Loading...
HomeMy WebLinkAboutLandscape Plan V1APPROVED os zz zz ENERAL LANDSCAPE NOTES - CONSTRUCTION VERIFICATION OF TOTAL LANDSCAPE MATERIAL QUANTITIES AS SHOWN ON THIS LANDSCAPE PLAN AND IN THE PLANT SCHEDULE SHALL BE THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR. IF QUANTITIES LISTED DO NOT CORRELATE WITH WHAT IS SHOWN ON THE PLAN, THE QUANTITIES SHOWN ON THE PLAN SHALL GOVERN. THIS INCLUDES, BUT IS NOT LIMITED TO TREE, SHRUB, ROCK, TOPSOIL, MULCH, SEED OR SOD, EDGING, AND DRIP LINE QUANTITIES. 2. IMMEDIATELY AFTER AWARD OF CONTRACT, NOTIFY THE LANDSCAPE ARCHITECT OF AVAILABLY OF SPECIFIED PLANT MATERIAL FROM COMMERCIAL NURSERIES. IF A SPECIFIED PLANT IS NOT AVAILABLE, THE LANDSCAPE ARCHITECT WILL PROVIDE ALTERNATE PLANT MATERIAL SELECTIONS. SUCH CHANGES SHALL NOT ALTER THE ORIGINAL BID PRICE UNLESS A CREDIT IS DUE TO THE OWNER. 3. CONTRACTOR SHALL LOCATE AND IDENTIFY EXISTING UNDERGROUND AND OVERHEAD UTILITIES WITHIN CONTRACT WORK AREAS PRIOR TO CONSTRUCTION. CONTACT DIG LINE, INC. @ 1.800.342.1885. PROVIDE ADEQUATE MEANS OF PROTECTION OF UTILITIES AND SERVICES DESIGNATED TO REMAIN. REPAIR UTILITIES DAMAGED DURING SITE WORK OPERATIONS AT CONTRACTOR'S EXPENSE. 4. PROVIDE REQUIRED SOIL EROSION CONTROL MEASURES THROUGHOUT THE DURATION OF THE CONTRACT PERIOD. SHOULD THERE BE EXISTING SOIL EROSION CONDITIONS THAT REQUIRE MITIGATION, NOTIFY THE RESPONSIBLE PERSON IMMEDIATELY. FAILURE TO NOTIFY THE RESPONSIBLE PERSON IMPLIES ACCEPTANCE OF THE SITE IN ITS EXISTING CONDITION. 5. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING ALL PLANTED AREAS. ALL DELETERIOUS MATERIAL SUCH AS ROCK, TRASH, CONSTRUCTION DEBRIS, AGGREGATE BASE MATERIAL, ASPHALT, ETC.., SHALL BE REMOVED PRIOR TO ANY FILL OPERATIONS. FINISH GRADES TO BE SMOOTH AND EVEN. GRADIENTS TO REMOVE LOW AND HIGH POINTS AND TO PROVIDE POSITIVE DRAINAGE. 6. FILL ALL PLANTING AREAS WITH CLEAN EARTHEN FILL, AS PER SPECIFICATIONS. SOIL SHALL BE FREE OF HEAVY, STIFF CLAY AND ANY DELETERIOUS MATERIAL OVER ONE INCH IN SIZE. REUSE EXISTING SURFACE TOPSOIL IF AVAILABLE. 7. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS, OR OTHER FOREIGN MATERIALS AND A PH OF 5.5 TO 7.0. IF ON -SITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER: PROVIDE APPROVED IMPORTED TOPSOIL OR, AMEND THE ON -SITE TOPSOIL. 8. TOPSOIL DEPTHS SHALL BE AS FOLLOWS (WHERE APPLICABLE): LAWN AREAS-6" MIN.; PLANTER BEDS - 12" MIN.; CURB ISLANDS - 18" MIN.ALL PLANTING BEDS SHALL BE TREATED WITH A PRE -EMERGENT HERBICIDE. 9. FINISH GRADES FOR LANDSCAPE AREAS TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE WITH SITE GRADING PLAN. SLOPES FOR TURF AREAS SHALL NOT EXCEED 3:1. 10. PRE -EMERGENT HERBICIDE SHALL BE APPLIED PER MANUFACTURER'S RECOMMENDATIONS AND SHALL OCCUR AFTER TOPSOIL PLACEMENT AND PRIOR TO INSTALLATION OF PLANT MATERIALS AND MULCH. 11. 12. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN HEALTHY GROWING CONDITION. 13. ALL WRAPPING MATERIAL SHALL BE CUT AND REMOVED FROM AROUND THE UPPER PORTION OF THE ROOT BALL. METAL BASKET WIRES AND BURLAP SHALL BE PULLED BACK AND TUCKED UNDER THE EDGES OF THE SAUCER RINGS ON ALL TREES AND LARGE SHRUBS. ALL SYNTHETIC BURLAP SHALL BE REMOVED FROM ROOT BALLS PRIOR TO BACKFILLING. 14. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF ACCEPTANCE BY OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN HEALTHY CONDITION IMMEDIATELY WITH COMPARABLE SIZE AND SPECIES AT NO COST TO THE OWNER. 15. FERTILIZE ALL TREES AND SHRUBS WITH AGRIFORM PLANTING TABLETS. QUANTITY PER MANUFACTURER'S RECOMMENDATIONS. 16. CONTRACTOR'S MAINTENANCE SHALL INCLUDE: PRUNING, CULTIVATING, WEEDING, WATERING, AND APPLICATION OF APPROPRIATE INSECTICIDES AND FUNGICIDES NECESSARY TO MAINTAIN PLANTS FREE OF INSECTS AND DISEASE UNTIL FINAL ACCEPTANCE BY OWNER. RE -SET SETTLED PLANTS TO A PROPER GRADE AND POSITION. RESTORE PLANTING SAUCER AND ADJACENT MATERIAL AND REMOVE AND REPLACE DEAD MATERIAL. TIGHTEN AND REPAIR GUY WIRES AND STAKES AS REQUIRED ONLY IF ORIGINALLY NEEDED. CORRECT DEFECTIVE WORK AS SOON AS POSSIBLE AFTER DEFICIENCIES BECOMES APPARENT AND WEATHER AND SEASON PERMIT. THIS DRAWING CONTAINS INFORMATION WHICH IS THE PROPRIETARY PROPERTY OF ALC ARCHITECTURE. NO UNAUTHORIZED REUSE OR DUPLICATION OF THESE PLANS OR ANY INFORMATION CONTAINED HEREIN, WITHOUT THE EXPRESS WRITTEN CONSENT OF ALC ARCHITECTURE. THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECT. COPYRIGHT @ ALC ARCHITECTURE TREE PROTECTION NOTES 1. THE CONTRACTOR SHALL TAKE EXTREME CARE TO PROTECT THE CRITICAL ROOT ZONE OF ALL TREES AT ALL TIMES THROUGHOUT PROJECT. 2. PRIOR TO COMMENCING WORK, TEMPORARY FENCING SHALL BE INSTALLED IMMEDIATELY AROUND EACH TREE IMPACTED BY DEMOLITION OR CONSTRUCTION. FENCING SHALL BE MAINTAINED THROUGHOUT THE COURSE OF THE ENTIRE DEMOLITION AND CONSTRUCTION PROCESS. 3. BULK MATERIAL, EQUIPMENT, VEHICLES, AND CONSTRUCTION DEBRIS AND WASTE SHALL NOT BE STOCKPILED WITHIN HE CRITICAL ROOT ZONE. 4. COMPACTION BY EQUIPMENT TRAFFIC IS PROHIBITED WITHIN THE CRITICAL ROOT ZONE. 5. MAINTAIN WATERING WITHIN THE CRITICAL ROOT ZONE. APPLY A MIN. 1.5" OF WATER OVER THE CRITICAL ROOT ZONE PER WEEK. THIS IS A MIN. RECOMMENDATION. CONTRACTOR IS RESPONSIBLE TO DETERMINE IF MORE WATER IS NECESSARY DURING CONSTRUCTION. 6. ANY DAMAGE TO EXISTING TREES DURING CONSTRUCTION SHALL BE THE CONTRACTORS RESPONSIBILITY. THE CONTRACTOR SHALL PERFORM REMEDIAL WORK TO DAMAGED TREES AT THE CONTRACTOR'S EXPENSE. KEY NOTES 1. EXISTING TREE TO BE SPADE AND RELOCATED PER PLAN. 2. SAVE AND PROTECT EXISTING TREE. 3. EXISTING SHRUB TO BE RELOCATED PER PLAN. 4. SAVE AND PROTECT EXISTING SHRUB. 5. INSTALL EXISTING, RELOCATED TREE IN THIS LOCATION. 6. INSTALL EXISTING, RELOCATED SHRUB IN THIS LOCATION. 7. REMOVE EXISTING BLACK AND TAN ROCK MULCH AND EVENLY PLACE IN EXISTING PLANTER BEDS ON SITE. ADJUST EXISTING IRRIGATION TO FIT NEW SITE. 8. SAVE AND PROTECT EXISTING LANDSCAPE AND IRRIGATION. s� i 3" MIN. MULCH �y FINISH GRADE -\ AMENDED BACKFILL UNDISTURBED SOIL 2 x ROOTBALL i SHRUB PLANTING DETAIL NTS SET TOP OF ROOT BALL 2" ABOVE FINISH GRADE PLANT PIT WITH ANGLED SIDES FERTILIZER TABLETS ROOT BALL PREVAILING WIND DIRECTION FINISH GRADE NOTES: 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. 2 SHRUB PLANTING DETAIL NTS LANDSCAPE PLAN 0 30 60 Scale 1" = 30'-0" U J O Q z B A E R o greg@baerdg.com Ph. 208.859.1980 G4�G P 04 ti LA-16635 l4NDSCA4E A \\\ w a 0 ' z 0 w o z i� -44 N v 00 00 z R z a_ O w F_qO J V Oz U w oC a- Q onz 0 J O U u Y z w 0 � w N Ln n DRAWN BY: JRL CHECKED BY: JL JOB # 22052 DATE: 4.28.2022 CONSTRUCTION DOCUMENTS