1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER,THE CONTRACTOR IS
RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO
STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS;
YEAR WARRANTY PERIOD. IMPROPERLY PRUNED TREES (AS DETERMINED BY THE
2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED.
NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING.
3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO
INSTALLATION OF PLANT MATERIAL. PREVAILING WIND DIRECTION
4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE
STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH TREE WRAP TRUNK PROTECTION,
GALVANIZED NAILS TO PREVENT SLIPPAGE. REMOVE AFTER INSTALLATION
5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE RUBBER CINCH TIE
ARCHITECT IMMEDIATELY. 2"x 2"x 8'CEDAR STAKE- DO NOT PENETRATE ROOTBALL.
ROOT PROBE SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND.
ro
SOIL LINE �� MULCH LAYER, KEEP MULCH 3"AWAY FROM
� TRUNK
UTILIZE SOIL/ROOT PROBE AROUND TRUNK r \
BACKFILL WITH SOIL PLANTING MIX. SEE
(APPROX. 34"AWAY FROM TRUNK)TO LOCATE 31
1 SPECIFICATIONS FOR ADDITIONAL INFORMATION.
HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE
POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. FINISH GRADE
REMOVE BURLAP,TWINE,AND WIRE BASKET FROM TOP \j�\j\ \� \� \ / j\j/
OF ROOTBALL, REMOVE ALL NAILS,TIES,AND PLASTIC / \V A//
� COMMERCIAL SLOW RELEASE FERTILIZER TABLETS
FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO V/VA V �VA�VA�
WRAP THE ROOTBALL, IT SHALL BE COMPLETELY
REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE
LEFT ON THE BOTTOM OF THE ROOTBALL.
SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL
2x ROOTBALL DIAMETER W
Deciduous Tree PlantingO
3x ROOTBALL DIAMETER
Scale: NTS UJ
u
u a)
O
C.� y
O cc
WATER RETENTION -0 cv
MULCH LAYER BASIN o �
CD 00
\ ,\ \
LU
CC cy)
COMMERCIAL \\%/�\%j\j�\j /j\\j�\j�\j�\j�\j�\j�\j�\j�\%/�\%// BACKFILL WITH SOIL PLANTING Revisions Q
FERTILIZER TABLETS MIX. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION. 1. CUP REVISIONS 05-09-22
z =
a
_ w
Shrub Planting
2 Scale: NTS
\\\ oE OF
F,LR.T i
LA-16888
ANDSCAY�
05/09/2022
Project No.: 122008
Date of Issuance: 05-09-2022
Project Milestone: CONDITIONAL USE PERMIT