Loading...
HomeMy WebLinkAboutTM Crossing Wireless Comm Facility Upgrades CZC A-2022-0095 V1�j(E IDIA r w IDIAN�-- IDAHO APPROVED DATE: 06/01 /22 FILE NUMBER:A-zoz 005 Planning Division Community Development Department 33 E. Broadway Avenue, Suite 102 Meridian, Idaho 83642 CERTIFICATE OF ZONING COMPLIANCE REPORT Project Number A-2022-0095 Project Name TM Crossing Wireless Communication Facility Upgrades Project Address 2678 W Excursion Lane Project Description Existing Wireless Communication Facility / Verizon Wireless Equipment Modification. Remove (3) antennas Add (6) Antennas Add (3) RRU's Add (2) OVP/Junction Boxes There will be some additional modifications within their cabinets on the ground, but no changes to the ground space or height of the tower. Applicant Heather Petro, Technology Associates EC, INC TAEC Assigned Planner Julia Garofalo Expiration Date June 1, 2023 Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. I. DECISION The applicant's request for Certificate of Zoning Compliance is approved with the conditions listed below. Site Specific Conditions of Approval 1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B. 2. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 3. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 4. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 1 1 P a g e 1 E IDS IAN;r- APPROVED DATE: 06/01 /22 FILE NUMBER:A-zoz 005 If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. 7. The approved site plan, landscape plan, and/or elevations and/or may not be altered without prior written approval of the City of Meridian Planning Division. General Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 3. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 4. The applicant has a continuing obligation to comply with the outdoor lighting provisions asset forth in UDC 11-3A-11. 5. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. 6. The applicant and/or assigns shall have the continuing obligation to meet the specific use standards for the proposed use as set forth in UDC 11-4-3-43, wireless communication facility. II. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before June 14, 2022 within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. 2 1 P a g e