HomeMy WebLinkAbout2022-06-08 Meridian Pathways
Reviewer: Kim Warren / Pathways Project Manager
Planner Assigned: Alan Tiefenbach
Project Name: Vertex Sub Nos 1 & 2 FP File #s: H-2022-0015 & H-2022-0016
Date: 6.8.2022
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways
Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be
coordinated through the Pathways Project Manager.
2. Prior to Final Approval, the applicant shall submit a public access easement for a multi-use
pathway running parallel to the Farr Lateral alignment at the south end of the property. This
pathway shall connect to S Recreation Avenue across the Pipeline Pathway easement. Pathway
shall be located outside of irrigation easement unless permission is obtained from the governing
irrigation district to build pathway within their easement.
Detached 10’ pathway is welcome but not required along the east side of Recreation Avenue.
For all multi-use pathways, submit easement documents via the online access portal for Council
approval and subsequent recordation. The easement shall be a minimum of 14’ wide (10’
pathway + 2’ shoulder each side). Easements parallel to a public ROW need only be wide enough
to accommodate additional sidewalk width plus two feet.
Use standard City template for public access easement. Submit all easement documents online
through Citizen’s Access Portal.
3. Construct multi-use pathways per paving section based on existing site conditions as
recommended by project civil engineer in accord with UDC 11-3A-8 and 11-3B-12. Prior to
occupancy, the applicant’s engineer shall provide written documentation that the pathway
segment was constructed per the recommended specifications.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi-use pathway.
5. 6’ high open vision fencing shall be installed between pathways and (live) water irrigation canals
and laterals as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3-5. All other
fence details per UDC 11-3A-7.
Rev. 02.11.22
6. Project developer shall be responsible for obtaining license agreement and other permission(s)
as required for constructing within irrigation district easements and the Williams Northwest
Pipeline easement.
7. Should any discrepancy exist between these conditions of approval and the requirements of the
irrigation district or utility, the developer shall work with Pathways Project Manager to achieve a
pathway design that meets both City and irrigation district objectives. City requirements as
stated shall not (nor are they intended to) override those of the irrigation district or utility having
jurisdiction over the project area.
Rev. 02.11.22