HomeMy WebLinkAboutEngineer Statement V1L ( E IDIAN>
APPROVED
DATE: 05/04/22 ley))) Horn
f I! E NUMBER' FP-2o22-1
January 14, 2022
City of Meridian
33 E Broadway Avenue
Meridian, Idaho 83642
RE: Graycliff Subdivision- Phase 2 Construction Drawings
To Whom it May Concern —
Groundwater monitoring was conducted by Natural Resource Solutions, LLC throughout a period
from 2006-2019. Based on the results of these groundwater readings, the roadway centerline
elevations within the Graycliff Subdivision Phase 2 are designed to be greater than 3' above highest
established groundwater elevation.
Respectfully,
�S\ONAL FN\
V\CENSF� �y
" '08670
L 01/14/2022 O
qTF OF
/GA IL NP%
Abbey Hahn, PE
Kimley-Horn