Loading...
HomeMy WebLinkAboutDWG_Ground Equipment Layout_C100_Page 2 V1APPROVED ChM, M0vzz Fu . NOTES: 1. POWER UPGRADE - GC TO VERIFY WITH CM BEFORE INSTALLATION: • INSTALL (6) 48V, 75A RECTIFIERS 2. GENERAL CONTRACTOR IS RESPONSIBLE FOR FULL REVIEW OF THE RF DATA SHEET AND MA/SA DOCUMENTS FOR FURTHER DETAIL AND DIRECTION ON DELIVERABLES. (N) (1) ADDITIONAL ERICSSON 6630 BBU AND (1) 6648 BBU (E) MONOPINE WITHIN EQUIPMENT CABINET r \ Z1111\ (N) (1) ADDITIONAL OVP WITHIN EQUIPMENT CABINET o ° o ° ° (E) EQUIPMENT ° (E) BATTERY o CABINET CABINET ° 0 Q (E) ICE BRIDGE (E) GENERATOR �i] a 0 N% EXISTING EQUIPMENT LAYOUT D 2' 1 SCALE: _ - x v I (OR) 1/4" = 1'-0" (11x17) NOT USED SCALE 2 I NOT USED N.T.S. ■ verizon 9656 SOUTH PROSPERITY ROAJ WEST JORDAN, UTAH 840� Technology Associates MOUNTAIN REGION OFFICE 1042 E. FORT UNION BLVD., # 484 MIDVAIL, UTAH 84047 CORPORATE OFFICE 3129 TIGER RUN COURT, SUITE 206 CARLSBAD, CALIFORNIA 92010 DRAWN BY: SEAN T. CHECKED BY: TREVOR C. D 04.18.2022 II,A_ CONSTRUCTION DRAWINGS REVISED C 04.01.2022 B 01.28.2022 RI:`,FD 9C"ISTRUCTION DRAWINGS 1)-� 0N A 01.24.2022 REV DATE 04.22.22 B01 HAPPY CAMPER - D W. EXCURSION LN. MERIDIAN, ID 83642 --SITE MODIFICATION SHEET TITLE EQUIPMENT LAYOUT SHEET NUMBER C100 SCALE 3 N.T.S.