Loading...
HomeMy WebLinkAboutEngineer Statement V1�E IDIAN> APPROVED DATL 05/25/22 FILE NUMBEJLI -zozz- M L THE LAND GROUP Mr. Warren Stewart, PE City of Meridian 33 E. Broadway Ave. Meridian, ID 83642 RE: Aviator Springs Subdivision Street Centerline Elevation Certification I PN 120194 Dear Mr. Stewart: As required by the City's final plat application requirements, please accept this statement certifying that all street finish centerline elevations are set a minimum of three (3) feet above the highest established normal groundwater elevation. According to the initial test pit investigations and recent groundwater monitoring, the groundwater within this project was not encountered within a depth of three (3) feet of the existing ground. Based on the above information, I certify that groundwater would be greater than three (3) feet below the designed finished street centerline elevations throughout the project. Sincerely, �IONAL �N THE LAND GROUP, INC. ��5G\5 G James W. Gute, PE , Principal, Project Civil Engineer 68 04/07/2022 �T�T F of \OP 4�ES 462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 thelandgroupinc.com