Loading...
HomeMy WebLinkAboutL3.2_Drip Irrigation Details V12 3 4 5 6 7 8 9 10 12 b t r h I J K L M N V F FLUSH VALVE AIR RELIEF VALVE REFER TO START PLUMBED TO PLUMBED TO CONNECTION DRIPLINE INLINE DRIPLINE DETAIL. EMITTER FLUSH VALVE PER PLANS 'RAINBIRD' 3/4" DRIPLINE PLUMBED TO DRIP LINE OF HEADER AS NEEDE FV BLANK DRIPLINE EXHAUST HEADER DRIPLINE PER PLANS STAPLED ON TOP OF AR FINISH GRADE. INSTALL DRIP LINE UNDER WEED BARRIER FABRIC WITH J MULCH PLACED ON TOP. X NO KINKS IN LINE. INSERT TEE PrAs PUPS 2 ROOT BALL TREETRUNK -�— 6-INCH SOIL STAPLE (TYP) DRIPLINE SPACING SEE DRIP NOTES AREA PERIMETER SHAPE DRIPLINE TO MEET PER PLANS FOR ROW SPACING SPECIFIED SPACING OR USE (1) 1 GPH EMITTER 'RAINBIRD' 3/4" OF HEADER INTO DISTRIBUTION ( PERIMETER LATERALS AS NEEDED. CD AT BASE BLANK DRIPLINE MAX DISTANCE 1/2 OF TREE ABOVE SUPPLY HEADER ROW SPACING CONTROL ZONE KIT -REMOTE CONTROL VALVE, MULCH SO VISIBLE NOTE: FILTER AND PRESSURE REGULATOR PER PLANS. (INDICATOR ONLY) INSERT CROSS (TYP) 1. CENTER FEED LITE LAYOUTS ALLOW 2X MAX TUBING LENGTH OF y" MIN PVC/POLY TUBING TO INSTALL DRIPLINE STANDARD LAYOUTS. CONNECTION; SIZE AS WITH EMITTERS ADAPTER AS NEEDED 2. PLACE SOIL STAPLE EVERY 3'-5' PLUS TWO ON EACH TEE, ELBOW OR INDICATED ON PLANS. INLINE TO BE CROSS. 3. SEE MAX LINE DISTANCE FOR CENTER FEED LAYOUT @ 40 PSI INLET; .4 @ 12" o.c. = 800 .6 @ 18" o.c. = 900' LOCATED EVENLY ON TOP OF ROOT BALL DRIP LINE LATERAL PER PLANS, REFER TO FULL CHART FOR ALTERNATE PRESSURES: A @ 18" o.c. = 1,200, � SIZE PER FLOW (DO NOT 6 @ 12" o.c. = 600' EXCEED 5 F.P.S.) IPLINE LAYOUT _ NOTES: SCH. 40 PVC THREADED TEE T_EIR NOT TO SCALE 1. FOR EVERGREEN TREES, LOCATE INDICATOR EMMITTER ON OR START CONNECTION AS OUTSIDE OF OUTER DRIP RING.) DETAILED 2. ALL FITTINGS TO INLINE DRIP TUBING TO BE COMPRESSION FITTINGS. IF MALE INSERTS ARE NEEDED, INSTALL WITH OETICKER 1/4" SINGLE OUTLET BARBED EMITTER CLAMPS. PER PLANS: LOCATE 12" MAX. FROM PLANT TRUNK. BOTTOM OF EMITTER TO BE FLUSH WITH TOP OF MULCH D RIP LINE TREE RING LAYOUT 1/4" VINYL SPAGHETTI TUBING 1/4" TUBING STAKE TOP OF MULCH 1/4" SELF -PIERCING BARBED CONNECTOR PE PIPE: INLINE DRIP TUBING OR DISTRIBUTION TUBING (UNDER WEED FABRIC) FINISH GRADE NOTES: 1. CONNECT EMITTER DIRECTLY INTO IN -LINE OR BLANK DRIP TUBING. 2. OPTIONALLY USE DISTRIBUTION MANIFOLDS CONNECTED DIRECTLY TO LATERAL LINE AS NEEDED. 3. LOCATE EMITTER ON BUILDING OR FENCE SIDE OF PLANT. 4. ON SLOPES, LOCATE EMITTER ON THE UPHILL SIDE OF PLANT OR TREE. 5. USE TEES ON DISTRIBUTION TUBING TO PROVIDE EACH PLANT WITH REQUIRED NUMBER OF EMITTERS PER PLANS. EMITTER ON 1/4" TUBING Cor SP FLI ECO I NDICATOR FINISH GRAL 6" ROUND VF BOX AUTOMATIC FLUSHING Vi BRICK SUPPi (THREE) PEA GRAVEL FLUSHING VALVE NOT TO SCALE 6" ROUND VALVE BOX FINISH GRADE AIR/VACUUM RELIEF — II III VALVE _I -III=1 _III = z _ II I=I I M � IIII 11= 3/4"M x 1/2"F REDUCTION _ � BUSHING == III-1 T IN -LINE DRIP TUBI 3/4" CRUSHED GRAVEL SUMP�- BRICK SUPPORTS (THREE)=1 �IIiIII 11 I II I II I I II _ IIIIII—III .,III-III=1111III11��� I_I�, I' 180 2-WAY ADAPTER TIII AIR / VACUUM RELIEF VALVE NOT TO SCALE MULCH FINISH GRADE FINISH GRADE IN -LINE EMITTER ? F z DRIP TUBING 4n4En D. w g 0 O p a -. - WEED BARRIER FABRIC ,. WHERE APPLICABLE ECO INDICATOR HUNTER MODEL: ' \\,!L-A:TERAL OPERIND SPACING PE MARLEX STREET SUB GRADE ELBOW MULCH PER PLANS 7 DRIPLINE SUBGRADE NOT TO SCALE DRIP TUBING CTION PER ACTURERS MENDATIONS. NOT TO SCALE J INSTALLATION FINISH GRADE 3/4" COME DRIPLINE 3/4" MIN. TRIPLE SWING, LENGTH AS REC NOTE: EACH CONNECTIOI DRIPLINE START CONNECTION START CONNECTION NOT TO SCALE NOT TO SCALE 2 3 4 5 6 7 8 9 10 12 STAMP: 000016p Too G. ml `W 00� � ti Uo o o LA - 276o 11/4/21 F'o 4C'04� DATE: 11/04/2fd21 arco= W oo o y Lp� � \\ WmQLLIlON �O jr w� �QU�'QCWW w 3$3 ¢1V0 .IQ�Gg�W t2 g utiux v u_ om E E g $ li C co N tl�0 3 Vim@, 00 o O �O Q u 01 C Q P a u u �a G OWat� Y/�� a uc Copyright © 2021 aReP oa"ctian o<aaa m aar sr vaa ceamuaam r soam rams�re"xmne v re v.c oea somn ..rasa arn�m,re P c..a o�iaamem w�eruo o�n,iaa roaaw."a. REVISIONS: No. Date Description 1 02/01/22 Civil Comments W a M Go 1�1 WO S Axe z Op �j .. o O a 0 .� � z A � 1� DRAWN BY: JizB CHECKED BY: JGM PROJECT NUMBER 21-045 SHEET: L3.2 w w 0� Z N w 0 A B C D E F G H I J K L M N 0 P