HomeMy WebLinkAboutDrainage Report V1 Approvedkimley-horn.com 950 W Bannock St., Suite #1100 | Boise, Idaho 83702 801-915-7842 Oakwind Estates Subdivision Meridian, ID Prepared By: Kimley-Horn Associates 950 W Bannock St Suite 1100 Boise, ID 83702 Contact: Brandon McDougald, P.E. (801) 915-7842 Job No. 093893000 February 04, 2022 05/12/22 FP-2022-0006 kimley-horn.com 950 W Bannock St., Suite #1100 | Boise, Idaho 83702 801-915-7842 I. GENERAL LOCATION AND DESCRIPTION This drainage study is being prepared for both Phase 1 and Phase 2 of the Oakwind Estates Subdivision in Meridian, Idaho. The site is located to the northeast of the intersection of McDermott Road and McMillan Road. It is bound to the north by a commercial development, east by Phases 1 and 2 of the Oaks North Subdivision, west by McDermott Road, and south by McMillan Road. This project consists of approximately 24.36 acres and 185 lots. The site is located within section 28, Township 4 North, Range 1 West Meridian, Ada County, Idaho. The proposed development will consist of approximately 212 residential and common lots with the associated roadways and utilities. The site currently slopes mostly to the west at a grade of ±0.25-1%. The site is currently a portion of an undeveloped field used historically for agricultural purposes. The site is in zone “X”, an area determined to be outside the 0.2% annual chance floodplain, according to the Flood Insurance Rate Map, Map Number 16001C0140J, which bears an effective date of June 19, 2020. II. HISTORIC DRAINAGE Currently, the site is undeveloped, and is bounded by McDermott Rd to the west and McMillan, to the south. This site generally slopes from the east to the west at a rate of approximately 0.25-1°%. In the existing condition it appears that storm water runoff will mostly infiltrate into the undeveloped ground. Any runoff appears to drain to ditches along McMillan or McDermott where it is eventually conveyed by a culvert under McDermott to the west. No detention/retention was found to be existing on the current site. III. DRAINAGE DESIGN CRITERIA Ada County Highway District (ACHD) requires that new developments provide primary conveyance for the 100-yr storm event and retention for the 100-yr storm event. The site has been designed to these standards with detention volumes being determined for the 1-hr 100-yr event per the ACHD Calculation Sheet for Finding Peak Discharge/Volume Spreadsheet. This volume was used to design the infiltration beds. The infiltration rate and high groundwater elevation for this design were taken from the geotechnical reports BI80977g (July 20, 2018) and B210822g. (April 16, 2021) prepared by Materials Testing and Inspection, Inc. The Rational Method was used in calculating the required retention volume for the site. The site was delineated into drainage areas based upon the proposed grading and drainage design. The C-factor was taken to be 0.5 which is the higher end for single family residential listed in the ACHD “Estimated Runoff Coefficients for Various Surfaces” table. Along the McDermott 05/12/22 FP-2022-0006 kimley-horn.com 950 W Bannock St., Suite #1100 | Boise, Idaho 83702 801-915-7842 frontage where the residential C-factor did not apply, a composite C-factor was determined using 0.9 for the roadway and 0.35 for the planted areas. The required volume and the provided volume of retention for each drainage area has been calculated and is shown in the appendixes along with all design assumptions. III. PROPOSED DRAINAGE The proposed drainage infrastructure will consist of an on-site storm drain system discharging into an underground infiltration bed for each of the drainage areas. Prior to releasing water into the on-site underground infiltration beds, the water will be treated by a sand/oil separator unit per ISPWC SD-606. This treatment unit will be capable of treating the 25-year event. Since the seepage beds are located in common lots, no silt factor was used in sizing the infiltration beds per the requirements of the ACHD design requirements. The design infiltration rates were taken to be between 1-8in/hr per the geotechnical report No. BI80822g prepared by Materials Testing & Inspection, Inc prepared April 16 th 2021. Each bed was assigned an infiltration rate in this 1-8in/hr range based upon its location on site in relation to the closest infiltration test. Given this infiltration rate each infiltration bed will drain in under the required 48 hrs. 05/12/22 FP-2022-0006 kimley-horn.com 950 W Bannock St., Suite #1100 | Boise, Idaho 83702 801-915-7842 IV. APPENDIX 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 1.17 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 2,022 2,022 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 19.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 35.6 35.6 ft3/ft 15 Calculate Design Length L 57 57 ft 56.79775281 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 57 57.0 ft 17 Variable Infiltration Window W SWW 19.0 19.0 ft 18 Time to Drain 2.5 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 57 57 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP01.1.xlsm Version 10.0, May 2018 2/3/2022, 4:18 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 1.75 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 3,024 3,024 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 13.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 24.4 24.4 ft3/ft 15 Calculate Design Length L 124 124 ft 123.9344262 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 124 124.0 ft 17 Variable Infiltration Window W SWW 13.0 13.0 ft 18 Time to Drain 2.5 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 124 124 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP01.2.xlsm Version 10.0, May 2018 2/3/2022, 4:19 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 5.99 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 10,351 10,351 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 60.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 5.50 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 99.7 99.7 ft3/ft 15 Calculate Design Length L 104 104 ft 103.8214644 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 104 104.0 ft 17 Variable Infiltration Window W SWW 60.0 60.0 ft 18 Time to Drain 3.3 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 104 208 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP02.xlsm Version 10.0, May 2018 2/3/2022, 4:22 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 1.93 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 3,335 3,335 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 17.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 1.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 22.0 22.0 ft3/ft 15 Calculate Design Length L 152 152 ft 151.5909091 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 152 152.0 ft 17 Variable Infiltration Window W SWW 17.0 17.0 ft 18 Time to Drain 13.9 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 152 100 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP03.xlsm Version 10.0, May 2018 2/3/2022, 4:24 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 2.19 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 3,784 3,784 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 25.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.50 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 43.7 43.7 ft3/ft 15 Calculate Design Length L 87 87 ft 86.59038902 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 87 87.0 ft 17 Variable Infiltration Window W SWW 25.0 25.0 ft 18 Time to Drain 2.9 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 87 87 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP04.xlsm Version 10.0, May 2018 2/3/2022, 4:27 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 0.93 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 1,607 1,607 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 6.50 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 17.6 17.6 ft3/ft 15 Calculate Design Length L 91 92 ft 91.30681818 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 92 92.0 ft 17 Variable Infiltration Window W SWW 10.0 10.0 ft 18 Time to Drain 2.9 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 92 92 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP05.xlsm Version 10.0, May 2018 2/3/2022, 4:29 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 3 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 1.51 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 2,609 2,609 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 20.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 7.50 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 36.7 36.7 ft3/ft 15 Calculate Design Length L 71 72 ft 71.08991826 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 72 72.0 ft 17 Variable Infiltration Window W SWW 20.0 20.0 ft 18 Time to Drain 2.6 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 72 72 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP06.xlsm Version 10.0, May 2018 2/3/2022, 4:30 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.65 Link to: 5 Area A (Acres) 0.63 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 1,415 1,415 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 1.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 13.0 13.0 ft3/ft 15 Calculate Design Length L 109 109 ft 108.8461538 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 109 109.0 ft 17 Variable Infiltration Window W SWW 10.0 10.0 ft 18 Time to Drain 14.0 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 109 109 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP07.xlsm Version 10.0, May 2018 2/3/2022, 4:32 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.65 Link to: 5 Area A (Acres) 0.26 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 584 584 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 18.8 18.8 ft3/ft 15 Calculate Design Length L 31 32 ft 31.06382979 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 32 32.0 ft 17 Variable Infiltration Window W SWW 10.0 10.0 ft 18 Time to Drain 2.5 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 32 32 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP08.xlsm Version 10.0, May 2018 2/3/2022, 4:33 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.65 Link to: 5 Area A (Acres) 0.84 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 1,887 1,887 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 3.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 14.7 14.7 ft3/ft 15 Calculate Design Length L 128 129 ft 128.3673469 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 129 101.0 ft 17 Variable Infiltration Window W SWW 10.0 10.0 ft 18 Time to Drain 6.7 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 129 101 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_SP09.xlsm Version 10.0, May 2018 2/3/2022, 4:35 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 2.02 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 3,491 3,491 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 39.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 3.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 56.7 56.7 ft3/ft 15 Calculate Design Length L 62 62 ft 61.5696649 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 62 62.0 ft 17 Variable Infiltration Window W SWW 39.0 39.0 ft 18 Time to Drain 5.2 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 62 62 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_PH2_SP1.xlsm Version 10.0, May 2018 2/3/2022, 4:37 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 1.75 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 3,024 3,024 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 17.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 3.30 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 25.3 25.3 ft3/ft 15 Calculate Design Length L 120 120 ft 119.5256917 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 120 120.0 ft 17 Variable Infiltration Window W SWW 17.0 17.0 ft 18 Time to Drain 4.9 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 120 120 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_PH2_SP2.xlsm Version 10.0, May 2018 2/3/2022, 4:39 PM 05/12/22 FP-2022-0006 Steps for Seepage Beds Calculate Post-Development Flows (for pre-development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name 2 Enter number of Seepage Beds (25 max) 1 3 Design Storm 100 'Q,V' 4 Weighted Runoff Coefficient C 0.50 Link to: 5 Area A (Acres) 2.69 acres 6 Approved discharge rate (if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 4,648 4,648 ft3 0% Sediment 8 Set Total Design Width of All Drain Rock W 22.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 3.40 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 32.8 32.8 ft3/ft 15 Calculate Design Length L 142 142 ft 141.7073171 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 142 142.0 ft 17 Variable Infiltration Window W SWW 22.0 22.0 ft 18 Time to Drain 4.7 hours 90% volume in 48-hours minimum OK 19 Length of WQ & Overflow Perf Pipes 142 142 ft 20 Perf Pipe Checks. Qperf >= Qpeak; OK where Qperf=CdxAx√(2xgxH) d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 1-StormTech, SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90% volume in 48-hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers Note this spreadsheet pulls information from the "Peak Q,V" tab Oakwind Estates NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. K:\BOI_Civil\093893000 Oakwind BB Living\_Project Files\Eng\Drainage\ACHD Calcs\ACHD_SD_CALCS_PH2_SP3.xlsm Version 10.0, May 2018 2/3/2022, 4:40 PM 05/12/22 FP-2022-0006 BLOCK 1 BLOCK 2 BLOCK 9 BLOCK 9 BLOCK 4 13 2 4 3 7 8 14 11 12 10 9 5 6 51 51 52 5 4 1 2 3 1 1 3 1 1 1 1 BLOCK 1 BLOCK 1 BLOCK 3 BLOCK 2 3 2 2 9 1 26 16 15 14 12 13 8 7 6 5 4 3 2 11 10 23 24 31 25 32 33 18 34 19 27 35 20 21 28 22 29 30 National Flood Hazard Layer FIRMette 0 250 500 1,000 1,500 2,000 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zone X Future Conditions 1% Annual Chance Flood Hazard Zone X Area with Reduced Flood Risk due to Levee. See Notes. Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 1/11/2022 at 10:34 AM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 116°28'38"W 43°39'13"N 116°28'1"W 43°38'47"N Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 05/12/22 FP-2022-0006 17 BLOCK 4 BLOCK 6 BLOCK 7 BLOCK 8 14 13 6 12 5 11 4 10 3 2 17 9 1 15 8 7 3 2 1 50 49 48 47 46 45 44 43 42 41 40 39 38 37 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 52 51 36 BLOCK 5 1 N DELPHI AVE W RIVA CAPRI ST W APGAR CREEK ST W DAPHNE ST W DAPHNE ST N PALUSTRIS WAY N PALUSTRIS WAY N PALUSTRIS WAY BLOCK 8 BLOCK 8 BLOCK 5 BLOCK 6 BLOCK 7 7 8 9 6 3 4 8 5 7 10 9 2 8 21 22 7 6 5 4 20 11 16 17 18 19 13 12 15 20 6 5 4 19 15 16 17 7 18 12 11 10 9 8 14 21 23 10 10 9 6 5 4 13 12 11 10 9 8 15 14 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 BLOCK 4 BLOCK 8 W MILANO ST W SOPRANO ST W AVILLA ST N DELPHI AVE N PATIMOS AVE W RIVA CAPRI ST N DELPHI AVE APN: S0429440000 APN: S0428325610 APN: S0428325460 EXISTING OAKS NORTH SUBDIVISION NO. 1 (NOT A PART) EXISTING OAKS NORTH SUBDIVISION NO. 2 (NOT A PART) EXISTING OAKS WEST SUBDIVISION NO. 1 (NOT A PART) N TRIDENT WAY W MILANO DRIVE 16 7 OAKWIND ESTATES MERIDIAN, ID CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES Call beofre you dgi. Know whas't below . R FOR REVIEW ONLY NOT FOR CONSTRUCTION PROPOSED DRAINAGE AREA MAP 1 1 NORTH 05/12/22 FP-2022-0006