Loading...
HomeMy WebLinkAboutDrainage Report V1(E IDIAN - APPROVED DATE: 05/04/22 FILE NUMBER: Fa-2D-Wl2 Drainage Report-Graycliff Subdivision Phase 3 701 W. Harris Street, Meridian, ID Prepared For: KB Home Prepared by: Kimley-Horn 950 W Bannock St. Suite 1100 Boise, ID 83702 Contact: Abbey Hahn, PE 208-917-4977 abbey.hahn@kimley-horn.com S\ONAL FH\ \ \CENS,, F: 18670 0 03/04/2022 O �eoP \'GA IL NP% Kimley>Morn (E IDIA\ APPROVED DATE: 05/04/22 dey)))Horn I4►1a:7_10X9141_lI[Q LNI_1i,U7�7 ,iage study is being prepared to describe the existing and proposed drainage conditions roposed Graycliff Estates Phase 3 located in Meridian, Idaho. The site is located at 710 West Harris Street. The site area is approximately 5.25 acres and is located within the Section 25, Township 3 North, Range 1 West of the Meridian, City of Meridian, Ada County, Idaho. The property is bounded two sides by development. The site is currently an open field and is located southeast of Phase 1 of Graycliff Estates Subdivision. Undeveloped land is located to the east and south of the property. Future Phase 4 of the Graycliff subdivision will be located southeast of Phase 3 and runoff from a portion of this phase was accounted for in Phase 3 improvements, as noted in Basin 2 description below. Proposed development of the site will consist of 35 buildable single family residential lots and 3 common lots with associated public roads, landscaping and utilities. II. EXISTING CONDITIONS The property is undeveloped. The site currently drains to the northwest corner of the site. The property is pervious and has no drainage structures located on site. Runoff from the property infiltrates into the ground. The majority of the existing ground cover consists of native grasses with the rest containing no vegetation. The site consists of 1-2ft of silty clay loam with pit run material below. Proposed drainage facilities have been designed to infiltrate into the pit run material. In areas where hardpan is encountered, the material will be removed, broken and returned to the trench where it will permeate with a similar rate of the pit run material. The site is in zone "X", or areas determined to be outside the 0.2% annual chance flood hazard, according to FEMA Map Number 16001CO234J, dated 06/19/2020. It is unlikely that any offsite water runoff will enter the proposed site. Area west of the site is undeveloped native grasses and sage brush. III. DRAINAGE DESIGN CRITERIA The storm drainage conveyance and storage systems are designed to meet ACHD's Stormwater Policy. Seepage beds are designed to store and infiltrate the 100-year storm event. The Water Quality storm will be treated through sand and grease traps prior dispersion into the seepage beds. Inlet piping for Seepage Bed 1 and 2 include diversion manholes which allow flows greater than the Water Quality storm to bypass the sand and grease traps. The Rational Method was used in calculating the required detention volume for the site. The site was delineated into hardscape areas and landscape areas and appropriate runoff coefficients were applied. A weighted runoff coefficient was calculated for the site using 0.20 for landscaping and 0.95 for hardscape areas. Two seepage beds will be constructed on this site and all water will be retained on site as shown on the Grading and Drainage plans. pley))) Horn APPROVED DATE: 05/04/22 was delineated into multiple drainage basins as shown on the Drainage Area Map FILENUMBER:FP- 22- 12 hese basins were divided into subbasins and a minimum time of concentration of 10 minuietwas used to determine peak flows to each catch basin. The proposed storm pipes were sized according to the accumulative peak flows of each interconnected pipe and sub basin. See Appendix A for storm drainage calculations. III. PROPOSED DRAINAGE Basin 1: Basin 1 includes drainage from the right of way, sidewalks and lots along South Graycliff Way. Drainage from these areas will be directed to catch basins, treated through a sand and grease trap. The stormwater will be stored/infiltrated through Seepage Bed 1. Basin 2: Basin 2 includes drainage from the right of way, sidewalks and lots along a portion of West Learmont Street. This basin includes 1.4 acres east of West Learmont Street from the future Phase 4 of Graycliff. Drainage from these areas will be directed to catch basins, treated through a sand and grease trap. The stormwater will be stored/infiltrated through Seepage Bed 2. Name Width Depth (ft) Length (ft) Runoff Volume (cf) Seepage Bed #1 15 10 157 8,833 Seepage Bed #2 15 10 89 4'986 �E IDIAN> APPROVED DATE: 05/04/22 FILE NUMBER: Fa- D-GG12 ley))) Horn PENDIX A- Storm Drainage Calculations (E IDS IAN,_- APPROVED �� �\ \ CAM 05/04/22 \� � GRAYCLIFF SUBDIVSION PHASE 3 FRFNOMRFR:FP-zozz- M \ 3 BLOCK 3 T \ \ \ A 2 \ DRAINAGE BASIN MAP \ \ \ \ 4 1C \\ \\\ 1> 3 \, \ / 1C 4 \ / /BLOCK 2 5 3 6 / 29 4 \ \ \ \ 22 8 28 27 26 25 \ 9 24 / 7 10 8 �0 22 10 BASIN 1 12 \ \ \ — — — 21 Ex NORTH r9i o ei N o O / N .5 tm GRAPHIC SCALE IN FEET x 0 75 150 300 o a° 12 20 \ \ � 13 19 18 14 BLOCK 3 \ \ \ \ \ BLOCK 2 15 17 15 \ FUTURE BA S I N 2 PHASE \ FT \ \ 1 4 \ a 2 34 iu 2 \ \ \ ULULL. 3 35 4 36 5 37 Kimley>))Horn (E IDIAN — ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method APPROVED is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These 05/04/22 DATE blish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILE NUMBER: FP-zoz2-DDi 2 Jost -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Basin 1 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities (25 max) 2 rlir4 to Chn , KA— O ihha in n 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)j/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 user caicwate min 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc i 2.58 in/hr 9 Calculate the Post -Development peak discharge (QPeak) Qpe.k 6.59 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 8,833 W V = Ci(Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vr, 5,521 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 883 W Primary Treatment/StorageBasin V 7,950 W Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 8,833 W Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 2 3 4 5 6 7 8 9 10 109,246 65,054 4.00 0.90 0.20 0.64 Estimated Runoff Coefficients for Various Surfao Type of Surface Runoff Coefficients "t Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type Slope A B C D Flat: 0-2% 0.04 0.07 0.11 O. Average: 2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 O. Adapted from ASCE ACHD Calcs- Ph3.xlsm Version 10.5, November 2018 3/3/2022, 4:43 PM IDS IAy- �J ACHD Calculation Sheet for Finding Peak Discharge/Volume -Rational Method APPROVED is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These 05/04/22 DATE blish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILE NUMBER:rP- Dlz ost-Development Flows (for pre -development flows, increase number of storage facilities to create new tab) put in yellow cells. 1 Project Name Basin 2 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100-Year or 25-Year With 100-Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) SF Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Av@ riirL r,. Ch...., K—r. C..kk­i, n Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 2 3 4 5 6 7 8 9 10 56,840 58,470 2.65 0.90 0.20 0.55 7 User Calculate -1 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 min -1 8 Determine the average rainfall intensity (i) from IDF Curve based on Tc i 2.58 in/hr 9 Calculate the Post -Development peak discharge (QPeak) Qpek 3.72 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 4,986 W V = Ci(Tc=60)Ax3600 ■ 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 3,117 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 499 W Primary Treatment/StorageBasin V 4,488 W Subsurface Storage Volume Without Sediment Factor (See BMP 20 Tab) V 4,9 Estimated Runoff Coefficients for Various Surface Type of Surface Runoff Coefficients "( Business Downtown areas 0.70-0.95 Urban neighborhoods 0.50-0.70 Residential Single Family 0.35-0.50 Multi -family 0.60-0.75 Residential (rural) 0.25-0.40 Apartment Dwelling Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10-0.25 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Streets Asphalt 0.95 Concrete 0.95 Brick 0.95 Roofs 0.95 Gravel 0.75 Fields: Sandy soil Soil Type n I a I r n ACHD Calcs- Ph3.xlsm Version 10.5, November 2018 3/3/2022, 9:49 PM � I , �JE IDS IAy_ �J ACHD Quick Calcs for Pipe and Ditch Capacity APPROVED DATE 05/04/22 is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations um requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILENUMBER:rP-zoz 12 in yellow cells. 1 Project Name Basin 1 (WQ) 1 Enter Flow Q= 2.94 cfs 2 Manning's n n= 0.015 Table on QV Tab 3 Slope S= 0.0100 ft/ft 4 Pipe Diameter D= 12 in 5 Uniform Flow Depth y„ = 9.3 in 6 Normal Velocity V= 4.49 ft/s 7 Critical Flow Depth yc = 8.82 in 8 Critical Velocity V= 4.75 ft/s 8 Full Flow QfuII = 3.09 cfs 9 Full Flow % 95% 1 Project Name Basin 1 (100 YEAR) 2 Pipes 1 Enter Flow Q= 6.59 cfs FULL GRAVITY 2 Manning's n n= 0.015 Table on QV Tab I 3 Slope S= 0.0377 ft/ft I 4 Pipe Diameter D= 12 in I 5 Uniform Flow Depth Y. = 12.0 in I 6 Normal Velocity V= 8.39 ft/s 7 Critical Flow Depth yc= 11.62 in 8 Critical Velocity V= 8.47 ft/s 8 Full Flow Qfml = 6.00 cfs 9 Full Flow % -PIPE -DEPTH OF FLOW 5 4 2 1 -7-5d3-2-11 1 2 3 4 5 7 _2 -3 -5 12" DIAMETER _7 0.015 MANNINGS FLOW 2.94 CFS 0.01 FT/FT SLOPE -PIPE -DEPTH OF FLOW 5 4 3 r1 2 -7 -5 -4 -3 -2 _1I 1 2 3 4 5 7 _2 d 5 12" DIAMETER -7 0.015 MANNINGS FLOW 6.59 CFS 0.0377 FT/FT SLOPE ACHD Calcs- Ph3.xlsm 2/22/2022, 11:29 AM Version 10.0, May 2018 IDS IAN— ACHD Quick Calcs for Pipe and Ditch Capacity APPROVED 05/04/22 is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations DATE um requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. FILE NUMBER: F-2D22-12 UbeF put in yellow cells. 1 Project Name Basin 2 (WQ) 2 Pines 1 Enter Flow Q= 3.17 cfs 2 Manning's n n= 0.015 Table on QV Tab 3 Slope S= 0.0150 ft/ft 4 Pipe Diameter D= 12 in 5 Uniform Flow Depth y„ = 8.4 in 6 Normal Velocity V= 5.40 ft/s 7 Critical Flow Depth yc = 9.15 in 8 Critical Velocity V= 4.93 ft/s 8 Full Flow QfuII = 3.78 cfs 9 Full Flow % 84% 1 Project Name Basin 2 (100 YEAR) 2 Pines 1 Enter Flow Q= 3.72 cfs 2 Manning'sn n= 0.015 Table on QV Tab 3 Slope S= 0.0377 ft/ft 4 Pipe Diameter D= 12 in 5 Uniform Flow Depth yn = 6.8 in I 6 Normal Velocity V= 8.06 ft/s 7 Critical Flow Depth yc = 9.86 in 8 Critical Velocity V= 5.39 ft/s I 8 Full Flow QJUII = 6.00 cfs 9 Full Flow % 62% I -PIPE 71 -DEPTH OF FLOW 5 4 3 1 -7-5d3-2-1t 1 2 3 4 5 7 _2 3 -5 12. DIAMETER -7 0.015 MANNINGS FLOW 3.17 CFS 0.015 FT/FT SLOPE -PIPE 7 -DEPTH OF FLOW 5 4 /001� 3 2 -7 7 2ETER 7 0.015 MANNINGS FLOW 3.72 CFS 0.0377 FT/FT SLOPE ACHD Calcs- Ph3.xlsm 2/22/2022, 11:27 AM Version 10.0, May 2018 CUEIDR IAy �� ACHD Calculation Sheet for Sand/Grease Traps APPROVED ksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the DATE 05/04/22 lation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must s that meet or exceed these calculations in order to be accepted. FILE NUMBER: F-D-W12 s for Sand Grease Trap Velocity User input in yellow cells. 1 Project Name SGT 1 2 Enter number of Sand/Grease Traps (25 max) 2 Reference for Throat widths (inch) Boise ADS Vault Lar-ken WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 Number Peak Baffle Throat Velocity Is the Vault Size of S/G Flow Q- Spacing width Area (ft2) 0.5 fps Velocity Traps cfs (inch) (inch) max. ok? 1000 G 1 2.94 48 20 6.67 0.44 ACHD Calcs- Ph3.xlsm 2/22/2022, 11:32 AM Version 10.0, May 2018 CUEIDR IAy �� ACHD Calculation Sheet for Sand/Grease Traps APPROVED ksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the DATE 05/04/22 lation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must s that meet or exceed these calculations in order to be accepted. FILE NUMBER: F-D-W12 s for Sand Grease Trap Velocity User input in yellow cells. 1 Project Name SGT 2 2 Enter number of Sand/Grease Traps (25 max) 2 Reference for Throat widths (inch) Boise ADS Vault Lar-ken WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 Number Peak Baffle Throat Velocity Is the Vault Size of S/G Flow Q- Spacing width Area (ft2) 0.5 fps Velocity Traps cfs (inch) (inch) max. ok? 1000 G 1 3.17 48 20 6.67 0.48 ACHD Calcs- Ph3.xlsm 2/22/2022, 11:34 AM Version 10.0, May 2018 (E IDIAN — ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers et is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's APPROVED logy. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that DATE- 05/04/22 a calculations in order to be accepted. et pulls information from the "Peak CE,V" tab FILE NUMBER: Fe-zozz-ooiz Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Graycliff Phase 3 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? No 100 0.64 4.00 acres 0.00 cfs V 11,041 2 Link to: Q,V2 Q,V TR55 J ft3 25%Sediment 8 Set Total Design Width of All Drain Rock W 15.0 ft 9 Set Total Design Depth of All Drain Rock D 10.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Perf 1801) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360% REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 70.2 ft3/ft 15 Calculate Design Length L 157 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 157 ft 17 Variable Infiltration Window W SWW 15.0 ft 18 Time to Drain 6.3 hours 90%volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 157 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) uptLonaL btorage Lnamners Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 2 Volume to Store V 3 Installed Chamber Width Cw Installed Chamber Depth Cd Installed Chamber Height Ch 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 6 Chamber Storage Volume, With Rock, Per Manuf 7 Total Number of Units Required 8 Area of Infiltration Aperc 9 Volume Infiltration Vperc 10 Time to Drain 90%volume in 48-hours minimum ACHD Calcs- Ph3.xlsm 3/3/2022, 9:51 PM Version 10.0, May 2018 (E IDIAN — ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers et is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's APPROVED logy. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that DATE- 05/04/22 a calculations in order to be accepted. et pulls information from the "Peak CE,V" tab FILE NUMBER: Fe-zozz-ooiz Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Graycliff Phase 3, Facility 2, Bed 2 2 Enter number of Seepage Beds (25 max) 3 Design Storm 4 Weighted Runoff Coefficient C 5 Area A (Acres) 6 Approved discharge rate (if applicable) 7 Is Seepage Bed in Common Lot? No V 100 0.55 2.65 acres 0.00 cfs 6,233 2 Link to: Q•v Q,V TR55 J ft3 25%Sediment 8 Set Total Design Width of All Drain Rock W 15.0 ft 9 Set Total Design Depth of All Drain Rock D 10.0 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Perf 1801) Dia pipe 18 in 13 Size of Overflow Perf Pipe (Perfs 360% REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 70.2 ft3/ft 15 Calculate Design Length L 89 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 89 ft 17 Variable Infiltration Window W SWW 15.0 ft 18 Time to Drain 6.3 hours 90%volume in 48-hours minimum 19 Length of WQ & Overflow Perf Pipes 89 ft 20 Perf Pipe Checks. Qperf>= Qpeak; where Qperf=CdxAxV(2xgxH) uptLonaL btorage Lnamners Note: This assumes chambers are organized in a rectangular layout. 1 Type of Chambers 2 Volume to Store V 3 Installed Chamber Width Cw Installed Chamber Depth Cd Installed Chamber Height Ch 4 Chamber Void Factor 5 Chamber Storage Volume, Without Rock, Per Manuf 6 Chamber Storage Volume, With Rock, Per Manuf 7 Total Number of Units Required 8 Area of Infiltration Aperc 9 Volume Infiltration Vperc 10 Time to Drain 90%volume in 48-hours minimum ACHD Calcs- Ph3.xlsm 3/3/2022, 9:53 PM Version 10.0, May 2018 �E IDIAN> APPROVED DATE: 05/04/22 FILE NUMBER: Fa- D-GG12 ley))) Horn PENDIX B- Grading and Drainage Plan Sheets DWT-,)- APPROVED _ 01 I 'T ITT I III T' iss5 6 7 2 �TT� 1 4 oFF 11 -21 ­T 11 1. — 1212— —T nis 2 [. ­.. T —T DEE I� —T [.: 7a,l. [T. , —T 2A.... 2E .124 —I 1A 1_1 2 -Lf * 12 IT 1 18' 1 AT T \_'I ­713 OFF 171 5— TI PAVING CONSTRUCTION NOTES LLJ CGGUTTER PER " IT _"I AC HE ILEIEITE STI DIG �l 7.1 CONl-l-IT 1ILL-D _11 I'Ll 31TTIR PER ACHO SU PL III l, 11 DONA I I I ­-E, 11 VERTICAL C P , UR�,� D TE IF E—TITEN LEITE P. SID '4' "N' A T IAIA PER LLEVE��2' ATI 'DZ �D­�� 21. M­ C-1— -PE 1', 1, 1 : DE ILIAD ­11 1111 ' IE ABLE T­ A I- 11TIED11T CURB II-'IFIFITI AT- DIG D 6 rg ­A_HE I Tl­ �77 I -,TD -,',C -D-A2L 11TI ED PIFFLE , ION LI - L LGIF 12 EDR35 PVC 'IPE LENGTH AND SLOPE 0 10' 20' 40' r12 N 1 1 12 PERFORATED — PIPE. LENGTH AND `E HE' 'LAN SCALE: 1 10' Ll ,N, SEEPAGE BID PER DETAIL ON SHEET I— S GR­CLIF­ ITA 1,1,6, �5,,RT 2 rezneP-711- 1 R12— T,T­'­, T 5 31 11 11T 2�.1114 26 25 223 21 20 1 I 19 1 BLOC 2 [L. AD..UA ­Nl OLE i TO GRBt2AD [0-` N D 'I R'E DRAIN MANHOLE TYPE A 13 14 1. ALL STAT-ING AND OFFSETS ARE FROM THE STREET as CALL NTERLUNE. ­DT 2. BI EWAILRB SHALL -PLY WITH THE LATEST ADA rkv.-iT�- STANDARDS. CROSS SLOPE SHALL BE LESS THAN cd z :5 z 27M _PIG Z46 g 276 + 2712 21M2 + - t 12' SO INI 2711.10 27. _17% IZ V IL APPROVED ChM, 0510a22 ILLIII rPaar GO ED c AD m K® P A I tt 5i 7m IS ri I w r I swti+sT I I. L w 9 S W LEARMONT ST ® 01 ox T❑ 1 F ' oreSJ l 3 4 z1ez— Tc. n1, oreTJ ` 1c a1z zre e7 z eT 5 7Tm 2M0 8 - 27. $. i wxw Q BR:Zi1fi 2718 -_- -------- +0.45X- --_- ____ m m _ 2718 2712 12" INI ED 2714.64 o�n F 12712 2710 2710 i) -0 4)6Fki` 4)fY/FY) SIN, �i i3i /i I� ♦�� Y>O1�2) 4)liA�fi ®iYifY6I651 � ��1— FliYB),.� PiTFA)� �i)6A`1•i FiDbi 4)fIL[i iiUdZi, �erueva V)iYAA) CURB RAMP BLOWUP DETAIL IN PAVING CONSTRUCTION NOTES - - 510E WALK PER C -lIc STD ❑ CPO ..- I _ —E L ., Tv - A - SHEET Cd1C 0 C - - CURB F_ LDIG SE ' SPWC _IL ,.�� .A-524 WITH 20 BAFFLE SEPAEATION. LF ,' DR35 PVC PIPE. LENGTH AND SLOPE _LrIRFORATED PVC PIPE. LENGTH AND PE LEE P 103 CONS _i _IDEA.,[ DED PLI DETAIL ON SHEET C7.10� ADJUST WATER VALVE BOX AND COVER TO GRADE. 15 ADJUST MANHOLE RIM TO GRADE. 17 INSTALL TYPE II TERMINUS BARRICADE PER ACHD SO-1— 0 INSTALL TYPE II TERMINUS BARRICADE PER ACHD SD 1132B 6 9 O 0 1❑9 INSTALL 48 DA. STORM DRAN MANHOLE TYPE A PER ISPW STD DWG SD 612 ^ Nj TE.ALL STATIONING AND OFFSETS ARE FROM THE STREET CENTERLINE 2 ALL SIDEWALKS SHALL COMPLY KITH THE LATEST ADA m STANDARDS. CROSS SLOPE SHALL BE LESS THAN 2%. LONGITUDINAL SHALL BE LESS THAN 5% UNLESS AT A ` RAMP. � I Y B ILL J wQm Has C7.1 CL. cd F- Z W rn o LL = K 3 LL On 13720 Z q} LL rc lL U i KEY MAP N.T.S. Q C7 Of o ED NORTH O 0 30' 60' 120' SCALE: 1" = 30' 3 _ o i1\ 86700� ', 9e�GA ILxMP� MEIuDIANg 60' PUBLIC RIGHT-OF-WAY PROVED WALK 6' PLANTER 16.50' 16.50' 6' PLANTER V 61DEWALK i. 05/04/22 f NUMBEP'ra-mzzm �J" ROLLED CURB AND 50 iU TVF 2' RAT LANDING BEHIND SIDEWALK, M —I _ III III III —III III ✓II III III II L II III III —III � � III 1L� C � C FCf �� D L �,.0 25 -i CRUSILL A LLIR,E E 8 I�: 11, OF Ct;xli NUS P1, RUN =.._ L a�EF SJ IADE 8 TO 2 33' TYPICAL LOCAL STREET SECTION WITH DETACHED SIDEWALK _ A^ W n ,)LOCAL ROAD TYPICAL SECTION SCALE: NTS 2 NOT USED SCALE: NTS = F -TIA12T Tlll- Y w�xsE ,a.I - = rnm 0 H a J H z- 1 H w0a mp 0 sFFf bxlrH rzv 0 LL ED J ti m IF I c r NL xAxxaF °N- o m 0 EPAGE BED PLAN V EW norts Nonitdaxc x[u ' - iI cxcou IDD nsovE MAx xscw LlcvAnon F F .1 R — 1—, ~ `LMua sr JRM WATER RETENTION SUMMARY TABLE 4 I J NAME LENGTH t'J- -FTH TOP OF ROCK BOTTOM OF GROUNDWATER REO'D SEPARATION DESIGN INFILTRATION (ft) (ft) (tt) ELEV. ROCK ELEV. ELEV. (3' MIN) RATE (IN/HR) �t( 86�� 9ex0'AaLzMP C8FFI 0 3 SEEPAGE BED DETAIL SCALE: NTS 4 NOT USED SCALE: NTS �E IDIAN> APPROVED DATE: 05/04/22 FILE NUMBER: Fa- D-GG12 ley))) Horn PENDIX C- Geotechnical Report and Addendum