HomeMy WebLinkAboutDWG_Ground Equipment Layout_C100_Page 2 V1APPROVED
ChM, M0vzz
Fu .
NOTES:
1. POWER UPGRADE - GC TO VERIFY WITH CM BEFORE INSTALLATION:
• INSTALL (6) 48V, 75A RECTIFIERS
2. GENERAL CONTRACTOR IS RESPONSIBLE FOR FULL REVIEW OF THE RF
DATA SHEET AND MA/SA DOCUMENTS FOR FURTHER DETAIL AND
DIRECTION ON DELIVERABLES.
(N) (1) ADDITIONAL ERICSSON 6630 BBU AND (1) 6648 BBU
(E) MONOPINE WITHIN EQUIPMENT CABINET
r \ Z1111\
(N) (1) ADDITIONAL OVP WITHIN EQUIPMENT CABINET
o °
o
°
° (E) EQUIPMENT ° (E) BATTERY o
CABINET CABINET °
0
Q
(E) ICE BRIDGE
(E) GENERATOR
�i]
a 0 N%
EXISTING EQUIPMENT LAYOUT D 2' 1
SCALE: _ - x
v I (OR) 1/4" = 1'-0" (11x17)
NOT USED
SCALE 2 I NOT USED
N.T.S.
■
verizon
9656 SOUTH PROSPERITY ROAJ
WEST JORDAN, UTAH 840�
Technology Associates
MOUNTAIN REGION OFFICE
1042 E. FORT UNION BLVD., # 484
MIDVAIL, UTAH 84047
CORPORATE OFFICE
3129 TIGER RUN COURT, SUITE 206
CARLSBAD, CALIFORNIA 92010
DRAWN BY: SEAN T.
CHECKED BY: TREVOR C.
D
04.18.2022
II,A_ CONSTRUCTION DRAWINGS
REVISED
C
04.01.2022
B
01.28.2022
RI:`,FD
9C"ISTRUCTION DRAWINGS
1)-� 0N
A
01.24.2022
REV
DATE
04.22.22
B01 HAPPY CAMPER - D
W. EXCURSION LN.
MERIDIAN, ID 83642
--SITE MODIFICATION
SHEET TITLE
EQUIPMENT LAYOUT
SHEET NUMBER
C100
SCALE 3
N.T.S.