HomeMy WebLinkAboutOwyhee HS Storage Shed CZC A-2022-0094 V1C+E IDIAN�- Planning Division
�� Community Development Department
D A H O 33 E. Broadway Avenue, Suite 102
APPROVED Meridian, Idaho 83642
DATE: 05/23/22
FILE NUMBER:^- 0ofoo
CERTIFICATE OF ZONING COMPLIANCE REPORT
Project Number
A-2022-0094
Project Name
Owyhee HS Storage Shed CZC
Project Address
3650 N. Owyhee Storm Avenue
Project Description
The proposed 720 square foot new storage shed
consists of (3) three rooms for athletic
equipment. The location of the shed is south of
the Rugby Field and across from the football
field on 60.98 acres of land in the R-8 zoning
district.
Applicant
Joe Presher, HAS Architects
Assigned Planner
Stacy Hersh
Expiration Date
May 23, 2023
Note: This is not a building permit. Please contact Building Services at (208) 887-2211
to verify if you need a building permit and/or inspection. If you do need a building
permit, you must complete that process before you commence the use or construction.
Please contact Building Services for additional details about building permits and
inspections.
I. DECISION
The applicant's request for Certificate of Zoning Compliance is approved with the conditions
listed below.
NOTE: The proposed 720 square foot new storage shed consists of three (3) rooms for
athletic equipment and will be located south of the rugby field across from the football field.
Site Specific Conditions of Approval
1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC,
consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B.
2. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter
3 Article D and receive approval for such signs.
3. The applicant shall complete all improvements related to public life, safety, and health as set
forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in
accord with UDC 11-5C-3C.
4. The approved site plan and/or elevations may not be altered without prior written approval of
the City of Meridian Planning Division.
5. The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
6. If any changes must be made to the site plan to accommodate ACHD requirements, the
applicant shall submit a new site plan to the City of Meridian Planning Division for approval
prior to issuance of the building permit.
11 Page
(E IDIAN -
APPROVED
DATE: 05/23/22
FILE NUMBER: ^ zozz ooea
The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building
Official has issued a Certificate of Occupancy.
General Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that
meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping
as set forth in UDC 11-313-5, UDC 11-313-13 and UDC 11-313-14.
2. The applicant shall comply with the outdoor storage as an accessory use standards as
set forth in UDC 11-3A-14.
3. The project is subject to all current City of Meridian ordinances and previous conditions of
approval associated with this site (AZ, CUP H-2018-0075; DA Instrument #2019-005924;
DA Instrument #2019-005925).
4. The issuance of this CZC does not release the applicant from any previous requirements of
the other permits issued for the site.
5. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a
minimum height of six feet above the ground or sidewalk surface to afford greater visibility
of the area.
6. The applicant shall have an ongoing obligation to maintain all pathways.
7. The applicant has a continuing obligation to comply with the outdoor lighting provisions as
set forth in UDC 11-3A-11.
8. The applicant and/or property owner shall have an ongoing obligation to maintain all
landscaping and constructed features within the clear vision triangle consistent with the
standards in UDC 11-3A-3.
9. The applicant and/or assigns shall have the continuing obligation to meet the specific
use standards for the proposed use as set forth in UDC 11-4-3-14 (education institution),
including all provisions for accessory uses and portable classrooms.
II. CITY COUNCIL REVIEW
The applicant or a parry of record may request City Council review of a decision of the Director.
All requests for review shall be filed in writing with the Planning Division on or before June 7,
2022, within fifteen (15) days after the written decision is issued, and contain the information
listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a
final decision on a land use application. You have the right to request a regulatory taking analysis
under Idaho Code 67-8003.
2 1 P a g e