Loading...
Narrative V1APPROVED DATE: 06/23/22 FILE NUMBER:^-022-0- liew Building 5 - CZC/DR Response To: City of Meridian From: Hallie Hart, BVA Date: April 5t", 2022 The following information is in response to the CZC/Design Review comments received for Building 5 at Eagle View Landing. Planning: a. Stamped site plan from Republic Services i. Republic Services no longer stamps plans. Please see confirmation email from company stating location/design is approved. b. Photometric plan needs to demonstrate that the site lighting will not trespass onto the adjacent residential property to the south (depict the residential property on the plan demonstrating zero light trespass at the property boundary) i. Photometric revised and attached. c. Landscape plan needs to include calculations table per the application checklist i. Landscape revised and attached. d. AutoCad file of conceptual engineering plans including pipe sizes and profiles, in a format that complies with the specifications for project Drawings (if required by Land Development/Public Works) i. A CAD file has been uploaded. e. Submit PDF copy of the conceptual engineering plans in the format specified above (if required by Land Development/Public Works) i. A PDF file has been uploaded. f. The ROW & easements need to be vacated prior to issuance of the CZC/DES approval (H-2022-0018) i. ROW vacation to be on hearing on June 8'. Per discussions with City, project will be held up at issuance of building permit. II. GIS Review: a. Need AutoCAD file including proposed utility lines i. A CAD file has been uploaded. III. Land Development: a. Two domestic water service connections with two meters are shown. It is preferred that a single service connection with single meter large enough to serve the building is used. Include ownership of the pressure irrigation system and backup source with civil plans. Include drainage calcs and geo tech report if drainage is being contained on site. 2775 W Navigator Dr., Suite 220 Meridian, Idaho 83642 T: 208.616.1050 W: bvadev.com 1 E IDIAN - APPROVED DATE: 06/23/22 FILE NUMBER:-0zaoos5 Per the ISPWC, service connections are only detailed for up to 2" water lines. Because of this, we typically show two (2) 2" line manifolding into a single 4" service to the building to provide enough flow and following City standard drawings. Pressure irrigation owned by Rackham subdivision with backup source constructed in Phase 1 improvements. Drainage calculations and full geotechnical report to be included with construction documents. IV. MFD: a. The site plan for the proposed building does not meet fire code. The drive aisles closest to the building need to be 26' wide for ladder truck access. The north and south aisles are showing 25'. As this building is 5 stories, this building will require a Firefighter Air Replenishment system (FARS) system installed in it. I have added Anthony from Rescue Air as he is the subject matter expert when it comes to FARS systems. I highly recommend contacting him ASAP as the system will need to be incorporated into your building plans. The building will also require radio testing for radio coverage per the IFC. I would plan on potential areas for adding repeaters in the building if they are required. Please upload a new site plan showing the 26' drive isles to PDOX. i. Drive lanes around the building have been widened to 26'. A FARS system will be included with the construction documents. V. Wastewater Modeling: a. Sewer main requires 20' easement. i. 20' easement labeled on sewer. b. No permanent structures (trees, bushes, buildings, carports, trash receptacle walls, fences, infiltration trenches, light poles, etc) can be within the permeant easement. There appears to be a structure overtop of the sewer near the building which is not allowed. One possible solution is to have the public sewer end before this point and have longer services to buildings. i. Sewer location shifted to the west side of the building to be located at the center of the drive isle. c. Flow is committed. VI. Water Modeling: a. Line work for modeling is not in model. GIS. Is waiting for line work. i. CAD file has been uploaded. Please contact iallie( bvadev.con or 208.761.7191 for questions or concerns. Hallie Hart, El Rob Sunderlage, PE 2