Loading...
HomeMy WebLinkAbout2022-06-13 BPBCDAVID REYNOLDS CHAIRMAN OF THE BOARD BOISE PROJECT BOARD OF CONTROL DONALD BARKSDALE VICE CHAIRMAN OF THE BOARD (FORMERLY BOISE U.S. RECLAMATION PROJECT) ROBERT D. CARTER 2465 OVERLAND ROAD PROJECT MANAGER BOISE, IDAHO 83705-3155 THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER 08 June 2022 City Clerk's Office 33 E Broadway Avenue Meridian ID, 83642 RE: Vertex Sub #1 and #2 FP-2022-0016, FP-2022-0015 Lake Hazel Rd West of Eagle Rd. New York Irrigation District NY-216-001-00 Farr Lateral 103+60, 121+60 Sec. 05, 2N, lE. Alan Tiefenbach: OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL: (208) 344-1141 FAX: (208) 344-1437 RECEIVED JUN 13 2022 CITY OFC M 9101 CITY CLERKS OFFICE Boise Project approves of the plans for Vertex #1 and #2 subdivisions, stamped and dated 5/10/2022 by Lachlin C Kinsella P.E., with the following highlights being noted. No exceptions will be given on these highlighted items. The United States' Farr Lateral lies within the boundary of the above -mentioned location. The easement for this canal is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391 43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert the federal easement 30 feet south and west and 25 feet north and east of the lateral's centerline. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. The Boise Project does not approve landscaping including trees and/or shrubs (other than grass or gravel) within its easements, as this will certainly increase our cost of maintenance. All fences/pathways must be .lust off the edge of all Boise Project easements. Easements must be left a flat drivable surface. Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Project facility easements must be approved by Boise Project Board of Control prior to construction. Project facilities and/or easements that parallel, and are within and/or intended to be within road right -of --ways due to any development of this property must be relocated outside of road right -of --ways. The easements of Boise Project facilities will remain the same unless agreed upon and/or approved with written permission from Boise Project Board of Control. The construction of any roadway crossings must be conducted only during the AL Ix season when the canal is dewatered. In any case no work shall take place within the easement before the proper crossing agreements have been secured through the Bureau of Reclamation and the Boise Project Board of Control. Utilities planning to cross any project facility must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In any case, no work shall take place within the easement before proper crossing agreements have been secured through both the Bureau of Reclamation and the Boise Project Board of Control. Crossing agreements must be secured and signed by all parties prior to March lst of each year. A time schedule for the construction to be done during the non -irrigation season must be approved by Boise Project prior to any activity within Project easements. No construction will be allowed within the easement boundaries of the Boise Project Board of Control facilities after March 15`h of each year. However, on a case -by -case basis, overhead utilities and utilities boring underneath a Project facility may be allowed after March 15' if reviewed and approved by the Boise Project. The piping and relocation of any Lateral, Canal and/or Drain must be reviewed and approved by the Project and is (to include all appurtenant boxes and/or structures) and must be warranted by the landowner for a period of (5) five -years. The Warrantee Agreement must be secured prior to ANY disturbance of that facility. A relocation agreement must also be procured through the Bureau of Reclamation prior to any construction within the above -mentioned easement. Boise Project Board of Control must approve any requests and/or relocation of delivery points prior to construction. Storm Drainage and/or Street Runoff must be retained on site. NO DISCHARGE into any live irrigation system is permitted. Per Idaho Statutes, Title 42, local irrigation/drainage ditches and pressurized irrigation lines that cross this property, in order to serve nei�hborin� properties, must remain unobstructed and protected by an appropriate easement by the landowner, developer and contractors. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting afull-size copy of the irrigation and drainage plans. Whereas this property lies within New York Irrigation District it is important that representatives of this development contact the NYID office as soon as possible to Is scuss a pressure system prior to any costly design work. If applicable, the irrigation system will have to be built to specific specifications as set by the District / Project. Boise Project Board of Control must receive a written response from the New York Irrigation District as to who will own and operate the pressure irrigation system prior to review and approval of an irrigation plan by Boise Project Board of Control. Wording on the preliminary and final recorded plat needs to state that any proposed and/or firture usage of the Boise Project Board of Control facilities are subject to Idaho Statues, Title 42-1209. Future preliminary and final plats must call out the Project easements and the plats must also note, which lots have surface irrigation water rights and which lots do not. Whereas this development is in its preliminai� stakes, Boise Project Board of Control reserves the right to review plans and require changes when our easements and/or facilities are affected by unknown factors, even during the construction phase. . If you have any further questions hesitate to contact me at (208) 344-1 Ritthaler Assistant Project Manager, BPBC for/tr cc: Clint McCormick Terry Hasson File or comments regarding this matter, please do not 141. Watermaster, Div; 2 BPBC Secretary -Treasurer NYID