Loading...
HomeMy WebLinkAbout2022-07-05 ACHD Development Services Department CHD 60,-�a-to e� Project/File: Black Rock Coffee/ MER22-0059/ H-2022-0019 & A-2022-0134 This is a conditional use permit, design review, and certificate of zoning compliance application to develop a drive-through coffee shop on 0.84 acres. Lead Agency: City of Meridian Site address: 3300 S Eagle Road . Staff Approval: July XX, 2022 Applicant: Tamara Thompson The Land Group, Inc. 462 E. Shore Drive., Ste. 100 =` Eagle, ID 83616 Applicant: Michelle Landay The Land Group, Inc. 462 E. Shore Drive, Ste. 100 ' VI Eagle, ID 83616 � Representative: White-Leisure Development Company 8385 W Emerald Street { " Boise, ID 83704 Staff Contact: Margaret Szeles Phone: 387-6294 E-mail: mszeles(a)_achdidaho.org A. Findings of Fact 1. Description of Application: The applicant is requesting approval of a conditional use permit, design review, and certificate of zoning compliance for a drive-through coffee shop on 0.84 acres. The site is zoned C-C (Community Business) located on the southeast corner of Eagle Road and Victory Road. The applicant's proposal is consistent with Meridian's Future Land Use map which designates this area as Mixed Use Community. 2. Description of Adjacent Surrounding Area: Direction I Land Use Zoning North Community Business C-C (City of Meridian) South Rural-Urban Transition RUT (Ada County) East Rural-Urban Transition RUT Ada Count West Medium Density Residential R-8 (City of Meridian) 3. Site History: ACHD has not previously reviewed this site for a development application. 4. Transit: Transit services are not available to serve this site. 1 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 5. New Center Lane Miles: The proposed development includes 0 centerline miles of new public road. 6. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 7. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP): • Victory Road is listed in the CIP to be widened to 5-lanes from Eagle Road to Cloverdale Road between 2026 and 2030. • Amity Road is listed in the CIP to be widened to 3-lanes from Eagle Road to Cloverdale Road between 2036 and 2040. • The intersection of Eagle Road and Victory Road is listed in the CIP to be widened to 6-lanes on the north leg, 6-lanes on the south, 7-lanes east, and 6-lanes on the west leg, and signalized between 2026 and 2030. 8. Roadways to Bikeways Master Plan: ACHD's Roadways to Bikeways Master Plan (BMP) was adopted by the ACHD Commission in May of 2009 and was update in 2018. The plan seeks to implement the Planned Bicycle Network to support bicycling as a viable transportation option for Ada County residents with a wide range of ages and abilities, maintain bicycle routes in a state of good repair in order to ensure they are consistently available for use, promote awareness of existing bicycle routes and features and support encouragement programs and to facilitate coordination and cooperation among local jurisdictions in implementing the Roadways to Bikeways Plan recommendations. The BMP identifies Eagle Road and Amity Road as Level 3 facilities that will be constructed as part of a future ACHD project. B. Traffic Findings for Consideration 1. Trip Generation: This development is estimated to generate 1,030 additional vehicle trips per day; 75 additional vehicle trips per hour in the PM peak hour, based on the Institute of Transportation Engineers Trip Generation Manual, 11th edition. 2. Condition of Area Roadways Traffic Count is based on Vehicles per hour(VPH) Roadway Frontage Functional PM Peak Hour PM Peak Hour Classification Traffic Count Level of Service Eagle Road 300-feet Principal 679 Better than "E" Arterial Victory Road 0-feet Minor Arterial 539 Better than "E" **Falcon Drive 0-feet Local N/A N/A * Acceptable level of service for a five-lane principal arterial is "E" (1,780 VPH). * Acceptable level of service for a five-lane minor arterial is "E" (1,540 VPH). ** ACHD does not set level of service thresholds for Local Roadways. 3. Average Daily Traffic Count (VDT) Average daily traffic counts are based on ACHD's most current traffic counts. • The average daily traffic count for Eagle Road north of Amity Road was 12,637 on 07/21/20. • The average daily traffic count for Victory Road east of Eagle Road was 11,630 on 10/07/21. 2 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 C. Findings for Consideration 1. Black Rock Coffee Queuing Analysis Kittelson & Associates, Inc. prepared a queuing analysis for Black Rock Coffee on 06/2022. An executive summary of the findings presented by Kittelson & Associates, Inc. can be found in Attachment 3 below. R � P.aPoyed geh Rods od9BB Shop 1'JM SF I II 1 O"gn QUeUe Skor@ge fdo�lonal{ uem SbFage N.T.S. RR a. Staff Comments/Recommendations: The report evaluated existing traffic conditions at three Black Rock Coffee locations on similar arterial roadways during the AM peak period of coffee shop trip generation to evaluate trip generation and queuing rates at the peak operation. The analysis was warranted to determine the need for a northbound right-turn lane on Eagle Road to accommodate potential queuing from the proposed Black Rock Coffee. Based on these conditions, the report concluded that a maximum queue of 9 vehicles is recommended for use as the design queue for the proposed shop on Eagle Road, as well as space for 6 additional vehicles to queue back from the order kiosk. The analysis concluded that the queue storage provided in the site plan is expected to be sufficient to support the maximum queue during critical AM peak hour traffic. However, the report indicated that at the operational level, there are circumstances that extend the service time for a customer or result in multiple vehicles arriving at the order window that will require additional mitigation. Staff supports the findings in the queuing analysis. Therefore, staff does not recommend that the applicant be required to construct an additional northbound right-turn lane on Eagle Road or provide additional queuing improvements as part of this application. However, the applicant should be required to coordinate with the City of Meridian to address the operational strategies mentioned in the analysis to mitigate the impacts of single vehicles with long services times and increase the order efficiency when multiple vehicles arrive at the order kiosk. 3 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 2. Eagle Road a. Existing Conditions: Eagle Road is improved with 5-travel lanes, vertical curb, gutter, 3-foot wide concrete buffer between the curb and street edge of sidewalk and attached 10-foot wide concrete sidewalk abutting the site. There is 96-feet of right-of-way for Eagle Road (47-feet from centerline). b. Policy: Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map and Livable Streets Design Guide. The developer or engineer should contact the District before starting any design. Street Section and Right-of-Way Width Policy: District Policies 7205.2.1 & 7205.5.2 state that the standard 5-lane street section shall be 72-feet (back-of-curb to back-of-curb)within 96- feet of right-of-way. This width typically accommodates two travel lanes in each direction, a continuous center left-turn lane, and bike lanes on a minor arterial and a safety shoulder on a principal arterial. Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation for additional right-of-way dedicated beyond the existing right-of-way along arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the Impact Fee Service Area. No compensation will be provided for right-of-way on an arterial that is not listed as impact fee eligible in the Capital Improvements Plan. The District may acquire additional right-of-way beyond the site-related needs to preserve a corridor for future capacity improvements, as provided in Section 7300. Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing streets adjacent to a proposed development may be required. These improvements are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction or replacement; curb and gutter construction or replacement; replacement of unused driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps; pavement repairs; signs; traffic control devices; and other similar items. ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway 4 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 features required through development. This segment of Eagle Road is designated in the MSM as a Residential Arterial with 5-lanes and on-street bike lanes, a 72-foot street section within 96-feet of right-of-way. c. Applicant Proposal: The applicant is not proposing any street improvements to Eagle Road abutting the site. d. Staff Comments/Recommendations: Eagle Road was constructed with 5-lanes, vertical curb, gutter, 3-foot wide concrete buffer, and 10-foot wide attached concrete sidewalk within 96-feet of right-of-way as part of an ACHD project completed in 2022. Therefore, staff does not recommend any additional road improvements or right-of-way dedication for Eagle Road abutting the site. Consistent with the District's Minor Improvements Policy, the applicant should be required to replace any broken or deteriorated segments of curb, gutter, and sidewalk on Eagle Road abutting the site. 3. Driveways 3.1 Eagle Road a. Existing Conditions: There are two existing driveways from the site onto Eagle Road located as follows (measured centerline to centerline): • 36-foot wide paved curb-return type driveway located 33-feet north of the site's south property line and 477-feet south of Eagle Road. • 38-foot shared access paved curb-return type driveway that provides access to the site and the adjacent parcel to the north. Of the 38-foot driveway, 12-feet of the driveway is onsite and located approximately 273-feet south of Victory Road. b. Policy: Access Points Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. Access Policy: District policy 7205.4.7 states that direct access to principal arterials is typically prohibited. If a property has frontage on more than one street, access shall be taken from the street having the lesser functional classification. If it is necessary to take access to the higher classified street due to a lack of frontage, the minimum allowable spacing shall be based on Table 1 b under District policy 7205.4.7, unless a waiver for the access point has been approved by the District Commission. Driveways, when approved on a principal arterial shall operate as a right-in/right-out only, and the District will require the construction of a raised median to restrict the left turning movements. Driveway Location Policy: District policy 7205.4.7 requires driveways located on principal arterial roadways to be located a minimum of 355-feet from the nearest intersection for a right- in/right-out only driveway. Full-access driveways are not allowed on principal arterial roadways. Successive Driveways: District policy 7205.4.7 Table 1 b, requires driveways located on principal arterial roadways with a speed limit of 45 MPH to align or offset a minimum of 380-feet from any existing or proposed driveway. Driveway Width Policy: District policy 7205.4.8 restricts high-volume driveways (100 VTD or more) to a maximum width of 36-feet and low-volume driveways (less than 100 VTD) to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high- 5 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for low-volume driveways with less than 100 VTD. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7205.4.8, the applicant should be required to pave the driveway its full width and at least 30- feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7205.4.8. Cross Access Easements/Shared Access Policy: District Policy 7202.4.1 states that cross access utilizes a single vehicular connection that serves two or more adjoining lots or parcels so that the driver does not need to re-enter the public street system. c. Applicant's Proposal: The applicant is proposing to utilize the existing driveways from the site onto Eagle Road to provide access to the site. d. Staff Comments/Recommendations: The applicant's proposal to use the existing driveways should be approved, as proposed. These driveways were approved as part of ACHD's action on Shops at Victory subdivision, which final platted in 2016. These driveways may be restricted at any time as traffic conditions warrant as determined by ACHD. 4. Tree Planters Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 5. Landscaping Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 6. Other Access Eagle Road is classified as a principal arterial roadway. Other than the access specifically approved with this application, direct lot access is prohibited to this roadway. D. Site Specific Conditions of Approval 1. Replace any broken or deteriorated segments of curb, gutter, and sidewalk on Eagle Road abutting the site. 2. Other than the access specifically approved with this application, direct lot access is prohibited to Eagle Road. 3. Submit civil plans to ACHD Development Services for review and approval. The impact fee assessment will not be released until the civil plans are approved by ACHD. 4. Payment of impact fees is due prior to issuance of a building permit. 5. Comply with all Standard Conditions of Approval. E. Standard Conditions of Approval 6 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non- compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number)for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled)are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. F. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. G. Attachments 7 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 1. Vicinity Map 2. Site Plan 3. Technical Memorandum Queuing Analysis 4. Utility Coordinating Council 5. Development Process Checklist 6. Appeal Guidelines 8 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 VICINITY MAP , E ]]a 32J# . � �� / � . . . \ \ ' Victory "Rd ��. �•. � x � • � , � � 3279 ] 32 ]}37 3-2 0 325§ ) � 2n! f —WLJ335 - - V7 » « J3 ] b4 328n . w 2 . . . . � ■ ._ 32r 32k8 -� »»[ � � . � �� ■ ■ \ .()7 . \ LU - _ U� - _ ( � _ - ]]§9 . . § >. y . \ . - . � t`Fa|con Dr ]8§2 ~ \ § DRAFT Black Rock Coffee/ 9 E R22-OO59 H- 2022-0019 SITE PLAN I [MKIPIpL ■ -14 I I 1 , ' 1 a s ■ lq � ■ �4�P 4,�a�'1�PP�P—P-4-9—P�P�pppp�Pyp�■ ■ p ■ ■ p���— � Y � III I ' ! ; AirraxRAlw 11+ 1 I ■ �J I I - { 1 H�YLe1Y'—I,i� IY n ■ I I 1 1 + n 1 1 1 i • Pa�■rru� r■.■� e ■nr�r■noon■ter I I I wM'PVn■.■Iw■�r ".h.' ff .'.' ■ _ � 1 sl f-�---v1 P■aw -iz---+�• IW�J + *+++*+*+++7 5 C 116 �- f14}.415 + f + g I +.+«+.*+++++ � �ttrtrtr +-f+�+�*-+,•+rr+,•+ram+�+ ++++++*++++! sui■PY� ,1 anrcummmrcm pm. numn � I s'+'Ltt.i_txSl�ixs;r" ,--________-`-,- i ' I r -�'d I I� �-'� �rr�■wr' I .. i +pRRAPSi.N�PP.R,.1P rurP PPd�Wr aw■a it 1 �u i��rlP�lva�n .�. llly bi— 10 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 , IKITTELSON eoise,I$cpitol Bodeuxct 9Ute 600 .&ASSQCIATES P208.338.2683 Technical Memorandum June 6,21)22 Project#27723 To: Ken Lenz White Leasure Development Company 8355 W. Emerald Street Boise,ID 53704 From: John Ringert, PE and Sam Mantsch RL- Black Rock Coffee Queuing Arrodysb Introduction The purpose of this memorandum is to evaluate the need for a northbound right-turn lane on Eagle Road to accommodate potential vehicle gveving from a proposed Black Rock Coffee Shop to be located at the soWtheast corner of Eagle Road and Victory Road in Meridian, Idaho. The coffee shop will be constructed within an existing commercial development and is planned to be approximately 1,925 square feet with a drive-through window and indoorseating.Two driveways on Eagle Road serve as direct access to the coffee shop and two driveways on Victory Road provide additional access through the parking lot of the adjacent Rite Aid.Figure 1 shows the preliminary site plan, including access locations. '.lc-ov I?ocd r _ G d i W a■ ;YF Figure 1. Proposed Black Rock Coffee Shop—Eagle RoadfVictory Rood IGttel5on&Assodates,Inc. 11 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 June 6,2022 Page 2 Black Rock Coffee Queuing Analysis The Ada County Highway District (ACHD) has requested an analysis of the vehicle queuing for the site in order to determine if the queuing from the drive-through windowwill be accommodated on-site or whether a northbound right-turn lane at the southern driveway on Eagle Road might be considered for additional queuing storage. Data Collection The findings from previously collected data at various coffee shops indicate that trip generation and queuing for coffee shops can vary significantly based on the brand,operational strategies,and amount of traffic on the adjacent roadways.Therefore,for the purpose of this analysis,data was collected at three established Black Rock coffee shops on similar type arterials to estimate the projected trip generation and queuing characteristics for the proposed site.The three sites include: ■ Chinden Boulevard& Linder Road:This shop is on the south side of Chinden Boulevard to the west of Linder Road in a commercial development.The site includes a seating area and drive through.Based on information provided by Black Rock Coffee,this shop is approximately 1,426 square feet. ■ Ustick Road:This shop is on the south side of Ustick Road to the east of Cloverdale Road.The site includes a seating area and drive through.Based on information provided by Black Rock Coffee,this shop is approximately 1,426 square feet. ■ Fairview Avenue:This shop is on the south side of Fairview Avenue to the east of Milwaukee Street and west of Etheridge Lane.The site does not include any indoor seating.Based on information provided by the Ada County assessor,this shop is approximately 620 square feet. Based on a review of the data from past studies and trip generation information in the 1TE Trip Generation Manual,the morning peak hour represents the critical weekday time period for traffic operations analysis. Therefore,trip generation and queuing data was collected during the AM peak period of coffee shop trip generation (approximately 7:00 AM to 9:00 AM) to represent peak operations analysis. Trip Generation While trip generation was not the focus of this study,the trip generation of the three sample Black Rock Coffee shops was compared to the trip generation estimated for the proposed shop using the 1TE Trip Generation Manual, 1 Iffi Edition.Table 1 shows the observed trip generation for the three example sites and the average trip generation of the three sites during the AM peak hour. Table 1 Observed Trip Generation of Sample Black Rock Coffee Shops Estimated Size Weekday AM Peak Hour Estimated AM Peak Location Hour Trip Rate (GSF) Total In Out (Trips/1,000 GSF) Chinden Boulevard 1,426 104 52 52 74.33 Fairview Road (No Seating) 620 110 55 55 177.42 Ustick Road 1,426 122 61 61 84.15 Observed Average Trip Rate(Shops with Seating Area) 79.24 As shown in Table 1,the trip rates per 1,000 square feet were relatively consistent for the two sites with indoor seating,while the trip rate for the site on Fairview without indoor seating was much higher.Because the majority of the trips to each site are drive-through trips,the results indicate that additional square footage associated with the seating does not significantly impact the trip generation.Therefore,the Kittelson&Associates,Inc. 12 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 June 6,2022 Page 3 Black Rock Coffee Queuing Analysis observed average trip rate was calculated based on the shops with indoor seating similar to the proposed shop. The trip generation for the proposed shop was estimated based on the average trip rate in Table 1 (excludes data from site with no indoor seating).The observed trip generation rate of Black Rock Coffee Shops with indoor seating in the area was applied to the proposed 1,925 square foot coffee shop to develop an expected trip generation during the AM peak hour.Table 2 shows the proposed coffee shop is expected to generate approximately 152 trips in the AM peak hour(76 inbound 176 outbound). Table 2 Trip Generation For Proposed Coffee Shop Based on Sample Black Rock Coffee Shops Location Size (SF) Weekday AM Peak Hour Total In Out Eagle Road Black Rock Coffee (Proposed) 1,925 152 76 76 The ITE Trip Generation Manual, 11th Edition estimate results in 1,030 daily trips with the critical AM peak hour generating approximately 166 trip (85 inbound/81 outbound).Table 3 shows the estimated trip generation based on the ITE Trip Generation Manual. Table 3 Trip Generation for Proposed Coffee Shop Based on ITE Trip Generation Manual Size Weekday AM Peak Weekday PM Land Use ITE Code (GSF) Daily Trips Hour Peak Hour Total In Out Total In Out Coffee/Donut Shop with 937 1,925 1,030 166 85 81 75 37 38 Drive-Through Window Average Trip Rate(Trips/1,000 GSF) 86.23 38.96 The estimated trip generation based on example Black Rock Coffee Shops was found to be approximately 8%lower than the trip generation estimate based on the ITE Trip Generation Manual in the weekday AM peak hour used for the analysis. Drive Through Queuing Analysis Drive-Through queueing data from the three Black Rock Coffee Shops was used to estimate the 95th percentile queue and maximum queue at the proposed coffee shop.Due to the drive-through trip generation not being associated with the square footage of the shop,adjacent street traffic counts were used to develop a queueing rate per 1,000 peak hour trips.Table 4 shows the 95th percentile queue and maximum observed queue at each of the example locations.Also shown in Table 4 are traffic counts obtained from ACHD. As shown in Table 4,the maximum queues were relatively consistent between all three sites and there is no strong correlation between size of the shop and queue lengths.There is also not a strong correlation between the queue lengths and volumes on the adjacent arterial street,but the differences in adjacent street volumes and queueing were minor between the shops.This indicates that adjacent street traffic volume may be more correlated to queueing than square footage,but data from additional sites would be required to determine the level of correlation of either indicator. Kittelson&Associates,Inc. 13 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 June 6,2022 Page 4 Black Rock Coffee Queuing Analysis Table 4 Observed Queue Lengths at Existing Black Rock Coffee Shops AM Peak Hour Maximum 951f'Percentile Location Estimated Size (GSF) Adjacent Arterial Queue(veh) Observed Queue Traffic Volume (veh) Chinden 1,700 Boulevard 1,426 (10/19/21) 8 9 Fairview 1,555 Road 620 (6/15/18) 5 7 Ustick 1,210 Road 1,426 (3/2/22) 7 8 Estimated Queue Length per 1,000 1,490 4.5 5.3 vph in AM Peak Based on the existing traffic counts on Eagle Road,year 2030 traffic volumes were estimated and used to predict the 95th percentile queue and maximum queue for the proposed shop in 2030.Table 5 shows the results. Table 5 Estimated Queue Lengths at Proposed Coffee Shop Estimated Size AM Peak Hour Estimated 95th Estimated Location (GSF) Adjacent Arterial Percentile Queue Maximum Queue Traffic Volume Existing/2030(veh) Existing/2030 (veh) Eagle Road 1,925 1,365 (7/21/20)1 7/8 8/9 1,665 (Est 2030)2 1. Volume bred on 2020 traffic count north of Easy Jet Drive 2. 2030 Volume based on 20%/year trofflc growl Based on the results in Table 5,a projected 951h percentile queue of 8 vehicles is recommended and a maximum queue of 9 vehicles is recommended for use as the design queue in for the new shop proposed on Eagle Road. Order Kiosk Queuing at Arrival As part of the data collection,data was gathered on the queue back from the order kiosk at Chinden Boulevard and Ustick Road shops.The Fairview Shop did not have an advanced order kiosk.The reason for collecting arrival queue data at the order kiosk is to capture instances of multiple vehicles queue at the order kiosk even though there may not be a queue between the order kiosk and the pick-up window. Those observations found that the maximum queue that developed in back of the order kiosks was 6 vehicles with a 95th percentile queue of 5 vehicles.Therefore,it is recommended that the design also account for 6 vehicles of queueing back from the order kiosk. Proposed Site Plan Queuing Evaluation Figure 2 illustrates the recommended design queue on the proposed site plan.The site plan includes a total drive-through storage distance of approximately 210'which will accommodate approximately 8 vehicles assuming an effective vehicle length of 25'.There is approximately 1 15'of drive-through storage from the order kiosk which will accommodate approximately 4 vehicles.This indicates that the proposed drive- through will accommodate the projected 95th percentile queue.But during a maximum queue event or a time period where a group of vehicles arrive at the order Kiosk,one vehicle will queue in the parking lot area. Kittelson&Associates,Inc. 14 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 June 6,2022 Page 5 Black Rock Coffee Queuing Analysis I 7 Rmposed Black Rode Cedtee Sheer +f 1,925 SF r J1 ++r r r t � r+ QA Design Queue Storage Additional Queue Storage x — N.T.S. Figure 2 Queuing Sfarage Available Additionally,there is approximately 125'of distance between the drrue-through entry lane and the southern driveways on Eagle Road which could accommodate another 6 vehicles before reaching Eagle Road. While stacking vehicles beyond the drive-through storage lane during the maximum queuing event will have impacts to parking accessibility,the additional distance to Eagle Road provides a buffer to ensure vehicle queues don't extend onto Eagle Road. There is also an additional 75'storage area to the north of the drive thru lane that can accommodate 3 vehicles if drive-through customers decide to enter from one of the other development access driveways. Based on this analysis,the queue storage provided in the site plan is expected to be sufficient to support the projected maximum queue P vehicles) during the critical AAA peak hour.Therefore,we do not recommend a northbound right-turn lane on Eagle Road be installed for the purpose of addressing queue spillback from the proposed Black Rock Coffee Shop. Kittelson&Associates,hc. 15 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 June 6,2022 Page 6 Black Rock Coffee Queuing Analysis Operational Observations While the site plan is expected to accommodate the recommended queue storage for the drive-through, on-site observations indicate that the drive-through queues may be influenced by the coffee shop service time and operations.The two most common elements observed that resulted in increased queues were the following: Extended service time for a single customer order: There were observations in which the service time for a vehicle arriving when no queue was present took over 6 minutes.During that time,a queue of 6- 7 vehicles can occur,thus reaching the maximum queue behind the single vehicle.There may be options for customers with orders that require extended time to be directed out of pick-up window line to park and wait for their order to be hand-delivered,such that they don't delay other vehicles behind them. z Multiple vehicles arriving at the order window: There were observations when 4-5 vehicles arrived within a couple minutes and queued back from the order kiosk,while no vehicles were queued between the order kiosk and the pickup window.Both the Chinden Boulevard shop and Ustick Road shop utilized employees to go out and take orders manually to minimize the service time,but this was observed to occur only after a significant queue had developed.The process of having a person take orders seemed to reduce the service times and reduce queuing_Responding with an employee to take orders quickly when multiple vehicles arrive could reduce maximum queues and we recommend implementation of this practice at this proposed Black Rock Coffee Shop. Summary Based on an evaluation of the trip generation and queueing data from three existing Black Rock Coffee shops in similar arterial locations,the maximum queue length for the proposed Eagle Road Black Rock Coffee shop is projected to be approximately 9 vehicles during the weekday AM peak hour.The site plan shows a drive through lane that can store approximately 8 vehicles.Additionally,there is available storage for 6 additional vehicles between the southern driveway on Eagle Road and the drive-through lane. Therefore,no on-site mitigation is recommended to accommodate queuing vehicles from the Black Rock Coffee Shop,and a northbound right-tum lane on Eagle Road is not recommended to accommodate potential queue spillback onto Eagle Road. Even though site plan changes or adding a turn lone on Eagle Road are not required to accommodate on-site queuing,we recommend that store management incorporate operational strategies to reduce the impacts of a single vehicle with a long service time and increase order efficiency when multiple vehicles arrive at the order kiosk. We trust that the information provided herein adequately addresses the question from ACHD regarding the need for a turn lane on Eagle Road to accommodate queueing from the Black Rock Coffee Shop.Please contact us if you have any questions or need any additional information. ION�4t. Attachments: f 6 A. Existing Site Traffic Counts&Queuing Estimates. d 6/6/Z�Q B. Roadway volumes 0 OF jSyA Kittelson&Associates,Inc. 16 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 Ada County Utility Coordinating Council Developer/Local Improvement District Right of Way Improvements Guideline Request Purpose: To develop the necessary avenue for proper notification to utilities of local highway and road improvements, to help the utilities in budgeting and to clarify the already existing process. 1) Notification: Within five (5)working days upon notification of required right of way improvements by Highway entities, developers shall provide written notification to the affected utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to, project limits, scope of roadway improvements/project, anticipated construction dates, and any portions critical to the right of way improvements and coordination of utilities. 2) Plan Review: The developer shall provide the highway entities and all utility owners with preliminary project plans and schedule a plan review conference. Depending on the scale of utility improvements, a plan review conference may not be necessary, as determined by the utility owners. Conference notification shall also be sent to the UCC. During the review meeting the developer shall notify utilities of the status of right of way/easement acquisition necessary for their project. At the plan review conference each company shall have the right to appeal, adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter of review indicating the costs and time required for relocation of its facilities. Said letter of review is to be provided within thirty calendar days after the date of the plan review conference. 3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans. Utilities may request an updated plan review meeting if revisions are made in the preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days after receiving the revisions to review and comment thereon. 4) Final Notification: The developer will provide highway entities, utility owners and the UCC with final notification of its intent to proceed with right of way improvements and include the anticipated date work will commence. This notification shall indicate that the work to be performed shall be pursuant to final approved plans by the highway entity. The developer shall schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity shall be completed within the times established during the preconstruction meeting, unless otherwise agreed upon. Notification to the Ada County UCC can be sent to:50 S. Cole Rd. Boise 83707, or Visit iducc.com for e-mail notification information. 17 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 Development Process Checklist Items Completed to Date: ®Submit a development application to a City or to Ada County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Section will receive the development application to review ®The Planning Review Section will do one of the following: ❑Send a"No Review" letter to the applicant stating that there are no site specific conditions of approval at this time. ®Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Items to be completed by Applicant: ❑For ALL development applications, including those receiving a "No Review" letter: • The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD,then architectural plans may be submitted for purposes of impact fee assessment.) • The applicant is required to get a permit from Construction Services(ACHD)for ANY work in the right-of-way, including, but not limited to,driveway approaches, street improvements and utility cuts. ❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Non-Subdivisions) ❑ Driveway or Property Approach(s) • Submit a "Driveway Approach Request"form to ACHD Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑Working in the ACHD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application"to ACHD Construction—Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment&Erosion Submittal • At least one week prior to setting up a Pre-Construction Meeting an Erosion &Sediment Control Narrative&Plan, done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD Stormwater Section. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ❑ Final Approval from Development Services is required prior to scheduling a Pre-Con. 18 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the Development Services Manager when it is alleged that the Development Services Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary and Clerk of the District, which must be filed within ten (10)working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The Development Services Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the Development Services Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 19 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019 Request for Reconsideration of Commission Action 1. Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD staff or any other person objecting to any final action taken by the Commission may request reconsideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. a. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 11:00 a.m. 2 days prior to the Commission's next scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be placed on the agenda for that next scheduled regular Commission meeting. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d. If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originally. It will normally be returned to ACHD staff for further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e. At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACHD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commission deems advisable. f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission. 20 DRAFT Black Rock Coffee/ MER22-0059/ H- 2022-0019