HomeMy WebLinkAboutConstruction Drawing - 0.00 V1W HARRIS STREET RUMPLE LANE
S KENTUCKY WAY
W AMITY ROAD
S LINDER ROAD
W VICTORY ROAD
N MERIDIAN ROAD
T
his document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse
of and improper reliance of this document without written authorization by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
Path:
Date: User:
K:\BOI_CIVIL\093888000 KB HOME_GRAYCLIFF- MERIDIAN ID\CADD\PLAN SHEETS\GN.DWG
1/14/2022 11:09 AM HAHN, ABBEY (STOVER)
GRAYCLIFF ESTATES
GRAYCLIFF SUBDIVSION - PHASE 2
701 W HARRIS ST MERIDIAN, IDAHO 83642
1/14/2022
SHEET
DRAWN BY:
DESIGNED BY:
CHECKED BY:
ARH
PROJECT No.: SCALE:
093888000 AS SHOWN
# DATE DESCRIPTION
SEAL
950 W Bannock Street, Suite 1100, Boise, ID 83702 | Tel. No. (208) 297-2885
ARH
BM
1/14/2022
1/14/2022
FOR REVIEW ONLY - NOT APPROVED FOR CONSTRUCTION
SITE DEVELOPMENT PLANS
FOR
GRAYCLIFF ESTATES PHASE 2
701 W HARRIS ST
MERIDIAN, IDAHO 83642
(SEC 25 3N 1W)
VICINITY MAP
NORTH
BENCHMARK
CONSULTANTS
AGENCY CONTACTS
SITE INFORMATION
PLANNING:
ENGINEERING:
FIRE DEPARTMENT:
GAS SERVICE:
ELECTRIC:
TELEPHONE:
STORM DRAIN:
CABLE:
PROJECT
LOCATION
COVER SHEET
C0.00
GENERAL NOTES
ACHD CERTIFICATE OF COMPLIANCE
PROPERTY OWNER:
DEVELOPER:
CIVIL ENGINEER:
SURVEYOR:
GEOTECHNICAL ENGINEER:
CITY OF MERIDIAN
STANDARDS, SPECIFICATIONS
& DRAWINGS
CAUTION: NOTICE TO CONTRACTOR
CALL 2 BUSINESS DAYS
IN ADVANCE BEFORE
YOU DIG, GRADE, OR
EXCAVATE FOR THE
MARKING OF
UNDERGROUND
MEMBER UTILITIES
Call beofre you dgi.
Know what' s below .
R
SHEET INDEX
01/14/2022
05/04/22
FP-2022-0005