQUARE SUBDIVISION OCTOBER 13, 2005 A PARCEL OF LAND BEING PORTIONS OF PARCEL "0" OF RECORD OF SURVEY NO. 6418 AND OF THE NE Y. OF SECTION 5, TOWNSHIP 3 NORTH, RANGE 1 EAST OF THE BOISE MERIDIAN, MERIDIAN, ADA COUNTY, IDAHO, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SECTION 5, T. 3 N., R. 1 E" 8.M., THENCE S 00"00'00" E 677.57 ALONG THE EAST LINE OF SAID SECTION 5 TO A POINT; THENCE N 83"54'00" W 57.36 FEET TO A POINT ON THE WESTERL Y RIGHT OF WAY OF EAGLE ROAD, THE REAL POINT OF BEGINNING OF THIS DESCRIPTION; THENCE S 01°14'39" W 974,96 FEET ALONG SAID RIGHT OF WAY TO A POINT; ALONG THE BOUNDARY OF CAROL'S SUBDIVISION THE FOLLOWING: THENCE N 44"05'18" W 227.63 FEET TO A POINT; THENCE N 72°24'04" W 221.28 FEET TO A POINT; THENCE S 77°26'30" W 667,36 FEET TO A POINT; THENCE N 72°35'42" W 233.35 FEET TO A POINT; THENCE N 00015'11"W 1129.35 FEET ALONG SAID BOUNDARY TO A POINT: LEAVING SAID BOUNDARY OF CAROL'S SUBDIVISION; THENCE S 71°28'10" E 803.90 FEET TO A POINT: THENCE S 83°54'00" E 510.21 FEET TO THE REAL POINT OF BEGINNING OF THIS DESCRIPTION, COMPRISING 27.36 ACRES, MORE OR LESS. SADIE-PARCEL A Meridian Gateway Variance Application Exhibit B Page I CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 3/14/06 ------, - - --- - ,,--, z 0 N UJ 4 5 0 CD :;:) UJ ! UJ ~ 0 Q: ,. "Í U 10 :- a a z USTICK ROAD 32 33 ,--- ----"-" --u ----~ 5 14 --"----------,._-----. CAROL'S SUBDIVISION REVISIONS '0/51/05 ' ANNEXA TJON EXHIBIT FOR I' BIENVILLE SQUARE SUBDIVISION LOCATED IN THE NE 1/4 OF SECTION S, TOWNSHIP J NOrnH, RANGE' 1 [ T, 8 M l\:)A COU/'rJ Y. [)ÞJW , -"'-----------'--,, '" DRAWN: UBi I Stanley CÓnsultants INC 1940 $. BONITO WAY , SUirE 14>] M&:RIDIAN. leMlr 6 ~GI!-;;, 208- 288,-()~,T', -- ---- --"-"""'--------_""""",n",_,,, '" ",~,.",- "","-"--'" ""'"--"'--------",,--,,,, OATf; 10/20/0:::1 1", j{() . SCAlE: . J:)3 \I~!, Bi[,<VkLèC Meridian Gateway Variance Application Exhibit B Page 2 CITY OF MERIDIAN PLANNING AND ZONfNG DEPARTMENT STAFF REPORT FOR HEARING DATE OF 3/14/06 Exhibit C: Required Findings from UDC (Variance) The City Council shall apply the standards listed in Idaho Code 67-6516 and all the findings listed in Section 11-5B-4.E of the UDC to review the variance request. In order to grant a variance. the Council shall make thefollowingfindings: A. The variance shall not grant a right or special privilege that is not otherwise allowed in the district: If the City Council grants the access point to Eagle RoadlSH55, it would grant a right that is cUITently prohibited not only in the C.G zone but for all new development adjacent to state highways. The applicant has been conditioned to provide a cross access frontage road system to which they have agreed with the Planning Commission findings for the project approval. They applicant has more than 800 feet with three connections to Ustick Road with which to design multiple access points and take public street access as shown with the 10 acres of annexation in 2004. . Section 11-3H-3 of the UDC does state that the City Council may consider and apply modifications to the standards of Article H upon specific recommendation of the ITD. However, to staffs knowledge, no such recommendation has been provided to date. B. The variance relieves an undue hardship because of characteristics of the site; Council finds there are no physical characteristics of the site which demand access points be constructed that are any more unique or different than other properties along Eagle Road/SH55. For example, there are no major canals or ditches which prevent access to Us tick Road. The subject property has no barriers to connecting multiple access points to Ustick Road as approved by ACHD. Settlers Irrigation District would allow the applicant to cover the Finch Lateral if requested for a canal crossing. Granting the proposed access point may relieve some traffic congestion within the site because southbound traffic on Eagle Road/SH55 would not be forced to travel north to Ustick Road to get through the Eagle/Ustick intersection; drivers could potentially make a free right-out turn and merge with traffic, however merging traffic slows down the flow of traffic which is unimpeded for an additional % miles which will further cause reductions in speed on Eagle Road. However, the free right option is not tied to a physical characteristic of the site, which is what this finding requires. In addition, when construction upgrades to Sadie Creek Avenue, with the connection to Ustick Road west of Eagle Road are complete, a right.hand turn on to Eagle Road from the subject property should be relatively simple with little or no stacking for southbound traffic, a controlled intersection, and multiple turning lanes for northbound traffic. C. The variance shall not be detrimental to the public health, safety, and welfare. Council finds that granting the right.inlright-out access point to Eagle Road/SH55 has the potential of increasing traffic conflicts due to the increased number of vehicles that will need to merge with existing southbound traffic. Granting a full movement access as requested by the Commission has the additional potential conflict of adding vehicles to the center turn lane, does not comply with the Eagle Road Corridor study, and slows traffic speeds where the speed limit is 55 miles per hour. A vehicle going 55 miles per hour will travel 80.685 feet each second, as the site is only 1320 feet long, it would take a north bound vehicle approximately 15 seconds to cover the entire length of the development where vehicles would be merging in multiple lanes. If a center median is constructed as shown on the Eagle Road Corridor study, a pennanent barrier will exist at Meridian Gateway Variance Application Exhibit C Page I CITY OF MERIDIAN PLANNING AND ZONING DEPARTMENT STAFF REPORT FOR HEARING DATE OF 3/14/06 the location ofthe requested access which does not show an acceleration/deceleration lane for traffic accessing the site. We recommend the Meridian Fire and Police Departments provide further testimony on this issue. Meridian Gateway Variance Application Exhibit C Page 2