Loading...
TRASH ENCLOSURE APPROVAL V14/11/22, 6:34 A Straightline, PLLC ail - new construction project IDp— O' APPROVED ENh: 06/29/22 FKE NLWKR:-0zz-ooei project iblicservices.com> inearchitects.com> Scott Marshall Sr. <scott@straightline.biz> on, ar 21, 2022 at 12:46 P Hello Scott, A hammerhead turn around would be fine. I don't want the driver to back up too far for safety purposes and was having a little uncertainty of where the intended turn around spot is located. The enclosure design is fine. Thank you for your submittal. Do you need an approval letter? Bill From: Scott arshall <Scott@straightlinearchitects.com> Sent: onday, arch 21, 2022 11:09 A To: Pastoor, William <WPastoor@republicservices.com> Subject: Re: new construction project GARBAGE ENCLOSURE --- -I 26 GA. PREFINISHED METAL = PARAPET CAP W/TREATED zo a � 2X8 & Z' AB'S @ 32" ox i i #4 CONT. HORIZONTAL #4 CONT. VERT. @ 32" O.C. GROUT WALL SOLID L - a -: 8X8X16 CMU SMOOTH FACE, GRAY, PRIME & PAINT OP], �..= BOND BEAM, #4 CONT. HORIZONTAL - 6" THICK CONCRETE APRON fl w/W1.4xW1.4WWM-TOE DOWN EDGES 12" >yi'. OVERLAP #4 DOWEL & WALL REINFORCING 30" TOPSOIL/PAVING -� (SEE PLAN) i #4 VERTICAL @ 32" D.C. i�.. ALIGN WITH WALL REINF. 4 ��''3''.. ij ALT. ENDS i #4 CONT. �L. HORIZONTALTOP & BOTTOM (2) #4 HORIZ CONT. 1�4" New Garbage Enclosure Wall Section �"� SCALE: NOT TO SCALE 12' (INSSIIDEE DIM.))� (3) I A 1 nC o 0 o � 3 s op Ao.1 m N - � E a F z CD V O N � m 0. B O4" DIA. x 48" HIGH METAL BOLLARDS AS INDICATED. FRAME GATES OMETAL WITH'SOLIDFENCING MATERIAL'- METAL PANEL TO MACH BUILDING METAL PANELS. (SEE EXTERIOR ELEVATIONS) TRASH ENCLOSURE OCMU WALLS - COLORED MASONRY TO MATCH BUILDING COLOR SCHEME (SEE EXTERIOR ELEVATIONS) DUTY CONCRETE OHEAVY APRON, IN FRONT OF ENCLOSURE GATES, SEE CIVIL PLANS OCONCRETE SIDEWALK, SEE CIVIL PLANS OSIDE ACCESS OPENING IN CMU WALL n Garbage Enclosure - Plan Nu SCALE: 1/8" = 1'-0" https:Hmail.google.com/mail/u/0/?ik=4a31 ad8fa 1 &view=pt&search=all&permmsgid=msg-f%3Al 727936198851681207&simpl=msg-f%3Al 7279361988... 1 /1