Loading...
DWG_Recommendations and Special Instructions_RF1_Page 7 V129' EIZIDIANg- APPROVED iwh M01Qz FU NUNBFN:"-sav ' Mount Structural Analysis Report (3) 5.00-Ft T-Arm March 16, 2= Site ID: 443517-VZW / HAPPY CAMPER - D Page 14 4. All member connections are assumed to have been designed to meet or exceed the load carrying capacity of the connected member un less otherwise specified in this report. 5. The mount was checked up to, and including, the bolts that fasten it to the mount collarlattachment and threaded rod connections in collar members if applicable. Local deformation and interaction between the mount collarlattachment and the supporting tower structure are outside the scope of this analysis. 6. All services are performed, results obtained, and recommendations made in accordance with generally accepted engineering principles and practices. Maser Consulting is not responsible for the conclusion, opinions, and recommendations made by others based on the information supplied 7. Structural Steel Grades have been assumed as follows, if applicable, unless otherwise noted in this analysis: o Channel, Solid Round. Angle, Plate ASTM A3611136) o HSS (Rectangular) ASTM 500 (Gr. B-46) o Pipe ASTM A53 (Gr. B-35) o Threaded Rod F1554 1 36) o Bolts ASTM A325 Discrepancies between in -field conditions and the assumptions listed above may render this analysis invalid unless explicitly approved by Maser Consulting. Analysis Results: Component Utilization % PaWFail Face Horizontal 41.5 % Puss Mount Pipe 28 4 % Puss Standoff Horizontal 17.8 % Pass Connection Check 30.9 % Pass Structure Rating — (ControNing 11611 of all Cornnonents) 41.5% Results valid after hardware upgrades noted in the PMI Requirements are installed Mount Steel (EPA)a aer ANSIlTIA-222-H Section 2.11 Ice Thickness (In) Mount Pipes Excluded Mount Pipes Included Front (EPA)a (Sq. Ft.) Side (II (Sq. Ft.) Front (EPA)a (Sq. Ft.) Side (EPA)a (Sq. FL) 0 2.0 0.3 10.5 6.6 0.5 2.7 03 14 S 12.5 1 1 3.3 1 0.4 1 19 1 1 16.1 Notes: - (EPA)a values listed above may be used in the absence of more precise informaton - (EPA)a values in the table above include 1 sector(s ). - Ka factors included in (EPA)a calculations RECOMMENDATIONS PAGE AND SPECIAL INSTRUCTION PAGE NOT USED ■ These photos shall also certify that the placement and geometry of the equipment on the mount is as depicted in the antenna placement diagram in this form. Photos that show the model number of each antenna and piece of equipment installed per sector. Antenna & eauipment Placement and Geometry Confirmation: e The contractor shall certify that the antenna & equipment placement and geometry is in accordance with the sketch and table as included in the mount analysis and noted below- C The contractor certifies that the photos support and the equipment on the mount is as depicted on the sketch and table included in this form and with the mount analysis provided. OR ❑ The contractor notes that the equipment on the mount is not in accordance with the sketch and has noted the differences below and provided photo documentation of any alterations. al Instructions / Validation as required from the MA or anv other information the contractor deems necessary to share that was identified: Issue: Prior to insta Iation of equipment, contractor shall record all dimensions and member sizes shown m the Mount Geometry Verification Requirements section of the Mount Analysis report Escalate any discrepancies to FOR immediately as it may render the results of this analysis invalid and require additional modifications. Contact FOR � these documents are not available to the general contractor Contractor shall inspect climbing facilities and safety climb, I present, and ensure they are in good condition Contractor shall install safety climb wire rope guides in locations where wire rope is rubbing against the mount or mount -to -tower connection steel. Wire brush clean any observed corrosion and protect with two (2) coats of cold ga:varuzation (Zinga or Zinc Kote). Contractor shall provide photos of wire rope guide installation as part of PMI documents. Contact FOR if additional guidance is required. Contractor shall shift mount pipes horizontally in position 1 on all sectors such that it is 3' from left end of face horizontal_ Reconnect shifted pipes to mount horizontals using existing connection crossover plates, etc with new bolting hardware. Do not reuse existing bolts. Contractor shall shift mount pipes honzonta Ily in position 2 on all sectors such that it is 21" from left end of face horizontal. Reconnect shifted pipes to mount horizontals using existing connection crossover plates, etc with new bolting hardware. Do not reuse existing bolts. Contractor shall install a new 120' long P2 STD mount pipe position 3 (in all sedors). Install 3" from right end of face horizontal. Top of pipe shall be 48' from face horizontal. Attach using VZWSMART MSK2 crossover pl ates. Refer to placement diagrams. Contractor shall relocate existing OVP from position 3 in Beta Sector to position 3 in Alpha Sector. Refer to placement IN verizoal 9656 SOUTH PROSPERITY ROAD WEST JORDAN, UTAH 84088 Technology Associates MOUNTAIN REGION OFFICE 1042 E. FORT UNION BLVD., # 484 MIDVAIL, UTAH 84047 CORPORATE OFFICE 3129 TIGER RUN COURT, SUITE 206 CARLSBAD, CALIFORNIA 92010 DRAWN BY: SEAN T. CHECKED BY: TREVOR C. D 04.18.2022 FINAL CONSTRUCTION DRAWINGS C 04.01.2022 REVISED B 01.28.2022 REVISED A 01 .24.2022 90% CONSTRUCTION DRAWINGS REV DATE DESCRIPTION B01 HAPPY CAMPER - D W. EXCURSION LN. MERIDIAN, ID 83642 -- SITE MODIFICATION -- SHEET TITLE RECOMMENDATIONS AND SPECIAL INSTRUCTION PAGES SHEET NUMBER RF2 2