Loading...
HomeMy WebLinkAbout06-517 Bldng Dept Fee Changes CITY OF MERIDIAN RESOLUTION NO. C 6 - ç-( 7 BY THE CITY COUNCIL: BIRD, BORTON, ROUNTREE, WARDLE A RESOLUTION RATIFYING THE CITY COUNCIL'S APPROVAL OF THE BUILDING DEPARTMENT FEE CHANGES FOR RE-INSPECTIONS; TEMPORARY POWER POLES/CONSTRUCTION SERVICES; RESIDENTIAL ELECTRICAL PERMITS; AND HOT TUBS, SWIMMING POOLS AND OTHER SPAS; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on April 18, 2006, the City Council of the City of Meridian, held a hearing on the adoption of the Building Department Fee Changes for re-inspections, temporary poles/construction services, residential electrical permits, and hot tubs, swimming pools and other spas as shown by Exhibit "A" and incorporated herein by reference; and WHEREAS, after such hearing, the City Council, by formal motion, did approve said Building Department Fee Changes; and NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF MERIDIAN, IDAHO: Section 1. That the Building Department fee changes for re-inspections, temporary poles/construction services, residential electrical permits, and hot tubs, swimming pools and other spas is hereby adopted. A copy of the fee schedule is attached as Exhibit "A". Section 2. That the Director of Public Works is hereby authorized to implement and carry out the collection of said fees. Section 3. That this Resolution shall be in full force and effective on June 1, 2006. of ADOPTED by the City Council ofthe City of Meridian, Idaho ~/l APPROVED by the Mayor of the City of Meridian, Idaho, this ¥/l Z§Æ day ,2006. /) ri~ Vj' day of ,2006. BUILDING DEPARTMENT FEE CHANGES FOR RE-INSPECTIONS; TEMPORARY POWER POLES/CONSTRUCTION SERVICES; RESIDENTIAL ELECTRICAL PERMITS; AND HOT TUBS, SWIMMING POOLS AND OTHER SPAS - RESOLUTION Page 1 of2 APPROVED: ,\ \ \ '.', I II I Ii ¡ f " " ~,\\\"fi w~~~' R:, T " --( ( ':!. r, ~;-~ ,~~, ~ '- C) r J",V-,,' "tJ,'.:.' '" ~ '- " ' '- '. ." ... ~ I' ,"~-' <:." ".. '- (' ",'I v"" ~. ~ ~~/ de WEERD - BUILDING DEPARTMENT FEE CHANGES FOR RE-INSPECTIONS; TEMPORARY POWER POLES/CONSTRUCTION SERVICES; RESIDENTIAL ELECTRICAL PERMITS; AND HOT TUBS, SWIMMING POOLS AND OTHER SPAS - RESOLUTION Page 2 ofl oÇ.Gri d ¡!it", \ 'D,"iD f} ~~Q;,,-t'Þ ',Q"-<,.,:¡:""""""".",,, ""';1', Exhibit "A" Fee Chanees Effective June 1.. 2006 The fee changes are the result of Public Notice and City Council approval. Fee Chane:e #1 - All re-inspection fees for Structural, Mechanical, Plumbing and Electrical will be $45,00 for each re-inspection, A double fee of $90,00 will be charged for any re-inspection that is scheduled with the Building Department and the corrections have not been made when the inspector arrives, ---------------------------------------------------------------------------------------------------------------------------------- Fee Cban2e #2 - "New" Electrical Fee Schedule 01. Temporarv power poles/construction services - Every temporary power pole must be called in for inspection, Idaho Power will not set the meter until the temporary pole has passed city inspection. To be installed for construction purposes only for a period not to exceed one (1) year. a. 200 amps or less, one 10cation""""""",.......$40.00 b. All others to be calculated using section 06. 02. New Residential- single family dwelling (includes everything contained within the residential structure and attached garage. All must be wired at the same time.) a. Up to and including 200 amp service"""..." ,,$120.00 b, 201 amp service up to 400 amps................ ..$210,00 c, 401 amp service and above.................... .....Use section 06, Other Residential Structures (unattached) - See section 06. Multi-family Dwellings - Duplexes"............ ....$210.00; Three (3) or more multi-family units" ..$120.00 per building plus $60,00 per unit. * New residential includes three electrical inspections total. After three, fe-inspection fees apply. 03. Existine Residential- $40.00 permit fee plus $10,00 for each branch circuit. 04. Hot Tubs. Swimminf Pools. and other spas - $40.00 pennit fee plus an additional $40.00 for any grounding grid where applicable, Page 1 of 2 05. Electrical Space Heating; and Air Conditioning; - Fees in section 03. are applicable when this is not part of a new residential construction permit. 06. Commercial. Industrial. and other permit fees not listed - this section applies to all installations not specifically listed above, The total wiring cost shall be all labor and material to install the wiring system consistent with valuation data (market value for the geographic area). Mobile home and recreational vehicle park service conductors and feeders to the individual unit service switch or pedestal are calculated using this section. This section includes: lawn sprinklers, limited energy installs, elevators, escalators, etc. a. Wiring costs not exceeding $100,00,.".."..,..,..,..,.....,............$25,00 b. Wiring costs over $100.00 not exceeding $2,000,00..................,$20.00 (plus 2% oftotal wiring cost) c. Wiring costs over $2,000.00 not exceeding $10,000,00,...........,. ,$70.00 (plus 1 % of total wiring cost) d, Wiring cost over $10,000.000 = $180.00 (plus Y2 of 1 % of that portion of the wiring costs over $10,000. 07. Re-Inspection Fees - A fee of $45.00 is charged for each re-inspection, A double fee of$90,OO will be charged when a re-inspection is scheduled with the Building Department and the correction(s) have not been performed, Page 2 of2