Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PZ - Landscape Buffer updated
o ° �� � '� PLANT SCHEDULE Material Legend: `1 F�_= DECIDUOUS TREES BOTANICAL/COMMON NAME SIZE CONTAINER QTY + + + + SOD TURF --- 3"DEPTH, 1" MINUS 1�►i T H E °Q a a �\ GI GLEDITSIA TRIACANTHOS INERMIS 'SKYCOLE' TM/SKYLINE THORNLESS HONEY LOCUST 2" CAL. B&B 4 +%+++++' --- ANGULAR GRAVEL MULCH, LAN D ° COLOR: TAN TR TILIA AMERICANA 'REDMOND' /REDMOND AMERICAN LINDEN 2" CAL. B&B 3 . _ - GROUP ZV ZELKOVA SERRATA 'VILLAGE GREEN' /SAWLEAF ZELKOVA 2" CAL. B&B 1 EXISTING LANDSCAPE ° �16T RETAIN AND PROTECT. If a % ^ FLOWERING TREES BOTANICAL/COMMON NAME SIZE CONTAINER QTY CD ��II\\vk�°� � ° � a ° a a �^„�,� 4,0 � �V°" MP MALUS X 'PRAIRIFIRE' /PRAIRIFIRE CRAB APPLE 2" CAL. B&B 3 ° 4l % ° �°'' o • ° ' ° so „ ,,� ; �' II„ "�% Landscape Notes: MW 1�"" ""°� ° `�' ^ °° ° Gov °„ "� 'y „„ SHRUBS BOTANICAL/COMMON NAME SIZE CONTAINER QTY ° 0 ° ° ,^4/%_ ° �' A. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR II\\ �4 CK CALAMAGROSTIS X ACUTIFLORA 'KARL FOERSTER' /FEATHER REED GRASS 2 GAL 10 AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. CR CORNUS SERICEA/RED TWIG DOGWOOD 5 GAL 3 B. FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE WITH SITE GRADING PLAN. REMOVE RIDGES AND FILL DEPRESSIONS, AS cc: SD SD SD SD JB2 JUNIPERUS SCOPULORUM BLUE ARROW /BLUE ARROW JUNIPER 5 GAL. 10 REQUIRED TO MEET FINISH GRADES. PLACE 4" OF ROCK MULCH OVER SUBGRADE SOIL TO LA LAVANDULA ANGUSTIFOLIA/ENGLISH LAVENDER 2 GAL 5 ACHIEVE FINISH GRADE. FINISH GRADE RELATED TO ADJACENT SITE ELEMENTS SHALL BE: G G G G G G G G G G G B.A. 1-INCH BELOW TOP OF ADJACENT PAVEMENT,VALVE BOX,VAULT, ETC. PB PENNISETUM ALOPECUROIDES LITTLE BUNNY' /LITTLE BUNNY FOUNTAIN GRASS 2 GAL 18 B.B. 3-INCHES BELOW TOP OF CURB UNLESS NOTED OTHERWISE. PS PINUS MUGO 'SLOWMOUND' /MUGO PINE 5 GAL 13 C. ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18" OF TOPSOIL, SOD AREAS A MINIMUM OF 12" RF ROSA X 'NOARE' /FLOWER CARPET RED GROUNDCOVER ROSE 2 GAL 9 OF TOPSOIL. SPREAD, COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE. cv RG RHUS AROMATICA 'GRO-LOW' /GRO-LOW FRAGRANT SUMAC 2 GAL 3 D. RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE.VERIFY SUITABILITY OF SURFACE SOIL TO PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN NECESSARY. TOPSOIL SHALL SG SPIRAEA JAPONICA 'GOLDMOUND' /SPIREA 2 GAL 2 BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, SL SPIRAEA X BUMALDA 'LIMEMOUND' TM/LIMEOUND SPIREA 2 GAL 10 WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER: A) PROVIDE APPROVED IMPORTED TOPSOIL, OR B.) IMPROVE ON-SITE TOPSOIL WITH • _ _ _ _ _ _ _ _ _ _ 8 W - S89°35'46 E 193.65 _ 8 W _ _ 811W 811W C/) 811W 811W METHODS APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH IMPORTED TOPSOIL — — �— — — — — - — — — — • WHEN QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS, PLANTS, SODS, STONES, CD coCK (5) CLAY LUMPS AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. PS (3) (5) LA GI (1) GI (1) E. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEW TOPSOIL THAT IS SL (4) r_ (3) PS——————————————RG (3) FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER PB (10) — — — — — — — — — — — — — — _ - THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO _ PLANT GROWTH. f++ ++ + + + + + + + �\\ — — — — — _ till — ; `• _ F. OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL ° - - — — — — — _ CHARACTERISTICS TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY FROM + + + + + + + ° ;�°/' ° � — - - — _______ _ _____ _____ : —, - — — 1it NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF NOT LESS THAN 4 _ _ _ INCHES. I + + + + + + tali — — — _ i — — — — _ G. ALL LANDSCAPE AREAS SHALL BE WEED FREE AT THE TIME OF LANDSCAPE + + + + + + rtH. NEW TREE PLANTING, SEE DETAIL 1/L1.50. CONTRACTOR SHALL STAKE ALL TREES DEEMED + + + + + + + + + + �\`II I ------_--- — — _ — — NECESSARY, LE..... FROM BEING BLOWN OVER, PLANTED WITH LOOSE ROOT BALL, ETC. CONTRACTOR'S OPTION. � ° + + + + + + = °� ° � � G _ _ __ I. NEW SHRUB PLANTING. SEE DETAIL 2/L1.50. a + + + + + + + + + ii JB2 (10) — _ J. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE 1� _ _ - AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. D + + + + + + + + + + + "�` � CIDI ° CK(2) _ — — _ K. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE a + + + + + + + = MP (2) ��^,� — ",,,,, tt��� �' DATE OF SUBSTANTIAL COMPLETION. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A O a + + + + + + + + — -- . - � HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE Sao' — — — OWNER. 3D SD D + + + + + + + + + + + ++ ;+ + + ;+++;+;+ It\\\���! It\����� ° L. TREE PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND FERTILIZER FOR + + + + +1+++++++++++++ '.++ TREE PIT BACKFILL AT THE FOLLOWING RATES. BLEND AMENDMENTS THOROUGHLY WITH SOIL a + + + + + + + ° I — ++ + + + + + + + + +++ BACKFILL.TREE PITS SHALL BE 5'x5'x1.5' (37.5 CF/1.5 CY). a + + + + + + + u + + .+ ' + ' + ' ' ++' ' + L.A. APPLICATION RATES: Q + + + + + + o+ + + _ % ) +++++ + + + + + + + + ..... I PROPOSED 6 RF + + �J+. . . . . . . L.A.A. HUMIC ACID: 25 LBS PER TREE PIT + + + + + + + ( +++1+ + +++++++++ ++ + + + + + . + + BUILDING �� + + + ' + ' + + + + + ' + + ° L.A.B. COMMERCIAL GRADE COMPOST- 10 CUBIC FEET PER TREE PIT ° � + + + + + + +++[+++++++.+++.++++ ' ' + L.A.C. PLANTING TABLET FERTILIZER -4 TABLETS PER TREE PIT + + + + + + + + + �� • - -++ + + ' ' + ao "— _ ++ T+++++++++++++` . . . L.A.D. CALCIFIED DIATOMACEOUS EARTH 75 LBS PER TREE PIT + + + + + + + I `�� � _++++ +.+.+.+.+.+. +++++++++ _ M. SHRUB PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND FERTILIZER CL + + + + + + + + ° + + + + + + + � + + + + + + + + + + + FOR SHRUB PIT BACKFILL AT THE FOLLOWING RATES. BLEND AMENDMENTS WITH THOROUGHLY O + 4 + + + + + + + + I ++++ +++++++++++++++++ + ++ a + wV+ +� BPP + + + ++J+++ + + + + + + + +++ + WITH SOIL BACKFILL. SHRUB PITS SHALL BE 2.5'x2.5'x1' (6.25 CF/0.25 CY). W M.A. APPLICATION RATES: LU I _ + +t+ + + + + + + M.A.A. HUMIC ACID: 2 LBS PER SHRUB PIT + + + + + + + + + + + + + + + + + �� ++ + + +++ M.A.B. COMMERCIAL GRADE COMPOST-2 CUBIC FEET PER SHRUB PIT LLI + + + + + + + + s�,y,� -++ + + ++ + + + + + + M.A.C. PLANTING TABLET FERTILIZER -2 TABLETS PER SHRUB PIT + + + + + + + + ,>� , -+++I++ ++++++++++++++++++ M.A.D. CALCIFIED DIATOMACEOUS EARTH - 15 LBS PER SHRUB PIT + + + + + + L' + + + + + + + + N. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM O Q Wv + - + + + + + + +++ +++ +++ +++ +++ + 8"W &"W "W 811W 8"W — — -.+3' + ' + ' + + + ' + ' ++ LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. + + + + + + + + "µhi (3) CK - +++++++++1�++++++++++ + + + + + + + + -+.J. . . . . . . . . . . + 0. CONTRACTOR SHALL SUBMIT MATERIAL SAMPLES FOR LANDSCAPE ROCK MULCH TO a + + + + + + + %„ (1)ZV -++) + + + + + + + + + + + ° LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PROCUREMENT. LANDSCAPE BOULDERS, + +° + + + + + + + + wul 0 �" _ + + + + + + + + + + + + PHOTO SUBMITTAL IS ADEQUATE. FOR ROCK MULCH, SUBMIT 1 GALLON BAG SAMPLE TO +1+ + + +.+. +'+ .+++ OWNER. + + ° + + + + °� I .,� + + + + + + + + + ++ i �, . +++++++++++++ + : : +++++ Automatic Underground Irrigation Notes: CJ + + + + + + + + c + + + + + + + + + + + + + 4 + + Q + + + + + = ° F + + + + - + + + + + + + + + + + + 4 + + +� + + + + + + + + + ` �„ +++ +++ ++ ++ +++ +++ ++ ++ + + �o + J++++++++++++++++++++++++ A. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM + + + + + +++ + + + + + +++ + + ++++ ++ + + + + w + + + + ++ + + + + + + + + + + + - + ° + + + � + + + + + + + + + + + � + + + + + + +++ + + + + + + + + + + + + + + + + + WHICH ENSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. + + "° + + + + + + + + + + + + + + + + + + + + + + + + + + + + J ° + + + + +'+ + `+ + + + + + +++ + + + + ++ - J+++++ +++ +++ +++ + + + B. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS. + + + + + + + + + + + +++ +++ + ++++ +++ +++ + + p+++ +++ ++++++ +++++++++++ + + + + + + + + + + + + a + + + + + + + + �'J + + + + + + + + + + + + ++""+ . . . . + + . . . . . °° 1++++++++++++++++++++++++ C. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 18"AT PLANTER BEDS, 6" -o N ���� + + + + + + + + + + + + + + + + + + + + + + +++ + + + + ++ . . . . . . . . . . . . + + ° + + + + + + + + + +'+ + + + + + + + + AT LAWN AREAS.. `� zj- ~' . .`. .` .`. .`.+.`. . .`. ++ + + + + + + + + r+ +++ +++ +++ +++ +++ + o co 'mil a + + + + "+ + + Via`° + + + +'+ + +. . + + + + + +.� + + + ++ + + + + + + + + + + + D. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEMS WITH DRIP CONTROL ZONE KIT AND_ ° \ + + + + + + + + + + + + + + + + +.++ .++ .++ .+.+.+.+ +++++++++++++++++++++++ 150 MESH FILTER (MIN.). °� 00 + + + + + + + + + I . . . + . . . . + + . + + J- + + + + + + + C0 + + + + + + + + + + + + + +++ + + + + +++ +++++ ++++ +++++ + +++++++ ++ + + +++ +++ +++ +++ + a + + + + + + + + + + + + + + + + + ° ° I + + + Y+ + ++ + + _++ + + + + + + + + E. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM ■ w CONTROLLER REQUIREMENTS ARE AS FOLLOWS: C + + + + + + ++ +++ ++ + + + + + + + + + + Q ° + + + + + + + + + + + + + + + + + 0 + + cc + J + + + + + + + + + + + E.A. PRECISE INDIVIDUAL STATION TIMING + + ; + + + + + + + ° ��_� +'.' i ' J+++ + + + + + + + + + + >c E.B. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES o + + + + + +° + I + + + + + + + + + + + + + + ++.',�+ �✓� +++++++++++++++++++++++ E.C. AT LEAST ONE PROGRAM FOR EACH HYDROZONE M N ' ° +++++++ ++++++++++++++++++++++++ +++++ + + + + + + + + N a + +a+ B1 + + + + + + + + + ca + + + + + PS (3) — — — — .+�+' +J.+.+.+.+.+.+.+.+.+.+.+.+ E.D. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF Ch ° + + + + + + + + + �II GI (1�) _ _ — _ — +++++++++++ + + +++ �+ +++ �+ ++++++++++++++++++++++++ + -J++.'+'.'++.+.+.+.+.+.+.+ E.E. POWER FAILURE BACKUP FOR ALL PROGRAMMED INDIVIDUAL VALVED WATERING + + N + + + + + + SL (3) + + + + + + + + + + + + + + + + + + + + + + + + + + +++ ++++++++ Revisions 1� W + + 0 + + + + + — — — ++ + + +'+'+'+'+'+'+'+'++++++++++++++++++++++++++++++++ +I+ +++++++++® + + + + + STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE rr�� - +° + -z + + + + + + ; ' I _ — - —' — + + + + + + + + + + + + + + + + + + + + + + + +++J + + + + + ' + + HYDRO-ZONES. 1 �1 + + + + + + + + + + i ++++++++ + + + + + + + + + +++++ + + + + +++ +++ + ++ ++++++++++++++ + ++++ + a+ + + + + + + 0°� ---- — .J++'+'+'+'+'+ F. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE + + + + + + + + + + ++++�++;+++++++++ + ++�� + WATER TO RESPECTIVE HYDRO-ZONES. + + + + + + + + + + + + + + + + + I + + + ++ + + G. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% COVERAGE WITH HEAD TO ° + + + + + + J�"" 0 I -+++++++J+++'+'+' +'+'+'+'+++�+ HEAD SPACING OR TRIANGULAR SPACING AS APPROPRIATE. ++J+++++++++++++++++++ + + + + + + + + + ++.+. . + . . . . . + . . . .+ H. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES a + +Q + + + +° + ;"� %� (1) MP TR (3) + + +++++++++++++++++++++ + • SUCH AS SIDEWALKS, DRIVEWAYS, AND PARKING AREA. + + I� + + + + + + yell" 0 + + + + + + + + M I. EACH VALVE SHALL BE INSTALLED IN A VALVE BOX LARGE ENOUGH TO ALLOW FOR "' ++J.+.+++.+++.+++.+++ +.i MAINTENANCE AND REMOVAL. ONLY ONE VALVE PER BOX. +++++++++++++++++ ° + + + + + O + 1 1 ++++ :+:+:+:�:+:�:�:+ ++ ++++ + +++: ++ +++++ Tree Protection Notes: Q +� + + + + + + + + i r - + + + + +++ I� + a + + + + + + � — - _ _ °° + + + + + + + + + + + + + + + + + + + + + + + + + + + +� + ++ + + + + + o .+.+.+.+.+.+.+.+.+ +.+.+.+.+++++++++++++:+++++++ :+++ : + +:+++:+++ ++++:++++++++ ++ ++++++++++++ + + + + + + + , — — — — + ++ �'++ + + +.J +++� � ++++++ +++ + i A. PROTECT THE CRITICAL ROOT ZONE OF THE TREES TO BE RETAINED ON SITE: (NOTE: CRITICAL ro + + + + + + + + ++++++++ ++++++++++++++++++++++++++++++++ +++++++++++++ + + +++++++++++ ° + + + + + + + ° SG (I) — + ++... ++ +;+;+;+ + + + + + b + + + + ++ J++++ + +�+ + + + + ROOT ZONE IS THE AREA DIRECTLY BELOW THE DRIP LINE OF THE TREE.) + + + + + ++ . . . .+.+.+ +++ . . .+ + ++++ + + + + + + ++ + + + + + + ++ + + + + + + +++++++++++ A.A. CONSTRUCT PROTECTIVE FENCING OF CHAIN-LINK AROUND THE CRITICAL ROOT ZONE UD + + + + + + + + SL (4) - — — — — +++ +++++++ +_ + —+7 �+ +�+-+T+-+�++++++++++++++ PRIOR TO DEMOLITION OR CONSTRUCTION. C +° + + + + + + + + + GI (1) — — — — +++++++++ ++++++++ ++++++++++++++++++++++++ +++++++++++ +++++++ + +++ ++ + +++ + ++�++++++++++++ + ++++++++i C ° ° — — '++ ++.`. . + . . + . . . . . . + + + + + + + + + + + + + + + + + + + + + + A.B. DO NOT ALLOW COMPACTION BY EQUIPMENT TRAFFIC DURING CONSTRUCTION OR DURING + + ++ + + ++ + + + + + + + + + + + _ _ _ _ + + + + + + + + + + �" PS (4) — — — — ++ + ++++++.+++ + +++++++ +++++++.+++.++++++++++++ +++++++++++++++ +++++++++++++++ +++++++++++++++++++++++++++ +++++++++ DEMOLITION. + + + + + + + — I + + + + + + + + + + + + + + + + + + + + + + + + + + + A.C. DO NOT ALLOW CEMENT TRUCKS TO RINSE WITHIN THE PROTECTION AREA,ANYWHERE 4 + + + + + + + + + — — — — — — ++ + + + + + + + + ++++++++++++++++++++++++ ++ +++ +++++++++++++++++++ + + +++++++++++++++++++++++ ++ ++++++++i 4 + + + • + + . . + . . . . ......... + + + + + . + + + . . . . . THAT TREE ROOTS EXIST OR IN PLANNED PLANTING BEDS. °+ + + + + + + + + + — -- - I + + + + + ' + ' + +.+++.++'++ +++++++++++++++++++++++ +++ +++'+++'++++ +'+++++++++++++ A.D. DO NOT STOCKPILE MATERIALS, DEBRIS OR DIRT WITHIN THE TREE PROTECTION AREA. + + + + + + + + —."t},,, + + + + + + + + + + + + + + + + + + + + + + + + A.E. MAINTAIN WATERING WITHIN THE CRITICAL ROOT ZONE FROM MID-APRIL TO — — _ + .+. .+.+.+. .+ ++++ ++++++++++.++++++++ +++++++ +++++++++++++ + +++++++++++++++++ +++ ++++++++++++++++++++ x MID OCTOBER AT THE RATE OF NOT LESS THAN THE + +° I� + + — — J '+1.+.+.+.+.+.+.+.+.+.+.+.+.+.+.+.'.++ a + + + + + + + + + ° — +++ + + + + + + + + + + + + + + + + + +++++++++++++++++++++++++ +++++'+'+'+'+'+'+'+'++++++++++++++++++++++++++++++++++++++++++++.+ EQUIVALENT OF1-1/2"OF WATER OVER THE ENTIRE AREA PER WEEK. ° + + + + + 0 o A.F. DO NOT TRENCH, EXCAVATE, FILL OR OTHERWISE DISTURB THE SOIL WITHIN THE CRITICAL + + + + + + + = = ROOT ZONE. + + + + + + + + + + + + + + ° r "`° ° ° o • ° A.G. ADJUST PROPOSED IMPROVEMENT LOCATIONS AS REQUIRED TO AVOID DAMAGING TREE +° + + + + + + ° v° ROOTS. a + + + + + + + + + a & B. PROTECT THE CROWN AND TRUNK OF TREES TO BE RETAINED ON SITE: + + + + + + + + + — J _ _ _ B.A. OPERATE EQUIPMENT IN SUCH A WAY AS TO AVOID CONTACT WITH TREE TRUNKS OR + + + + + +° N89°31'13"W 90.01' BRANCHES. Project No.: 122008 o + + + + + + + + + + + + + + + _`4 Date of Issuance: 03.04.2022 B.B. PRUNING OF PUBLIC PROPERTY TREES SHALL BE PERFORMED BY A LICENSED ARBORIST. a+ + + + + + + + + 0 a C. ALL TREES DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED USING THE Project Milestone: Conditional Use Permit + + a + + + + + FOLLOWING CRITERIA: Conditional Use Permit + + + + + + + + + WWI °''� ° EXISTING TREE REPLACEMENT LandscapePlan WE + + + + + + + 1"TO 6"CALIPER 2X CALIPER OF TREE REMOVED o T Landscape Plan 6"TO 12"CALIPER......................1.5X CALIPER OF TREE REMOVED N d� 0 10' 20' > 12"OR LARGER CALIPER.........1 X CALIPER OF TREE REMOVED goo Horizontal Scale: 1" = 10' EXAMPLE:IF AN 8"CALIPER TREE IS REMOVED,AN ACCEPTABLE REPLACEMENT WOULD BE L1 .00 (3)4"CALIPER TREES OR(4)3"CALIPER TREES.