HomeMy WebLinkAbout8 - Landscape Plan V2a
+�'���
SOIL LINE
aey ale `
ROOT PROBE
\
\
WHEN PRESENT: LOCATE THE
BUD POINT 1 1/2" ABOVE SOIL
\
\
LINE
ROOT LOCATE FLARE/ COLLAR f
\
SOIL LINE. THIS CAN BE N-7
@
BY LINE,
LOCATEDETHE
OF THE
WERE THE BARK OF THE TREE
BARK
/
TRANSITIONS TO ROOT BARK)
HIGHEST L T SHALL BE 2"
MAXIMUM BELOW SOILS NE. UTILIZE
— —
—
\
\
SOIL/ ROOT PROBE AROUND TRUNK
X AWAY FROM TRUNK)
TO LOCATE
TO LOCATEE HIGHEST ROOT.
\
RUBBER CINCH TIE
I
\
2"X2"WOOD STAKE AT OR BELOW
r — — — _ _
_ _ _ _
\
\
GRADE PLACE STAKES PARALLEL
\
\
\
TO PREVAILING WIND.
\ \
\
REMOVE TREE WRAP AFTER
ATION.
\
3"THI K MULCH 3" FROM TREE
\
TRUNK.
\
\
\
\
\
CONSTRUCT 2" EARTH BERM
I \ \
\
AT EDGE OF ROOTBALL,
\
\
\
\
REMOVE BURLAP, TWINE, AND
WIRE BASKET FROM TOP 2/3" OF
\
\
ROOTBALL, REMOVE ALL
\
\
NONBIODEGRADABLE TRASH
I \
\
\
FROM
\
\
\
ROOTBALL TO BE PLACED
\ \
\
.
ON NATIVE SOILCOMMERCIAL
S LEABE
I
\
\
FERTILIZERRE
TABLETS
BACKFILL W/ APPROVED TOPSOIL.
BACK FILL IN 6" LIFTS, WATERING
\
\
\
\
A A
EACH
I
\ \
\
REQUI RDE O SUPPORT TREE.
I I
\
I
\
\
vv
I I
I I I
v
v
—III=III
I
I
v
v v
I
2" settled layer
of mulch
Tilled Or Broken up
Soil min 12" Deep
i \ \ WIDTH OF BALL WIDTH OF BALL WIDTH OF BALL WIDTH OF BALL
5' MIN DIA. TREE RING
NOTES: TREE PLANTING (>2"CAL.1
1. ALL PLANT MATERIALS SHALL BE IN ACCORDANCE WITH
THE AMERICAN STANDARDS FOR NURSERY STOCK (ANSI
Z60.1-2004). PLANT ACCORDING TO ANSI A300 PART 6.
2. DIG THE PLANTING HOLE A MINIMUM OF 2x WIDTH OF
ROOTBALL FOR AT LEAST THE FIRST 12 INCHES OF DEPTH.
BELOW 12 INCHES, DIG HOLE WIDE ENOUGH TO PERMIT
ADJUSTING. DO NOT DIG THE HOLE DEEPER THAN ROOT BALL
DEPTH.
3. SCARIFY THE SUBGRADE AND SIDES OF THE PLANTING
HOLE WHEN PLANTING IN CLAY SOILS (MORE THAN 15%
CLAY).
4. LIFT AND SET THE TREE BY ROOT BALL ONLY. DO NOT LIFT
USING THE TREE TRUNK AND DO NOT USE TREE TRUNK AS A
LEVER.
5. SET THE TOP OF THE ROOT BALL LEVEL WITH THE SOIL
SURFACE OR SLIGHTLY HIGHER IF THE SOIL IS PRONE TO
SETTLING.
6. AFTER THE TREE IS SET IN PLACE, REMOVE BURLAP, WIRE
AND STRAPS FROM AT LEAST THE UPPER 1/3 OF THE
ROOTBALL.
7. BACKFILL WITH EXISTING SOIL THAT HAS BEEN WELL -
TILLED OR BROKEN UP. DO NOT ADD AMENDMENTS TO THE
BACKFILL SOIL. AMEND THE SURFACE WITH MULCH.
8. USE THREE 2" X 2" WOOD STAKES DRIVEN INTO
UNDISTURBED SOIL A MINIMUM OF 16 INCHES. SPACE STAKES
EQUALLY AROUND THE TREE.
9. ATTACH 3/4" NYLON WEBBING TO CONNECT THE TREE TO
STAKES. ATTACH WEBBING AT 113 THE TREE HEIGHT.
10. APPLY A 2-3" (SETTLED) DEPTH OF PINE STRAW OR BARK
MULCH TO THE PLANTING SURFACE. LEAVE A 2" SPACE
AROUND THE TRUNK FOR AIR CIRCULATION.
11. PRUNING SHALL BE LIMITED TO DEAD, DISEASED, OR
BROKEN LIMBS ONLY AND SHALL BE IN ACCORDANCE WITH
ANSI A300 SPECIFICATIONS.
12. REMOVE ANY TRUNK WRAP REMAINING AT TIME OF
PLANTING. NO WRAPS SHALL BE PLACED ON TRUNK.
FINISH GRADE
WIDTH OF BALL
\ \ \ 3 2" and larger conifer tree detail
L — — — — — — — — — — — - L--- \ �0O v 3116
&eF \ \
\
W Newland Ct.
I
I. 4
I\ \
I \
I I \ \ \
I \ \
Idaho Power 10'x10'
Transformer Easement \
J V A\
r---------- vv ` vv
I I I I I
I I I I I \ \ \\ \ \\ \ \
I I I I I I I I \\ \ \\\ \ o \
I I I I \ \ \ \ \
I ------------I I \\ \ \ \ \\ \ \
I
— — — — — — — — — — — — — — — — I I------------� \ \
61-0" CEDAR PICKET FENCE
\
\
Union Pacific Railroad \
\
Graphic Scale:
Attention is Drawn to the Fact That Drawing Scales May be
Altered During Reproduction Processes. Scales Shown
Hereon are Based on a Full Scale Sheet Size of 24" x 36".
Scale: 1" = 15'
PLANTING LEGEND
NORWAY SPRUCE
TURF OVER APPROVED TOPSOIL. PROVIDE SEED AT ALL
DRAINAGE SWALES AND SOD AT ALL OTHER LOCATIONS
CONCRETE
STREET LIGHTING
1. ALL STREET LIGHT CONSTRUCTION SHALL BE DONE IN
ACCORDANCE WITH THE CURRENT VERSION OF THE ISPCW, THE
MERIDIAN SUPPLEMENTAL SPECIFICATION TO THE ISPWC, AND
THE NATIONAL ELECTRIC CODE.
2. A STREET LIGHTING ELECTRICAL PERMIT SHALL BE OPENED
PRIOR TO STARTING WORK. USE THE ONLINE CITIZEN PORTAL AT
HTTP://CITIZENPORTAL.MERIDIANCITY.ORG/CITIZENACCESS/ TO
OPEN A PERMIT AND REQUEST INSPECTIONS.
3. INSTALLATION WILL REQUIRE INSPECTIONS FOR THE CONCRETE
BASES AND BELOW GROUND WIRING.
4. STREET LIFT BASES SHALL BE LOCATED 10' MINIMUM FROM
TREES, 5' MINIMUM FROM FIRE HYDRANTS, AND 2' MINIMUM FROM
WATER METERS.
5. KEEP ACCURATE AS BUILTS OF ALL CONDUIT, JUNCTION BOXES,
AND SUBMIT AN ELECTRONIC COPY OF THE RED LINE AS -BUILT
WITH THE APPROCED PERMIT TO THE CITY OF MERIDIAN AT
COMPLETION OF PROJECT.
6. COORDINATE WITH THE CITY TRANSPORTATION AND UTILITY
COORDINATOR @ (208)898-5500 FOR QUESTIONS REGARDING
UTILITY CONFLICTS, OR ACCESS LOCKED METER PEDESTALS.
KEYNOTE LEGEND
6-0" CEDAR FENCING, SEE DETAIL 511
STREET LAMPS ARE TO BE TYPE 2 PER MERIDIAN STANDARD
DRAWINGS T1 AND T2. STREET LIGHTS ARE TO BE INSTALLED
PER CURRENT CITY OF MERIDIAN SUPPLEMENTAL
SPECIFICATIONS.
N
O
2"x4" Top and Bottom
1"x6" Rough Sawn
�Ihp
""Spruce Post
c Post
Rough Sawn Spruce Stained
w/ "Sandstone" Solid Wood
Stain By Cloverdale Paints.
Fence Boards To Be Close
Nailed. Space Dia. Of one
Nail 1"x6" Sas Spruce.
1' Dia Conc. Base
Note:
1. All wood to be stained with "Sandstone" solid wood stain both sides prior to installation.
2. All hardware to be galvanized.
3. All stain to be applied to manufacturer's specifications.
5. Nail to be 3 1/2" coated for stringers to posts and 2" ardox for boards.
7. All planed materials #2 and better.
Fence Detail
1 /4" = V-0"
O
VJ
Da0J
Q
vJ < � ^
JzQLUL
LLIC) 0
LLJ Z_ w w Z
J
PROJECT NO.
R21228
DRAWING NAME
1 OF 1