Loading...
HomeMy WebLinkAboutDWG_L1.1 Landscape - Hatch Industrial V16 3 4 5 I 6 APPROVED 06/30/22 A 3 c x NORTH LINDER ROAD TREE MITIGATION LEGEND EXISTING TREES TO BE REMOVED AND MITIGATED FOR PER CITY STANDARDS EXISTING SHRUBS TO BE REMOVED, -------- NO MITIGATION REQUIRED ----------- CUT EDGE AS DETAILED - - PROPERTY LINE (VERIFY) TREE MITIGATION NOTES: 1. THE LANDSCAPE ARCHITECT WILL COORDINATE WITH THE LICENSED ARBORIST TO ESTABLISH AND VERIFY MITIGATION REQUIREMENTS FOR REMOVAL OF EXISTING TREES ON SITE. TREE MITIGATION EFFORTS WILL BE FINALIZED PRIOR TO PERMIT SUBMITTAL. 2. THE EXISTING TREES TO BE REMOVED THAT REQUIRE MITIGATION ARE AS FOLLOWS FROM THE INTERIOR OF THE SITE (AS NOTED ON PLAN): - (1) 16" CAL. JUNIPER - GOOD HEALTH - (1) 14" CAL. APPLE - HEALTHY, NO MITIGATION REQUIRED - (1) 14" CAL. MULTI -TRUNK APPLE - GOOD HEALTH - (1) 10" CAL. APPLE - GOOD HEALTH, NO MITIGATION REQUIRED - (1) 6" CAL. APPLE - GOOD HEALTH, NO MITIGATION REQUIRED - (1) 12" CAL. MAPLE - GOOD HEALTH - (1) 8" CAL. MAPLE - GOOD HEALTH - (1) 10" CAL. MULTI -TRUNK MAPLE - POOR HEALTH, DEAD - (1) 6" CAL. PONDEROSA PINE - GOOD HEALTH TOTAL CALIPER INCHES OF EXISTING TREES = 96 CALIPER INCHES TOTAL CALIPER INCHES REQUIRED FOR MITIGATION = 30 CALIPER INCHES 2. THE METHODS OF MITIGATION PROVIDED WILL ALIGN WITH THE CITY OF MERIDIAN STANDARDS FOR MITIGATION AND PROTECTION EFFORTS AS DEFINED IN CHAPTER 10-3B-10 OF THE CITY CODE. PROPOSED REQUIRED TREES (28) ALONG PERIMETER OF SITE, FRONTAGE AND PARKING LOT ARE TO BE INCREASED BY 1 CALIPER INCH FOR A TOTAL OF 28" TOWARDS MITIGATION EFFORTS. ONE (1) ADDITIONAL TREE HAS BEEN PROPOSED ALONG THE SOUTH PROPERTY LINE FOR A TOTAL OF 3" TOWARDS MITIGATION EFFORTS. THIS IS UNDER THE ASSUMPTION THAT AN 8' TALL EVERGREEN IS COMPARABLE TO A 3" CALIPER. TOTAL CALIPER INCHES PROVIDED FOR MITIGATION = 31 CALIPER INCHES TREE PROTECTION NOTES: 1. PROTECT THE CRITICAL ROOT ZONE (THE AREA DIRECTLY BELOW THE DRIPLINE OF THE TREE) OF THE TREES TO REMAIN ON SITE BY: a. CONSTRUCTING A TEMPORARY CHAINLINK FENCE AROUND THE CRITICAL ROOT ZONE OF THE TREE TO BE PROTECTED PRIOR TO DEMOLITION, CONSTRUCTION, OR ANY SITE WORK. b. NOT ALLOWING COMPACTION BY EQUIPMENT TRAFFIC DURING CONSTRUCTION OR DURING DEMOLITION. c. NOT ALLOWING CONCRETE TRUCKS TO RINSE WITHIN THE PROTECTION AREA, OR ANYWHERE NEAR EXISTING TREE ROOTS OR IN PLANNED PLANTING BEDS AREAS. SEE EROSION AND SEDIMENT CONTROL PLAN FOR APPROVED CONCRETE WASHOUT AREAS. d. NOT STOCKPILING MATERIALS, DEBRIS, OR DIRT WITHIN THE TREE PROTECTION AREA. e. WATERING WITHIN THE CRITICAL ROOT ZONE FROM MID-APRIL TO MID-OCTOBER AT THE RATE OF NOT LESS THAN THE EQUIVALENT OF 1-1/2" OF WATER OVER THE ENTIRE AREA PER WEEK. f. NOT TRENCHING, EXCAVATING, FILLING, OR OTHERWISE DISTURBING THE SOIL WITHIN THE CRITICAL ROOT ZONE. g. ADJUST PROPOSED IMPROVEMENT LOCATIONS AS REQUIRED TO AVOID DAMAGING TREE ROOTS. 2. PROTECT THE CROWN AND TRUNK OF TREES TO BE RETAINED BY: a. OPERATING EQUIPMENT IN SUCH AWAY AS TO AVOID CONTACT WITH TREE TRUNKS OR BRANCHES. b. HAVING TREES PRUNED BY A LICENSED ARBORIST. 3. ALL TREES DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED USING THE FOLLOWING CRITERIA: EXISTING TREE REPLACEMENT 1" TO 6" CALIPER........................................................................ 2X CALIPER OF TREE REMOVED 6" TO 12" CALIPER................................................................. 1.5X CALIPER OF TREE REMOVED > 12" OR LARGER CALIPER....................................................... 1X CALIPER OF TREE REMOVED EXAMPLE: IF AN 8" CALIPER TREE IS REMOVED, AN ACCEPTABLE REPLACEMENT WOULD BE (3) 4" CALIPER TREES OR (4) 3" CALIPER TREES. TREE MITIGATION PLAN z O(B SCALE: 1" = 20'-0" W o H z� a C z7Z z ¢-zoa a p W U F �zax� RODNEY EVANS + PARTNERS a + + m dpnrtnc ,,. 1 208-514-3300 1 1450 W. [I ..... k St-L Hoisc, Id,ho 8 A 0 c U Z Z B_I Lu N VJ M M WUNma� F-w0 UZ M O v o K= r U U- aHU a 00 u_ X O Q K = a N m O LL U= a omz ww� �o ww maw�o moo F zo",�z Ravi oo£�zxua LL�i izk= aa�w�o oP wf�o Iwoa wf �zn -.TFaw w� 3°oQlooaz i ww3� mwao��z F>ou aaro ==v���oc�w Ffz ZoaF uowouw'�u' a w>ma�x a�z o�au"' oao�ou > aa��F - �z�oz��w o Juiz�wa ao�w gzwow�mi� �azozF� lou¢¢¢ moo.. O LL z Lu G LLJ CL O J W W w z 0 16940 0/22 . J Q ul Z3 cl Z L] Q N m 00 0 z Q I -I 0 ry Lu 0 ry W 0 z J z O DATE: JAN 2021 DRAWN BY: ST CHECKED BY: JLH JOB NUMBER: 20131 SHEET TITLE TREE MITIGATION PLAN SHEET NUMBER L I . I SHEET I I 1 1 2 I 3 I 4 I 5 I b I II II