VIA ON-LINE PORTAL
CITY OF MERIDIAN, ID
May 10, 2022
CITY OF MERIDIAN, ID
Building Services
33 E. BROADWAY AVE, SUITE 102
MERIDIAN, ID 83642
**********NOTICE OF ELIGIBLE FACILITIES REQUEST**********
RE: Request for Minor Modification to Existing Wireless Facility – Section 6409
Site Address: 2100 S Silverstone Way, Meridian, ID 83642
CZC APPLICATION – A-2022-0098
Crown Site Number: 822731 / Crown Site Name: Boise_Call_Center
Customer Site Number: IDL01044 / Application Number: 600404
Dear Planning Dept.,
On behalf of New Cingular Wireless PCS, LLC (”AT&T Mobility” or “Applicant”), Crown Castle USA Inc.
(“Crown Castle”) is pleased to submit this request to modify the existing wireless facility noted above
through the collocation, replacement and/or removal of the Applicant’s equipment as an eligible facilities
request for a minor modification under Section 64091 and the rules of the Federal Communications
Commission (“FCC”).2
Section 6409 mandates that state and local governments must approve any eligible facilities request for the
modification of an existing wireless tower or base station that does not substantially change the physical
dimensions of such tower or base station. Under Section 6409, to toll the review period, if the reviewing
authority determines that the application is incomplete, it must provide written notice to the applicant
within 30 days, which clearly and specifically delineates all missing documents or information reasonably
related to whether the request meets the federal requirements.3 Additionally, if a state or local government,
fails to issue any approvals required for this request within 60 days, these approvals are deemed granted.
1 Middle Class Tax Relief and Job Creation Act of 2012, Pub. L. No. 112-96, § 6409 (2012) (codified at 47 U.S.C.
§ 1455).
2 Acceleration of Broadband Deployment by Improving Wireless Facility Siting Policies, 29 FCC Rcd. 12865
(2014) (codified at 47 CFR § 1.6100); and Implementation of State & Local Governments’ Obligation to Approve
Certain Wireless Facility Modification Requests Under Section 6409(a) of the Spectrum Act of 2012, WT Docket
No. 19-250 (June 10, 2020).
3 See 47 CFR § 1.6100 (c)(3). 4 See 2020 Upgrade Order at paragraph 16.
05/17/22
A-2022-0098
The Foundation for a Wireless World
CrownCastle.com
1505 Westlake Ave N, N
Seattle, WA 98109
Phone:
www.crowncastle.com
The FCC has clarified that the 30-day and 60-day deadlines begins when an applicant: (1) takes the first
step required under state or local law; and (2) submits information sufficient to inform the jurisdiction that
this modification qualifies under the federal law4. Please note that with the submission of this letter and
enclosed items, the thirty and sixty-day review periods have started. Based on this filing, the deadline for
written notice of incomplete application is June 9, 2022, and the deadline for issuance of approval is July
9, 2022.
The proposed scope of work for this project includes:
Add or replace antennas, ancillary equipment and ground equipment as per plans for an existing
carrier on an existing wireless communication facility.
At the end of this letter is a checklist of the applicable substantial change criteria under Section 6409.
Additionally, please find enclosed the following information in support of this request:
(1) City of Meridian Idaho Addressing Approval, LDAV-2022-0358;
(2) NARRATIVE – SEE THIS DOCUMENT, Eligible Facilities Request cover letter and narrative, with
Attachment “A,” Section 6409 Substantial Change Checklist, and Attachment “B,” Proposed Scope
of Work;
(3) WARRANTY DEED;
(4) AFFIDAVIT OF LEGAL INTEREST;
(5) VICINTIY MAP;
(6) TRASH ENCLOSURE APPROVAL;
(7) PHOTOMETRIC PLAN;
(8) RECORDED PLAT;
(9) SITE PLAN;
(10) LANDSCAPE PLAN;
(11) ELEVATION;
(12) CZC CHECKLIST;
(13) CONSTRUTION DRAWINGS – SEPARATED INTO INDIVIDUAL PDF’S;
(14) PROPERTY DETAIL REPORT;
(15) PRIOR APRPOVALS (CZC) FOR THIS SITE;
(16) CROWN CASTLE AUTHORIZTION TO SUBMIT FOR PERMITS.
As these documents indicate, (i) the modification involves the collocation, removal or replacement of
transmission equipment; and (ii) such modification will not substantially change the physical dimensions
of such tower or base station. As such, it is an “eligible facilities request” as defined in the FCC’s rules to
which the 60-day deadline for approval applies. Accordingly, Applicant requests all authorization necessary
for this proposed minor modification under Section 6409.
05/17/22
A-2022-0098
The Foundation for a Wireless World
CrownCastle.com
1505 Westlake Ave N, N
Seattle, WA 98109
Phone:
www.crowncastle.com
Our goal is to work with you to obtain approvals earlier than the deadline. We will respond promptly to any
request for related information you may have in connection with this request. Please let us know how we
can work with you to expedite the approval process. We look forward to working with you on this important
project, which will improve wireless telecommunication services in your community using collocation on
existing infrastructure. If you have any questions, please do not hesitate to contact me.
Regards,
Gary Abrahams
Gary Abrahams
GMA Network Services, LLC
Consultant to Crown Castle
05/17/22
A-2022-0098
The Foundation for a Wireless World
CrownCastle.com
1505 Westlake Ave N, N
Seattle, WA 98109
Phone:
www.crowncastle.com
Attachment “A”
Section 6409 Substantial Change Checklist
Towers Outside of the Public Right of Way
The Federal Communications Commission has determined that a modification substantially changes the physical dimension of a
wireless tower or base station under 47 U.S.C. § 1455(a) if it meets one of six enumerated criteria under 47 C.F.R. § 1.6100.
Criteria for Towers Outside the Public Rights of Way
YES/NO
NO
Does the modification increase the height of the tower by more than the
greater of:
(a) 10%
(b) or, the height of an additional antenna array plus separation of up to
20 feet from the top of the nearest existing antenna?
YES/NO
NO
Does the modification add an appurtenance to the body of the tower that
would protrude from the edge of the tower more than 20 feet or more than the
width of the tower structure at the level of the appurtenance, whichever is
greater?
YES/NO
NO
Does the modification involve the installation of more than the standard
number of new equipment cabinets for the technology involved or add more
than four new equipment cabinets?
YES/NO
NO
Does the modification entail any excavation or deployment outside the
current site by more than 30 feet in any direction, not including any access or
utility easements?
YES/NO
NO
Does the modification defeat the concealment elements of the eligible support
structure?
YES/NO
NO
Does the modification violate conditions associated with the siting approval with the
prior approval the tower or base station other than as specified in 47 C.F.R. §
1.6100(c)(7)(i) – (iv)?
If all questions in the above section are answered “NO,” then the modification does not constitute a substantial
change to the existing tower under 47 C.F.R. § 1.6100.
05/17/22
A-2022-0098
The Foundation for a Wireless World
CrownCastle.com
1505 Westlake Ave N, N
Seattle, WA 98109
Phone:
www.crowncastle.com
Attachment “B”
Proposed Scope of Work
05/17/22
A-2022-0098