HomeMy WebLinkAboutEngineer Statement V1(E IDI� I.�1\
APPROVED
DATE: 05/04/22 ley))) Horn
i I J NUMBER:FP-2o22-12
March 4, 2022
City of Meridian
33 E Broadway Avenue
Meridian, Idaho 83642
RE: Graycliff Subdivision- Phase 3 Construction Drawings
To Whom it May Concern —
Groundwater monitoring was conducted by Natural Resource Solutions, LLC throughout a period
from 2006-2019. Based on the results of these groundwater readings, the roadway centerline
elevations within the Graycliff Subdivision Phase 3 are designed to be greater than 3' above highest
established groundwater elevation.
Respectfully,
S\ONAL FN\
o< _\CENSr �y
18670
t j,03/04/2022O
qTF OF \OP
\�GAILHP%
Abbey Hahn, PE
Kimley-Horn