Grayson Sub A&Z- Pathway Conditions 220311 V1CUEIDR IAy
APPROVED
DATE 06/22/22
FILE NUMBER: H-2D22-DDia
r: Kim Warren / Pathways Project Manager
Planner Assigned: Joseph Dodson
CqlfERIDIAN�--
Parks and Recreation
Project Name: Grayson Subdivision AZ,PP File No: H-2022-0014 Date: 3/11/2022
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi -use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways
Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be
coordinated through the Pathways Project Manager.
2. Prior to submittal of the final plat for City Engineer signature, the applicant shall submit a public
access easement for a detached multi -use pathway parallel to Amity Road to the Planning
Division for Council approval and subsequent recordation. The easement shall be a minimum of
14' wide (10' pathway + 2' shoulder each side).
Use standard City template for public access easement. Submit all easement documents online
through Citizen's Access Portal.
3. Construct multi -use pathways per paving section based on existing site conditions as
recommended by project civil engineer in accord with UDC 11-3A-8 and 11-313-12. Prior to
occupancy, city engineer signature on the final plat the applicant's engineer shall provide written
documentation that the pathway segment was constructed per the recommended
specifications.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi -use pathway.
Rev. 02.11.22