Loading...
Amenity Details V1I1'�F IDI� fF NOTES: NOTES: �1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION' HOWEVER THE CONTRACTOR IS 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION' HOWEVER THE CONTRACTOR IS APPROVED RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS' INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS' STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE � STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE DATE °sizsizz IMPROPERLY PRUNED TREES AS DETERMINED BY THE IMPROPERLY PRUNED TREES (AS DETERMINED BY THE YEAR WARRANTY PERIOD. ( YEAR WARRANTY PERIOD. ``` `0'f9 e, Pz zz"", 2 IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO i INSTALLATION OF PLANT MATERIAL. PREVAILING WIND DIRECTION INSTALLATION OF PLANT MATERIAL. PREVAILING WIND DIRECTION 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO GALVANIZED NAILS TO PREVENT SLIPPAGE. TREE WRAP TRUNK PROTECTION, PREVENT SLIPPAGE. d 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. REMOVE AFTER INSTALLATION 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. RUBBER CINCH TIE 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE RUBBER CINCH TIE 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. ARCHITECT IMMEDIATELY. ° 2" x 2" x 8' CEDAR STAKE - DO NOT PENETRATE ROOTBALL. c 2" x 2" x 8' CEDAR STAKE - DO NOT PENETRATE FOOTBALL. ROOT PROBE SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. ROOT PROBE SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. SOIL LINE MULCH LAYER, KEEP MULCH 3" AWAY FROM SOIL LINE ° o MULCH LAYER, KEEP MULCH 3" AWAY FROM TRUNK TRUNK UTILIZE SOIL/ROOT PROBE AROUND TRUNK \ BACKFILL WITH SOIL PLANTING MIX. SEE UTILIZE SOIUROOT PROBE AROUND TRUNK BACKFILL WITH SOIL PLANTING MIX. SEE (APPROX. 3-4" AWAY FROM TRUNK) TO LOCATE 41- 3 (APPROX. 3-4" AWAY FROM TRUNK) TO LOCATE 3" SPECIFICATIONS FOR ADDITIONAL INFORMATION. HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE L 1_ - - SPECIFICATIONS FOR ADDITIONAL INFORMATION. 'I / HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. dl �l, l / ,y, TI� \ Y j FINISH GRADE POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. \ \ \ \ \ \ \ FINISH GRADE REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP ll��//V� V ��/V�� REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP//�// v v vv v L 4Q ��//��% X2 OF ROOTBALL, REMOVE ALL NAILS, TIES, AND PLASTIC / \ / //\� COMMERCIAL SLOW RELEASE FERTILIZER TABLETS Y OF FOOTBALL, REMOVE ALL NAILS, TIES, AND PLASTIC \ � � � COMMERCIAL SLOW RELEASE FERTILIZER TABLETS FROM FOOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO / FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO \// WRAP THE FOOTBALL, IT SHALL BE COMPLETELY/ \ x//� WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE \/\'/\/\/\'/\ \ /\/\/ \/!v REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. ��/ V/%V/% /�/%V/% / /%//V/ \ // LEFT ON THE BOTTOM OF THE ROOTBALL. /��/�� /j�/j��j /j�/j�% �/ SET FOOTBALL ON NATIVE UNDISTURBED SUBSOIL V�%jam%/%jam%�%�%jam%� j���j� / / / / _ SET FOOTBALL ON NATIVE UNDISTURBED SUBSOIL 2x FOOTBALL DIAMETER 2x ROOTBALL DIAMETER Deciduous Tree Planting 3xROD BALLDIAVETER 1�,�� Coniferous Tree Planting 3xROOTBALL DIAMETER \ Scale: NTS \ 2 Scale: NTS MULCH LAYER COMMERCIAL FERTILIZER TABLETS Shrub Planting Scale: NTS BOULDER RETAINING WALL BY o DESIGN -BUILD CONTRACTOR c� a CD s MULCH AT EDGE - BETWEEN PAVEMENT AND FACE OF BOULDER 0 w SIDEWALK PER CIVIL PLANS C C 11i=.a=.awn=ni SouthI I = 1 WATER RETENTION BASIN BACKFILL WITH SOIL PLANTING MIX. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. NOTES: 1. NOTIFY LANDSCAPE ARCHITECT WHEN PLACING BOULDERS FOR APPROVAL. 2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION SYSTEM. 3. CLEAN ALL BOULDERS OF DIRT AND LOOSE DEBRIS. 4. WHEN PLACING BOULDERS, BURY 1/4 TO 1/3 OF BOULDER BELOW FINISH GRADE. 5. DO NOT SCAR OR DAMAGE BOULDERS. Boulder Installation Scale. NTS TOP OF WALL, REFER TO CIVIL SHEETS LANDSCAPE SOD MIX, PER FOR MORE INFORMATION LANDSCAPE PLANS TOP OF BERM, REFER LANDSCAPE PLANTING BED, PER r TO CIVIL SHEETS FOR LANDSCAPE PLANS. I MORE INFORMATION INSTALL SHRUB PER DETAIL 3/1-1.50 5' TREE PLANTING MIX PER NOTES ON SHEET 1-1.00 47.8' )GATED, SIZE AND TYPE PER SUBGRADEAS E OUT -TO -OUT DECK PLANKS **CLEAR WIDTH 5/8"0 X 1'-4" TIMBER BOLT & 6„ STRUCTURE NUT W/(2)-MALLEABLE IRON WASHERS. FIELD DRILL 11/16"0 TL HOLES IN CURB , DECK PLANKS & CONTINUOUS PLATE TO MATCH 2" X 8" MINIMUM CURB BLOCK. TREAT HOLES PER RUNNING PLANK GENERAL NOTES. 2" X 12' SHOWN 6" X 6" CURB 3" X 6" X 2'-0" CURB BLOCKS SPACED AT 5'-0" ON CENTER 3" X 8" MINIMUM DECK PLANKS ' = = 2" X 6" CONTINUOUS PLATE *SPACE 2'-0' MAXIMUM INCREMENTS STRINGER STRINGER BRIDGE WITH CURBS ONLY DECK SECTION W/STRINGERS @2'-0" O.C. * MINIMUM NUMBER OF STRINGERS IS THREE ** INSIDE FACE TO INSIDE FACE OF RAILING 11/16"0 (TYP) SYSTEM 11/16"0 (TYP) 1 1/2" 1 1/2" 6" 6" 10 1/2" 10 1/2 10 1/2" 10 1/2 1 1/2" 1 1/2" 1 1/2" 1 1/2" 2'-0" 2'-0" PLAN -CURB BLOCK PLAN -CURB BLOCK AT SPLICE 5/8% TIMBER /2 CURB BOLTS (TYP) CURB CURB 1 CURB DEPTH J BLOCK �T7 '" T DECK PLANKS 2" X 6" CONTINUOUS PLATE ELEVATION -TYPICAL CONNECTION ELEVATION -CONNECTION AT SPLICE SOLID SAWN CURB CONNECTION DETAILS USFS Standard Bridge Detail 962-10-03a Scale: NTS INSTALL TREE PER DETAILS 1 & 2/L1.50 T-3.5' HT. BOULDERS FOR TREE WELL. REFER TO DETAIL 4/1-1.50 FOR BOULDER INSTALLATION DETAIL. 5' 2.5' 2.5' � 2:1 SLOPE MAX PER CIVIL F DRAWINGS FINISHED GRADE FUTURE ITD SERVICE ROAD AND HWY 16 TOP OF BERM PER CIVIL PLANS 3-3 5' FOR 5'x5' TREE WELL BOULDER TREE WELL: PLAN VIEW GENERAL NOTES: SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-03) AND STANDARD SPECIFICATIONS FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FEDERAL PROJECTS, TIMBER & LUMBER: SOLID SAWN TIMBER MEMBERS SHALL CONFORM TO THE REQUIREMENTS OF THE GRADING RULES AGENCY FOR THE SPECIES, TYPE, AND GRADE SPECIFIED BELOW. DECK PLANKS, CURBS, SILLS, & BACKING PLANKS - COASTAL REGION DOUGLAS FIR -LARCH ROUGH SAWN NO.1 GRADE, GRADING RULES AGENCY - WWPA, WCLIB RUNNING PLANKS - COASTAL REGION DOUGLAS FIR -LARCH ROUGH SAWN NO.2 GRADE, GRADING RULES AGENCY - WWPA, WCLIB RAILS & POSTS (SEE PROJECT CRITERIA) UNTREATED - REDWOOD, S4S, NOT GRADE GRADING RULES AGENCY - RIS WESTERN RED CEDAR, S4S, SELECT STRUCTURAL GRADE GRADING RULES AGENCY - WWPA, WCLIB TREATED - HEM-FIR/DOUGLAS FIR, S4S, NOT GRADE GRADING RULES AGENCY - WWPA, WCLIB TREATMENT: SEE PROJECT CRITERIA FOR MEMBERS IDENTIFIED TO BE TREATED AND FOR TREATMENT TYPE. PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH THE CURRENT AMERICAN WOOD PROTECTION ASSOCIATION (AWPA) SPECIFICATIONS USING THE TREATMENT MATERIALS LISTED BELOW. TREATMENT WILL COMPLY WITH THE REQUIREMENTS OF THE CURRENT EDITION OF WESTERN WOOD PRESERVERS INSTITUTE (WWPI) "BEST MANAGEMENT PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC ENVIRONMENTS". STRINGERS, DECKING, RUNNING PLANKS, & RAILING SYSTEM, IF TREATED - AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 3B ABOVE GROUND -EXPOSED (UC3B) - PENTACHLOROPHENOL IN LIGHT OIL (TYPE C SOLVENT) - COPPER NAPHTHENATE (Cu N) IN LIGHT OIL (TYPE C SOLVENT) SILLS, BACKING PLANKS, CRIBS, & TIMBER WALLS, IF TREATED AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 4B GROUND CONTACT -HEAVY DUTY (UC4B) - PENTACHLOROPHENOL IN HEAVY OIL (TYPE A SOLVENT) COPPER NAPHTHENATE (CuN) IN HEAVY OIL (TYPE A SOLVENT) FIELD TREATMENT: COPPER NAPHTHENATE (2% SOLUTION) SHALL BE FURNISHED FOR FIELD TREATING OD WOOD. ALL ABRASIONS AND FIELD CUTS -APPROVED BY THE C.O.R.- SHALL BE CAREFULLY TRIMMED AND GIVEN THREE BRUSH COATS OF THE FIELD TREATMENT SOLUTION. WHERE APPROVED FIELD DRILLING OF BOLT OR NAIL HOLES IS REQUIRED, THE HOLES SHALL BE FILLED WITH PRESERVATIVE PRIOR TO INSERTING THE FASTENERS. HARDWARE AND STRUCTURAL STEEL: SEE PROJECT DESIGN CRITERIA FOR STEEL HARDWARE FINISH. GALVANIZED OR UNFINISHED HARDWARE SHALL MEET THE REQUIREMENTS OF AASHTO M270, GRADE 36, WITH NUTS AND BOLTS CONFORMING TO ASTM A307, GRADE A. WEATHERING STEEL AND HARDWARE SHALL MEET THE REQUIREMENTS OF AASHTO M270, GRADE 50W, WITH BOLTS AND NUTS CONFORMING TO ASTM A325, TYPE 3. USE MALLEABLE IRON WASHERS AGAINST WOOD UNLESS OTHERWISE NOTED. WHEN STRUCTURAL STEEL IS TO BE WELDED, THE WELDING PROCEDURE SHALL BE IN ACCORDANCE WITH AWS D1.1 AND SHALL BE SUITABLE FOR THE GRADE OF STEEL AND INTENDED USE OR SERVICE. FABRICATION: SUBMIT SHOP DRAWINGS FOR ALL BRIDGE COMPONENTS (EXCEPT TIMBER RUNNING PLANKS). SHOW ALL DIMENSIONS AND FABRICATION DETAILS FOR ALL CUT OR BORED TIMBER. FIELD DRILLING OF HOLES SHALL NOT BE ALLOWED UNLESS OTHERWISE NOTED ON THE PLANS. CLUR WIDTH VARIES C 2% CROSS O. J:m ulK•rrrrcl�s�l•rulra , ._.. 8RGLABS'V AWHALT PAVINIS g*AdREGATE BASE GEOTEXTILE FABRIC UNDISTURBED EARTH Figure 3-2. Asphalt Pathway Cross -Section Detail City of Meridian Pathways Master Plan Asphalt Pathway Section Scale: NTS \\ r -ter /JNI -' 10 LAND OW maw.MGROUP O y COD CO3 yCD J y •- OCC O E (D CJ En co GD CC U ■� Cz a z c co co Revisions 1. OF AD.4 LA-1�6589 01�1\ 04/07/2022 Project No.: 120194 Date of Issuance: 04.07.2022 Project Milestone: Permit Set Construction Documents Landscape Details L1.50 (�j�ERO)IANg- APPROVED CAM. 05ns¢2 FU NUABFR:m-�z 2"-6" WASHED RIVER COBBLE AT 12" DEPTH. PLACE ROCKS IN ORGANIC FASHION TO CREATE A SMALL CREEK LIKE APPEARANCE 2" ROUND COBBLE AT 4" DEPTH Dry Creek Scale: NTS naawarr wiunnW Tn rOGE OF DRY CREEK, 4' TYP, SEE PLAN ILDERS PER ETAIL 4/1-1.50 D FINISH GROUND )ING PLAN AGE WINDOW Aure outline at 'SS wedge anchor (3) id icing (by others) ode r reinforced concrete ,si (3) (by others) :ing subgrade (by others) / \ Min 6' use zone be verified by installer) y s-s•• � culpture net / 16"x36" Fiber reinforced concrete / pier, 4000 psi (3) (by others) \ 3 10 3' 9" 3'-4" / m P a" I I__--- integral footing / \ 16' ) ----_GFRC sculpture/ plan outline o z a a' IM Woodland FortAP018 ID Sculpture Woodland Fort Play Feature Timberform Colossus Bench Scale: NTS B j Community Pool Parking Lot Shrub Planting Detail Scale: NTS ` V % Scale: 1" = 20' Y 3 Bears Playgrounds Embankment Slide Scale: NTS EO Fallen Log Open Play Amenity Scale: NTS PLANT SCHEDULE SHRUBS CODE BOTANICAL/COMMON NAME SIZE CONTAINER QTY BB BOUTELOUA GRACILIS'BLONDE AMBITION' / 3 GAL. POT 52 i BLONDE AMBITION BLUE GRAMA CM CORNUS SANGUINEA'MIDWINTER FIRE' / 5 GAL. POT 111 MIDWINTER FIRE BLOODTWIG DOGWOOD CM2 CERCOCARPUS MONTANUS / ALDERLEAF 5 GAL. POT 21 MOUNTAIN MAHOGANY FI FORSYTHIA X INTERMEDIA / BORDER FORSYTHIA 5 GAL. POT 41 FP2 FALLUGIA PARADOXA/APACHE PLUME 3 GAL. POT 33 JS JUNIPERUS SABINA / SAVIN JUNIPER 5 GAL. POT 28 O P62 PHYSOCARPUS OPULIFOLIUS'MONLO' TM / 5 GAL. POT 9 DIABOLO NINEBARK PG PHILADELPHUS LEWISIPGOOSE CREEK' / WILD 5 GAL. POT 32 MOCKORANGE wry= PT PURSHIA TRIDENTATA /ANTELOPE BITTERBRUSH 5 GAL. POT 20 RA RHUSTRILOBATA'AUTUMN AMBER' /AUTUMN 5GAL. POT 131 AMBER SUMAC RW ROSA WOODSII / MOUNTAIN ROSE 5 GAL. POT 53 SD SALVIA DORRII / DESERT SAGE 3 GAL. POT 46 SS SCHIZACHYRIUMSCOPARIUMTHEBLUES'/THE 3GAL. POT 89 BLUES LITTLE BLUESTEM SHRUB AREAS CODE BOTANICAL / COMMON NAME SIZE CONTAINER QTY AB ACHD BASIN FORB MUC/ FORB MD( 10,417 SF SIF AM ACHILLEA MILLEFOLIUM / COMMON YARROW 1 GAL. POT 98 PLANT AT 24" O.C. AGASTACHE NEOMEXICANA / NEW MEXICO AN HUMMINGBIRD MINT 1 GAL. POT 64 PLANT AT 24" O.C. FESTUCA IDAHOENSIS'SISKIYOU BLUE' / SISKIYOU FS BLUE FESCUE 1 GAL. POT 526 PLANT AT 18" O.C. NEPETA X FAASSENII'WALKER'S LOW / WALKER'S NW LOW CATMINT 1 GAL. POT 41 PLANT AT 36" O.C. PENSTEMON STRICTUS / ROCKY MOUNTAIN PS PENSTEMON 1 GAL. POT 62 PLANT AT 36" O.C. Z-4 THE i LAND -GROUP O ■ .y CA y J C Cc ■� n Cn■- OCco t3 � U C:) ■5 CZ z a a CYDCD C� Revisions 1Q 1. OF ID, c� LA-1 589 ' ftsc /01111 Ott/07/2022 Project No.: 120194 Date of Issuance: 04.07.2022 Project Milestone: Permit Set Construction Documents Landscape Details L1■51