Loading...
HomeMy WebLinkAboutEngineer Statement V1L ( E IDIAN> APPROVED DATE: 05/04/22 ley))) Horn f I! E NUMBER' FP-2o22-1 January 14, 2022 City of Meridian 33 E Broadway Avenue Meridian, Idaho 83642 RE: Graycliff Subdivision- Phase 2 Construction Drawings To Whom it May Concern — Groundwater monitoring was conducted by Natural Resource Solutions, LLC throughout a period from 2006-2019. Based on the results of these groundwater readings, the roadway centerline elevations within the Graycliff Subdivision Phase 2 are designed to be greater than 3' above highest established groundwater elevation. Respectfully, �S\ONAL FN\ V\CENSF� �y " '08670 L 01/14/2022 O qTF OF /GA IL NP% Abbey Hahn, PE Kimley-Horn