Loading...
HomeMy WebLinkAboutPZ - Landscape Plan Updated NOTES:TREE PLANTING(>2"CAL.) SOIL LINE 1.ALL PLANT MATERIALS SHALL BE IN ACCORDANCE WITH i / _7 QJ THE AMERICAN STANDARDS FOR NURSERY STOCK(ANSI Q sae . `\ ROOT PROBE Z60.1-2004).PLANT ACCORDING TO ANSI A300 PART 6. Q \ Q \ WHEN PRESENT:LOCATE THE BUD POINT 1 1/2"ABOVE SOIL 2.DIG THE PLANTING HOLE A MINIMUM OF 2x WIDTH OF \ ROOTBALL FOR AT LEAST THE FIRST 12 INCHES OF DEPTH. N LINE BELOW 12 INCHES,DIG HOLE WIDE ENOUGH TO PERMIT ADJUSTING.DO NOT DIG THE HOLE DEEPER THAN ROOT BALL DEPTH. /\ ROOT LOCATE FLARE/COLLAR 2 \ @ SOIL LINE.THIS CAN BE i1 3.SCARIFY THE SUBGRADE AND SIDES OF THE PLANTING \ \ LOCATED BY SWELLING LINE, HOLE WHEN PLANTING IN CLAY SOILS(MORE THAN 15% / \ WERE THE BARK OF THE TREE CLAY). m / \ TRANSITIONS TO ROOT BARK) \ 4.LIFT AND SET THE TREE BY ROOT BALL ONLY.DO NOT LIFT — HIGHEST ROOT SHALL BE 2" USING THE TREE TRUNK AND DO NOT USE TREE TRUNK AS A \ MAXIMUM BELOW SOIL LINE.UTILIZE LEVER. SOIL/ROOT PROBE AROUND TRUNK 1/2 1/4 o 112 Full \ (APPROX 1-2"AWAY FROM TRUNK) I 5.SET THE TOP OF THE ROOT BALL LEVEL WITH THE SOIL \ TO LOCATE HIGHEST ROOT. SURFACE OR SLIGHTLY HIGHER IF THE SOIL IS PRONE TO \\ RUBBER CINCH TIE SETTLING. Graphic Scale: \ 2"X2"WOOD STAKE AT OR BELOW 6.AFTER THE TREE IS SET IN PLACE,REMOVE BURLAP,WIRE _ _ _ _ _ _ __ \ GRADE PLACE STAKES PARALLEL AND STRAPS FROM AT LEAST THE UPPER 1/3 OF THE 9 Y Attention is Drawn to the Fact That Drawing Scales May be \ TO PREVAILING WIND. ROOTBALL. Altered During Reproduction Processes. Scales Shown \ \ REMOVE TREE WRAP AFTER 7.BACKFILL WITH EXISTING SOIL THAT HAS BEEN WELL- Hereon are Based on a Full Scale Sheet Size of 24"x 36". I \ \ INSTILATION. TILLED OR BROKEN UP. DO NOT ADD AMENDMENTS TO THE \\ 3"THICK MULCH 3"FROM TREE BACKFILL SOIL.AMEND THE SURFACE WITH MULCH. Scale: 1"— 15' — / \ TRUNK. 8.USE THREE 2"X 2"WOOD STAKES DRIVEN INTO UNDISTURBED SOIL A MINIMUM OF 16 INCHES.SPACE STAKES CONSTRUCT 2"EARTH BERM EQUALLY AROUND THE TREE. AT EDGE OF ROOTBALL, \ \ REMOVE BURLAP,TWINE,AND 9.ATTACH 3/4"NYLON WEBBING TO CONNECT THE TREE TO \ WIRE BASKET FROM TOP 2/3"OF 2"settled layer STAKES.ATTACH WEBBING AT 1/3 THE TREE HEIGHT. \ \ ROOTBALL,REMOVE ALL of mulch 10.APPLY A 2-3"(SETTLED)DEPTH OF PINE STRAW OR BARK NONBIODEGRADABLE TRASH MULCH TO THE PLANTING SURFACE.LEAVE A 2"SPACE \ \\ FROM HOLE. Tilled Or Broken up AROUND THE TRUNK FOR AIR CIRCULATION. \ \ ROOTBALL TO BE PLACED Soil min 12"Deep PLANTING LEGEND \ \ \ ON NATIVE SOIL. 11.PRUNING SHALL BE LIMITED TO DEAD,DISEASED,OR O \ \ COMMERCIAL SLOW RELEASE BROKEN LIMBS ONLY AND SHALL BE IN ACCORDANCE WITH �� Ln I \\ FERTILIZER TABLETS ANSI A300 SPECIFICATIONS. �K'� NORWAY SPRUCE \ \ BACKFILL W/APPROVED TOPSOIL. 12.REMOVE ANY TRUNK WRAP REMAINING AT TIME OF \ \ BACK FILL IN 6"LIFTS,WATERING PLANTING.NO WRAPS SHALL BE PLACED ON TRUNK. TURF OVER APPROVED TOPSOIL. PROVIDE SEED AT ALL EACH LAYERAND TAMP AS O \ \ \\ REQUIERDTO SUPPORT TREE. FINISH GRADE DRAINAGE SWALES AND SOD AT ALL OTHER LOCATIONS Z v vv CONCRETE T_ co \ \ ~ I v ♦ v 00 I I v vv Z o o v v v Q v \\ � m \ \ WIDTH OF BALL WIDTH OF BALL WIDTH OF BALL WIDTH OF BALL WIDTH OF BALL Ld CZ c 5'MIN DIA.TREE RING — E:CO o i STREET LIGHTING .N 4 l _ jo J 2 and larger conifer tree detail U] — — — — — — _ — _ _ _ J ( \ ij�. 3/16 - 1 0 1. ALL STREET LIGHT CONSTRUCTION SHALL BE DONE IN c}n `�,� \ ���oC \\ ACCORDANCE WITH THE CURRENT VERSION OF THE ISPCW, THE a o s \ MERIDIAN SUPPLEMENTAL SPECIFICATION TO THE ISPWC, AND CM N \ � THE NATIONAL ELECTRIC CODE. 0 ti \ 2. A STREET LIGHTING ELECTRICAL PERMIT SHALL BE OPENED 72 lzt — PRIOR TO STARTING WORK. USE THE ONLINE CITIZEN PORTAL AT > z — _ _ _ _ ,5\ ♦ \ HTTP:HCITIZEN PORTAL.MERIDIANCITY.ORG/CITIZENACCESS/ TO ` — C o OPEN A PERMIT AND REQUEST INSPECTIONS. Ix co Cn I N N\\ \\\ 3. INSTALLATION WILL REQUIRE INSPECTIONS FOR THE CONCRETE � � BASES AND BELOW GROUND WIRING. T 4. STREET LIFT BASES SHALL BE LOCATED 10' MINIMUM FROM co 'bj \ TREES, 5' MINIMUM FROM FIRE HYDRANTS, AND 2' MINIMUM FROM Ir` c!y \ WATER METERS. \ .(r� \ 5. KEEP ACCURATE AS BUILTS OF ALL CONDUIT, JUNCTION BOXES, cn U W Newland Ct. \ \\ AND SUBMIT AN ELECTRONIC COPY OF THE RED LINE AS-BUILT �' � Y Q N Id ��� \ WITH THE APPROCED PERMIT TO THE CITY OF MERIDIAN AT !' Q Y oN \\ COMPLETION OF PROJECT. z } o m 0. 4 6. COORDINATE WITH THE CITY TRANSPORTATION AND UTILITY = > m W o COORDINATOR @ (208)898-5500 FOR QUESTIONS REGARDING Q Q Q 2 w \ UTILITY CONFLICTS, OR ACCESS LOCKED METER PEDESTALS. U U of Lu = Q to cn U o KEYNOTE LEGEND 4 Idaho Power 10'x10' l , \ ' \ -0" CEDAR FENCING, SEE DETAIL 5/L1 � � � � � \\ 6'\ Transformer Easement L STREET LAMPS ARE TO BE TYPE 2 PER MERIDIAN STANDARD / v v \ \ \ DRAWINGS T1 AND T2. STREET LIGHTS ARE TO BE INSTALLED PER CURRENT CITY OF MERIDIAN SUPPLEMENTAL vv v vv SPECIFICATIONS. I I I I � / vvv vv vv v V 0 \ \ \ \ \ 2"x4"Top and Bottom 1"x6" Rough Sawn c�/�J Z \\ \\ \ y \ 4"x4" PT. Spruce Post - - - - - Property line N I I \ \ 8 -0 4 x4 PT Post \ \ \V A Rough Sawn Spruce Stained o \ \\ \\ \ V A w/"Sandstone" Solid Wood \\ \ \ \\\ \\ Stain By Cloverdale Paints. Z D_ I 0 _ _ _ — � � � � W \ Fence Boards To Be Close Z Z — — — V A \ \ Nailed. Space Dia. Of one \\ \V A A `° Nail 1"x6"Sas Spruce. o I I vv v v v �� A \ \ �_ U) 4 Q I I I v �v v �� V A\ N � � � 0 N LU I vv v vv \ Z w\ \ \ \ V 1' Dia Conc. Base co co - IL — — — — — — — — — — — — — v v v A \ v — — — — — — -- -- — — — A - -- -- -- -- -- - \ Note: �S\(DNAL E p \ \ 1. All wood to be stained with "Sandstone"solid wood stain both sides prior to installation. \STE 2. All hardware to be galvanized. OF — — — — — — — — — \ 3. All stain to be applied to manufacturer's specifications. 0- >_ .0 �� — — — — — — — — — — — — \ 5. Nail to be 3 1/2" coated for stringers to posts and 2" ardox for boards. b �� 6 -0 CEDAR PICKET FENCE \ — 7. All planed materials#2 and better. � — — — — N �FG�F \OP � N CO \ n Fence Detail �N o M G° \ CN 11-011 Union Pacific Railroad PROJECT NO. \ aol \ R21228 N N aa) N \ DRAWING NAME o Z ca o c d 20OF 1