Construction Drawing - C0.10 V1APPROVED M0a22 GENERAL CONSTRUCTION 1. ALL CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT VERSION OF THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC), THE CITY OF MERIDIAN SUPPLEMENTAL SPECIFICATIONS TO THE ISPWC (AND ANY ADDENDUMS), MERIDIAN DESIGN STANDARDS, THE REQUIREMENTS OF THE ADA COUNTY HIGHWAY DISTRICT (ACHD), AND/OR THE REQUIREMENTS OF THE IDAHO TRANSPORTATION DEPARTMENT (ITD). THE MORE STRINGENT OF ANY OF THESE STANDARDS SHALL BE THE CONTROLLING STANDARDS OR SPECIFICATIONS. 2. THE CONTRACTOR SHALL HAVE A COPY OF THE LATEST CITY OF MERIDIAN STANDARD SPECIFICATIONS AND DRAWINGS ON SITE OR READILY ACCESSIBLE AT ALL TIMES DURING CONSTRUCTION (AVAILABLE ON THE WEBSITE). FAILURE TO HAVE ACCESS TO A CURRENT COPY OF THE STANDARD SPECIFICATIONS ON SITE COULD BE GROUNDS FOR A STOP WORK ORDER UNTIL THE SITUATION IS RESOLVED. 3. THE CONTRACTOR SHALL HAVE PLANS STAMPED "APPROVED FOR CONSTRUCTION" BY THE CITY OF MERIDIAN ON SITE AT ALL TIMES. 4. ALL CONTRACTORS, SUBCONTRACTORS, AND UTILITY CONTRACTORS SHALL ATTEND A PRE -CONSTRUCTION CONFERENCE PRIOR TO START OF WORK. 5. CONTRACTORS SHALL NOTIFY THE APPROPRIATE AGENCY WHEN MATERIALS ARE ON SITE OR INSPECTION OF THE WORK IS REQUIRED. NO WORK MAY BEGIN ON ANY PROJECT WITHOUT TWENTY FOUR (24) HOUR PRIOR NOTICE. 6. CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR 48 HOURS PRIOR TO THE REQUIRED TESTING. THE CONTRACTOR MAY NOT OPEN OR CLOSE WATER VALVES. 7. ALL MATERIAL FURNISHED ON, OR FOR THE PROJECT MUST MEET THE MINIMUM REQUIREMENTS OF THE APPROVING AGENCIES. AT THE REQUEST OF THE APPROVING AGENCY OR THE DESIGN ENGINEER, CONTRACTORS SHALL FURNISH PROOF THAT ALL MATERIALS INSTALLED ON THIS PROJECT MEET THE SPECIFICATION REQUIREMENTS SET FORTH IN GENERAL CONSTRUCTION NOTE NO. 1. 8. WORK SUBJECT TO APPROVAL BY ANY GOVERNMENTAL AGENCY MUST BE APPROVED PRIOR TO (A) BACKFILLING TRENCHES FOR PIPE; (B) PLACING OF AGGREGATE BASE; (C) PLACING OF CONCRETE; (D) PLACING OF ASPHALT PAVING. 9. INSPECTION, APPROVAL AND FINAL ACCEPTANCE OF ALL WATER AND SEWER CONSTRUCTION SHALL BE BY THE PUBLIC WORKS DEPARTMENT, AND THEIR DECISION SHALL BE FINAL. SUCH INSPECTIONS SHALL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF PERFORMING THE WORK IN AN ACCEPTABLE MANNER IN ACCORDANCE WITH THE DEQ/QLPE APPROVED CONSTRUCTION PLANS. 10. ANY DEVIATION FROM THE APPROVED PLANS AND SPECIFICATIONS MUST HAVE THE APPLICABLE AGENCY APPROVAL IN WRITING PRIOR TO CONSTRUCTION. 11. PRIOR TO BEGINNING INSTALLATION OF STREET LIGHTS, THE ELECTRICAL CONTRACTOR SHALL OBTAIN AN ELECTRICAL PERMIT FROM THE BUILDING DIVISION OF THE MERIDIAN PUBLIC WORKS DEPARTMENT. ANY DEVIATION IN STREET LIGHT LOCATIONS FROM THE APPROVED PLANS MUST BE APPROVED IN WRITING FROM THE CITY ENGINEER. WATER NOTES 1. CONSTRUCTION OF THE WATER SYSTEM SHALL CONFORM TO THE STANDARDS IN THE "IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08)" AS WELL AS THE STANDARDS AND SPECIFICATIONS REFERRED TO IN GENERAL CONSTRUCTION NOTE NO. 1. 2. THE HORIZONTAL SEPARATION OF POTABLE WATER MAINS AND NON -POTABLE WATER MAINS (SANITARY SEWER, STORM DRAIN, AND IRRIGATION) SHALL BE A MINIMUM OF TEN (10) FEET. WHERE IT IS NECESSARY FOR A POTABLE WATER MAIN AND NON -POTABLE WATER MAIN TO CROSS WITH LESS THAN EIGHTEEN (18) INCHES OF VERTICAL SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 542.07 OF THE IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08) AND SECTION 430.02 OF THE WASTEWATER RULES (IDAPA 58.01.16). 3. THE HORIZONTAL SEPARATION OF NON -POTABLE SERVICES AND POTABLE WATER SERVICES OR POTABLE WATER MAINS SHALL BE A MINIMUM OF SIX (6) FEET. WHERE IT IS NECESSARY FOR A POTABLE WATER MAIN AND NON -POTABLE WATER MAIN TO CROSS WITH LESS THAN EIGHTEEN (18) INCHES OF VERTICAL SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 542.07 OF THE IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08) AND SECTION 430.02 OF THE WASTEWATER RULES (IDAPA 58.01.16). 4. PLACE WATER SERVICE LINES IN A TWO (2) INCH DIAMETER PIPE SLEEVE WHEREVER THE SERVICE LINE CROSSES A STORM WATER TREATMENT FACILITY (I.E. SEEPAGE BEDS, DRAINAGE SWALES). 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONTINUOUS WATER SERVICE TO ALL EXISTING WATER USERS AFFECTED BY CONSTRUCTION. IF WATER SERVICE MUST BE INTERRUPTED, THE CONTRACTOR SHALL COORDINATE WITH THE PUBLIC WORKS INSPECTOR. SEWER NOTES 1. CONSTRUCTION OF THE SEWER SYSTEM SHALL CONFORM TO THE STANDARDS IN THE WASTEWATER RULES (IDAPA _ 58.01.16) AS WELL AS THE STANDARDS AND SPECIFICATIONS REFERRED TO IN GENERAL CONSTRUCTION NOTE NO. _ 1. 2. THE HORIZONTAL SEPARATION OF POTABLE WATER MAINS AND NON -POTABLE WATER MAINS (SANITARY SEWER, a STORM DRAIN, AND IRRIGATION) SHALL BE A MINIMUM OF TEN (10) FEET. WHERE IT IS NECESSARY FOR A POTABLE WATER MAIN AND NON -POTABLE WATER MAIN TO CROSS WITH LESS THAN EIGHTEEN (18) INCHES OF VERTICAL SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 542.07 OF THE IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08) AND SECTION 430.02 OF THE WASTEWATER E RULES (IDAPA 58.01.16). 3. THE HORIZONTAL SEPARATION OF NON -POTABLE SERVICES AND POTABLE WATER SERVICES OR POTABLE WATER MAINS SHALL BE A MINIMUM OF SIX (6) FEET. WHERE IT IS NECESSARY FOR A POTABLE WATER MAIN AND _ NON -POTABLE WATER MAIN TO CROSS WITH LESS THAN EIGHTEEN (18) INCHES OF VERTICAL SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 542.07 OF THE IDAHO RULES FOR PUBLIC 3 DRINKING WATER SYSTEMS (IDAPA 58.01.08) AND SECTION 430.02 OF THE WASTEWATER RULES (IDAPA 58.01.16). 4. PLACE SEWER SERVICE LINES IN A SIX (6) INCH DIAMETER WATER CLASS PIPE SLEEVE WHEREVER THE SERVICE LINE CROSSES A STORM WATER TREATMENT FACILITY (I.E., SEEPAGE BEDS, DRAINAGE SWALES). ROADWAY 1. ALL CONTRACTORS WORKING WITHIN THE PUBLIC ROAD RIGHT-OF-WAY ARE REQUIRED TO SECURE A RIGHT-OF-WAY CONSTRUCTION PERMIT FROM ACHD OR ITD AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION. r 2. ACHD OR ITD WILL INSPECT ALL WORK WITHIN THE PUBLIC RIGHTS -OF -WAY TO INCLUDE UTILITY TRENCHES ABOVE THE PIPE ZONE. PRESSURIZED IRRIGATION 3 1. THE PRESSURIZED IRRIGATION SYSTEM MUST BE BUILT TO THE STANDARDS OF THE IRRIGATION DISTRICT IN WHICH IT IS BEING CONSTRUCTED. 3 2. INSTALL A REDUCED PRESSURE BACKFLOW PREVENTER IN ANY CONNECTION BETWEEN THE POTABLE WATER SYSTEM AND THE PRESSURE IRRIGATION SYSTEM. THE DEVICE MUST BE APPROVED BY THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) AND THE CITY OF MERIDIAN WATER DEPARTMENT. DRAINAGE 1. FOR ANY DRAINAGE FACILITIES WITHIN A PUBLIC RIGHT OF WAY, ACHD OR ITD SHALL BE RESPONSIBLE FOR E INSPECTION. FOR ANY PRIVATE DRAINAGE FACILITIES THE PROJECT ENGINEER OR ARCHITECT SHALL BE RESPONSIBLE FOR INSPECTION AND CERTIFICATION OF DRAINAGE FACILITIES; HOWEVER ANY ROOF DRAINAGE AND PIPING TO THE DRAINAGE FACILITIES WILL BE INSPECTED BY THE MERIDIAN PLUMBING OFFICIAL UNDER THE APPROPRIATE PERMIT. I GENERAL NOTES ADA NOTES 1. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE 1. ALL HANDICAP PARKING STALLS SHALL BE PAINTED AND SIGNED IN STRICT ACCORDANCE WITH CURRENT ADA CONTRACTOR SHALL COMPLY WITH IDAHO CODE CHAPTER 22, TITLE 55 REGARDING UNDERGROUND FACILITIES STANDARDS AND LOCAL REGULATIONS. ALL HANDICAP RAMPS AND ACCESSIBLE RAMPS SHALL BE CONSTRUCTED IN DAMAGE PREVENTION. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF EXISTING UTILITIES BEFORE STRICT ACCORDANCE WITH CURRENT ADA STANDARDS AND LOCAL REGULATIONS. COMMENCING WORK. THEY AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE THEIR A. THE FOLLOWING CRITERIA SHALL APPLY TO ALL CONSTRUCTION WITHIN THE LIMITS OF THIS PROJECT. FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. CALL DIGLINE, INC., 48 HOURS BEFORE B. THE MAXIMUM CROSS SLOPE OF ANY SIDEWALK, PEDESTRIAN ACCESS OR STORE FRONT SHALL NOT EXCEED COMMENCING ANY UNDERGROUND WORK AT 811 OR 208-342-1585. 2.0 PERCENT. THE SLOPE SHALL BE MEASURED PERPENDICULAR TO THE DIRECTION OF TRAVEL. 2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT EDITION OF THE IDAHO STANDARDS FOR C. THE GRADES WITHIN HANDICAP PARKING STALLS SHALL NOT EXCEED 2.0 PERCENT MEASURED IN ANY PUBLIC WORKS CONSTRUCTION (ISPWC). DIRECTION. HANDICAP PARKING STALLS SHALL HAVE AN ACCESSIBLE ROUTE, AS NOTED BELOW, TO THE 3. CONTRACTOR SHALL REPAVE TO EXISTING GRADES ANY PAVED AREAS DISTURBED BY CONSTRUCTION. BUILDING ENTRY AS SHOWN ON THE DRAWINGS. 2. ACCESSIBLE ROUTES SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5.0 PERCENT. ACCESSIBLE ROUTES 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COMPACTION TESTS FOR SUBGRADE AND PAVEMENT IN EXCEEDING 5.0 PERCENT SHALL BE CONSTRUCTED WITH RAMPS AND HANDRAILS HAVING A MAXIMUM SLOPE OF ACCORDANCE WITH CITY OF MERIDIAN BACKFILL STANDARDS. 8.33 PERCENT FOR A MAXIMUM RISE OF 30 INCHES. A 5-FOOT BY 5-FOOT LANDING PAD (WITH A MAXIMUM SLOPE OF 2 PERCENT IN ANY DIRECTION) SHALL BE CONSTRUCTED AT THE BOTTOM AND TOP OF ALL RAMPS. 5. ALL NON-COMPACTABLE MATERIALS SHALL BE REMOVED PRIOR TO COMPACTION OF SUBGRADE. 3. ALL SITE DIRECTIONAL SIGNS SHALL HAVE A MINIMUM CLEAR DISTANCE OF 7-FEET AS MEASURED FROM THE 6. CONTRACTOR SHALL OBTAIN ALL APPLICABLE CONSTRUCTION PERMITS. GROUND TO THE BOTTOM OF THE LOWEST SIGN. 4. ALL ACCESSIBLE ROUTES THAT CROSS A VEHICULAR DRIVE SHALL CONTAIN A DETECTIBLE WARNING IN STRICT 7. SITE TOPOGRAPHIC SURVEY AND ROAD TOPOGRAPHIC SURVEY PROVIDED BY DIAMOND LAND SURVEYING, LLC. ACCORDANCE WITH CURRENT ADA STANDARDS AND LOCAL REGULATIONS WHETHER OR NOT A RAMP IS NEEDED. (06/29/2021). 5. THE MAXIMUM VERTICAL GRADE DIFFERENTIAL BETWEEN SURFACES ALONG AN ACCESSIBLE ROUTE SHALL BE A MAXIMUM OF %-INCH. 8. THE CONTRACTOR SHALL VERIFY THE ELEVATIONS OF THE TEMPORARY BENCHMARKS, PAVEMENT MATCH LOCATIONS, AND NOTIFY ENGINEER OF ANY DISCREPANCY PRIOR TO CONSTRUCTION. 6. THE CONTRACTOR SHALL HAVE ALL CONCRETE FORMS THAT ARE PART OF ANY DESIGNATED ACCESSIBLE ROUTE, STORE FRONT, HANDICAP PARKING SPACE OR RAMP SURVEYED BY A LICENSED SURVEYOR AND SUBMITTED TO 9. THE CITY OF MERIDIAN MAY OPT TO HOLD A PRE -CONSTRUCTION MEETING FOR THIS PROJECT. IF SO, THEN NO THE ENGINEER TO VERIFY GRADES AND CROSS SLOPES PRIOR TO PLACEMENT OF ANY CONCRETE. THE CONSTRUCTION SHALL BEGIN BEFORE THE PRE -CONSTRUCTION MEETING WITH THE CITY OF MERIDIAN, WHICH THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL COSTS AND DAMAGES FOR IMPROVEMENTS INSTALLED OR CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO ATTEND. OTHERWISE IMPACTED BY WORK NOT APPROVED BY THE ENGINEER. 10. THE CONTRACTOR SHALL OBTAIN A RIGHT-OF-WAY PERMIT FROM THE ADA COUNTY HIGHWAY DISTRICT (ACHD) PRIOR TO COMMENCING CONSTRUCTION IN ANY ACHD RIGHT-OF-WAY. PLEASE ALLOW MINIMUM OF 48 HOURS FOR PROCESSING OF APPLICATION. 11. ALL UNDERGROUND UTILITIES AND SERVICE LINES SHALL BE INSTALLED AND TESTED PRIOR TO STREET CONSTRUCTION AND ON -SITE PAVING. 12. DISTURBANCES TO THIS SITE WILL REQUIRE AN APPROVED EROSION AND SEDIMENT CONTROL PERMIT FROM THE CITY OF MERIDIAN. 13. IN ADDITION, ALL OWNERS AND CONTRACTORS INTENDING TO DISTURB ONE ACRE OR MORE OF GROUND AS PART OF CONSTRUCTION ACTIVITIES SHALL DO THE FOLLOWING: A. FILE A NOTICE OF INTENT (NOI) WITH EPA'S CONSTRUCTION GENERAL PERMIT (CGP). B. PREPARE A STORM WATER POLLUTION PREVENTION PLAN (SWPPP). C. INSTALL SIGNAGE PER THE CGP. D. MAINTAIN ON -SITE COPIES OF THE NOI, CGP, AND SWPPP. E. COMPLY WITH REQUIREMENTS OF CGP AND SWPPP INCLUDING DOCUMENTING THAT ALL INSPECTIONS AND MONITORING HAVE BEEN PERFORMED. F. FILE A NOTICE OF TERMINATION (NOT) WHEN ON -SITE WORK IS COMPLETE AND PERMANENT EROSION AND SEDIMENTATION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. 15. ANY CHANGE FROM THE PLANS SHALL BE APPROVED BY THE ENGINEER OF RECORD, AND THE CITY OF MERIDIAN. 16. WITHIN 30 DAYS OF COMPLETION OF CONSTRUCTION BEFORE CERTIFICATE OF COMPLETION IS ISSUED, THE OWNER'S ENGINEER SHALL COLLECT AND NEATLY RECORD ACCURATE "AS -CONSTRUCTED" RECORD INFORMATION AND PREPARE COMPLETE SEALED RECORD DRAWINGS IN ACCORDANCE WITH THE CITY'S RECORD DRAWINGS REQUIREMENTS. RECORD DRAWINGS ARE THE RESPONSIBILITY OF THE OWNER'S ENGINEER. HOWEVER THE CONTRACTOR SHALL SUBMIT A COPY OF REDLINED AS -BUILT DRAWINGS TO THE OWNER'S ENGINEER IN ORDER TO VERIFY ALL FIELD CHANGES WITHIN 15 DAYS OF COMPLETION OF THE WORK. ACHD NOTES 1. ANY REQUEST FOR VARIANCE OF DISTRICT POLICY MUST BE MADE IN WRITING AND REFERENCE THE APPROPRIATE SECTION(S) OF THE ACHD POLICY MANUAL OR ISPWC. TO BE VALID, THE DISTRICT MUST APPROVE THE VARIANCE REQUEST IN WRITING. 2. ANY PRIVATE SEWER, WATER OR OTHER NON-PUC REGULATED UTILITY ARE PROHIBITED FROM BEING LOCATED WITHIN THE RIGHT-OF-WAY. 3. ANY IRRIGATION FACILITIES SHALL BE RELOCATED OUTSIDE OF THE RIGHT-OF-WAY. 4. ALL UTILITY RELOCATION COSTS ASSOCIATED WITH IMPROVING STREET FRONTAGES ABUTTING THE SITE SHALL BE BORNE BY THE DEVELOPER. 5. IN ACCORDANCE WITH DISTRICT POLICY, 7203.3, THE APPLICANT MAY BE REQUIRED TO UPDATE ANY EXISTING NON -COMPLIANT PEDESTRIAN IMPROVEMENTS ABUTTING THE SITE TO MEET CURRENT AMERICANS WITH DISABILITIES ACT (ADA) REQUIREMENTS. THE APPLICANT'S ENGINEER SHOULD PROVIDE DOCUMENTATION OF ADA COMPLIANCE TO DISTRICT DEVELOPMENT REVIEW STAFF FOR REVIEW. 6. REPLACE ANY EXISTING DAMAGED CURB, GUTTER AND SIDEWALK AND ANY THAT MAY BE DAMAGED DURING THE CONSTRUCTION OF THE PROPOSED DEVELOPMENT. CONTACT INSPECTION SERVICES AT 387-6284 (WITH FILE NUMBER) FOR DETAILS. 7. UTILITY STREET CUTS IN PAVEMENT LESS THAN FIVE YEARS OLD ARE NOT ALLOWED UNLESS APPROVED IN WRITING BY THE DISTRICT. CONTACT THE DISTRICTS UTILITY COORDINATOR AT 387-6258 WITH FILE NUMBERS FOR DETAILS. ( ) 8. ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE ADA COUNTY HIGHWAY DISTRICT POLICY MANUAL, ISPWC STANDARDS AND APPROVED SUPPLEMENTS, CONSTRUCTION SERVICES PROCEDURES AND ALL APPLICABLE ACHD ORDINANCES UNLESS SPECIFICALLY WAIVED. AN ENGINEER REGISTERED IN THE STATE OF IDAHO SHALL PREPARE AND CERTIFY ALL IMPROVEMENT PLANS. 9. CONSTRUCTION, USE AND PROPERTY DEVELOPMENT SHALL BE IN CONFORMANCE WITH ALL APPLICABLE REQUIREMENTS OF THE ADA COUNTY HIGHWAY DISTRICT PRIOR TO DISTRICT APPROVAL FOR OCCUPANCY. 10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL EXISTING UTILITIES WITHIN THE RIGHT-OF-WAY. THE CONTRACTOR AT NO COST TO ACHD SHALL REPAIR EXISTING UTILITIES DAMAGED BY THE CONTRACTOR. THE CONTRACTOR SHALL CALL DIGLINE (1-800-342-1585) AT LEAST TWO FULL BUSINESS DAYS PRIOR TO BREAKING GROUND WITHIN ACHD RIGHT-OF-WAY. THE CONTRACTOR SHALL CONTACT ACHD TRAFFIC OPERATIONS 387-6190 IN THE EVENT ANY ACHD CONDUITS (SPARE OR FILLED) ARE COMPROMISED DURING ANY PHASE OF CONSTRUCTION. 11. THE MAXIMUM CROSS SLOPE OF ANY SIDEWALK, PEDESTRIAN ACCESS OR STORE FRONT SHALL NOT EXCEED 2.0 PERCENT. THERE ARE NO TOLERANCES ALLOWED. 12. CONSTRUCT ALL PAVEMENT MATCHES (INCLUDING DRIVEWAY APPROACHES AND UTILITY CUT STREET REPAIRS) WITHIN ACHD RIGHT-OF-WAY TO MATCH THE EXISTING STREET PAVEMENT SECTION OR TO USE THE FOLLOWING: COLLECTOR, LOCAL COMMERCIAL, AND LOCAL INDUSTRIAL ROADWAYS SHALL BE SP-3, 0.50 INCH (Nz") MIX, PG-64-28 THREE INCHES (3") THICK, AS A MINIMUM WITH 4" OF �4" BASE AND 20" OF 6" MINUS PIT RUN GREATER. MINOR ARTERIAL ROADWAYS (PINE AVE) SHALL BE SP-3, 0.50 INCH (1/2") MIX. PG-64-28 FIVE INCHES (5") THICK AS A MINIMUM WITH 4" OF 3/4" BASE AND 25" OF 6" MINUS PIT RUN. 13. ACTUAL FIELD CONDITIONS DURING TRENCHING MAY REQUIRE ADDITIONAL PAVEMENT REPAIR BEYOND THE LIMITS SHOWN ON THE PLANS. THE FOLLOWING CONDITIONS ARE LISTED IN SECTION 6000 OF THE ACHD POLICY MANUAL. A. ALL ASPHALT MATCH LINES FOR PAVEMENT REPAIR SHALL BE PARALLEL TO THE CENTERLINE OF THE STREET AND INCLUDE ANY AREA DAMAGED BY EQUIPMENT DURING TRENCHING OPERATIONS. B. IF THE CUMULATIVE DAMAGED PAVEMENT AREA EXCEEDS 50% OF THE TOTAL ROAD SURFACE, CONTRACTOR SHALL REPLACE THE ENTIRE ROADWAY SURFACE. C. CONTRACTOR SHALL REPLACE THE PAVEMENT SURFACE TO ENSURE MATCH LINE DOES NOT FALL WITHIN THE WHEEL PATH OF A LANE. MATCH LINE SHALL ONLY FALL IN THE CENTER OR EDGE OF A TRAVEL LANE. D. FLOWABLE FILL OR IMPORTED MATERIAL MAY BE REQUIRED IF THE NATIVE TRENCH MATERIAL IS DEEMED UNSUITABLE BY ACHD INSPECTOR, DOES NOT MEET COMPACTION STANDARDS OR TIME IS A CRITICAL FACTOR. E. ANY EXCEPTIONS TO THESE RULES SHALL BE PRE -APPROVED IN WRITING BY DISTRICT STAFF BEFORE CONSTRUCTION BEGINS. ENGINEERING GRADING NOTES 1. CONTOURS ON SIDEWALKS AND PRIVATE/PUBLIC ROADWAYS ARE TO FINISH GRADE. 2. FOR GROUND TREATMENT OF ALL OPEN AREAS WITHIN THE PROJECT SITE, REFER TO LANDSCAPE PLANS. 3. FIELD DENSITY TESTS SHALL BE TAKEN AT REGULAR FREQUENCY AS REQUIRED IN THE GEOTECHNICAL REPORT AND SPECIFICATIONS. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT RISING AND SCATTERING IN THE AIR DURING CONSTRUCTION AND SHALL PROVIDE WATER SPRINKLING OR OTHER SUITABLE METHODS OF CONTROL. THE CONTRACTOR SHALL COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. 5. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO CONTROL TURBIDITY, INCLUDING BUT NOT LIMITED TO THE INSTALLATION OF TURBIDITY BARRIERS AT ALL LOCATIONS WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED SOLIDS INTO THE RECEIVING WATER BODY EXISTS DUE TO THE PROPOSED WORK. TURBIDITY BARRIERS MUST BE MAINTAINED IN EFFECTIVE CONDITION AT ALL LOCATIONS UNTIL CONSTRUCTION IS COMPLETED AND DISTURBED SOIL AREAS ARE STABILIZED. THEREAFTER, THE CONTRACTOR MUST REMOVE THE BARRIERS. AT NO TIME SHALL THERE BE ANY OFF -SITE DISCHARGE WHICH VIOLATES THE WATER QUALITY STANDARDS. 6. SOD OR SEED/MULCH MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES WITHIN 48 HOURS OF COMPLETING FINAL GRADING, AND AT ANY OTHER TIME AS NECESSARY, TO PREVENT EROSION, SEDIMENTATION OR TURBID DISCHARGES. 7. THE CONTRACTOR MUST CONSTRUCT AND MAINTAIN A PERMANENT VEGETATIVE PROTECTIVE COVER FOR EROSION AND SEDIMENT CONTROL ON ALL LAND SURFACES EXPOSED OR DISTURBED BY CONSTRUCTION OF THE PERMITTED PROJECT. THE PROTECTIVE COVER MUST BE INSTALLED WITHIN FOURTEEN DAYS AFTER FINAL GRADING OF THE AFFECTED LAND SURFACE. 8. THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL A GRASS STAND OR OTHER FINAL LANDSCAPE PLANTING IS WELL ESTABLISHED. 9. THE CONTRACTOR SHALL ENSURE THAT ISLAND PLANTING AREAS AND OTHER PLANTING AREAS ARE NOT COMPACTED AND DO NOT CONTAIN COMPACTED BASE MATERIAL. THE CONTRACTOR SHALL ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM ALL AREAS ON THE SITE TO BE PLANTED. 10. STRIP TOPSOIL AND ORGANIC MATTER AND PAVING MATERIAL FROM ALL AREAS UNDER BUILDING AND PAVED SURFACES. TOPSOIL MAY BE STOCKPILED ON SITE FOR REPLACEMENT ON SLOPES IN GREEN AREAS. STOCKPILED TOP SOIL MAY NEED TO BE AMENDED TO MEET PROJECT SPECIFICATION SECTIONS. 11. ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT. 12. CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS. 13. UNLESS OTHERWISE SHOWN, NO PROPOSED SLOPE SHALL EXCEED THREE (3) HORIZONTAL TO ONE (1) VERTICAL. ALL SLOPED AREAS MUST BE PROTECTED FROM EROSION. 14. IF STRIPPED MATERIALS CONSISTING OF VEGETATION AND ORGANIC MATERIALS ARE STOCKPILED ON THE SITE, TOPSOIL MAY BE PLACED TO A HEIGHT OF FIVE FEET. SILT FENCE SHALL BE PLACED AROUND THE BASE OF THE STOCKPILE AND THE STOCKPILE SHALL BE SEEDED WITH NATIVE SEED MIX IMMEDIATELY AFTER STRIPPING OPERATIONS ARE COMPLETE. 15. ON -SITE MATERIALS SUITABLE FOR FILL BENEATH DRIVES AND PARKING AREAS BEYOND 5 FEET OF THE BUILDING SHALL BE COMPACTED IN ACCORDANCE WITH GUIDELINES PRESENTED IN THE SOILS REPORT. 16. SPOT ELEVATIONS SHALL TAKE PRECEDENCE OVER CONTOURS AND SLOPES SHOWN. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF SPOT ELEVATIONS THAT DO NOT APPEAR TO BE CONSISTENT WITH THE CONTOURS AND SLOPES. SPOT ELEVATIONS AND SPECIFIC PROFILE DESIGN SHALL BE USED FOR SETTING ELEVATIONS OF CURB, GUTTER, AND UTILITIES. 17. BENCHMARK VERIFICATION: CONTRACTOR SHALL USE BENCHMARKS AND DATUMS SHOWN HEREON TO SET PROJECT BENCHMARK(S), BY RUNNING A LEVEL LOOP BETWEEN AT LEAST TWO BENCHMARKS, AND SHALL PROVIDE SURVEY NOTES OF SUCH TO PROJECT ENGINEER PRIOR TO COMMENCING CONSTRUCTION. 18. CONTOURS ON SIDEWALKS AND PRIVATE/PUBLIC ROADWAYS ARE TO FINISH GRADE. 19. FOR GROUND TREATMENT OF ALL OPEN AREAS WITHIN THE PROJECT SITE, REFER TO LANDSCAPE PLANS. 20.FIELD DENSITY TESTS SHALL BE TAKEN AT REGULAR FREQUENCY AS REQUIRED IN THE GEOTECHNICAL REPORT AND SPECIFICATIONS. 21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT RISING AND SCATTERING IN THE AIR DURING CONSTRUCTION AND SHALL PROVIDE WATER SPRINKLING OR OTHER SUITABLE METHODS OF CONTROL. THE CONTRACTOR SHALL COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. 22. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO CONTROL TURBIDITY, INCLUDING BUT NOT LIMITED TO THE INSTALLATION OF TURBIDITY BARRIERS AT ALL LOCATIONS WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED SOLIDS INTO THE RECEIVING WATER BODY EXISTS DUE TO THE PROPOSED WORK. TURBIDITY BARRIERS MUST BE MAINTAINED IN EFFECTIVE CONDITION AT ALL LOCATIONS UNTIL CONSTRUCTION IS COMPLETED AND DISTURBED SOIL AREAS ARE STABILIZED. THEREAFTER, THE CONTRACTOR MUST REMOVE THE BARRIERS. AT NO TIME SHALL THERE BE ANY OFF -SITE DISCHARGE WHICH VIOLATES THE WATER QUALITY STANDARDS. 23. ALL UTILITIES (MANHOLES, VALVE COVERS, CLEANOUTS, VAULTS, BOXES, ETC.) SHALL BE ADJUSTED TO FINAL GRADE PRIOR TO THE FINAL LIFT OF ASPHALT. 24. ALL EARTH MOVING AND PLACEMENT OPERATIONS SHALL BE IN CONFORMANCE WITH THE RECOMMENDATIONS IDENTIFIED IN THE GEOTECH REPORT. THE CONTRACTOR SHALL HAVE A SIGNED AND SEALED COPY OF THE GEOTECH REPORT ON THE SITE AT ALL TIMES. 25. THE CONTOURS SHOWN REPRESENT FINAL GRADE. THE TOP 6 INCHES OF MATERIAL IN THE LANDSCAPE AREAS SHALL BE TOP SOIL AS SPECIFIED IN THE LANDSCAPE PLANS. 26. GRADES WITHIN ASPHALT AND/OR CONCRETE PARKING AREAS SHALL BE CONSTRUCTED TO WITHIN 0.10 FEET OF THE DESIGN GRADE. HOWEVER, THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AT ALL TIMES TO INSURE NO STANDING WATER. ALL CURBS SHALL BE BUILT IN ACCORDANCE TO THE PLAN. CURBS OR PAVEMENT AREAS WHICH DO NOT PROVIDE PROPER DRAINAGE MUST BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE. 27. SPOT ELEVATIONS REPRESENT FLOW LINE OR TOP OF ASPHALT UNLESS OTHERWISE NOTED. 28. WHERE NEW CURB AND GUTTER IS BEING CONSTRUCTED ADJACENT TO EXISTING ASPHALT OR CONCRETE PAVEMENT, THE FOLLOWING SHALL APPLY: PRIOR TO PLACEMENT OF ANY CONCRETE THE CONTRACTOR SHALL HAVE A LICENSED SURVEYOR VERIFY THE GRADE AND CROSS SLOPE OF THE CURB AND GUTTER FORMS. THE CONTRACTOR SHALL SUBMIT THE SLOPES AND GRADES TO THE ENGINEER FOR APPROVAL PRIOR TO PLACEMENT OF CONCRETE. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY SECTION WHICH DOES NOT CONFORM TO THE DESIGN OR TYPICAL CROSS SECTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CURB AND GUTTER POURS WITHOUT THE APPROVAL OF THE ENGINEER. 29. CONTRACTOR SHALL REFER TO GEOTECHNICAL INVESTIGATION PREPARED BY NATURAL RESOURCE SOLUTIONS, LLC DATED 08/03/2020 AND 02/17/2021 ZO a U w 0 0 N 04 LLI v (%� Q cam') N F- 5-00 O Lu F_ Q O F- Z Z Z W Fn o J LL Of p w W J � 0 U U) w LL Of of U = U�o N N N N 0 N N 0 N N 0 N Z z O 07 Lu J Q Q U U) Q Q m O m m 00 ❑ ❑ Z c0 C) rn C9 U w = � ❑ U 10- SEAL \ONAL fNC \,\CENSFO i • • l S 01/14/2022 f 9TF OF \QP \�A IL Nj SHEET Co. 10