HomeMy WebLinkAbout2022-06-10_CZC Responses & Dwgs Package V1Cycle Department Reviewer Email Status Reviewer Comments Applicant Comments
1
Planning Review Alan Tiefenbach atiefenbach@meridiancity.org More Information Required
Land Development
Review
Steve O'Brien SOBrien@meridiancity.org No Comment
Wastewater Modeling
Review
Tyson Glock tglock@meridiancity.org Approved
•Additional 387 gpd committed to model. WRRF decline
balance is 14.35 MGD •No changes to public sewer
infrastructure in record. Any changes must be approved
by public works. • Ensure no sewer services pass
through infiltration trenches.
Transportation Plan
Review
Micah Bandurraga mbandurraga@meridiancity.org Approved
A streetlight plan is required with a new streetlight
centered between the (2) existing streetlights along the
road frontage.
Water Modeling Review Tyson Glock tglock@meridiancity.org More Information Required
• Instead of having multiple connections to the 12"
watermain run an 8" main on to the site and then take
all necessary services, fire lines, and fire hydrants off of
8" main. Provide an updated layout with this
configuration. • Water main and fire hydrant laterals
required 20' easement. • Provide easement up to and
10' past fire hydrants and water meters.
GIS Review Teresa Grange tgrange@meridiancity.org Approved
MFD Plan Review Joe Bongiorno JBongiorno@meridiancity.org Approved
A full fire plan review will need to be completed prior to
construction.
MPD Review Shawn Harper sharper@meridiancity.org Approved
ACHD Review Alan Tiefenbach atiefenbach@meridiancity.org No Comment
Project Name:
Workflow Started:
Report Generated:
A-2022-0090
04/29/2022 3:44 PM
05/24/2022 12:17 PM
Department Review Status Report
06/15/22
A-2022-0090
Grouping Cycle Ref # Complete? Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response
Main Workflow 1 1 False Unresolved Planning Review Landscape Plan.pdf Landscape Plan UDC 11-3B-7 All street buffers with
attached sidewalks shall
be measured from the
back of sidewalk. Where
ACHD is anticipating
future widening of the
street, the width of the
buffer shall be measured
from the ultimate sidewalk
location as anticipated by
ACHD.
Check with ACHD and
see if S. Industrial Wy will
be widened in the future.
05/13/2022 4:46
PM
Alan Tiefenbach
2 False Unresolved Planning Review Landscape Plan.pdf Landscape Plan UDC 11-3B-7 Lawn and other grasses
requiring regular mowing
shall comprise no more
than sixty-five (65)
percent of the vegetated
coverage of a landscape
buffer. This maximum
area excludes landscaped
parkway with trees. All
other vegetated coverage
shall be mulched and
treated as planting area
for shrubs or other
vegetative cover.
Do you comply?
05/13/2022 4:46
PM
Alan Tiefenbach
Project Name:
Workflow Started:
Report Generated:
A-2022-0090
04/29/2022 3:44 PM
05/24/2022 12:19 PM
Changemarks Report
Landscape to advise.
06/15/22
A-2022-0090
Grouping Cycle Ref # Complete? Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response
Main Workflow 1 3 False Unresolved Planning Review Landscape Plan.pdf Landscape Plan UDC 11-3B-8 No linear grouping of
parking spaces shall
exceed twelve (12) in a
row, without an internal
planter island. The planter
island shall run the length
of the parking space and
may be reduced by two
(2) feet to allow for
improved vehicular
maneuvering.
Landscape planters shall
contain a minimum of fifty
(50) square feet, and the
planting area shall not be
less than five (5) feet in
any dimension, measured
inside curbs. The only
exception to the five-foot
minimum dimension is at
the tip of triangular
planters located at the
end of rows of angled
parking.
05/13/2022 4:46
PM
Alan Tiefenbach
4 False Unresolved Planning Review Landscape Plan.pdf Landscape Plan Tree Ends of parking rows
must meet landscape
island requirements (tree,
at least 50 sf).
05/13/2022 4:46
PM
Alan Tiefenbach
5 False Unresolved Planning Review Landscape Plan.pdf Landscape Plan Trash How are trash enclosures
and mechanical
equipment being
screened? No details or
elevations were provided.
05/13/2022 4:46
PM
Alan Tiefenbach
6 False Unresolved Planning Review Site Plan.pdf Site Plan Comments Parking spaces Need to indicate
dimensions of parking
spaces. Must be at least
19x9, or 17' with a 2'
overhang. If overhanging
over walkway, additional
2' needs to be added to
minimum width of 5.
05/13/2022 4:28
PM
Alan Tiefenbach
Changemarks Report
NV5 and Landscape to review
and confirm.
NV5 to confirm.
06/15/22
A-2022-0090
Grouping Cycle Ref # Complete? Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response
Main Workflow 1 7 False Unresolved Planning Review Site Plan.pdf Site Plan Comments UDC 11-3A-3 The following standards
shall apply to any use
and/or property that takes
direct access to an
arterial and/or collector
roadway. Prior to any
new, expanded, or
extended use or
development of the
property:
Where access to a local
street is not available, the
property owner shall be
required to grant cross-
access/ingress-egress
easements to adjoining
properties. This standard
is intended to apply
primarily to nonresidential
properties, but may
extend to residential
properties where the use
is anticipated to change
to a nonresidential use.
S. Industry Way is a
Collector. Need to provide
cross access easement to
the north, and both
buildings must be served
by one driveway. We
cannot approved two
drives next to each other
when applicant owns all
this.
05/13/2022 4:28
PM
Alan Tiefenbach
Changemarks Report
06/15/22
A-2022-0090
Grouping Cycle Ref # Complete? Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response
Main Workflow 1 8 False Unresolved Planning Review Site Plan.pdf Site Plan Comments 11-4-3-18. - Flex space In the C-C, C-G and M-E
Districts, roll-up doors
and loading docks shall
not be visible from a
public street.
Roll up doors will be very
visible from S. Industrial
Way.
05/13/2022 4:28
PM
Alan Tiefenbach
9 False Unresolved Planning Review Elevations.pdf Architecture Materials Building materials must
be indicated
05/13/2022 4:44
PM
Alan Tiefenbach
10 False Unresolved Planning Review Elevations.pdf Architecture ASM 2.1B For buildings with
façades longer than
200-feet, reduce massing
of buildings by grouping
or incorporating smaller
tenant spaces along the
commercial façade, or
by incorporating at least
one significant modulation
with depth at least 3% of
the total façade length
or 10-feet, and a width in
combination at least 20%
of the façade length.
Site plan shows flat plane
on north elevation. How is
this happening?
05/13/2022 4:44
PM
Alan Tiefenbach
Changemarks Report
WM to suggest a solution
WM to clarify and address.
06/15/22
A-2022-0090
Grouping Cycle Ref # Complete? Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response
Main Workflow 1 11 False Unresolved Planning Review Elevations.pdf Architecture ASM 3.1A Incorporate at least one
type of the following
modulations in the
façade plane, including
but not limited to
projections, recesses, and
step backs that articulate
wall planes and break up
building mass. Examples
include but are not limited
to columns with trim or
accent materials, change
in finished material
depths, building
overhangs, and inset
features and materials
such as false windows or
fenestration with
architectural accents.
How is this being met on
north side? Site plan
shows flat plane.
05/13/2022 4:44
PM
Alan Tiefenbach
12 False Unresolved Planning Review Elevations.pdf Architecture ASM 2.3A Consistently incorporate
at least two (2)
architectural features into
the building design that
are pedestrian scale, to
include: fenestration
patterns; architectural
elements such as ledges,
lighting, or canopies;
material or pattern
banding; or detailing (see
Pedestrian Scale
definition).
How is this being met on
south elevation?
05/13/2022 4:44
PM
Alan Tiefenbach
Changemarks Report
WM to address.
06/15/22
A-2022-0090
Grouping Cycle Ref # Complete? Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response
Main Workflow 1 13 False Unresolved Planning Review Elevations.pdf Architecture ASM 3.2A Average 30% fenestration
for applicable first floor
façade, unless specified
elsewhere. May also
meet fenestration
alternative (see 3.3E).
Fenestration Alternative:
Incorporate doors and
windows for at least 30%
of applicable first floor
façade, or suggest their
inclusion using faux
treatments that
incorporate at least two of
the following: material
changes, reveals in
conjunction with color or
material change,
qualifying modulation
such as recessed areas,
architectural trellis,
awnings and canopies
over access areas,
detached structures such
as pergola, or similar
architectural features and
details.
How is this being met on
east side?
05/13/2022 4:44
PM
Alan Tiefenbach
Changemarks Report
06/15/22
A-2022-0090
Grouping Cycle Ref # Complete? Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response
Main Workflow 1 14 False Unresolved Planning Review Elevations.pdf Architecture ASM 3.4A 3.4A For flat roofs,
incorporate primary and
secondary roof elements
including but not limited
to: multiple material types
along parapets, multiple
parapet elevations with at
least 1-foot change in
elevation, or modulation
of at least 2-feet in the
parapet, such as along
entryway overhangs.
Qualifying elements must
exist for at least 20% the
length of applicable
façades. May also
incorporate secondary
roof types, such as hip
roofs along overhangs.
No scale has been listed
on this elevation. Do the
north and south
elevations meet the 20%
?
05/13/2022 4:44
PM
Alan Tiefenbach
Changemarks Report
WM to address.
06/15/22
A-2022-0090
Grouping Cycle Ref # Complete? Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response
Main Workflow 1 15 False Unresolved Planning Review Elevations.pdf Architecture ASM 5.1H & 5.1I The use of vinyl and
ordinary smooth face
block, unfinished, colored,
or painted, are prohibited
as a field materials for
building façades along
public roadways, adjacent
to public spaces, and
when visible from
residential
neighborhoods. Smooth
face block may be used
as an accent material.
Untextured concrete
panels and prefabricated
steel panels are
prohibited as field
materials for building
façades, except when
used with a minimum of
two other qualifying field
materials and meeting all
other standard
fenestration and material
requirements.
Elevations do not indicate
materials.
05/13/2022 4:44
PM
Alan Tiefenbach
Changemarks Report
06/15/22
A-2022-0090
PROPOSED BUILDING
+/- 73,778 GSF
50'
TYP.
60'
52'
TYP.
472'
160'
25'
89'
130'
40'
29'
13'
26'
53'
81'
118'
BICYCLE
PARKING
TRASH/RECYCLE
ENCLOSURE.
TYP
SCREEN WALL
NEW SIDEWALK
7' ATTACHED
FRONT
SETBACK
OFFICE AREA 24,086 SF
SHED TO BE
DEMO'D
EXT'G BLDG TO
REMAIN. TYP
10'
EASEMENT -
SEE NOTES
12 12 1212
1210
711
7
8
SCREEN WALL
17'
9'
18'
5'
19'
9'
LANDSCAPING
ALONG SOUTH
BOUNDARY.TYP
6'
This conceptual design is based upon a preliminary review of
entitlement requirements and on unverified and possibly
incomplete site and/or building information, and is intended
merely to assist in exploring how the project might be developed.
NORTH
SHEET
2022-06-06
PAGE
6
CENTRAL VALLEY CORPORATE PARK 04.01. 2022
MERIDIAN, ID - DEN 21-0171-00
EXTERIOR ELEVATIONS
CLEAR HEIGHT
28’-0”
TOP OF PARAPET
35’-5”
FINISH GRADE
0’-0”
TOP OF PARAPET
39’-5”
WEST ELEVATION EAST ELEVATION
SOUTH ELEVATION
NORTH ELEVATION
This conceptual design is based upon a preliminary review of entitlement requirements and
on unverified and possibly incomplete site and/or building information, and is intended merely
to assist in exploring how the project might be developed. Signage shown is for illustrative
purposes only and does not necessarily reflect municipal code compliance. All colors shown are
for representative purposes only. Refer to material samples for actual color verification.
06/15/22
A-2022-0090
PROPOSED BUILDING
+/- 73,778 GSF
OFFICE AREA 24,086 SF
SHED TO BE
DEMO'D
EXT'G BLDG TO
REMAIN. TYP
12 12 1212
1210
711
7
8
This conceptual design is based upon a preliminary review of
entitlement requirements and on unverified and possibly
incomplete site and/or building information, and is intended
merely to assist in exploring how the project might be developed.
NORTH
SHEET
2022-06-06
DEN21-0171-00
Waterline for Modeling
499 E Corporate Drive
scheme: SP3.1 SD Phase
Meridian, ID 1
0 16'' 32'' 64'' 128''
1/32"=1'-0"
06/15/22
A-2022-0090
PROPOSED BUILDING
+/- 73,778 GSF
12 12 12
12
10
12
7 11
7
8
1 1
1 1
2
2
3
3
3
3
3
3 3
3
4 4
5
6
7
7
4 GT
5 QR
2 PC
10 TT
9 PC
4 TT
1 PC
5 GT 1 TT
15 QR
7 PC
3 GT
6 BN
4 GT
3
3 PC
8
8
9
9
9
9
7 GT
EXISTING LAWN
AREA TO REMAIN
LANDSCAPE BUFFER REQUIREMENTS:
NORTHERN PARKING BUFFER: N/A (SHARED LOT)
10'-0" BUFFER REQUIRED WITH ONE (1) TREE PER 35':
@ 673' / 35 = 19 TREES REQUIRED
19 TREES PROVIDED.
SOUTHERN PARKING BUFFER: N/A (ADJACENT COMMERCIAL)
10'-0" BUFFER REQUIRED WITH ONE (1) TREE PER 35':
@ 523' / 35 = 15 TREES REQUIRED
15 TREES PROVIDED.
WESTERN PARKING BUFFER: N/A (CANAL LOT)
10'-0" BUFFER REQUIRED WITH ONE (1) TREE PER 35':
CALL 2 BUSINESS DAYS
IN ADVANCE BEFORE
YOU DIG, GRADE, OR
EXCAVATE FOR THE
MARKING OF
UNDERGROUND
MEMBER UTILITIES
Call before you dig.
Know what's below.
R
South Landscape Architecture P.C.
Dba South Beck & Baird Landscape Architecture P.C.
2002 S. Vista Ave
Boise, ID 83705
208.342.2999 Office
info@sbbgo.com
www.sbbgo.com
All rights reserved. Reproduction or use in any
form or by any means without written permission of
South Landscape Architecture P.C. Dba South
Beck & Baird Landscape Architecture P.C. is
unlawful and subject to criminal prosecution.
No. Date Description
THE PROFESSIONAL SERVICES OF THE DESIGN PROFESSIONAL ARE UNDERTAKEN FOR AND ARE PERFORMED IN THE INTEREST OF "THE CLIENT" NO CONTRACTUAL OBLIGATION IS ASSUMED BY THE DESIGN PROFESSIONAL
FOR THE BENEFIT OF ANY OTHER PERSON INVOLVED IN THE PROJECT.
Design Review
1 06/08/22 CITY COMMENTS
F
O
S
C
A
P
E
A
R
C
H
I
T
E
C
T
D
N
A
L
D
E
S
N
E
C
I
L
E
T
A
T
S
I
D
A
H
O
D .
H
O
J
O
T
E
R
R
N
S
LA - 16827
L1.1
1. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND
SPRINKLER SYSTEM WHICH INSURES COMPLETE COVERAGE AND
PROPERLY ZONED FOR REQUIRED WATER USES. EACH HYDROZONE IS
TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS.
2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE
HYDRO-ZONES.
3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4
INCHES AT LAWN AREAS AND 18" AT PLANTER BEDS.
4. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEM OR POP-UP
SPRAY SYSTEM.
5. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE
PROVIDED. MINIMUM CONTROLLER REQUIREMENTS ARE AS FOLLOWS:
a. PRECISE INDIVIDUAL STATION TIMING
b. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES
c. AT LEAST ONE PROGRAM FOR EACH HYDROZONE
d. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF
e. POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED
WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO
PROVIDE WATER TO RESPECTIVE HYDRO-ZONES.
6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND
INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO-ZONES.
7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD
TO HEAD COVERAGE WITH TRIANGULAR SPACING.
8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO
IMPERVIOUS SURFACES (BUILDINGS, SIDEWALKS, DRIVEWAYS, AND
ASPHALT AREAS).
9. PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC
VALVE ZONES. APPROVE Q.C.V. LOCATIONS WITH LANDSCAPE
ARCHITECT.
1. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN
NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS
WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION.
ALL PLANT MATERIAL SHALL BE GRADE #1 OR BETTER.
2. ALL PLANTING BEDS AND TREE WELLS IN LAWN AREAS (WELLS TO BE
3' IN DIAMETER) SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF
BLACK AND TAN ROCK MULCH. SUBMIT SAMPLE FOR APPROVAL BY
OWNER.
3. ALL LAWN AREAS SHALL BE SODDED WITH 100% TURF TYPE TALL
FESCUE (FESTUCA ARUNDINACIA). CONTRACTOR SHALL VERIFY AND
MATCH THE VARIETY EXISTING IN THE ADJACENT DEVELOPMENT.
4. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE
YEAR BEGINNING AT THE DATE OF ACCEPTANCE BY OWNER.
REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY
CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO
COST TO THE OWNER.
5. PLANTING BACKFILL FOR TREES AND PLANTING BEDS SHALL BE 5
PARTS TOPSOIL AND 1 PART COMPOST WITH STRAW. STAKE ALL
TREES PER DETAILS.
6. ALL LAWN AREAS SHALL HAVE 6" OF TOPSOIL AND ALL PLANTING
BEDS SHALL HAVE 12" OF TOPSOIL (MINIMUM). TOPSOIL SHALL BE A
LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC
MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS, OR
OTHER FOREIGN MATERIAL LARGER THAN 1" IN ANY DIMENSION, A PH
FROM 5.5 TO 7.0. TOP SOIL FROM SITE SHALL BE USED, IF MEETING
THESE STANDARDS. PLACE 1/2" COMPOST OVER ALL LANDSCAPED
AREAS AND ROTOTILL INTO TOP 4". SPREAD, COMPACT, AND FINE
GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE, 1" BELOW
SURFACE OF WALKS AND CURBS IN AREAS TO BE SODDED AND 3" IN
PLANTING BED AREAS.
7. FERTILIZE ALL TREES AND SHRUBS WITH 'AGRIFORM" PLANTING
TABLETS, 21 GRAM. QUANTITY PER MANUFACTURER'S
RECOMMENDATION.
8. PLANT MATERIAL SHALL NOT BE SUBSTITUTED WITHOUT THE
WRITTEN PERMISSION OF OWNER. SUBMIT NAMES OF THREE
SUPPLIERS CONTACTED IF SUBSTITUTION IS REQUESTED AND PLANT
MATERIAL SPECIFIED IS NOT AVAILABLE.
9. SHRUB PLANTING BEDS SHALL BE SHOVEL EDGED TO CREATE A
DISTINCT SEPARATION OF LANDSCAPE TYPES.
10. IMMEDIATELY CLEAN UP ANY TOPSOIL, OR OTHER DEBRIS ON SITE
CREATED FROM LANDSCAPE OPERATION AND DISPOSE OF
PROPERLY OFF SITE.
11. ALL LANDSCAPE AREAS SHALL HAVE AN STATE OF THE ART
AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH INSURES
COMPLETE COVERAGE AND IS PROPERLY ZONED FOR REQUIRED
WATER USES AND HAS A WEATHER STATION CAPABLE OF TURNING
OFF FOR RAIN/FREEZE EVENTS. ALL SHRUB ZONES, SPRAY ZONES
AND GEAR DRIVEN ZONES SHALL BE PLACED ON SEPARATE ZONES.
DO NOT EXCEED A MAXIMUM OF 5 FPS IN ALL MAINLINE AND LATERAL
LINES.
12. COORDINATE ALL DRAINAGE AREAS AND UTILITIES WITH TREE
LOCATIONS AND ADJUST PER FIELD CONDITIONS.
13. ALL EXISTING TREES SHOWN TO REMAIN SHALL BE RETAINED AND
PROTECTED THROUGH OUT CONSTRUCTION.
14. NO TREES SHALL BE PLANTED WITHIN THE 10 FOOT CLEAR ZONE OF
ALL ACHD STORM DRAIN PIPE, STRUCTURES, OR FACILITIES.
15. STORM PONDS MUST BE PROTECTED FROM ANY AND ALL
CONTAMINATION DURING THE CONSTRUCTION AND INSTALLATION OF
THE LANDSCAPE IRRIGATION SYSTEM.
16. ALL TREES TO BE LOCATED A MINIMUM OF 5 FEET OR GREATER FROM
THE BACK OF ANY SIDEWALK..
17. TRIM ALL TREES WITHIN VISION TRIANGLES TO 8' ABOVE FINISH
GRADE TO MEET ACHD STANDARDS.
LANDSCAPE NOTES
SHRUB PLANTING
NOT TO SCALE
1. WATER SHRUB TWICE WITHIN FIRST 24 HOURS.
2. APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER BEDS.
KEEP GROUND LINE SAME AS NURSERY LINE
REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER
MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT
ROOT GROWTH
CONSTRUCT 2" EARTH BERM TO FORM A WATER
RETENTION BASIN, FILL BERM WITH MULCH, AS
SPECIFIED
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO
NOT COVER CROWNS OF PLANTS
PROVIDE DEWITT PRO 5 WEED BARRIER FABRIC OR
APPROVED EQUAL
PROVIDE COMMERCIAL FERTILIZER TABLETS AND
BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB
BACKFILL WITH APPROVED TOPSOIL AND SOIL
AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS,
WATER EACH LAYER, DO NOT TAMP OR OVER
COMPACT.
CONSTRUCT 6" MOUND OF TOPSOIL
6"
6"
WIDTH OF
ROOTBALL 6"
1
'B'
'A'
'A'
'A'
'A'
PERENNIAL & GROUNDCOVER
PLANTING NOT TO SCALE
1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER
AND IN A TRIANGULAR PATTERN.
2. APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER BEDS.
FINISH GRADE PER PLANS
EDGING, PER PLANS AND DETAILS
GROUNDCOVER PLANTING PER PLANTING PLAN
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED.
DO NOT COVER CROWNS OF PLANTS
SPLIT ALL ROOT BOUND ROOTS WITH 3 EQUAL
SPACED VERTICAL CUTS.
TILL SOIL TO A DEPTH OF 12", BACKFILL WITH
APPROVED TOPSOIL AND SOIL AMENDMENTS, AS
SPECIFIED.
DEWITT PRO 5 WEED BARRIER FABRIC OR
APPROVED EQUAL
SUBGRADE
A = LENGTH, AS SPECIFIED
OR PER PLANT SCHEDULE
B = 85% OF 'A'
12" 3"
2
6"
1
1
2" 2"
HIGHEST ROOT SHALL BE
2" MAXIMUM BELOW SOIL
LINE. UTILIZE SOIL/ROOT
PROBE AROUND TRUNK
(APPROX 1"-2" AWAY
FROM TRUNK) TO
LOCATE HIGHEST
ROOTS.
SOIL LINE
ROOT FLARE/COLLAR (SWELLING AT SOIL
LINE WHERE STEM TISSUE TRANSITIONS
INTO ROOT TISSUE) TO BE AT SOIL LINE.
ROOT PROBE
WHEN PRESENT: BUD
POINT (A MINOR CROOK
IN THE TRUNK JUST
ABOVE THE SOIL LINE)
TO BE APPROXIMATELY 1
1
2" ABOVE THE SOIL LINE
1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE
PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION
WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD.
2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE
PROCEEDING.
3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL.
4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE
THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE.
5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
7. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT #24-2 OR APPROVED
EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. EXTEND ROOT BARRIER TO 80% OF MATURE TREE CANOPY. ALL
TREE INSTALLATIONS SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS.
REMOVE DEAD/DAMAGED BRANCHES AND
PRUNE TO INTERNATIONAL SOCIETY OF
ARBORICULTURE STANDARDS; IMPROPERLY
PRUNED TREES (AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL BE REMOVED
AND REPLACED. DO NOT REMOVE MAIN
LEADER!!
RUBBER CINCH TIE
2"x 2" WOOD STAKE (LENGTH AS
REQUIRED)-DO NOT PENETRATE ROOTBALL.
SEE NOTE 1. SET STAKES PARALLEL TO
PREVAILING WIND.
REMOVE TREE WRAP TRUNK PROTECTION,
AFTER INSTALLATION
CONSTRUCT 2" EARTH BERM AT EDGE OF
ROOTBALL, FILL TREE RING W/ MULCH, AS
SPECIFIED.
3" THICK MULCH LAYER, KEEP MULCH 3" AWAY
FROM TRUNK.
REMOVE BURLAP, TWINE,
AND WIRE BASKET FROM
TOP
2
3 OF ROOTBALL,
REMOVE ALL NAILS, TIES,
AND PLASTIC FROM
ROOTBALL. IF
SYNTHETIC BURLAP IS
UTILIZED TO WRAP THE
ROOTBALL, IT SHALL BE
COMPLETELY REMOVED.
ONLY BIODEGRADABLE
BURLAP SHALL BE LEFT
ON THE BOTTOM OF THE
ROOTBALL.
FINISH GRADE
PREVAILING WIND DIRECTION
DECIDUOUS TREE PLANTING
NOT TO SCALE
5' MIN.
CLEAR
AS
SPECIFIED
TO BASE
OF CROWN
5' MIN. DIA.
TREE RING
WIDTH
OF BALL
WIDTH
OF BALL
WIDTH
OF BALL
WIDTH
OF BALL
WIDTH
OF BALL
COMMERCIAL SLOW RELEASE FERTILIZER
TABLETS
SIDES OF HOLE ROUGH & UNEVEN
BACKFILL WITH APPROVED TOPSOIL AND
SOIL AMENDMENTS AS SPECIFIED.
BACKFILL IN 6" LIFTS, WATER EACH LAYER,
TAMP LIGHTLY AS REQUIRED, BACKFILL
SOIL EVEN W/ TOP OF ROOTBALL,
DO NOT OVER COMPACT!!
SET ROOTBALL ON NATIVE, UNDISTURBED
SOIL
4
IRRIGATION NOTES:
APPROVED TOPSOIL AND SOIL
AMENDMENTS AS SPECIFIED
3" DEPTH OF MULCH AT PLANTER
BEDS
CUT EDGE
FINISH GRADE,
PER PLANS
(TYPICAL AT TREES IN TURF AREAS)
PLANTER BED CUT EDGE
3 NOT TO SCALE
2'
3"
1'
2'-6"
R5"
3'
7
16"Ø HOLE FOR
3
8" REBAR
(BY INSTALLER)
2" SCH. 40 GALVANIZED STEEL PIPE (2
3
8"
O.D.) POWDER COAT, COLOR PER
ARCHITECT
BIKE RACK
Scale: 3/4"= 1'-0"
2'-6"
5
TREE PROTECTION NOTES:
1. PROTECT THE CRITICAL ROOT ZONE (THE AREA DIRECTLY BELOW THE
DRIPLINE OF THE TREE) OF THE TREES TO REMAIN ON SITE BY:
a. CONSTRUCTING A TEMPORARY CHAINLINK FENCE AROUND THE
CRITICAL ROOT ZONE OF THE TREE TO BE PROTECTED PRIOR TO
DEMOLITION, CONSTRUCTION, OR ANY SITE WORK.
b. NOT ALLOWING COMPACTION BY EQUIPMENT TRAFFIC DURING
CONSTRUCTION OR DURING DEMOLITION.
c. NOT ALLOWING CONCRETE TRUCKS TO RINSE WITHIN THE
PROTECTION AREA, OR ANYWHERE NEAR EXISTING TREE ROOTS OR
IN PLANNED PLANTING BEDS AREAS. SEE EROSION AND SEDIMENT
CONTROL PLAN FOR APPROVED CONCRETE WASHOUT AREAS.
d. NOT STOCKPILING MATERIALS, DEBRIS, OR DIRT WITHIN THE TREE
PROTECTION AREA.
e. WATERING WITHIN THE CRITICAL ROOT ZONE FROM MID-APRIL TO
MID-OCTOBER AT THE RATE OF NOT LESS THAN THE EQUIVALENT OF
1-1/2" OF WATER OVER THE ENTIRE AREA PER WEEK.
f. NOT TRENCHING, EXCAVATING, FILLING, OR OTHERWISE DISTURBING
THE SOIL WITHIN THE CRITICAL ROOT ZONE.
g. ADJUST PROPOSED IMPROVEMENT LOCATIONS AS REQUIRED TO
AVOID DAMAGING TREE ROOTS.
2. PROTECT THE CROWN AND TRUNK OF TREES TO BE RETAINED BY:
a. OPERATING EQUIPMENT IN SUCH A WAY AS TO AVOID CONTACT WITH
TREE TRUNKS OR BRANCHES.
b. HAVING TREES PRUNED BY A LICENSED ARBORIST.
3. ALL TREES THAT ARE DAMAGED, DESTROYED OR REMOVED DURING
CONSTRUCTION SHALL BE MITIGATED USING THE MITIGATION STANDARDS
AS SET FORTH IN THE CURRENT CITY CODE.
TREE PROTECTION DETAIL
NOT TO SCALE
OUTLINE OF TREE CROWN (EDGE
OF DRIPLINE) CORRESPONDING
WITH ROOT SPREAD. FENCE SHALL BE
PLACED AT EDGE OF TREE CROWN
(MINIMUM DISTANCE).
EXISTING GRADE
NOTE:
MAINTAIN PROTECTION UNTIL
CONSTRUCTION ACTIVITIES ARE
COMPLETED.
IF LOWER LIMBS INTERFERE WITH WORK,
TIE UP WITH HEAVY JUTE CORD.
ADJUST DIAMETER OF PROTECTIVE FENCE
TO PREVENT ANTICIPATED DAMAGE BY
EQUIPMENT.
TREE TRUNK
CROWN OF TREE.
OUTLINE OF TREE CROWN (EDGE
OF DRIPLINE) CORRESPONDING
WITH ROOT SPREAD. FENCE SHALL BE
PLACED AT EDGE OF TREE CROWN
(MINIMUM DISTANCE).
SECTION
PLAN VIEW
TREE CROWN
FENCE LINE
6
06/15/22
A-2022-0090
@414' / 35 = 12 TREES REQUIRED
12 TREES PROVIDED
EASTERN STREET LANDSCAPE BUFFER (S INDUSTRIAL WAY - LOCAL):
10'-0" BUFFER REQUIRED WITH ONE (1) TREE PER 35':
@ 403' / 35 = 12 TREES REQUIRED
12 TREES PROVIDED
35% OF THE BUFFER IS COVERED WITH MULCHED SHRUB BED AREA.
INTERIOR PARKING LANDSCAPING:
ONE CLASS II TREE WITH GROUNDCOVER AND SHRUBS PROVIDED FOR EACH ROW OF
PARKING.
SITE ZONING: C-G
ADJACENT ZONING: C-G
SETBACKS:
FRONT: 0' REAR: 0' SIDE: 0' STREET: 25'
STREET LANDSCAPE BUFFER: 10' (LOCAL)
PARKING REQ. :
ONE (1) SPACE FOR EVERY TWO THOUSAND (500) SQUARE FEET OF GROSS
FLOOR AREA = 148 STANDARD STALLS @ 73,778 S.F.REQUIRED.
172 STANDARD AND 6 ADA STALLS PROVIDED.
BICYCLE PARKING:
1 / 25 VEHICLE STALLS = 7 REQUIRED SPACES. TWO (5 STALL) RACKS PROVIDED
LANDSCAPE REQUIREMENTS:
SITE DATA:
TREE MITIGATION NOTES:
1. ALL EXISTING TREES ON SITE TO REMAIN.
2. SEE TREE PROTECTION NOTES AND DETAIL 6/L1.1 FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
3. THE LANDSCAPE ARCHITECT WILL MEET WITH THE CITY ARBORIST TO ESTABLISH
MITIGATION REQUIREMENTS BEFORE REMOVAL OF ANY EXISTING TREES.
10 JB
PLANT SCHEDULE
Betula nigra
River Birch
Gleditsia triacanthos inermis 'Skyline'
Skyline Honeylocust
Prunus cerasifera ‘Krauter Vesuvius’
Krauter Vesuvius Plum
Quercus robur x alba
Streetspire Oak
Tilia tomentosa ‘Sterling’
Sterling Linden
2" B&B
2" B&B
2" B&B
2" B&B
2" B&B
35' hgt. 25' w
45' hgt. 30' w
20' hgt. 15' w
35' hgt. 15' w
45' hgt. 35' w
CLASS II
CLASS II
CLASS I
CLASS II
CLASS II
Euonymous alatus 'Compactus'
Dwarf Burning Bush
Cornus alba 'Bailhalo'
Ivory Halo Dogwood
Cotoneaster horizontalis Perpusillus'
Prostrate Rock Cotoneaster
Juniperus scopulorum 'Medora'
Medora Juniper
Potentilla fruticosa 'Gold Star'
Gold Star Potentilla
Rosa x 'Flower Carpet'
Merlot Flower Carpet Rose
Spiraea japonica 'Goldmound'
Goldmound Spirea
Sedum 'TNSEDEEI' PPAF
Evolution™ Emerald Ice Sedum
Calamagrostis x. acutiflora 'Overdam'
Dwarf Feather Grass
Hemerocallis x 'Stella De Oro'
Stella De Oro Daylilly
Lavandula angustifolia 'Dilly Dilly'
Dilly Dilly Lavender
Pennisetum alopecuroides 'Little Bunny'
Little Bunny Dwarf Fountain Grass
2 Gal.
5 Gal.
2 Gal.
5 Gal.
2 Gal.
2 Gal.
2 Gal.
2 Gal.
1 Gal.
1 Gal.
1 Gal.
1 Gal.
4' hgt. x 4' wide
6' hgt. x 6' wide
12" hgt. x 6' wide
10' hgt. x 4' wide
3' hgt. x 3' wide
3' hgt. x 4' wide
3' hgt. 3' wide
16" hgt. x 16" wide
3' hgt. x 2' wide
18" hgt. x 2' wide
12" hgt. x 18" wide
2' hgt. x 3' wide
BOTANICAL NAME
COMMON NAME
BN
GT
PC
QR
TT
KEY
DECIDUOUS TREES .
PLANTING MATURE SIZE CLASS
SIZE
SHRUBS .
GROUND COVERS/ GRASSES/ PERENNIALS .
(*NOTE: ALL TREES TO BE GRADE
#1, SHOWN AT 80% MATURITY)
QUANTITY
PLANT IDENTIFICATION KEY
PLANTS TO BE INSTALLED
EXISTING TREES AND
SHRUBS TO REMAIN
PROPERTY LINE (VERIFY)
CUT EDGE, SEE DETAIL 3/L1.1
RTF TURF TYPE TALL
FESCUE SOD OVER
APPROVED TOPSOIL AS
SPECIFIED
PROPOSED BUILDING
LANDSCAPE LEGEND
TRASH ENCLOSURE PER
ARCHITECTURAL.
EXISTING CANAL AND ACCESS
ROAD TO REMAIN.
EXISTING TURF TO REMAIN. CUT IN
SOD TO PATCH BACK ANY
DISTURBED AREAS AND MEET
EXISTING.
BICYCLE PARKING RACK, SEE
DETAIL 5/L1.1.
EXISTING SHELTER TO REMAIN
EXISTING HORSESHOE PITS TO
REMAIN.
PROPOSED CONCRETE PATHWAY
CONNECTION TO EXISTING SITE
AMENITIES.
PROPOSED SCREEN WALL - SEE
ARCHITECTURAL
ALL TREES LOCATED IN THE
VISION TRIANGLE SHALL BE
TRIMMED TO 8' CLEAR PER ACHD
STANDARD DETAILS
1
2
3
4
5
6
7
SEE DETAIL 4/L1.1
SEE DETAIL 1/L1.1
SEE DETAIL 2/L1.1
8
9
CALL 2 BUSINESS DAYS
IN ADVANCE BEFORE
YOU DIG, GRADE, OR
EXCAVATE FOR THE
MARKING OF
UNDERGROUND
MEMBER UTILITIES
Call before you dig.
Know what's below.
R
South Landscape Architecture P.C.
Dba South Beck & Baird Landscape Architecture P.C.
2002 S. Vista Ave
Boise, ID 83705
208.342.2999 Office
info@sbbgo.com
www.sbbgo.com
All rights reserved. Reproduction or use in any
form or by any means without written permission of
South Landscape Architecture P.C. Dba South
Beck & Baird Landscape Architecture P.C. is
unlawful and subject to criminal prosecution.
No. Date Description
THE PROFESSIONAL SERVICES OF THE DESIGN PROFESSIONAL ARE UNDERTAKEN FOR AND ARE PERFORMED IN THE INTEREST OF "THE CLIENT" NO CONTRACTUAL OBLIGATION IS ASSUMED BY THE DESIGN PROFESSIONAL
FOR THE BENEFIT OF ANY OTHER PERSON INVOLVED IN THE PROJECT.
Design Review
1 06/08/22 CITY COMMENTS
F
O
S
C
A
P
E
A
R
C
H
I
T
E
C
T
D
N
A
L
D
E
S
N
E
C
I
L
E
T
A
T
S
I
D
A
H
O
D .
H
O
J
O
T
E
R
R
N
S
LA - 16827
L1.0
SEE SHEET L1.1 FOR LANDSCAPE NOTES AND DETAILS.
06/15/22
A-2022-0090
DEN21-0171-00
Conceptual Site Plan
499 E Corporate Drive
scheme: SP3.1 SD Phase
Meridian, ID 1
0 16'' 32'' 64'' 128''
1/32"=1'-0"
”
06/15/22
A-2022-0090