Loading...
HomeMy WebLinkAboutLetter from Dave McKinnon RECEIVED APR 26 2006 City Of Meridian City Clerk Office Date: April 25, 2006 To: Mayor and City Council Re: Final Plat Staff Report for The Reserve Subdivision Dear Mayor and Council, We have received and reviewed a copy of the staff report that has been prepared for the Reserve Subdivision and have prepared a written response below as requested. The response will follow the body of the report, with comments as needed for clarification; a "no comment" response indicates agreement with the comments or conditions. Application and Summary Location: No comment. Site Specific Comments: 1-2. 3. 4. No comment. The requested notes and revisions will be added to the face of the plat. The Landscape plan will be revised and requested. Three copies ofthe revised plan will be submitted to the Planning Department upon completion. 5-7. No comment. 8. The previously installed pressure sewer mains will not be needed in the very near future, a connection to the gravity line in Saguaro Canyon has already been constructed and the temporary lift station is no longer needed. A vacation request for the existing pressurized sewer easement has been submitted to the City of Meridian for approval. We will revised the construction drawings to reflect the water lines, and accompanying easement, to install a water line from the West as proposed in the Preliminary drawings. 11-16. No comment. 17. Clarification: If the turn-round is not used as a driveway to a garage, a 20' setback from the turnaround will not be required. 18-20. No comment. 10. 9. General Requirements 1-14. No Comment With the above noted changes and comments we are in agreement with the staff report and ask for your approval of the Final Plat for the Reserve Subdivision. If you have any questions please contact me at 353-2515 or via e-mail at dm ckinnon@congergroup.com. Sincerely, Dave McKinnon CMG