Loading...
HomeMy WebLinkAboutEngineer Statement V1(E IDI� I.�1\ APPROVED DATE: 05/04/22 ley))) Horn i I J NUMBER:FP-2o22-12 March 4, 2022 City of Meridian 33 E Broadway Avenue Meridian, Idaho 83642 RE: Graycliff Subdivision- Phase 3 Construction Drawings To Whom it May Concern — Groundwater monitoring was conducted by Natural Resource Solutions, LLC throughout a period from 2006-2019. Based on the results of these groundwater readings, the roadway centerline elevations within the Graycliff Subdivision Phase 3 are designed to be greater than 3' above highest established groundwater elevation. Respectfully, S\ONAL FN\ o< _\CENSr �y 18670 t j,03/04/2022O qTF OF \OP \�GAILHP% Abbey Hahn, PE Kimley-Horn