Loading...
Construction Drawings - C1.0 V1awIuDIA y- APPROVEEDDD O6 9/22 - - - TS' / LG LG n u � �� ONSITE PLANS BY OTHERS EEI �P O� ti �P L------- --- -- I ------- 1 3 ? O 06o 0% W 7 � N v, 00 !t �x K x � z x x x i I° I a� -I.. n I I I a ' ---- Z597- n of ----------- 1� lal .. a_ .: •,'- : •: : •:::: :': •: -. NE 4TH-ST. CL OFFSITE GRADING PLAN SCALE: 1 "= 10' O I I W z J W Lu W Z ~ z l n- o J v) W F of XIO WIW WIW UIZ EX. 30' R.O.W. I 2T ROAD SECTION - I EXISTING ROAD WIDTH VARIES 2.0% MIN. 1.8% 8.0% MAX. EXISTING PAVEMENT I SAWCUT EXISTING ROAD 2' FROM EXISTING EDGE OR AS NECESSARY CONCRETE SIDEWALK PER TO MEET MIN/MAX SLOPE. ACHD SD-709 2.5" ASPHALT PAVEMENT 4" 3/4" MINUS ROADMIX 14" 6" MINUS PITRUN ROLLED CURB AND GUTTER PER ACHD SD-702 NE 4TH STREET SECTION L SCALE:NTS NOTES: 1. CONSTRUCTION OF SEEPAGE BED SHALL BE PER THE LATEST VERSION OF ACHD STORMWATER DESIGN GUIDELINES BMP 20 "SEEPAGE BED WITH OPTIONAL CHAMBERS" 2. PERF. PIPE SHALL BE 18 INCH ADS, N-12 "SOIL TIGHT" PIPE WITH AASHTO CLASS II PERFORATION PATTERN. INSTALL PER MANUFACTURERS REQUIREMENTS. 3. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF GROUNDWATER IS ENCOUNTERED WITHIN T OF THE BOTTOM DESIGN ELEVATION FOR ANY INFILTRATION FACILITY. 4. CONTRACTOR SHALL EXCAVATE TO 5' BELOW BOTTOM DEPTH AND HAVE SOILS VERIFIED BY ENGINEER AND ACHD REPRESENTATIVE PRIOR TO CONSTRUCTION OF SEEPAGE BED. 5. DEPTH TO GROUNDWATER ESTIMATED TO REMAIN GREATER THAN 16.0' BELOW GROUND SURFACE. SEE "GROUNDWATER LETTER" PREPARED BY MATERIALS TESTING & INSPECTION PREPARED JANUARY 22ND, 2020 6. COORDINATE WITH ACHD INSPECTION FOR PLACEMENT OF ELECTRONIC MARKERS AT EACH CORNER OF FACILITY DURING CONSTRUCTION PRIOR TO BACKFILLING. ACHD TO PROVIDE MARKERS. SEEPAGE BED DETAIL SCALE: NTS OBSERVATION WELL PER ACHD SD-627, WRAP PORTION IN SAND SEDIMENT MANHOLE PER WITH DRAINAGE GEOTEXTILE ACHD SD-611, RATED HS25 OR GREATER WOVEN GEOTEXTILE FABRIC REQUIRED OVER TOP. - SEE SECTION 8202.23 FOR GEOTEXTILE REQ'S. PERFORATION SCHED. PER BMP 20 KEYNOTES: SURVEY MONUMENTS TO BE RETAINED AND PROTECTED. OEXISTING 1 CONTRACTOR SHALL HAVE A LICENSED SURVEYOR LOCATE AND MARK ALL EXISTING MONUMENTS PRIOR TO CONSTRUCTION. ANY MONUMENT DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE REPLACED BY A LICENSED LAND SURVEYOR ATTHE EXPENSE OF THE CONTRACTOR. OCONTROL POINT: #1- MCP. BABYMAG, EL. = 2596.78 OPROPERTY LINE. AC WIDENING/PATCH. PAVEMENT SHALL BE SP-3, 1/2" MIX, OPROPOSED PG-64-28, SECTION PER DETAIL 2 OR MATCH EXISTING, WHICHEVER IS GREATER. OAC SAWCUT LINE. PATCH TO MATCH EXISTING PER LIMITS SHOWN. OINSTALL ROLLED CURB AND GUTTER PER ACHD SD-702. OINSTALL ATTACHED Y SIDEWALK PER ACHD SD-709, 5" THICK CONCRETE WITH 4" OF 3/4" MINUS CRUSHED BASE. O INSTALL TYPE IV CATCH BASIN PER ACHD SD-604A FOR ROLLED CURB. O9 INSTALL SEDIMENT MANHOLE PER ACHD SD-611, RATED HS25 OR GREATER. LID SHALL BE SOLID AND RATED FOR ADA FOOT TRAFFIC. SEEPAGE BED PER DETAIL 3, SHEET C1.0 AND THE LATEST VERSION OINSTALL 10 OF ACHD STORMWATER DESIGN GUIDELINES BMP 20. SEEPAGE BED TO BE INSTALLED UNDER PROP. SIDEWALK. NOTE: o CONTRACTOR SHALL VERIFY SIDEWALK CROSS SLOPE DOES NOT EXCEED 2 %. NO TOLERANCES ALLOWED PER ACHD INSPECTION STAFF. a ° SEEPAGE BED DRAINAGE CALCULATIONS PROPOSED IMPERVIOUS CONTRIBUTING AREA ° PARKING LOT/SIDEWALK/ROOF: 1763SF C=0.95 LANDSCAPEAREA: OSF C=0.20 TOTAL AREA = 1763 SF C =0.95 STORAGE VOLUME AND DRAINAGE REQUIREMENTS ° 100YR- 1 HOUR VSTORM = (CONTRIBUTING AREA*C)*(1"/121NCHES/FT) 100YR-1HOUR VSTORM= 140CF MAXIMUM DRAINAGETIME= 48HOURS SEEPAGE BED CAPACITY SEEPAGE BED AREA = 75.0 SF 15.0' L x 5.0' W SEEPAGE BED DEPTH = 5.00 FT DRAIN ROCK VOLUME = 375CF 3 DRAIN ROCK VOID RATIO = 0.4 DRAIN ROCK STORAGE VOL. = VOLUME*VOID RATIO TOTAL STORAGE VOLUME= 150CF >REQUIRED, OK INFILTRATION WINDOW CAPACITY INFILTRATION WINDOW AREA= 75.0SF 15.0' Lx 5.0' W INFILTRATION RATE=8.OIN/HR OR0.67FT/HR TOTAL BASIN DRAIN TIME= VSTORM/(SAND FILTERAREA * INFILTRATION RATE) TOTAL BASIN DRAIN TIME= 3HR < REQUIRED, OK SAND & GREASE TRAP THROAT VELOCITY TH ROAT FLOW AREA = 6.8SF 1.7'Lx4.0'W 100YEARQ= 0.1CFS THROAT VELOCITY = 0.02 FPS <0.5 MAXIMUM, OK 4 STORM CALCS, SCALE:NTS 5' MIN. SIDEWALK EL. 2597.90 12" INLET FROM `-nd? TOP OF BED EL. 2595.90 ' CATCH BASIN 3' I.E. 2594.0 NON-PERF. PIPE 18" ADS N-12 PERFORATED PIP ., 5 18' I.E. 2593.90 2' MIN. SUMP ` 3" -- 2" ANGULAR ROCK a v v v v v v ;. BOTTOM OF DRAIN ROCK EL. 2590.90 ASTM C33 FILTER SAND 1.5' NONWOVEN GEOTEXTILE FABRIC ON BOTTOM OF SAND EL. 2589.40 TOP AND SIDES. OVERLAP 12" MIN AT SEAMS. SEE SECTION 8202.23 13' - GEOTEXTILE REQUIREMENTS. DESIGN INFILTRATION INSTALL 30 MIL PVC LINER ALONG RATE = 8"/HR 12" BELOW SAND LAYER EAST AND SOUTH SIDES. (WILL DRAIN IN 24 HRS (3' MIN.) WITH <1"/HR) j HIGH GROUNDWATER 15 CALL DIGLINE AT 811 BEFORE YOU DIG! Nines wM, below. Call beforeyoudig. Drawings not to be reproduced without written permission from Alpha Omega Engineering LLC. V / W 2 Oo 2 Z Z Q 3: W' W O F- W W Z (n W O ^ UJ W Z M M r � V W LL REVISIONS p NO. DATE DESCRIPTION U CC O LL 0 W PROJECT #: 22006 > 0 DATE: 02-11-22 a DRAWN BY: MRL Q SHEET TITLE: OFFSITE O z GRADING & DRAINAGE w PLAN cl) pro w W