Loading...
HomeMy WebLinkAboutIdeal Demolition (3401 W. Pine Ave -] V1/2014 J ID NUMBER APPROVED State of Idaho Department of Water Resources DATE: 05/25/22 AUTHORIZATION TO ABANDON (DECOMMISSION) A WELL FILE NUMBER: FPS-2oz2- 1 [WNER INFORMATION: (The well owner is the person who legally owns the property.) Name: Ideal Demolition Services Current Mailing Address: 2473 W. Success Way City: Emmett State: Idaho Zip Code: 83617 Telephone: ( ) 2. WELL LOCATION: (GPS required in Degrees Decimal Minutes.) Twp. 3N , Rge.1 W , Sec. 10 1 /4 NE (10) (40) Gov't Lot No. CountyAda Lat.43 36.690'N Street Address of Well Location: 3401 W. Pine Ave. City: Meridian Lot, block and subdivision: 3. TYPE OF WELL: 1/4SE Long. 1/4 (160) 116 26.166'W 0 DOMESTIC ❑ MONITORING ❑ IRRIGATION ❑ OTHER (Describe) 4. WELL INFORMATION: (*Casing size, well depth & static water level data are required.)i� Z� �13 Well Tag Number: N/A Previous Drilling Permit Number: 63-93-W-0901-000 Water Right Number: N/A _ Well Log on File? (Provide if available) DYes ❑No Temperature: ❑r less than 85°F ❑greater than 850F *Casing Size:6" *Material: Steel *Well Depth204' (measured) *Current Static Water Level:6' (measured) Flowing Artesian? ❑ Yes ❑✓ No 5. REASON FOR ABANDONMENT OF WELL: Developing a new subdivision and this well is in the way. 6. PROPOSED METHOD OF ABANDONMENT: (Must be consistent with IDAPA 37.03.09. This Application must be reviewed prior to commencement of abandonment.) Cut casing off below the surface, perforate the casing, mix & pump cement grout, weld metal plate on top, and bury. 7. Drilling company name: Dennis Phipps Well Drilling Inc. L 9. 10. Date of abandonment: 4/30/21 Applicants signature: Title: Driller date: 4/27/21 company lic. No. 332 ACTION OF THE DEPARTMENT OF WATER RESOURCES This application for abandonment has been reviewed by IDWR on t0 / Z / 2o2-1 This review does not constitute an endorsement by IDWR of the proper abandonment of this well. Pursuant to Section 42-238(12), Idaho Code, all abandonments must meet the requirements of the Administrative Rules for Well Construction Standards. Abandonment of this well will require the services of a well driller licensed in the State of Idaho unless a waiver has been granted. S, g1 ure of Authorized Department Representative JUN O Title WATER RESO RCE1 WESTERN HE�GION E IDI� I.A\ - 9/2010 APPROVED emolition Services ID NUMBER: DAT 05/25/22 :,E •;UiJB;R:FPS --2-I ABANDONMENT REPORT ABANDONMENTPROCEDURES: Must describe jU details of work performed, including perforations, sealing materials, and how casing was removed. PROCEDURE: FROM: I TO: I WEIGHTIVOLUME: Cut 6" casing off 4' below the surface, perforated I -4' 120411 2572 lbs. the 6" casing from 10' - 200', mixed and pumped cement grout from bottom to top, welded metal plate on top. DRILLER'S CERTIFICATION l0e certify that all minimum well construction standards were complied with: Drilling Company:Dennis Phipps Well Drilling Inc. License # 332 Principal Driller: Date: 5/21 /21 Operator: Date: RECEIVED p�i^r�► 1 -iz-7 qS6 OCT 2 2 W3 STATE OF IDAHO E DEPARTMENT OF WATER RESOURCES WA16R REBOU10to WEBTEIiN Fii�ICN WELL DRILLERS REP State law requires that this report be filed with the Director, Department APPROVED I within 30 days after the completion or abandonment of the Q41E: 05/25/22 OWNER FNiNtIAtKII FPs-zozzaoiv _ �, ��Z all 421�� Drilling Permit No. 1s3-91Z — Water Right Permit No. -- 2. NATURE OF WORK W'New well ❑ Deepened ❑ Replacement ❑ Well diameter increase Cl Modification ❑ Abandoned (describe abandonment or modification procedures such as liners, screen, materials, plug depths, etc. in lithologic log, section 9.) 3. PROPOSED USE (Domestic ❑ Irrigation ❑ Monitor ❑ Industrial ❑ Stock ❑ Waste Disposal or Injection ❑ Other (specify type) 4. METHOD DRILLED Votary ❑ Air ❑ Auger ❑ Reverse rotary able ❑ Mud ❑ Other (backhoe, hydraulic, etc.) 5. WELL CONSTRUCTION Casing schedule: R/Steel ❑ Concrete ❑ Other Thickness Diameter From To a75%� inches inches + -L;&— feet .146 feet inches inches feet feet inches inches — feet feet Was casing drive shoe used? I( Yes a No Was a packer or seal used? ❑ Yes :/' No Perforated? ❑ Yes ¢ No Mow perforated? ❑ Factory ❑ Knife ❑ Torch ❑ Gun Size of perforation? inches by inches Number From To perforations feet feet perforations feet feet perforations feet feet Well screen installed? ❑ Yes lr No Manufacturer ___ Type __ 1bp Packer or Headpipe Bottom of Tailpipe Diameter Slot size — Set from _ feel to — feet Diamatei _ Slot size Set from _ feet to _ feet Gravel packed? ❑ Yes -No ❑ Size of gravel Placed from feet to feet Surface seal depih�Material used in seal: ❑ Cement grout W"Bentonite ❑ Puddling clay ❑ Sealing procedure used: ❑ Slurry pit ❑ Temp. surface casing 0—overbore to seal depth Method of joining casing: F Threaded I�Nelded ❑ Solvent Weld ❑ Cemented between strata Describe access port Location Corrected by IDWR To: I T03N R01W Sec.10 NESE By: segbert 2012-02-27 7. WATER LEVEL Static water level feet below land surface. Flowing? ❑ Yes No G.P.M. flow — Artesian closed -in pressure p.s.i. Controlled by: ❑ Valve ❑ Cap ❑ Plug Temperature -- IF. Quality _ Ckscnx criesnn zones below. & WELL TEST DATA epump ❑ Bailer eAir ❑ Other j Otsehame G.P.M. j Pumping Level I _ Hours Pumved—j 6. LOCATION OF WELL Sketch map location must agree with written location. N Subdivision Name w e �•• I.1c;__ Lot No. Block No. is C ly_ Address of Well Site (give at least name of road) /��� T. ?_ N [!?'or S ❑ Mly 1/4 _V— 1/4 Sec. JA , R. i E ❑ or W IF"' 9. LITHOLOGIC LOG 705- 173 Mam�Bore Depth Water To Material Yes No MM 10. Work started 9 oZ3 finished 9�C`/L9i it. DRILLER'S CERTIFICATION I/We certify that all minimum well construction standards were complied with at the time the rig was removed. Firm Name Ato� it a ADZ Address 950 - _ Date Signed by Drilling Supervisor _­,�Z and (Operator) (ft differanY than the Drilling Supervisor) USE ADDITIONAL SHEETS IF NECESSARY — FORWARD THE WHITE COPY TO THE DEPARTMENT