Loading...
HomeMy WebLinkAboutConstruction Drawing - 0.00 V1W HARRIS STREET RUMPLE LANE S KENTUCKY WAY W AMITY ROAD S LINDER ROAD W VICTORY ROAD N MERIDIAN ROAD T his document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance of this document without written authorization by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Path: Date: User: K:\BOI_CIVIL\093888000 KB HOME_GRAYCLIFF- MERIDIAN ID\CADD\PLAN SHEETS\GN.DWG 1/14/2022 11:09 AM HAHN, ABBEY (STOVER) GRAYCLIFF ESTATES GRAYCLIFF SUBDIVSION - PHASE 2 701 W HARRIS ST MERIDIAN, IDAHO 83642 1/14/2022 SHEET DRAWN BY: DESIGNED BY: CHECKED BY: ARH PROJECT No.: SCALE: 093888000 AS SHOWN # DATE DESCRIPTION SEAL 950 W Bannock Street, Suite 1100, Boise, ID 83702 | Tel. No. (208) 297-2885 ARH BM 1/14/2022 1/14/2022 FOR REVIEW ONLY - NOT APPROVED FOR CONSTRUCTION SITE DEVELOPMENT PLANS FOR GRAYCLIFF ESTATES PHASE 2 701 W HARRIS ST MERIDIAN, IDAHO 83642 (SEC 25 3N 1W) VICINITY MAP NORTH BENCHMARK CONSULTANTS AGENCY CONTACTS SITE INFORMATION PLANNING: ENGINEERING: FIRE DEPARTMENT: GAS SERVICE: ELECTRIC: TELEPHONE: STORM DRAIN: CABLE: PROJECT LOCATION COVER SHEET C0.00 GENERAL NOTES ACHD CERTIFICATE OF COMPLIANCE PROPERTY OWNER: DEVELOPER: CIVIL ENGINEER: SURVEYOR: GEOTECHNICAL ENGINEER: CITY OF MERIDIAN STANDARDS, SPECIFICATIONS & DRAWINGS CAUTION: NOTICE TO CONTRACTOR CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES Call beofre you dgi. Know what' s below . R SHEET INDEX 01/14/2022 05/04/22 FP-2022-0005