HomeMy WebLinkAboutCrown Castle for AT&T @ 2100 S. Silverstone Way CZC A-2022-0098Planning Division
Community Development Department
33 E. Broadway Avenue, Suite 102
Meridian, Idaho 83642
1 | P a g e
CERTIFICATE OF ZONING COMPLIANCE REPORT
Project Number A-2022-0098
Project Name Crown Castle for AT&T at Silverstone
Project Address 2100 S. Silverstone Way
Project Description Modify existing facility for AT&T on 7.061
acres of land located in the C-G zoning district.
Tower scope of work:
Install (6) stacked integrated C-Band
antennas/RRHs;
Install (1) DC9 Surge suppressor;
Install (1) 6AWG DC trunks,
Install (1) 24- pair fiber trunk
Install (1) 2" innerduct;
Ground Scope of Work:
Install (1) ABIA
Install (3) ABIO
Install (1) ASIL within existing LTE/FIF rack
Applicant Gary Abrahams, GMA Network Services
Assigned Planner Julia Garofalo
Expiration Date May 13, 2023
Note: This is not a building permit. Please contact Building Services at (208) 887-2211
to verify if you need a building permit and/or inspection. If you do need a building
permit, you must complete that process before you commence the use or construction.
Please contact Building Services for additional details about building permits and
inspections.
I. DECISION
The applicant's request for Certificate of Zoning Compliance is approved with the conditions
listed below.
Site Specific Conditions of Approval
1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC,
consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B.
2. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter
3 Article D and receive approval for such signs.
3. The applicant shall complete all improvements related to public life, safety, and health as set
forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in
accord with UDC 11-5C-3C.
4. The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
5. If any changes must be made to the site plan to accommodate ACHD requirements, the
applicant shall submit a new site plan to the City of Meridian Planning Division for approval
prior to issuance of the building permit.
2 | P a g e
6. The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building
Official has issued a Certificate of Occupancy.
7. The approved site plan, landscape plan, and/or elevations and/or may not be altered without
prior written approval of the City of Meridian Planning Division.
General Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that
meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping
as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14.
2. The issuance of this CZC does not release the applicant from any previous requirements of
the other permits issued for the site.
3. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a
minimum height of six feet above the ground or sidewalk surface to afford greater visibility
of the area.
4. The applicant has a continuing obligation to comply with the outdoor lighting provisions as
set forth in UDC 11-3A-11.
5. The applicant and/or property owner shall have an ongoing obligation to maintain all
landscaping and constructed features within the clear vision triangle consistent with the
standards in UDC 11-3A-3.
6. The applicant and/or assigns shall have the continuing obligation to meet the specific
use standards for the proposed use as set forth in UDC 11-4-3-43, wireless
communication facility.
II. CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the Director.
All requests for review shall be filed in writing with the Planning Division on or before June 1,
2022, within fifteen (15) days after the written decision is issued, and contain the information
listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a
final decision on a land use application. You have the right to request a regulatory taking analysis
under Idaho Code 67-8003.