Loading...
HomeMy WebLinkAboutACHD Letter Eagle View Landing Apartments V1�E IDIAN-- low APPROVED C H D DATE: 06/27/22 It It FILE NUMBER: ^ 0210W /0y1 a'r� ,`i'Fi April 26, 2022 To: Josh Beach Brighton Development Inc. 2929 W. Navigator Drive, Suite 400 Meridian, ID 83642 Subject: MPP21-0007/ A-2022-0047 Parcel R7319431800 CZC/DR Application for Eagle View Landing Apartments Mary May, President Alexis Pickering, Vice -President Jim D. Hansen, 2nd Vice President Kent Goldthorpe, Commissioner Dave McKinney, Commissioner On January 10, 2022, the Ada County Highway District approved Rackham East Subdivision and Eagle View Apartments MPP21-0007/ H-2021-0075 for a preliminary plat for 2-multi-family lots and 6 commercial lots on 29.7 acres. The site -specific conditions of approval also apply to this application, A-2022-0047 for 396 multi -family units on 15.94 acres within the subdivision. If you have any questions, please feel free to contact me at (208) 387-6293. Sincerely, Paige Bankhead, PE Assistant Traffic Engineer Development Services cc: City of Meridian — Sonya Allen Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 2O8-387-6100 • FX 345-7650 • www.achd.ada.id.us CUEIDR IAy APPROVED DATE 06/27/22 FIEF NUMBER: ^-2D22 o 1 Standard Conditions of Approval All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 2. In accordance with District policy, 7203.6, the applicant may be required to update any existing non -compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 5. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 6. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 7. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 8. All design and construction shall be in accordance with the ACHD Policy Manual, ISPVVC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 9. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 11. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. (E IDIAN - APPROVED DATE: 06/27/22 FILE NUMBER: a 022 o 1 s 2�ftv i v.` 1 ACE H I � Development Services Department Project/File: Rackham East Subdivision and Eagle View Apartments/ MPP21-0007/ H-2021- 0075 This is an annexation and rezoning application to annex 25.76 acres into the City of Meridian with C-G zoning, a preliminary plat application for 2 multi -family lots and 6 commercial lots on 29.7 acres and a conditional use permit application for a 396 unit multi -family development within the site on 15.94 acres. Lead Agency: City of Meridian Site address: North of Rolling Hill Drive and Overland Road Staff Approval: January 10, 2022 Applicant: Josh Beach Brighton Development, Inc. 2929 W. Navigator Drive, Suite 400 Meridian, ID 83642 Representative: Same as above Staff Contact: Paige Bankhead, E.I. Phone: 387-6293 E-mail: pbankhead(a)achdidaho.org A. Findings of Fact Vicinity Map �l'ei yy "."Opp — Description of Application: This is a preliminary plat application for 2 multi -family lots and 6 commercial lots on 29.7 acres and a conditional use permit application for a 396 unit multi -family development within the site on 15.94 acres. The City of Meridian's Future Land Use Map designates this area as Mixed Use Regional. 2. Description of Adjacent Surrounding Area: Direction Land Use Zoning North 1-84 NA South General Retail and Service Commercial District C-G East Residential Ada Count R1 West General Retail and Service Commercial District C-G 3. Site History: ACHD previously reviewed a small eastern portion of this site as part of Rackham Subdivision in July 2019. The requirements of this staff report for that small portion are consistent with those of the prior action. 4. Adjacent Development: The following developments are pending or underway in the vicinity of the site: Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 CUEIDR IAN APPROVED DATE 06/27/22 FILE NUMBER: a 0210W ;ackham Subdivision, a 20-lot mixed use subdivision with hotel, office buildings, restaurants nd residential uses on 52 acres located directly west of the site and approved by ACHD on my 18, 2019. p� W 1� WLAN,�� ' Site Location - Eagle View Landing Phase 2 (Rackham East Subdivision) located east of Rackham Subdivision (Original 52 acres) 5. Transit: Transit services are available to serve this site approximately'/4 mile south of the site on Overland Road via route 29. 6. Pathway Crossings: United States Access Board R304.5.1.2 Shared Use Paths. In shared use paths, the width of curb ramps runs and blended transitions shall be equal to the width of the shared use path. AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection Treatments: The opening of a shared use path at the roadway should be at least the same width as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the path, not including any flared sides if utilized. Detectable warnings should be placed across the full width of the ramp. FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average width of the trail to improve safety for users who will be traveling at various speeds. In addition, the overall width of the trail should be increased, so the curb ramp can be slightly offset to the side. The increased width reduces conflict at the intersection by providing more space for users at the bottom of the ramp. 7. New Center Lane Miles: The proposed development includes 0.0 centerline miles of new public road. 8. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 9. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP): • The intersection of Overland Road and Eagle Road is scheduled in the CIP to be widened to 7-lanes on the north and south legs, and 8-lanes on the east and west legs, and reconstructed/signalized in the future. The design year is listed as 2025 in the IFYWP and the is listed to be improved between 2031 and 2035. • Overland Road is listed in the CIP to be widened to 7-lanes from Eagle Road to Cloverdale Road between 2036 and 2040 and is listed as unfunded. 2 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 (E IDIA, he intersection of Cloverdale Road and Overland Road is listed in the CIP to be widened to APPROVED -lanes on the north and south legs and 8 lanes on the east and west legs and signalized osiz7iz2 e DATE tween 2026 and 2030. FILE NUMBER: 12D2 W11 ays to Bikeways Master Plan: ACHD's Roadways to Bikeways Master Plan (BMP) was d by the ACHD Commission in May of 2009 and was update in 2018. The plan seeks to implement the Planned Bicycle Network to support bicycling as a viable transportation option for Ada County residents with a wide range of ages and abilities, maintain bicycle routes in a state of good repair in order to ensure they are consistently available for use, promote awareness of existing bicycle routes and features and support encouragement programs and to facilitate coordination and cooperation among local jurisdictions in implementing the Roadways to Bikeways Plan recommendations. The BMP identifies Overland Road as Level 2 facilities that will be constructed as part of a future ACHD project. B. Traffic Findings for Consideration 1. Trip Generation: This development is estimated to generate 4,626 total additional vehicle trips per day (114 existing); 432 total additional vehicle trips per hour in the PM peak hour (12 existing), based on the traffic impact study. 2. Traffic Impact Study Fehr & Peers prepared a traffic impact study for the proposed Eagle View Landing Phase 2 development. An executive summary of the findings as presented by Fehr & Peers can be found in Attachment 3. The following executive summary is not the opinion of ACHD staff. ACHD has reviewed the submitted traffic impact study for consistency with ACHD policies and practices, and may have additional requirements beyond what is noted in the summary. ACHD Staff comments on the submitted traffic impact study can be found below under staff comments. r;r Site .: All Silverstone Wav Rackharn flay Rolling Hills Dfive ' - Overland HDad LEGEND Project Phase 1 { �* _ ■ Project Phase 2 Project Phase 3 OProject Intersecnon Intersections and Road Segments in the Study o Eagle Yew Landing Phase 1 Project Location 3. Mitigation/Required Improvements a. Policy: 3 Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 (E IDIA\ _- APPROVED DATE: 06/27/22 FILE NUMBER:-022-11 lation Proposals: Mitigation recommendations shall be provided within the report. At a num, for each roadway segment and intersection that does not meet the minimum ptable level of service planning threshold or v/c ratio, the report must discuss feasible ;ures to avoid or reduce the impact to the system. To be considered adequate, measures Id be specific and feasible. Mitigation may also include: • Revision to the Phasing Plan to coincide with the District's planning Capital Projects. • Reducing the scope and/or scale of the project. Alternative Mitigation Measures: 7106.7.3 states that if traditional mitigation measures such as roadway widening and intersection improvements are infeasible as determined by ACHD, the TIS may recommend alternative mitigation measures. Alternative mitigation measures shall demonstrate that impacts from the project will be offset. • If the impacted roadway segments and/or intersections are programmed as funded in the Integrated Five Year Work Plan (IFYWP) or the Capital Improvements Plan (CIP); no alternative mitigation is required. • If the impacted roadway segments and/or intersections are not programmed in either the IFYWP or the CIP; the applicant may (i) analyze the shoulder hour and (ii) provide a safety analysis to determine alternative mitigation requirements. o If the impacted roadway segments and intersections meet the minimum acceptable level of service planning thresholds in the shoulder hour the applicant may suggest feasible alternative mitigation such as: sidewalks, bike facilities, connectivity, safety improvements, etc. within 1.5 miles of the proposed development. o If the shoulder hour planning thresholds are exceeded the applicant may request to enter into a Development Agreement and pay into the Priority Corridor Fund an amount determined by the ACHD to offset impacts from the project. • Alternative Mitigation may also include: o Revision to the Phasing Plan to coincide with the District's future Capital Projects. o Reducing the scope and/or scale of the project. Level of Service Planning Thresholds: District Policy 7206.4.1 states that, Level of Service Planning Thresholds have been established for principal arterials and minor arterials within ACHD's Capital Improvement Plan and are also listed in section 7106. Unless otherwise required to provide a Traffic Impact Study under section 7106, a proposed development with site traffic less than 10% of the existing downstream roadway or intersection peak hour traffic shall not be required to provide mitigation for a roadway or intersection that currently exceeds the minimum acceptable level of service planning threshold or V/C ratio. b. Staff Comments/Recommendations: The study shows that all intersections and roadway segments operate acceptably, except for the following that are discussed below. All road segments are projected to meet ACHD's acceptable level of service (LOS) thresholds for a 5-lanes principal arterial road under all conditions, except for during the PM peak hour for the segment of Overland Road between Eagle Road and Silverstone Way and Rolling Hill Drive under the 2023 total traffic conditions. Overland Road — Eagle Road to Silverstone Way This segment of Overland Road is listed in the CIP to be widened to 7-lanes between 2026 and 2030, and the site traffic is projected to be approximately 9.6% of the total 2023 traffic on 4 Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 CUEIDR IAN APPROVED DATE: 06/27/22 FILE NUMBER:A-z 22-1 segment. Therefore, staff does not recommend that the applicant be required to widen this vent consistent with District policy 7106.7.3 Alternative Mitigation Measures, which states, impacted roadway segment or intersection are programmed as funded in the IFYVVP, or CIP; no mitigation is required; and the District's Level of Service Planning Thresholds :;y, which states that a proposed development with site traffic less than 10% of the existing nstream roadway or intersection peak hour traffic shall not be required to provide mitigation for a roadway or intersection that currently exceeds the minimum acceptable level of service planning threshold or V/C ratio. Rolling Hill Drive The applicant has proposed to vacate Rolling Hill Drive within the site, north of the site's south property line. The study reports the average daily traffic (ADT) for Rolling Hill Drive is projected to be 2,500 trips with all phases of the development in 2023, and approximately 1,200 for Phases 1 and 2, which consists of 396 apartment units. The phasing plan is shown below in the shaded regions. dw le ' - Wa Rolling Hills Drive land Roan 4iGEN0 Prom Phew 1 *.. ■ Projod Ehase i v vrojed Phase' orclect mierse€aon Eagle View LandirqtPhasr 1 Projestbacat4 ACHD does not set level of service thresholds for local roads, however, District Policy states that the ADT for local roads shall be less than 2,000. Staff does not recommend that Rolling Hill Drive be reclassified as a collector road or a commercial road to accommodate the traffic from all phases of the development due to the fact that there are several existing single family residential homes that will remain on Rolling Hill Drive to the south of the site and staff has concerns about the significant increase in traffic on an existing local road that will continue to serve single family homes after the development is completed. Therefore, staff recommends that the applicant should be restricted to phases 1 and 2 of the development for the 396 apartment units, and not be allowed to construct the offices proposed for phase 3 of the development until the existing residential homes on Rolling Hill Drive are purchased and the properties annexed into the City of Meridian with commercial or mixed use zoning. ACHD may consider reclassifying Rolling Hills Drive as a collector or commercial road at that time. In addition, staff recommends that Rolling Hill Drive be restricted to right-in/right-out only at Overland Road, consistent with the findings of the traffic impact study, which are discussed below. 5 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 and Road/Rollina Hill Drive APPROVED study recommends restricting the intersection of Overland Road/Rolling Hill Drive to right - DATE: 06/27/22 ight-out with phase 2 in 2022, or when the site generates 45 PM peak hour trips. The licant should be required to restrict the intersection to right-in/right-out only with a 6-inch FILE NUMBER:12022- 11 ed candles/median with the first phase of the development prior to ACHD's signature on the i t final plat and after the private road, Rackham Way, is completed from Silverstone Way to the Rolling Hill Drive. The applicant should be required to provide a public access easement over the private road, Rackham Way. Rolling Hill Drive aligns with an existing driveway on Overland Road for the Movado Green Subdivision apartments on the south side of Overland Road. As part of ACHD's action on Movado Greens Subdivision, ACHD approved this driveway as a temporary full access driveway and indicated that this driveway could be restricted to right-in/right-out at any time in the future. The study recommends the construction of a westbound right turn lane on Overland Road at Rolling Hill Drive in 2023 with phase 3. However, there is not enough existing right-of-way for the applicant to construct a westbound right -turn lane on Overland Road at Rolling Hill Drive and it is not typical for ACHD to require a right -turn lane for a 5-lane principal arterial road. Therefore, staff does not recommend that the applicant be required to construct the westbound right -turn lane with this development application. Due to concerns from the residents on Rolling Hill Drive about additional traffic from the Rackham East Subdivision and the Rackham West Subdivision using Rolling Hill Drive when Rackham East Subdivision connects to Rolling Hill Drive, and that the daily trips on Rolling Hill Drive at the full build out of the development will exceed ACHD's thresholds for the ADT on local roads, the applicant has also proposed to restrict the site's access to Rolling Hill Drive to emergency access only. This would direct all traffic from Rackham East Subdivision to the Silverstone Way/Overland Road intersection to access Overland Road. Therefore, prior to the submittal of any construction plans for the development, the applicant should be required to submit an updated analysis to staff for the intersection of Silverstone Way/Overland Road for Phases 1 and 2 under the 2022 conditions, and for the final buildout under the 2023 conditions, and the estimated ADT and peak hour trips on Silverstone Way with Phases 1 and under the 2022 conditions and all Phases under the 2023 conditions. Staff will evaluate if restricting the site's access onto Rolling Hill Drive to emergency access only is feasible based on the updated analysis. If staff finds that restricting Rolling Hill Drive to emergency access only is acceptable, then no additional improvements are required to Rolling Hill Drive. Rolling Hill Drive/Private road, Rackham Way The study shows that a mini -roundabout will operate acceptably at the terminus of Rolling Hill Drive where it will intersect the private road, Rackham Way. The applicant will be required to construct a mini -roundabout at the terminus of Rolling Hill Drive, see Finding 3. Eagle Road/Overland Road The study shows that the intersection of Eagle Road/Overland Road exceeds ACHD's acceptable LOS thresholds under the existing and future conditions in the AM and PM peak hours. The study recommends the following improvements with the associated phase/year: • Add 1 northbound through lane for a total of 3 northbound through lanes (existing) • Add 1 northbound right -turn storage lane to separate the right -turn movements from the through movements (existing) • Restripe the southbound left -turn lanes to increase the total storage length to 500-feet for existing and 600-feet for 2021 conditions • Add 1 westbound right -turn lane for a total of 2 westbound right -turn lanes (existing) 6 Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 �ERIDIAN'-- �J Add 1 westbound left -turn lane for a total of 2 westbound left -turn lanes (2023) APPROVED wever, the intersection is projected to exceed acceptable LOS thresholds in the PM peak DATE.-06/27/22 r under all conditions and the AM peak hour in the 2023 background and 2023 total traffic FILE NUMBER:^-0210W ditions even with these improvements. In addition, these improvements are not feasible there is not enough existing right-of-way to improve the intersection with additional lanes and the site traffic at this intersection is projected to be 4.8% of the 2023 total traffic conditions. This intersection is also listed in the CIP to be widened to 7-lanes on the north and south legs and 8-lanes on the east and west legs with a design year of 2025 in the IFYWP and improved between 2031 and 2035. Therefore, staff does not recommend that the recommended mitigation be constructed with this development application consistent with the District's Alternative Mitigation Measures Policy and the District's Level of Service Planning Thresholds Policy stated above. Overland Road/Silverstone Way The intersection of Overland Road/Silverstone Way exceeds ACHD LOS thresholds under the existing conditions, and thus the future build out conditions. The study recommends the following mitigation with the associated phase/year: • Add 1 eastbound right -turn lane (existing) • Add 1 westbound right -turn lane (existing) • Add 1 eastbound left -turn lane (2021) for a total of 2 eastbound left -turn lanes o Convert signal phasing to only allow protected left -turns • Add 1 southbound right -turn overlap signal timing phase with updated signal splits (2021) • Add a southbound right -turn lane for a total of 2 southbound right -turn lanes (2022) Even with the recommended mitigation, the intersection of Overland Road/Silverstone Way is still projected to exceed ACHD LOS thresholds with the 2022 and 2023 total traffic conditions. As part of ACHD's action on Rackham Subdivision in 2019, that applicant was required to construct an additional southbound left -turn lane for a total of 2 southbound left -turn lanes. This was completed earlier this year. Staff is not supportive of the proposal to install an additional southbound right turn lane to create dual right turn lanes, as this is not ACHD's standard practice and will not be approved. In addition, there is not enough right-of-way on Overland Road to accommodate the construction of eastbound dual left turn lanes or the recommended westbound and eastbound right -turn lanes, making these improvements infeasible. Therefore, staff does not recommend any additional improvements to the intersection of Overland Road/Silverstone Way with this development application. Eagle Road and 1-84 Ramps Eagle Road north of the eastbound 1-84 off ramp and the 1-84 eastbound and westbound ramps are under the jurisdiction of the Idaho Transportation Department (ITD). The applicant, City of Meridian, and ITD should work together to determine if additional right-of-way or improvements are necessary on Eagle Road abutting the site or the 1-84 eastbound and westbound ramps. 7 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 �J ion of Area Roadways APPROVED ount is based on Vehicles per hour (VPH) DATE: 06/27, FILE NUMBER:': Functional PM Peak PM Peak Existing L ay Frontage Classification Hour Hour Level Plus Traffic Count of Service Project Overland Road Principal Better than "F" Eagle Rd to 0-feet Arterial 1,369 " D" Silverstone Way Overland Road Principal Better than Better than Silverstone Way to 0-feet Arterial 1,218 "D" "D" Rolling Hill Dr Silverstone Way Better than Better than Rackham Way to 0-feet Collector 379 "D" "D" Overland Rd **Rolling Hill Drive From site to 0-feet Local 7 N/A N/A Overland Rd Private road - West leg of **Rackham Way intersection of From site to 0-feet Rolling Hill 49 N/A N/A Silverstone Way Drive/Rackha m Way * Acceptable level of service for a five -lane principal arterial is "E" (1,780 VPH). * Acceptable level of service for a two-lane collector is "D" (425 VPH). * Acceptable level of service for a four -lane collector is "D" (1,080 VPH). ** ACHD does not set level of service thresholds for local roads or private roads. 5. Average Daily Traffic Count (VDT) Average daily traffic counts are based on ACHD's most current traffic counts. • The average daily traffic count for Overland Road from Eagle Road to Silverstone Way was 29,000 on 6/15/2021. • The average daily traffic count for Overland Road from Silverstone Way to Rolling Hill Drive was 20,775 on 10/21/2020. • The average daily traffic count for Silverstone Way from Rackham Way to Overland Road was 6,600 on 10/21/2020. • The average daily traffic count for Rolling Hill Drive north of Overland Road was 200 on 10/21/2020. • The average daily traffic count for Rackham Way from Silverstone Way to the site was 400 on 10/21/2020. C. Findings for Consideration 1. Overland Road/Rolling Hill Drive The study recommends restricting the intersection of Overland Road/Rolling Hill Drive to right- in/right-out only with phase 2 in 2022, or when the site generates 45 PM peak hour trips. The applicant should be required to restrict the intersection to right-in/right-out with a 6-inch raised candles/median with the first phase of the development prior to ACHD's final approval of the first final plat and after the private road, Rackham Way, is completed from Silverstone Way to the 8 Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 (E NtNr g Hill Drive. The applicant should be required to provide a public access easement over the APPROVED to road, Rackham Way. DATE: 06/27/22 g Hill Drive aligns with an existing driveway on the south side of Overland Road for the FILE NUMBER: "-2022-°.' do Green Subdivision apartments. As part of ACHD's action on Movado Greens Subdivision, 7ACItED approved this driveway as a temporary full access driveway and indicated that this driveway could be restricted to right-in/right-out at any time in the future. This is consistent with ACHD's action on access management on Overland Road with new developments on Overland Road. Currently, Silverstone Way is signalized on Overland Road and the Movado Way/Overland Road intersection will be evaluated for signal warrants with the future development north of Overland Road. = - L j0Ii x Stfi s i co ? Y 1'Re,E�2'et-� ay J I 'r..w%Ci da'rwood Dr J _ e - 1-Iorida1Ct - s 1 -View ^ N -.(AI Cis—c L r `IILE OiYerland-Rd - s:. ' ~r _`.� C 1 f - _ Traffic Signal ' EiEsNerant,, _- 1 i = 4 = 5t E - RIRO > E Blueberry-, c l hlII - c Access on Overland Road If Rolling Hill Drive will be restricted to emergency access only for the site as determined by ACHD, then the applicant is not required to restrict the intersection of Rolling Hill Drive/Overland Road right- in/right-out only. 2. Rolling Hill Drive a. Existing Conditions: Rolling Hill Drive is improved with approximately 24-25 of pavement and no curb, gutter or sidewalk within the site and to the south of the site. There is 50-feet of right- of-way for Rolling Hill Drive (25-feet from centerline). b. Policy: Off -Site Streets Policy: District Policy 7206.2.3 states that if the proposed development is not served by a public street that is fully improved to urban standards (curb, gutter, sidewalk) or a minimum 30-feet of pavement, then the developer shall provide 30-feet of pavement with 3-foot wide gravel shoulders from the site to the public street specified by the District; OR the developer shall provide 24-feet of pavement with 3-foot wide gravel shoulders and a minimum 6-foot wide detached asphalt/concrete pedestrian facility, from the site to a public street specified by the District. Alternatives to pavement widening including sidewalks and pathways or other proposals, may be considered by the District. The extent of roadway improvements (improvement type and length) will be determined by evaluating certain criteria. Criteria to establish improvement type and length include but are limited to: traffic volumes (existing and projected); number of pedestrians (existing and projected); location of pedestrian "attractors" and "generators" (i.e. parks and schools); number of access points/streets serving the proposed development; usable right-of-way; need for traffic calming; utilities and irrigation facilities. All utility relocation costs associated with the off -site street widening shall be borne by the developer. 9 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 (E IDIAN - 1-de-sac Streets Policy: District policy 7207.5.8 requires cul-de-sacs to be constructed to APPROVED vide a minimum turning radius of 50-feet; in rural areas or for temporary cul-de-sacs the �� 06i27i22 ergency service providers may require a greater radius. Landscape and parking islands may constructed in turnarounds if a minimum 29-foot street section is constructed around the FILE NUMBER:^ 22- 1 nd. The pavement width shall be sufficient to allow the turning around of a standard SHTO SU design vehicle without backing. The developer shall provide written approval from the appropriate fire department for this design element. The District will consider alternatives to the standard cul-de-sac turnaround on a case -by -case basis. This will be based on turning area, drainage, maintenance considerations and the written approval of the agency providing emergency fire service for the area where the development is located. c. Applicant Proposal: The applicant has proposed to vacate Rolling Hill Drive north of the site's south property line as shown below in yellow in order to construct the development and an internal private road network. The applicant has proposed to provide a permanent right-of-way easement for a turnaround at the terminus of Rolling Hill Drive where it intersects the private road, Rackham Way, within the site. However, a turnaround is not shown on the site plan at this location. kU 111terstAte $4 L� Proposed vacation of Rolling Hill Drive in yellow 10 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 4­0210W FUTURE ACHD TURNAROUND EASEMENT FOR ROLLING HILLS DR. VC INSTALLSANITARY PVC SEWER MANHOLE TARY NHOLE SSMH CONNECT TO EXISTING / �_RIM:2670.88 IRRIGATION RRIGATION MAIN e t INV UT 5.77 B„ PVC O-2 INV UT:2655.67 8' PVC WN 6'0 6'PI T VIM 16 I 6'pl — — 6'PI 6-PI e`5 8"S— —e„s— -e� / _"Z:RIM:2671.75 INV IN:2655.14 8" PVC RIGATION MANHOLE INV OUT:2655.03 8" PVC EXISTING PIPE I I INSTALL SANITARY O I SEWER MANHOLE N J_ Z Z I ROLLING HILL SUBDIVISION I I d. Staff Comments/Recommendations: The vacation of Rolling Hill Drive north of the private road requires a separate application and has its own approval process. The applicant should be required to vacate Rolling Hill Drive prior to ACHD's signature on the first final plat. The applicant's proposal to provide a turnaround easement at the terminus Rolling Hill Drive does not meet District Policy and is not approved, as proposed. The applicant should be required to construct a mini -roundabout where Rolling Hill Drive and the private road, Rackham Way, are proposed to intersect similar to the mini -roundabout at Silverstone Way and the private road, Rackham Way, directly west of the site that was constructed with Rackham Subdivision. See Finding 3. The applicant should be required to improve the off -site portion of Rolling Hill Drive with 24- feet of pavement, 3-foot wide gravel shoulders and a 6-foot wide detached concrete sidewalk on one side of the road within the existing right-of-way. The study reports the average daily traffic (ADT) for Rolling Hill Drive is projected to be 2,500 trips under the 2023 total traffic conditions with all 3 phases, and approximately 1,200 for Phases 1 and 2, which accounts for the traffic from the 396 apartment units. Phases 1, 2 and 3 are shown in the shaded regions below. ACHD does not set level of service thresholds for local roads, however, District Policy states that the ADT for local roads shall typically be less than 2,000. Staff does not recommend that Rolling Hill Drive be reclassified as a collector or commercial road to accommodate the traffic from all phases of the development because are several existing single family residential homes that will remain on Rolling Hill Drive to the south of the site and staff has concerns about the significant increase in traffic on an existing local road that will continue to serve single family homes. Therefore, staff recommends that the applicant be restricted to phases 1 and 2 with this development and should not be allowed to construct the offices proposed for phase 3 of the development until the existing residential homes on Rolling Hill Drive are purchased and the properties annexed into the City of Meridian with commercial or mixed use zoning. 11 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 If ACHD determines that it is acceptable for the site to use Rolling Hill Drive as emergency access only, then the off -site improvements for Rolling Hill Drive and the construction of the mini -roundabout at the terminus of Rolling Hill Drive are not required and the applicant will be required to construct a standard cul-de-sac at the terminus of Rolling Hill Drive. 3. Mini -Roundabout - Rolling Hill Drive/Private Road Rackham Way If the site will use Rolling Hill Drive as a full access, then the applicant should be required to construct a mini -roundabout at the terminus of Rolling Hill Drive at the private road, Rackham Way, and follow the guidance provided in NCHRP 672 and will need to design the mini roundabout meeting the standards ACHD's Roundabout Design Guide policy section 5188. 4. Private Road — Rackham Way a. Private Road Policy: District policy 7212.1 states that the lead land use agencies in Ada County establish the requirements for private streets. The District retains authority and will review the proposed intersection of a private and public street for compliance with District intersection policies and standards. The private road should have the following requirements: • Designed to discourage through traffic between two public streets, • Graded to drain away from the public street intersection, and • If a private road is gated, the gate or keypad (if applicable) shall be located a minimum of 50-feet from the near edge of the intersection and a turnaround shall be provided. Driveway Location Policy: District policy 7207.4.1 requires driveways near intersections to be located a minimum of 75-feet (measured centerline -to -centerline) from the nearest local street intersection, and 150-feet from the nearest collector or arterial street intersection. Successive Driveways: District Policy 7207.4.1 states that successive driveways away from an intersection shall have no minimum spacing requirements for access points along a local street, but the District does encourage shared access points where appropriate. Driveway Width Policy: District policy 7207.4.3 states that where vertical curbs are required, residential driveways shall be restricted to a maximum width of 20-feet and may be constructed as curb -cut type driveways. 12 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 CUEIDR IAN,-li0cant �Jway Paving Policy: Graveled driveways abutting public streets create maintenance APPROVED ems due to gravel being tracked onto the roadway. In accordance with District policy, 06/27/224.3, the applicant should be required to pave the driveway its full width and at least 30-feet DATE e site beyond the edge of pavement of the roadway. fllE NUMBER: ^-zozz-oa� Proposal: The applicant has proposed to continue a private road, Rackham Way, from the west to intersect the terminus of Rolling Hill Drive at the site's south property line. c. Staff Comments/Recommendations: The applicant's proposal for the private road meets District Policy with the construction of the mini -roundabout as stated in Findings 2 and 3. If the City of Meridian approves the private road, the applicant shall be required to pave the private roadway its full width and at least 30-feet into the site beyond the edge of pavement of all public streets and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. If private roads are not approved by the City of Meridian, the applicant will be required to revise and resubmit the preliminary plat to provide public standard local streets in these locations. Street name signs are required for the private road. The signs may be ordered through the District. Verification of the correct, approved name of the road is required. ACHD does not make any assurances that the private road, which is a part of this application, will be accepted as a public road if such a request is made in the future. Substantial redesign and reconstruction costs may be necessary in order to qualify this road for public ownership and maintenance. The following requirements must be met if the applicant wishes to dedicate the roadway to ACHD: • Dedicate a minimum of 50-feet of right-of-way for the road. • Construct the roadway to the minimum ACHD requirements. • Construct a stub street to the surrounding parcels. 5. Traffic Calming a. Speed Control and Traffic Calming Policy (Local): District policy 7207.3.7 states that the design of local street systems should discourage excessive speeds by using passive design elements. If the design or layout of a development is anticipated to necessitate future traffic calming implementation by the District, or the streets extend greater than 750-feet in length, then the District will require changes to the layout and/or the addition of passive design elements such as horizontal curves, bulb -outs, chokers, etc. The District will also consider texture changes to the roadway surface (i.e. stamped concrete) as a passive design element. These alternative methods may require maintenance and/or license agreement. b. Staff Comments/Recommendations: There will be approximately 14 residential homes remaining on Rolling Hill Drive after the northern segment of Rolling Hill Drive is vacated for the development of the site. Due to the increase in traffic with phases 1 and 2, the applicant should be required to construct passive traffic calming measures on the off -site segment of Rolling Hill Drive consistent with District Policy with the first phase of the development. The construction plans for the passive traffic calming shall be submitted to ACHD with the first set of construction plans. If Rolling Hill Drive will be restricted to emergency access only for the site as determined by ACHD, then the applicant is not required to improve Rolling Hill Drive with traffic calming measures. 6. Bridge for Five Mile Creek There is 6-inch corrugated metal pipe with a smaller older metal pipe next to it, structure #1218, that crosses Five Mile Creek on Rolling Hill Drive just south of View Circle, circled in yellow below. The pipe has significant corrosion with deep pitting and thin sounding based on inspections by ACHD staff. This crossing is planned to be replaced by ACHD, however, the development is proposed to be ahead of ACHD's timeline to replace the structure. Staff has concerns about the 13 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 �E IDIAN-- APPROVED DATE: 06/27/22 FILE NUMBER: azozz-om� crossing's capacity for the construction traffic for the development and additional traffic t is improved. Therefore, the applicant should be required to enter into a Cooperative ment Agreement (CDA) with ACHD to replace the crossing with the first phase of the ment. The applicant will be reimbursed by ACHD for the crossing replacement and ments. The District will require that the applicant submit the crossing plans for the crossing of the Five Mile Creek for review and approval prior to the pre -construction meeting and final plat approval. Note: all plan submittals for bridges or pipe crossings of irrigation facilities should be submitted to ACHD for review no later than December 151" for construction in the following year prior to irrigation season. If Rolling Hill Drive will be restricted to emergency access only for the site as determined by ACHD, then the applicant is not required to replace structure #1218. Site Five Mile Creek E Vic!v1r Cir { I f Overland 10 7. Parking The applicant has proposed to provide 649 parking stalls to accommodate the residents and guests for 396 units for the proposed multi -family development, which is approximately 1.63 parking spaces per unit. Staff has concerns about the available parking for the multi -family in this development and the potential for overcrowded on -street parking on Rolling Hill Drive. 14 Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 (E IDIA\ _- APPROVED DATE: 06/27/22 FILE NUMBER: a 022 0 1 Traffic Services has received several complaints about overcrowded on -street parking in / of Meridian with new apartment complexes. It appears that there are more tenants per ent unit thus causing parking issues on adjacent public streets near apartment complex ae to the lack of affordable housing in the Treasure Valley. Parking spots are not allowed triped on public roadways and on -street parking should not count towards the City's I requirements as it can be removed any time at the discretion of ACHD. ACHD recommends that the City of Meridian require adequate on -site parking for the multi -family development, as well as with the future development of the commercial and office lots to the north of the multi -family development. If parking issues develop on Rolling Hill Drive in the future due to insufficient parking within the site for the development, staff recommends that the residents of Rolling Hill Drive contact ACHD traffic services to initiate an investigation to determine if No Parking signs are warranted on Rolling Hill Drive and the extents of the signage for No Parking on Rolling Hill Drive. 8. Tree Planters Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 9. Landscaping Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. D. Site Specific Conditions of Approval If the applicant chooses to request to restrict the site's access to Rolling Hill Drive to emergency access only, then the applicant should be required to submit an updated operational analysis to staff for the intersection of Silverstone Way/Overland Road with the traffic from Phases 1 and 2 of the development under the 2022 conditions and traffic from the full buildout under the 2023 conditions, and the estimated ADT and peak hour trips on Silverstone Way with Phases 1 and 2 under the 2022 conditions and all Phases under the 2023 conditions. ACHD will determine if restricting the site's access to Rolling Hill Drive to emergency access only will be acceptable based on the updated analysis and District Policy. 2. If the applicant chooses to not use Rolling Hill Drive as emergency access only, or ACHD determines that access to Rolling Hill Drive for the site is necessary based on the updated analysis, the applicant shall be required to restrict Rolling Hill Drive on Overland Road to right-in/right-out only with a 6-inch raised candles/median with the first phase of the development prior to ACHD's final approval on the first final plat and after the private road, Rackham Way, is completed from Silverstone Way to Rolling Hill Drive. Provide a public access easement over the private road, Rackham Way. The following is also required if Rolling Hill Drive will be used to access the site: a. Construct passive traffic calming measures on Rolling Hill Drive with the first phase of the development. Submit the construction plans for the passive traffic calming proposed on Rolling Hill Drive to ACHD with the first set of construction plans for the development. b. Improve Rolling Hill Drive with 24-feet of pavement, 3-foot wide gravel shoulders and a 6- foot wide concrete sidewalk on one side of the road within the existing right-of-way. 15 Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 CUEIDR IAy APPROVED DATE: 06/27/22 FILE NUMBER' n-2022-0- Construct a mini roundabout at the terminus of Rolling Hill Drive. The mini roundabout shall be designed per ACHD's Roundabout Design Guide policy section 5188. Follow the guidance provided in NCHRP 672. The center island and splitter islands shall be mountable. The sidewalk at the roundabout shall be detached or separated. Enter into a CDA to replace crossing #1218 on Rolling Hill Drive with the first phase of the development. Compensation will be provided for the crossing replacement. Submit the crossing plans for the crossing of the Five Mile Creek for review and approval prior to the pre -construction meeting and final plat approval. Note: all plan submittals for bridges or pipe crossings of irrigation facilities should be submitted to ACHD for review no later than December 15th for construction in the following year prior to irrigation season. e. The applicant is restricted to Phases 1 and 2 of the development and may not proceed with Phase 3 until the existing residential homes on Rolling Hill Drive are purchased and the property annexed into the City of Meridian with commercial or mixed use zoning, per Finding 2. When there are no remaining residential homes on Rolling Hill Drive, ACHD may reconsider reclassifying this roadway and additional improvements to Rolling Hill Drive may be required at that time as determined by ACHD. 3. Vacate the segment of Rolling Hill Drive within the site prior to ACHD's final approval of the first final plat. The vacation requires a separate application and approval process and is not approved as part of this application. 4. Street name signs are required for the private road. The signs may be ordered through the District. Verification of the correct, approved name of the road is required. 5. Submit civil plans to ACHD Development Services for review and approval. The impact fee assessment will not be released until the civil plans are approved by ACHD. 6. Payment of impact fees is due prior to issuance of a building permit. 7. Comply with all Standard Conditions of Approval. E. Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non- compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking 16 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 CUE IDR IAN,-- �J within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 APPROVED vent any ACHD conduits (spare or filled) are compromised during any phase of construction. DATE 06/27/22 treet cuts in pavement less than five years old are not allowed unless approved in writing by EPEE NUMBER: ^-2022-0.7 trict. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. ign and construction shall be in accordance with the ACHD Policy Manual, ISPVVC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. F. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. G. Attachments 1. Vicinity Map 2. Site Plan 3. Traffic Impact Study Executive Summary 4. Utility Coordinating Council 5. Development Process Checklist 6. Request for Reconsideration Guidelines OR Appeal Guidelines 17 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 (E IDIAN - APPROVED DATE: 06/27/22 FRE NUMBER: —022-7 VICINITY MAP i � -t '�_ I r� ►. r r - fr F 4gesy-q�'hrr.u, h Rutherford 's a t I n y Ct WBlntelstate 84 Ofl W e I iiterstate 84 �.., ' • 4 -" LR Interstate,84 ---------------------------- W: Norristown: st � Y r j Wtew-sburg ; Dr �s7 r g' i W.Castlew. id Dr ad •r. w r i•rl.rrw 1 Iri �- i.' rfl^ • t ]]] C t R„'- t 14 r y- ?_ 9 E-View r M t — P , -- — I Overland Rd W pyerian 18 Rackham East Subdivision/Eagle View Apartments M PP21-OOO7/H-2021-0075 APPROVED CE %UtJ B;R' A 2G22 -I r Site Plan for Apartments 0- FT T 19 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 (E IDI� I.�111 APPROVED 1ECUTIVE SUMMARY DATE 06/27/22 fllE NUMBER: n-zozz-oW fsnturas Ablquist �BVA) is proposing to develop a portion of the area between 1-84 and Overland Road bordered by Ea91e Road to the west irr Meridian, Idaiha, The mixed -user develaOrr 00 is proposed to construct a series of multi -family residential units and general office space. The purposc• of this study is to determinethe potential- impacts to trafficconditions due to the pro -posed develop ai:-r,l. L' 1 :1 1:103 d4311*It11 This Traffic Impact Study (115) uses the trip generation rates and methodologies published in the Institute of Transportatlan Englneers (ITE} Trfp Gerrerctror+ Manaof, 1011' Edition, 2017. Refer to Chapter 5 for additional details on the trip generation methodology. Traffic analysis was performed according to met♦3odolcglesoutlined in ACHDrs Genera!R€quirements& Procedure5 forDeveiapmentr 2020. STUDY AREA The Eagle View Landing phase 2 Development building is proposed to replace the existing FamDas Potatoes Farmstead and to share the brook with the proposed Idaho Central Credit Unlon (ICCUj Plaza, This project plans to develop in three phases: Phase 1 In 2021 includes 238 apartment units, Phase 2 in 2022 includes 138 apartment units, and Phase 3 includes 260,000 ftz of office space_ The weekday AM and PM peak hours were included to the transportation analysis to evaluate the potentlal irmpact on commuter traffic an.d the infrastructure system doe to the clov~loprnent of the proposed tagle View Landing Phase2 Development. The followingconditionswere analyzed asinditated: • Existing Conditions (2020) • Futur-a 12021� Background Conditions + Future (2(:21) Plus Project Condition + Future (2(1,22� Background Conditions • Future ()022� Plus Project Condltloos • future (2D23Backgrounds Conditions • future (2023Plus Project Conditions It should be noti2d that each of the above srerrarjos were analyzed bath with existing roadway conditions and with mitigated roadway conditions. The phased project is proposed toapen ir) 2023. HGwever, the project will apen alongside the ICCU development (considered known as Eagle View LarrdIr`g Phase 1) to the west (some of which is currently under construction`}. The background conditions for future scenarios include, • 2021 Background Future Volumes + ICCV Phase 1 + 2022 Background Future Volumes + ICCV Phase 2 • 2023 Background Future Volumes + ICCU Phase 3 These study conditionsare consistent withthe ACHD TI5 guidelines and the memorandurn of assumptions thatwas submitted an June 30. 2020 and approved by ACHDon July 27, 2020. 20 Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 APPROVED NDINGS DAT 06/27/22 cr %utJ are A-zozz — I is study �&afalyto-d jie traffic irie%pAcu� From Phdsf- 1 (2.021). 11,11H5i- 2 (21)221. grid I'riase 3 (2023I of rile lo.posed Eagle View Landing Phase 2 Ereve?aprnent, located In Meridjan, f9. Tne sire is art:cipated to gene�atr 80 total AM peak hour trips and 102 total PIV, peak hoor trips in 2021, 127 total AM peak hour t-nP5 and 163 total PPA peak huu= tri95 in 2027, ar%d :31j5 total AM pe-ok Four trips and 432 kokal PW- peak ;roar trips in 2023 (full b.Ljild-out). .Cey findings of this study show zha: the fagxe View LanJ,ng Phase 2 Deveiopment does impact the opera:aons of sorne study intr�rsettions -rea: the projecz site. In 2023, the Eagle Viow i-arid ing ?hose 2 ,�evel0pmers! traffii. rantribMes t+a approKimeeIV 4.4-4.81Y. of the traffic a *agIe �psid & Ovpslarsd Road, and 8.6-10.5% cf the traffic 5ilverstorte Way & ever?and Road in the AM and Purl peak l ou=-s. Table ES-00-1 shows .fie summary or ove{all intersection vol�jrne m capacity (V/C} ratjcs for !Me analyzes sconarios. Table ES•00-2 shows the summary of worst maven;errt VIC razacs far the arsalyzed scenarios. 21 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 (E IDIAN - APPROVED Table ES-00-1:AM and PM Overall V/C Compari 5an Summary 06/27/22 DATE VOLUME CAPACITY- Elf(STING CONIFIGURA.TIaN FILE NLMBER:Azozz-ooa ra�tl6orr Eri5tin630M 2421 =1PIu5 202i 2OZ2Plus M3 2423(IIvs Background Background Project Background Project Ba€kg ound Project ID Lnefftlon period owrAvIt C"Fah Vlc qugrpll wJr Quo-rgil V)r 9werakV/r Q"raMVN OffFRII VIC Eagle Road AM 1.12 3-09 L10 1.10 1.11 1.3.2 3-11 1 I.84 WB Ramp Prrl Im 1-32 1-35 1-14 1 38 1.17 1.41 2 Eagle Road& AM 0.92 EK94 0.95 0.95 0.% E},97 0.98 1-94ESRamp PM 697 LOl L01 L112 1.03 1.44 LM 3 Eagle Road& AM 1J08 1.17 1-19 1.20 1.21 I.n L32 Overland Raad PM 1.10 1-18 L12 1.24 1.29 1.29 L37 SLlverstone Wsy A AM DAR aE4 065 0.67 0.68 E1.99 fir Overland Road PM 0.81 1.42 1.51 1.61 1.73 1.75 L99 Overland Road& AM NfA NJA NJA N .A N/A N/A NJA 5 ROklingl-liII� [hive PM NJa NJA WA NjA N/A N/A NfA, Ra€kham Way& AWN NJA N/A lY)A 6 Sklverstone Way PM - NIA N/A NJA Rackhom Way & AM NIA. N/A NIA 7 ftorlingHills Driwe PM NfA NJA NIA VOLUME f CAPACITY - MITIGATED CONFIGURATION Ehi$Llrrg202D 3M1 201LPlui 2022 2022PIus 2W3 2423PIu1 IpWl1!lilW Ba€kgrvund Oaftraund project DmkEround Project Ba€kpound Project ID IawfiGrI period C-rjmVfc 4renllVIC Overall Vfc Ow rall VIC 0raElVEC OyeraMVft OwenmVIC 1 Eagle Road & AM 1.0() 1.00 096 1.03 O.99 1.04 1.02 I-& WB Ramp PM 0.97 0-97 1-1:14 1.03 1.06 1.0s 1.CN €&& R4$d $ AM U.92 OL92 (X95 0.95 4j.96 12.47 aga 1.84 E)B Ramp PM R83 EK83 0-86 0.87 0.97 a.88 1150 Eagle Road& AM E}.83 QF3 CL93 0.94 0.96 1.01 1.07 Overland Road PM 1.113 1.10 1-113 1.22 1.24 1.25 1.30 Silwerstanei4@V& AM a441 0.4S 053 0.56 4),56 0.65 aG9 Overland Road PM D.77 C195 0.96 0.88 1.06 0.99 pwerland Road A AM N/A NIA, N/A N/A N/A NIA NIA 5 Rol'IftHiIIs drive PM NIA NIA NJA N/A N/A N/A NIA 6 Racirham Way& AM N/A N/A HIA Vyetstone Way PM NIA - N/A - HfA RackhamWay & AM NfA N/A NfA 7 RallingHLlls DFlwe 12M NJA NJA HIA Qurrnll VIC Source: Fehr & Peers, 2021 22 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 (E IDIAN - APPROVED GATE: 06/27/22 flLE NUMBER:^-z 22-1 Id 1 2 3 a 5 6 7 Locillow Eagle Road & 1-134 WB Ramp Eagle Road a 1-840 Ramp - Eagle Road & Overland Road Silrerstone Way & Overland Rud Overland Road & Rol I.InHllls Drive Rr6lham Very & Hverstone Way Ra€kham way & Rol Iingli1115 Drive Table ES-W2. ISM and PM Worst Mmmirnent V/C Comparison Summary VOLUME ICAPACITY- FX19TING CONFIGURATION FAWrtg7n 201 2021 Plus 2022 2M Plus 2023 Lludqyvvnd O m*grvund PFg Po 9aGNgmury4 Project 6adlu"U"d Plwriod Vf" worse Worn woks[ wam worst LAM WE Lane YJC Lark VC Law Vir Lria Vic L.. VJC R M Z.n 7. PG 7-06 7.09 2.09 2.12 PM 1.65 1-L-.4 L64 I.6b 1.66 1.69 AM 0.90 a91 CL91 09t 0.91 0.99. PM 1A1 1.07 L08 1.09 1.21 2.12 AM 1A0 1-36 L37 L40 1.42 3-59 PM 1.32 1-19 LZI L30 1.34 1.39 A M1 0.44 0.80 0.85 0.86 0.92 1.47 PM 04a 2-56 X.B5 1.74 1.93 L93 A M1 0,05 0.04 029 005 0.45 0.07 PM G.to G.10 CL90 0.12 1.63 0.15 A ILA OAR fl.34 ?M 0-22 0.35 AM CL04 0.01 PM 0 06 0.08 - VOLU ME f CAPAcuy • mmGATEy coN FdG umnoN fidstlrtg201U W21 2021 Plus 2022 2022 Plus M23 Intersection Background BmAground propeeL 9aekgmund Project Background ID Locakion Period Wwu Worst Worst Worst Worst uva 11 lane VIG Lane M!S Lane wJ{ Lal-E VIC lame V10 lane VIG Eagle Road & AM 1.49 1-49 L36 L53 1.40 1-55 1 1-84 WB Ramp PM 1.10 1.1Q 1-09 L33 1.11 2.15 2 Eagle Road & AM 0.89 0.89 0-98 0.89 0.88 0.89 1-94ES Ramp PM 4-Ka aan 4-67 10.e9 0.90 0.9[1 3 Eaglc Road & AM 2.16 L. L37 Loa 1.42 1.S8 Overland Road PM 1.12 1.12 L18 L27 1.29 1.34 511ve rstone VJay & A.M 0.44 ago 0-90 U.99 0.92 2.49 A Ovedarld Road PM 0.77 RSA Im 1.04 1.22 2.09 5 OYerland Road & A G.05 0.05 G29 0.08 0.08 0.1Q Rol I irig Hi I Is 0rlve PM 0.113 al0 0-90 DAE 0.06 0.23 6 Raahkam WR a AM - - 018 0,29 - Srlve-rstone Way f1M 0-22 0.38 Rackham Way & AM - - 0-04 - 0.05 - 1kollingHills Drive PM 006 4.05 Worst movenwnt UIC Sour: Felrr L Peery. 2021 2M PIrrs Prujelcl Wr IgSA IBM voc 242 L69 0,93 135 Lis 1.54 1.86 Z19 0.'3G 198 adz 0.52 a 23 0,12 2023 Plus Project Womb L4hne Yg 1}43 1.1Z D.88 1.75 IAA 1.30 1.36 0.12 Ek �6 (06 13.58 alb R07 23 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 (E IDI� I.�111 APPROVED INMMENDATIOHS DATE 06/27/22 troject, ommenclatiorrs address findings f-of each of the seven scenarios faf which the sturdy was conducted FILENUMBEN:^-zoo-OW eirimpact on the study area: Existing, 2021 Background, 2021 Plus Project, 2022 background, 2022 2023 Background, and 2023 Plus Project- A summary of the study results and recornmen dal Ions fol lows, Existing The existing conditions r-equirethe following mitigationsthrough oLit the study area: 1-84 Westbound gnmp &Eagle Road o Add 1 northbound left -turn lane fofa total of 2 northbound left-tUirn lanes, o Add 1 SOW h'..L)IJI, rig-i °.,r17 lane for a total of 2 s ulh€ (Ir -1d i it-h I I urn €ones o Add 1 westbour--d right -tu-n lane for a total of 3 wF%..%rok.nd �;r� .,�: n lanes, 1-84 eastbound Ramp & Eagle Road o Add 1 eastbound right turn lane for a total of two eastbound right -turn lanes, + Ove rl and Road & Eagle Road o Add 1 northbound through lame for a total of 3 northbourid through lames, o Add 1 northbound right -turn storage iane to separate right -turning and through traffic, o Restripe 50J1'9100LII)d left turn lanes to increase the total storage length to 5,00 feet, o Add 1 Vwestbuur-d right -turn lane for a total of 2 wesWuL ri0 rid=� -' irn lanes, * Overland Road & S-krRrc.TonP Way a Add 1 east bc urd right -turn storage lane tosepairate right -turning and through traffic, This mitigation is based on the results of the turn lane analysis_ o Add 1 westbound right -#urn storage lane to separate right -turning and through truffle. ■ This mitigation is based on the results of the turn -lane analysis. Even with the above mitigations, the westbound 1-84 ramp, eastbound 1-84 ramp and the intersection a# Eagle Road & Overland Road were observed to continue to operate with unacceptable VIC ratios- A separate comprehensive study to determine further mltlgatlon at the 1-84 Interchange and the intersection of Eagle Road & Overland Road should be performed, Fehr & Peers anticipates that the study will Iikeiy recommend a reconfigured interchange and ppsslhly afl alteraatiye intersection configuration at Eagle Road & Overland Road. 2021 Background Background traffic projections were developed for Z021 by growing the existing volumes with the COMPASS annual growth rates. The trip generation reported in the iCCU Plaza TIS for the first phase of development was also included in the background growth forthe 2021 horizon yearfar this project as the first phase of the [CCU Plaza wasanticlpated to be completed by2030- The above exist€ng mitiSations and tha followine impravzsments are recommended throughout the study dr@3= 24 Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 (E IDI� I.�111 APPROVED DATE: 06/27/22 FILE NUMBEt - 0 -OW Overland Road & Eagle Road o Restripe southbourid Ieft turn lames to Increase the total storage ler,gtb to 600 feet, or as long as ACHU taper rate limitations will allow, overrand Road & Sihrerst,ane Way * Add 1 eastbound left -turn lane for a tatRIof Z eastbound left -turn ianas ■ 7his will require converting the signal phasing to only allow protected -lefts, instead of Dilo ving both protected and perrnissive-lefts, ■ A total of 96 eastbound left #urn vehicles per hour can be added to the PM peak period before this mitigation is required, o Add a south bound right -turn overiap signal timing phase with updated signal splits, ■ A total of 91 southbound right tufn vehicles per hour can be added to the PM peak period before this mitigation is required. Even with the above mitigations, the westbound 1-84 ramp, eastbound 1-84 ramp and the intersection at Eagle Road & Overland Road were observed to continue to operate with unacceptable V/C ratios- A separate comprehensive study to determine further mitigation at the I-84 interchange and the intersection of Eagle Road & Overland good should be performed, Fehr & Peers anticipates that the study will likely recommend a gurr : n-i i i. r Lrr and possibly an alternative intersection configuration at Eagle Road &Overland Road 2021 Plus Project The 2-021 Plus Project [ 3 lrliti:] }r included the addition of a NBAB stop -controlled intersection at the project access intersectiori of Rdckham Way & Rolling Hills Drive. The proposed roundabout that will provide access to the ICCU Plaza at Rackham Way & Silverstone Way is also included in all Pius Project conditions analyses_ Due to the proposed connectlon to Polling Hills Drive, and since the ICCU Plaza and Eagle View Landing developments are adjacent, Borne traffic from thie ICCU Plaza development was assumed to divert from Raeirham Way and Silverstone Way to Rolling Hills Drive in each 'Ius Project scenario, While the previously outlines lrnprove the network over the unmitigated network, the intersection at Overland Road & Silverstone Way was observed to operate at air unacceptable overall V/C ratio, but with no individually failing movements- Since the intersection was observed to operate just beyond acceptable V/C ratio thresholds, and no Individual movements are falling, no additional mItlgatlons are recommended forthis scenario. 2022 Background Background traffic projections were developed for 2022 by growing the existing volumes with the COMPASS annual growth rates. The trip generation reported in the ICCU P laza TIS for the first two phases of dr-vPIo-:�mt.-7t v;!,ro. a I ; o irr.ILdcd in tht, Imc<grc%iird g•r)w?Ii for th:• 2022 horimn year far this project as ie hrtr ,IF.;,.ek-- Ihi� IC',.:...:II•iri ,v g i,iI,F::,�iIr:d r(, i)c r;:.•r•-,1�-e,! h .71 ad M iQrl to themuugatlons inthe Z021I�ackgrvori6cvridit4on, tnefollowing mltlgation isreoommended; • Overland Road & Silverstona Way o Add sauthbound rig' it -turn lane for a total of 2 southbound right -turn lanes. Atotal of 158 southbound right turn vehicles per hour can be added to the P-M peak period before this mitigation is required - 25 Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 (E IDI� I.�1\ APPROVED� with the abo"rriitigatlons, the west bound 1-84e-amp,eastboWndl-84rarrrp,thelmersectlortatEaglp & Overland Road, and the intersection at Overland Road & 5ilverstone 'd,ay were oblcr:vcl to DATE 06/27/22 Lie too: ,atr, -,,-irh ,Enarc.oplab1-aV/C ratios. As!dc- ;rrn; thn snp,.atc% s-.;cl•r (if tl'o FILE NUMBEIL-0z-OW ercha nge grid tLe in t:: r�.cl4li un of Eagle Road & 0'-(!rI t!n,: R: d --id -3ti ri?: o l l'• rl i!: riiEed .',r{:'4 r: u`.. v.1rther mitigations are recommended in this scenario. 2022 Plus Project Like the 20n Plus Project scenario, the intersection of Overland Road & Rolling Hills Drive was analyzed as both an existing full NB/513 stop -controlled intersection and as a right - in- right -out restricted intersection- Only the right -Irk -right -out conflgvratlanscper4�r 1 at acceptable LOSand V/C, T'rr'-i:,ldition'othesamemitigationsth;Ewc,..rr,mr.nWrl'tpdedinpreviousanalysesinthisreport, i L =,711 .,inu re rri�r,endaLio•� is recornt ii I- n lh� ;lL.d, area; a Overland Road & Rolling Hills Drive o Convert the iniersectioiti to a RIRo configuration, ■ A total of 45 sauthbound left turn vehicles per hour can be added to the PM peak period before this mftigation is required - As mentioned previously, even with the above mitiE;ationsr the wastboixnd 1-34 raEnpr eastbound 1-84 ..3r-10, the intersection at Eagle Road & Overland Road, and the Intersection at Overland Road & Silver!'one Way were observed to continue to operate with unacceptable VIC ratios. Aside from the sr-: ar<Aa eornprahan 5ive study of the 1-84 interchange and the intersection of Eagle Road & Overland Road 1-w vas recommended previously, rpofurther mitigations are recommended in this scenarlo, 2023 Background Background traffic projectians were developed for ZD23 by growing the existing volumes with the COMPA55 anneal � rowth rates. It should be noted that while Phase 3 of the ICCU Plata is not autFdpated to be complc:ed ay 2023,.which is the horizon year far Phase 3 of the Eagle Yew Landing development, trlp generation frorn all ttkree phases 4f the IECQ Plaza were Included In the background of this analysis to present a holistic understanding of the traffic demands once all three phases of both developments are completed - In addition to the improvements recommended in previous chapters of this analysis, the following recommend2#ionsare recommended within the Study area- • Eagle Road & Overland Road o Add I westbound left -turn Ianefor 2 total of � southbour,,. left-turri lanes. A total -of 127 eastbourid through, 6 eastbound i ht turn, and 84 westbound left turn vehicles per hour can be added to the Pr -A peak. period westbound left turn before this mItlgation is requlred - As mentioned previously, even with the above mitigations, the westbound 1-84 ramp, easthound 1-84 ramp, the intersection at Eagle Road & Overland Road, and the lntersection at Overland Road & Silverstone Waywere observed to continue to operate with unacceptable VEC ratios - Notably, beginning in this Scenario, the southbound left -turn queue at Eagle Road & Overland Road will likely no longer be ace mrnodated by increasing the storage length- Fehr & Peers recognizes that widening 26 Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 (E IDI� I.�1\ APPROVED ersection Is planned For a future project. However, without a reconflguratloo of the Intersectlo:n at DATE 06/27/22 Road & Overland Road, it is likely that the 95eh percentile 50uthbound left -turning queue wall spill the eastbound offrarnp interne€tixi and impact operations there. Fehr & Peers recommends ruteuMetta�00W rating the pro€ens to evaluate and mfilumerit alterlariui, risnrwrflvn designs 5urtr as contlnuous tersection (CFI), through -U-turn inters.2ctionr etc. as par: of the redesign of the intersection at Eagle Road &, Overland 110ad. flkewlse, Fehr & i}c--ers recommends expediting the wldening of eagle Road and overland Road since acceptable VIC ratios and queues at that intersection cannot be achieved without either implementing these widening projects or an alternative intersectionconfiguration- 2023 Plus Project The 2023 Plus Project conditions included the addition of the roundabout at the project access at Rack ham Way & Silverstone Way as well as the NB/58 stop -controlled intersection at Rackham Way & Rolling Hills Drive- The intersection of Overland Road & RriI rig Hills Drive we arialyzed as both arT existing full NBl.i stop -controlled interne€tian and as a right -in rigl}t-o1-it restricted intersection. It was determined L-ia= thr.- right-in-right-out restricted stop control is re(.:)-n- w-i-d€>d for the 2023 Plus Prof eetcondltions- As t)cr the rr suits of .he right turn lane anaIvs s pr!i'formad for this srenarlor the following mitiga"on is :+:r_.c:r,ir,iPnri(�,^ ti+.i;-iin the Study area: Overland Road & Rellirg Hills Drive o Add aweswuvi10 ri8{1t-turnstorage lane. Overland Road from Eagle Road to511verstone way o Either advencethe planned C1P projectto widen overland Roadfrorn a five-Ianeto seven -lane Bross section .,- implernent sufPiclentTdM measures to reduce the total traffic demand by 35 vehid. !� p -r hour irti the shoulder hour before the PM peak period. ■ This mitigation is basserl on the results of the segment analysis - As mentioned previously, even with the previous mitigations, the westbound 1-18 Tamp and the intersection at Eagl a Road & Overland Road were abse rued to cantin ue to operate with u naeceptable VIC ratios and will require further study to eraluate alternative interchange and intersection oonflguratloos at those locations. Fehr & Peers does not recommend furth-er widening of either of these locations before obtaining the fenuIts frarn that study- Also, while improved over the unm ftig2ted scan arip, the intar5Wion at $ilveMurke Way & Overland Road was still observed to operate at kinarrE�ptahle VIC ratlo in the eastbound left turn movement, MitigAtirp. the failing movement beyond the is_ec re€ommendation5 would likely require extensive inter:ser,ior reconfiguration, so no additional mitigations are recommended lorthis scenaria- Project Contribution to Traffic Fehr & Pegs compared the trips generated by the development at ea€h intersection to the total trips at each intersection during the Plus Project conditions analyses- Table ES-00.3 outlines the percentage of traffic at each intersection that is generated by the development, table ES-00-4 -outlines the percentage of traffic at each study segment that is generated by the develapment- 27 Rackham East Subdivision/Eagle View Apartments M PP21-0007/H-2021-0075 (E IDIAN - APPROVED DATE: 06/27/22 FILE NUMBEF•n-zozz- W 1 3 4 5 6 7 Table E"0-3: Project Trips as a Percent of Total Plus Project Inter ctlan Volume 2021 Plus 2022 Mus 2023 Plus Location Period Projlect! Project Protect Eagle Road & AM 0.3% 0.4% 1.5% 1-84 WB Ramp PM 0.3% 0.5% 13% Eagfe Road & AM 0.5% 0.8% 2.3% 1-84 EB Ramp PM 0.6% 1.0% 2.6% Eagle Road & AM 1.1% 1.7% 4.8% Overlannd Road PIA 1.1% 1.8% 4.4% Silverstone Way & AM 2_6% 4.0% 10.S% Overland Road PM 2.5% 3.7% 8,6% Overland Road & AM 15% 5.2% 13.3% Rolling Hills Drive PM 3.096 4.5% 10.6% Rackharn way & AM 9.6% 10.4% 22.9% Silverstone way PM 10.9% 12.1% 23.1% Rackharn Way & AM 48.9% 51.1% 72.2r% Rolling Hills Drive .j3V 49,1% si.5% 70.3 $i uirrt� F�-v a Prrry 2021 Table ES-00-4; Project Trips as a Pereew of Total Plus Project Segment Volume Roadway Segment Period 2021 Plus 202.2 Plus 2021 Plus Project project Project Eagle Road to AM 2.4% 3.7% 9.6% Overland Road Silverstone way PM 2.2% 3.3% 7.9% Silverstone way to AM 2.7% 4.0% 10.9% Overland Road Rolling Hills Drive PM 2.1% 3.2% 7.9% Rackharn way to AM S.1% 10,796 21.9% SilverstoneLYay Overland Road PM 6.3% 8,0% 16,7% Overland Road to AM 38.9% 43.15% 66.8% Rolling Hills Drive North End of Study Area PM 42.8% 46.8% 66.0% SilverstorneWay to AM 7.7% 5.9% 8.1% tiacl€ham WayNorth Er,d of Study Area PM 1.9% 2.S% 10.0% 5oueCe: Fever & Peers ZQk 1. Internal Project Site Circulation 8VA's proposed Eagle View Landing Phase 2 Development is planned to include one site access at the N8/SB stop -controlled driveway at Rolling Hills Drive & Rackham Way and two connections on the west side of the development to the Eagle View Landing Phase 1 Development. The ITE Trlp Generation Handbook, 3`a Edition reports that pass -by trips are not likely to occur with the Planned land uses_ The internal roadways include an extension of Rolling Hills Drive north to meet at a T-i ntersecti o n between the residential and office land use sites. Fehr 84 Peers suggests two-lane {one lane In each diFe#ion} roadways for all internal streets. Fehr & Peers' operational analysis showed that shared through/left- turn/right-turn corkfiguratrons at the Internal T-Intersectlom for would be meet acceptable l.DS alnd V?C, providing, separate Ianesfiorturning movements would provide increased capacity. 28 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 CUEIDR IAy APPROVED DATE: 06/27/22 FILE NUMBER: a 0210W Ada County Utility Coordinating Council Developer/Local Improvement District Right of Way Improvements Guideline Request Purpose: To develop the necessary avenue for proper notification to utilities of local highway and road improvements, to help the utilities in budgeting and to clarify the already existing process. 1) Notification: Within five (5) working days upon notification of required right of way improvements by Highway entities, developers shall provide written notification to the affected utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to, project limits, scope of roadway improvements/project, anticipated construction dates, and any portions critical to the right of way improvements and coordination of utilities. 2) Plan Review: The developer shall provide the highway entities and all utility owners with preliminary project plans and schedule a plan review conference. Depending on the scale of utility improvements, a plan review conference may not be necessary, as determined by the utility owners. Conference notification shall also be sent to the UCC. During the review meeting the developer shall notify utilities of the status of right of way/easement acquisition necessary for their project. At the plan review conference each company shall have the right to appeal, adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter of review indicating the costs and time required for relocation of its facilities. Said letter of review is to be provided within thirty calendar days after the date of the plan review conference. 3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans. Utilities may request an updated plan review meeting if revisions are made in the preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days after receiving the revisions to review and comment thereon. 4) Final Notification: The developer will provide highway entities, utility owners and the UCC with final notification of its intent to proceed with right of way improvements and include the anticipated date work will commence. This notification shall indicate that the work to be performed shall be pursuant to final approved plans by the highway entity. The developer shall schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity shall be completed within the times established during the preconstruction meeting, unless otherwise agreed upon. Notification to the Ada County UCC can be sent to: 50 S. Cole Rd. Boise 83707, or Visit iducc.com for e-mail notification information. 29 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 CUEIDR IAy APPROVED Development Process Checklist DATE 06/27/22 FILE NUMBER: ^-zozzo 1 Ileted to Date: ❑Submit a development application to a City or to Ada County ❑The City or the County will transmit the development application to ACHD ❑The ACHD Planning Review Section will receive the development application to review ❑The Planning Review Section will do one of the following: ❑Send a "No Review" letter to the applicant stating that there are no site specific conditions of approval at this time. ❑Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ❑Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Items to be completed by Applicant: ❑For ALL development applications, including those receiving a "No Review" letter: • The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee assessment.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Non -Subdivisions) ❑ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to ACHD Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑ Working in the ACHD Right -of -Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction — Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment & Erosion Submittal • At least one week prior to setting up a Pre -Construction Meeting an Erosion & Sediment Control Narrative & Plan, done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD Stormwater Section. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con being scheduled. ❑ Final Approval from Development Services is required prior to scheduling a Pre -Con. 30 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 �E IDIAN-- Request for Appeal of Staff Decision F.1=11T11111 DATE. 06/27/22 al of Staff Decision: The Commission shall hear and decide appeals by an applicant of FILE NUMBER ^-zwz-om7 111opment nal decision made by the Development Services Manager when it is alleged that the Services Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary and Clerk of the District, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The Development Services Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the Development Services Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 31 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075 �E IDIAN-- Request for Reconsideration of Commission Action APPROVED DATE 06/27/22 est for Reconsideration of Commission Action: A Commissioner, a member of ACHD riiFeuMaFR:A �� or any other person objecting to any final action taken by the Commission may request sideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. a. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 11:00 a.m. 2 days prior to the Commission's next scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be placed on the agenda for that next scheduled regular Commission meeting. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d. If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originally. It will normally be returned to ACHD staff for further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e. At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACHD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commission deems advisable. f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission. 32 Rackham East Subdivision/Eagle View Apartments MPP21-0007/H-2021-0075