Loading...
HomeMy WebLinkAboutGateway Marketplace PP PP 06-002 MERIDIAN PLANNING & ZONING MEETING March 16, 2006 APPLICANT landmark Development REQUEST Continued Public Hearing from February 16, 2006 - Preliminary Plat approval for 23 commercia/lots on 22.85 acres in a C-G zonefor Gateway Marketplace Subdivision - southeast corner of Ustick Road and Eagle Road ITEM NO. 6 AGENCY COMMENTS CITY CLERK: See Previous Item Packet / Minutes CITY ENGINEER: CITY PLANNING DIRECTOR: See attached Staff Comments CITY ATTORNEY CITY POLICE DEPT: CITY FIRE DEPT: ),! /~ ~~ -I!: & CITY BUILDING DEPT: CITY WATER DEPT: CITY SEWER DEPT: CITY PARKS DEPT: MERIDIAN SCHOOL DISTRICT: SANITARY SERVICES: ADA COUNTY HIGHWAY DISTRICT: CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: SETTLERS' IRRIGATION: IDAHO POWER: INTERMOUNTAIN GAS: .'RECEIVED CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 311r.tÁ~O6 STAFF REPORT Planning & Zoning Commission r".-P /" "","' .~~; Hearing Date: Fehn"ny 16, 2006 I...../VltJri¡;/¡~1 ~ C . d M h 6 20 6 I II).\HO } onunue to; . arc 1, 0 "i,~¡. ,/J- TO: P&Z CommISSIon »",~,¡>""",-,"->"'Í/¡¡ FROM: Joseph Guenther, Associate Planner SUBJECT: Gateway Marketplace PP-06-002 - Preliminary plat for 18 lots on 22.85 acres for Gateway Marketplace by Landmark Development Group, LLC. 1. SUMMARY DESCRIPTION OF APPLICANT'S REQUEST The applicant, Landmark Development Group, LLC, is requesting approval of an amended Preliminary Plat for 18 commercial lots to construct up to 250,000 square feet of retail and restaurant uses on approximately 22.85 acres within the Gateway Marketplace development at the Southeast corner of Ustick Road and Eagle Road/SH-55 with a Variance to Chapter 3 Article H ofUDC for access to Eagle Road. This is the second application and would be the second commercial project constructed within the Kissler annexation project AZ-03-018. The 36.33-acre site was approved for annexation with a Development Agreement (DA) in April 2004 under the name Kissler Annexation (see File No. AZ-03~ 018). The DA (Instrument No.1 04107406) requires that any future use be consistent with the approved plans for the annexation. A concept plan for the overall site was submitted with the preliminary plat application showing building layouts and drive aisles. The Commission should note that a variance application, submitted concurrently with this preliminary plat application will be before the City Council at a date to be detennined, the variance request proposes two new approaches to N. Eagle Road/State Highway 55, one for right-inlright-out access driveway and one planned for a full access point. The Idaho Transportation Department (lTD) has not approved any approach pennits on this site and has made comment that this site does not qualifY for access by standard district policy. The overall design of the site is paramount on the approval of the Eagle Road approaches. If the City Council denies the approaches, Staff feels the design of the plat would not adequately provide a frontage connection trom Ustick Road, the future collector road west of the site, and south to the future signalized intersection with River Valley Drive. The Development Agreement for the 22.85 acres does require a trontage type of road. Staff feels that the future collector road east of the site sufficiently addresses the interconnectivity of the site as a public street access to Ustick Road and in conjunction with the three points of cross access and potential future public street south of the site to interconnect the entire comer. 2. SUMMARY RECOMMENDATION History: The Planning Commission heard the item on February 16,2006. On February 16,2006 the Planning Commission detailed their concerns on landscaping, interconnectivity, building layout and parking lot configuration. The main point of discussion was on the potential future public road which would provide connection from the site to the east and connect with Ally's Way. The commission made a recommendation to see a redesign citing staffs concerns. The commission made a second motion to direct staff to work with ITD and ACHD and forward a recommendation to have a signalized intersection with public street connection at the Y4 mile point south of the Eagle/Ustick intersection to facilitate an intersection bypass. The Planning Director wiIJ be presenting this recommendation to the city council, assuming a favorable recommendation by the Commission on the Gateway Marketplace Preliminary Plat redesigned March 10, 2006. Gateway Marketplace Subdivision PP-O6-002 page I CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 Staff is recommending approval of the subject application (PP-06~002) with the conditions contained in Exhibt B of this report. PROPOSED MOTIONS (to be considered after the public hearing) Approval After considering all staff, applicant and public testimony, I move to recommend approval to the City Council of File Number(s) PP-06-002 as presented in the staff report for the hearing date of March 16, 2006, and the preliminary plat labeled PP-I, REVISED March 10, 2006 with the following modifications to the conditions of approval: (add any proposed modifications). Denial After considering all staff, applicant and public testimony, I move to recommend denial to the City Council of File Number(s) PP-06-002 as presented in the staff report for the hearing date of March 16, 2006, for the following reasons: (you should state specific reasons for denial of the annexation or plat and you must state specific reason(s) for denial of the conditional use permit.) Continuance After considering all staff, applicant and public testimony, I move to continue File Number(s) PP- 06-002 to the hearing date of (insert continued hearing date here) for the following reason(s): (you should state specific reason(s) for continuance.) 3. APPLICATION AND PROPERTY FACTS a. Site Address/Location: SE comer of Us tick Road and Eagle RoadlSH55 Township 3N, Range IE, Section 4 b. Owner James Kissler 1125 W. Amity Boise Id 83705 c. Applicant: Landmark Development Group, LLC Tamara Thompson 1882 Toluka Way Boise ill 83702 d. Representative: Tamara Thompson, Landmark e. Present Zoning: General Retail and Commercial (C-G) (AZ~03~018) f. Present Comprehensive Plan Designation: Mixed Use-Regional- 2002 Comprehensive Future Land Use Map g. Description of Applicant's Request: 1. See Exhibit A (prepared by Landmark Development Group LLC) for a copy of the detailed site plan which depicts the lot layout, building, parking and access locations. Exhibit B shows the proposed landscape plan. h. Applicant's Statement/Justification: The application notes that the mixed use regional designation provides for the overall site to be developed with a mixture of RetaillRestaurant /Drive thru and other Commercial and office uses oriented around automobile traffic. The applicant notes that the site is an ideal location for a retail complex and will provide the additional landscaping along drive aisles, the design review for structures along the gateway Gateway Marketplace Subdivision PP-O6-002 page 2 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/J6/2006 corridor. 4. PROCESS FACTS a. The subject applications will in fact constitute preliminary plats as determined by City Ordinance. By reason of the provisions of the Unified Development Code Title 11 Chapter 6, a public hearing is required before the City Council on this matter. Newspaper notifications published on: 13th of February and 30th of January, 2006 (for Planning & Zoning Commission) Radius notices mailed to properties within 300 feet on: January 20, 2006 (for Planning & Zoning Commission) Applicant posted notice on site by: February 6, 2006 (for Planning & Zoning Commission). b. c. d. 5. LAND USE a. Existing Land Use(s): Bare land, single family residence b. Description of Character of Surrounding Area: Large lot residential, highway-oriented services, rapidly urbanizing. c. Adjacent Land Use and Zoning 1. North: Future pad sites within Sclunitchger Subdivision, Lowe's site zoned C-G. 2. West: Sadie Creek Promenade Subdivision, Bienville Subdivision proposals, zoned C-G, Rl, and RUT 3. South: undeveloped parcels zoned C-G with Redfeather Annexation. 4. East: Una Mas conceptual project and ACHD future right of way, zoned RUT- proposed zone C-G d. History of Previous Actions: In April 2004, the owners and City entered into a Development Agreement for various High Density Commercial, MuIti.family Residential, transitional, and office uses under File AZ-03-0 18. Some property was annexed and zoned to General Retail and Commercial (C-G) with a Development Agreement while other portions ofthe property (on the west side of Eagle Road) were not included in the annexation leaving out parcels which were addressed with the original conceptual plan. e. Existing Constraints and Opportunities 1. Public Works Location of sewer: Location of water: Extension of mains in Ustick Road Extension of mains in Ustick Road Issues or concerns: 2. Vegetation: Agricul turaVIrrigated Water main connection in Eagle Road is required. 3. Flood plain: N/A 4. Canals/Ditches Irrigation: The Milk Lateral bisects the property 5. Hazards: None identified 6. Size of Property: 22.85 acres 7. Description of Use: Up to 250,000 square feet of Retail, Commercial, and Gateway Marketplace Subdivision PP-O6-002 page 3 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3!l6/2006 Restaurant uses and associated parking and landscape improvements. f. Subdivision Plat Information - The submitted plat contains 23 lots in a C-G proposed zone with commercial uses. Commercial uses are shown to be a mix of restaurant/retail spaces with six approximate 30,000 square foot buildings and 8 approximate 3,000 to 6,000 square foot buildings and 8 approximate 2,000 square foot attached buildings, and one approximate 40,000 square foot office/retail building. g. Landscaping - 1. Width of street buffer(s): Per the Future Land Use Map, both Ustick Road and Eagle Road are designated as "Entryway Corridors." As such, the UDC (Table 11-2B-3) requires a 35-foot wide street buffer adjacent to both roadways. The landscape plan (Sheet L1.1) proposes a 35~foot wide buffer along both Ustick and Eagle Roads. Ifthe applicant proposes to construct the "Entryway Corridor" buffers in easements they must meet the landscaping standards required in the UDC. 2. Percentage of site as open space; The ODC does not require open space or site amenities for commercial uses. 4. Other landscaping standards: The landscape buffer along Ustick Road should be constructed in accordance with UDC Chapter 3, Article B. h. Planned Development Characteristics - N/ A i. Conditional Use Information: 1. Non~residential square footage: 250,000 2. Proposed building height: 65 feet 3. Percentage of site devoted to building coverage: 25% 4. Percentage of site devoted to landscaping: Not defined 5. Percentage of site devoted to paving: Not defmed 6. Percentage of site devoted to other uses: N/ A 7. Number of Residential units: N/A j. Amenities - The applicant is not required to provide an amenity k. Off-Street Parking (residential uses) - N/A 1. Proposed and Required Residential Standards - N/ A ill. Proposed and Required Non-Residential Parking - One off-street parking space required for every 500 square feet of gross floor area. This may be addressed during detailed CUP review, CZC review, and/or building design review but the design appears to meet the minimum standards of the UDC parking requirements. n. Summary of Proposed Streets and/or Access (private, public, common drive, etc.): . The applicant is proposing two new access points to Eagle RoadlSH55 to serve the Gateway Marketplace proj ect at approximately 700 feet and 1200 feet south of the UstickiEagle Intersection. As noted above, ITD must issue a right-inlright-out permit and a full access permit for this site, and the access is further contingent on the Meridian City Council granting a Gateway Marketplace Subdivision PP-O6-002 page 4 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 variance to UDC 11 ~3H. At this time the policy in place would be for frontage roads to serve this site and provide connection to the Y2 mile and the collector road systems. ITD has submitted a letter indicating that they will not make a decision on approving access to Eagle Road until such a time as the Meridian City Council has formally acted on the Variance request. City staff does not support any access to Eagle Road in this location. In addition, the applicant is proposing two new access points to Ustick Road at the following locations: . Driveway #1 - 350 feet east of Eagle (right~inlright-out with center median) . Driveway #2 - 700 feet east of Eagle (full access) Ustick Road, from Leslie Drive to Ally Street (on the east side of Eagle Road), including the Eagle Road intersection, has just been widened and improved to five lanes. The intersection was widened to include dualleft turn lanes. In addition, the recorded DA between the applicant and the City requires either a public or private street be constructed parallel to Eagle RoadlSH55 that may connect to the north boundary and may also connect to Eagle Road, if allowed by ITD at a point to be determined by ACHD. ACHD has stated that the applicant shall provide cross access south and east to connect to the future collector roadway east of the site and the connection to the signalized access proposed south of the site at River Valley Drive. This project along with the Una Mas Project east of the site will connect with Ally Street, a proposed public street serving as a collector roadway to the entire area. The design received March 10, 2006 lines up at three points to the east as requested. The area plan (Una Mas Annexation) shows private, internal driveways connecting to the future public street; such driveways run mostly east/west connecting the Kissler site to Ally Street and ultimately Ustick Road. For a detailed report on both ITD's and ACHD's actions and comments, please see the letters/reports submitted with the application. 6. AGENCY COMMENTS MEETING On December 28th 2005, staff held an agency comments meeting. The agencies and departments present included: Meridian Fire Department, Meridian Meridian Public Works Department, and the Sanitary Services Company. Staff will included all comments and recommended actions as Conditions of Approval if the Meridian Planning Commission requests approval of the design as presented. If the Meridian Planning Commission agrees with the staff analysis that a redraw of the plat will be required of the site then staff will provide comments at such time as a new proposal is ready for Commission review. 7. COMPREHENSIVE PLAN POLICIES AND GOALS The subject site is designated 'Mixed Use-Regional' on the Future Land Use Map. In Chapter VII of the Comprehensive Plan, this designation is deEmed in part as an area that is situated in highly visible or transitioning parts of the City where innovative and flexible design opportunities are encouraged. The MU~R has no upper limit on the square footage of non-residential uses and is intended to allow a broad range of uses. Staff finds the following Comprehensive Plan policies to be applicable to this property and apply to the proposed development (staff analysis in italics below policy): . Require that development projects have planned for the provision of all public services. (Chapter VII, Goal III, Objective A, Action 1) Gateway Marketplace Subdivision PP-O6-002 page 5 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 When the City established its Area of City Impact, it planned to provide City services to the subject property. The City of Meridian plans to provide municipal services to the lands proposed to be annexed in the following manner: . The subject lands currently lie within the jurisdiction of the Meridian Rural Fire District. Once annexed the lands will be under the jurisdiction of the Meridian City Fire Department, who currently shares resource and personnel with the Meridian Rural Fire Department. The subject lands currently lie within the jurisdiction of the Ada County Sheriff's Office. Once annexed the lands will be serviced by the Meridian Police Department (MPD). The roadways adjacent to the subject lands are currently owned and maintained by the Ada County Highway District (ACHD). This service will not change. The subject lands are currently serviced by the Meridian School District #2. This service will not change. The subject lands are currently serviced by the Meridian Library District. This service will not change and the Meridian Library District should suffer no revenue loss as a result of the subject annexation. . . . . . Municipal, fee-supported, services will be provided by the Meridian Building Department, the Meridian Public Works Department, the Meridian Water Department, the Meridian Wastewater Department, the Meridian Planning Department, Meridian Utility Billing Services, and Sanitary Services Company. Chapter VII, Goal I, Objective B: Plan for a variety of commercial and retail opportunities within the Impact Area. Staff finds that the site is designated for MU-R on the Comprehensive Plan Future Land Use Map. Although strictly commercial uses have not been specifically planned for this property on the Comprehensive Plan Future Land Use Map the Development Agreement from the annexation shows this portion as commercial and consistent with the overall site plan when combined with the proposed Bienville Subdivision, and Sadie Creek Promenade Subdivision which are all bound by the same development agreement. The bulk proposal of uses would also meet the general classifications for mixed use regional. . Chapter VII, Goal I, Objective B, Action 5: Locate new community commercial areas on arterials or collectors near residential areas in such a way as to complement with adjoining residential areas. Ustick Road is classified as an arterial roadway. The applicant is not proposing access from the acý'oining commercial areas by way of cross access, sidewalks or shared streets which will provide future connection to residential areas east of the site along Ustick Road. Staff believes that the commercial areas proposed compliment the existing and planned residential areas in the vicinity. . Chapter VII, Goal IV, Objective D: Encourage appropriate land uses along transportation corridors. Staff believes that the proposed land uses are appropriate along the adjoining transportation corridors (Ustick Road and Eagle Road). Staff supports the proposed uses at this site as they are consistent with the Mixed use regional district and the approved development agreement. . Chapter VII, Goal IV, Objective D, Action 2: Restrict curb cuts and access points on collectors and arterial streets. Gateway Marketplace Subdivision PP-06-002 page 6 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 The ACHD evaluates access points in their analysis; no direct lot access is allowed to any of the arteriallcollector roadways. The proposed access points to the arterial streets generally comply with ACHD '.'I standards as detailed in the staff report. Please see the ACHD staff report contained in the file. ITD has indicated that they will not act on the proposed access points to Eagle Road until such a time as the Meridian City Council acts on the variance requests. The Idaho Transportation Department (ITD) has a policy for access to a Type IV Principal Arterial will be at intersections only, and spaced at one-half mile intervals in urban areas. ITD allows approaches (other than intersections) in special cases and on a temporary basis. The Eagle Road access shall be eliminated from this project. . Chapter VII, Goal IV, Objective D, Action 5: Require appropriate landscape and buffers along transportation corridor (setback, vegetation, low walls, berms, etc.). The applicant is proposing to construct appropriate buffers along all of the adjacent arterial streets. By Ordinance, a minimum 35-foot wide landscape buffer to Gateway Corridors. The landscape plan shows the appropriate landscape buffers. Staff also finds the following 2002 Comprehensive Plan text policies to be applicable to this application: . "Require all new parking lots to provide landscaping in internal islands." (Chapter V, Goal III, Obj. D, #3, page 43) "Eagle Road is the major north-south arterial in Ada County. The capacity of this arterial should be protected by minimizing the number and location of private driveway access connections to this important roadway. The City should recognize, adopt, and help implement the Eagle Road Access Control Study, prepared by ACHD in 1997." (Chapter VI, page 71) "The capacity of arterial. . .roadways can be greatly diminished by excessive driveway connections to the roadways. The City should cooperate with ACHD to minimize access points on arterial. . .roadways as development applications are reviewed." (Chapter VI, page 72) "Develop methods, such as cross-access agreements, frontage roads, to reduce the number of existing access points on to arterial streets." (Chapter VI, Goal II, Obj. A, #12, page 79). "Identify transitional zones to buffer commercial and residential uses, to allow uses such as offices and other low intensity uses." (Chapter VII, Goal I, Obj. B, #7, page 102) "Restrict curb cuts and access points on. . . arterial streets." (Chapter VII, Goal IV, Obj. D, #5, page 107) . . . . . 8. UNIFIED DEVELOPMENT CODE a. Allowed Uses in the Commercial Districts: UDC Table 11-2B-2 lists retail store/restaurant/drive thrul office/ financial institute uses as permitted uses in the C-G zoning district. b. Purpose Statement of Zone: The pwpose of the Commercial Districts is to provide for the retail and service needs of the community in accord with the Meridian Comprehensive Plan. Four Districts are designated which differ in the size and scale of commercial structures accommodated in the district, the scale and mix of allowed commercial uses, and the location ofthe district in proximity to streets and highways. C-G General Retail And Service Commercial District: The purpose of the C-G district is to provide for commercial uses which are customarily operated entirely or almost entirely within a building; to provide for a review Gateway Marketplace Subdivision PP-O6-002 page 7 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 of the impact of proposed commercial uses which are auto and service oriented and are located in close proximity to major highway or arterial streets; to fulfill the need of travel-related services as well as retail sales for the transient and pennanent motoring public. All such districts shall be connected to the municipal water and sewer systems of the city, and shall not constitute strip commercial development and encourage clustering of commercial development. c. General Off-Street Parking Standards (from UDC 11-3C-5): The following standards shall apply for off-street vehicle parking for nonresidential uses: In all Commercial Districts the requirement shall be one (1) space for every five hundred (500) square feet of grOSS floor area. d. Structures Subject to Design Standards (I1-3A-19B5): All structures on property adjacent to an entryway corridor (UstickiEagle Roads) are subject to the design standards listed in this section. e. Outdoor storage/refuse areas (I1-3A-12): Outdoor utility meters, HV AC equipment, trash dumpsters, trash compaction and other service functions shall be incorporated into the overall design of buildings and landscaping so that the visual and acoustic impacts of these functions are fully contained and out of view trom adjacent properties and public streets. f. Development along State and Federal Highways (I1-3H-4B2): If an applicant proposes a change or increase in intensity of use, the owner shall develop or otherwise acquire access to a street other than the state highway. The use of the existing approach shall cease and the approach shall be abandoned and removed. a. No new approaches directly accessing a state highway shall be allowed. b. Public street connections to the state highway shall only be allowed at: 1. the section line road; and ii. the half-mile mark between section line roads. These half-mile connecting streets shall be collector roads. Section 11-3H-3: The applicant shall construct a street, generally paralleling the state highway, be designed to accommodate future connectivity and access to all properties fronting the state highway that lie between the applicant's property and the nearest section line road and/or half mile collector road. The intent is to provide for future connectivity and access to all properties fronting the state highway that lie between the applicant's property and the nearest section line road and/or half-mile collector road. The street shall be designed to collect and distribute traffic (emphasis added). 9. ANALYSIS 9a. Analysis of Facts Leading to Staff Recommendation The revised PP application substantially complies with the Unified Development Code. Below are several special considerations for the P&Z Commission to review at the public hearing: Gateway Marketplace Subdivision PP-O6-00Z page 8 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 Analysis of Facts Leading to Staff Recommendation PP Application (PP-06-002): The REVISED preliminary plat can be conditioned to comply with the Unified Development Code. Based on the policies and goals contained in the Comprehensive Plan and the general compliance of the proposed development with the Unified Development Code, Staff believes that this is a good location for the proposed development. Please see Exhibit D for detailed analysis of the required facts and findings for a Zoning Amendment. Non-Residential Buildil1llS: The applicant has requested a maximum of 250,000 square feet of retail/restaurant/office spaces. Staff does not propose to limit the applicant to their request as this area is designated as commercial, is surrounded by other commercial uses and is a prime location for intense commercial uses designed in a clustered fashion. Drive Thru Separation: The applicant has requested several lots to be drive thru retail uses which have a spacing requirement of 300'. Since the site plan is conceptual in nature staff feels that the applicant shall design the site to meet the 300' standard separation for drive thru uses with this application. If a drive-thru use is proposed within 300' of another drive thru then, a conditional use application must be approved. Access to SR 55/ Eagle Road: The applicant has requested an access point to Eagle Road. According to ITD records, the applicant has submitted a request for access permit but is not vested with an access point for this location as the change in use is the deciding factor as to when an access point be granted. Currently the site has no access to Eagle Road and the use is agricultural/residential where the plat will change the use to commercial and is subject to the design requirements ofUDC 11-3R. UDC requires that all access for Gateway Marketplace Subdivision shall be taken from Ustick Road at points determined by ACHD. Uses: All other lots shall be limited to Office/RetaillRestaurantiDrive thru uses and General Commercial uses listed as permitted in UDC Table 11 ~2B-2. Any uses (excepting Drive thru) not listed as permitted shall be subject to conditional approval. Sidewalks: The applicant is proposing to construct internal sidewalks on the major tenant entryways of the internal streets/drive aisles. The design shows the incorporation of the eight-foot walkway which is directed to the main access to the commercial building. When and if the plat is resubmitted as recommended, the applicant shall provide a consistent pedestrian access corridors as shown on the revised site plan dated March 10, 2006. Commercial Amenities: _The applicant is showing additional landscaping/patio/seating outside along lots 1, 17, and 18. Staff supports the elimination of additional parking along Eagle Road and when the detailed approvals are submitted for each building the applicant shall ensure these features are included as amenities in the intersections of the gateway corridors. Landscape Street Buffers: Arterials: UDC 11-2B requires a 35-foot wide street buffer along classified arterial roadways and entryway corridors. Eagle Road and Ustick Road are classified as Arterial Roads. On the submitted landscape plan, the applicant is proposing to construct a 35-foot wide street buffer along Ustick Road and Eagle Road. The applicant should be required to depict the required street buffers on the face of the final plat in an easement or place the required buffers in common lots as per UDC 11-3B. See Exhibit B below. Commercial Streets: UDC 1I-2B requires a lO-foot wide street buffer along commercial roadways. The submitted plat does not include commercial cross access east and south. Staff feels that a designed commercial cross access street shall be provided and subj ect to the Gateway Marketplace Subdivision PP-06-002 page 9 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 landscape standards for commercial street buffers. detached sidewalk shall be provided. Ditches. Laterals. and Canals; There are several irrigation laterals that bisect this parcel. Per ODC 11-3A-6, all irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled. The applicant is proposing to tile all of the iITigation facilities located on site. See Exhibit B below. Pressure IrrÜmtion; The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (UDC 11-3A-15). The applicant should be required to utilize any existing surface or well water for the primary source. If a surface or well source is not available, a single-point connection to the culinary water system shall be required. If a single-point connection is used, the developer will be responsible for the payment of assessments for the common areas prior to signature on the final plat by the City Engineer. An underground, pressurized irrigation system should be installed to all landscape areas per the approved specifications and in accordance with City Code. See Site Exhibit B below. Fencine: The applicant is not showing any fencing on any of the submitted plans. A detailed fencing plan should be submitted upon application of the final plat (UDC 11-3A- 7). If permanent fencing is not provided, temporary construction fencing to contain debris must be installed around the perimeter prior to issuance of a building permit. All fencing should be installed in accordance with City Code. See Exhibit B below. Within the 10-foot street buffer, a Cross-access Internal; There are some commercial lots that do not have frontage on a public street. Instead the applicant is proposing to provide cross-access easements to the lots that do not have public street frontage. Because several of the proposed lots do not have frontage on a public street, the applicant should provide a cross parking/cross access agreement for all of the lots within the retail and other commercial portions of the subdivision to use the driveways and parking aisles. The site should be redesigned to provide a backage road on Eagle Road. Access to Eagle road shall be determined by the Meridian City Council and at least the non-signalized access point to Ustick Road shall be designed to serve as a commercial collector for interconnectivity to the south and vehicular movement in the north/south direction in cooperation with the parcel east of the site. Maintenance of the drive aisles and parking areas should be provided for in a note on the face of the [mal plat, AND/OR in a document such as CCRs. See Exhibit B below. Cross-access South: The applicant shall be required to provide cross access to the parcels south of the site. The proj ect is a portion of a larger site proj ect (Kissler Annexation) and the sites shall maintain consistent traffic flow for the entire site. Eaele Road Access: The Idaho Transportation Department (ITD) has a policy for access to a Type IV Principal Arterial will be at intersections only, and spaced at one-half mile intervals in urban areas. ITD allows approaches (other than intersections) in special cases and on a temporary basis. The access points shown at approximately 700 feet south and 1,200 feet south of the Ustick Eagle Road intersection shall be eliminated as it does not meet criteria of either ITD or the Meridian Comprehensive Plan. Loadine SDace Parking: UDC 11-3C-8 requires off-street loading spaces for commercial uses. The Certificate of Zoning Compliance (CZC) application shall clearly demonstrate that both a Type A and Type B space are available on site, located near the refuse/service area behind the building. Elevations: The applicant has not submitted building elevations ofthe proposed structures. The application lists the proposed building materials, including stone, brick, stucco and timber to be Gateway Marketplace Subdivision PP-O6-002 page 10 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3!l6/2006 accented with chrome, aluminum and gloss painted trims. UDC 11 ~3A-19 requires all structures on property adjacent to an entryway corridor to comply with the design standards listed in this section, Staff s interpretation of the UDC is that the applicant may choose to place the "primary entrance" on an elevation other than the public street side, However, the public street elevations (Ustick Road and Eagle Road) must still meet the other standards listed in 11~3A-19 (except for the primary entrance standards). The elevations will need to be reviewed prior to issuance of CZC to comply with the following ordinance standards: a) Facades: Facades visible fÌ'om a public street shall incorporate modulations in the façade, roofline recesses, and projections along a minimum of twenty percent (20%) of the length of the facade. b) Roof lines: Roof design shall demonstrate two or more of the following: a) overhanging eaves, b) sloped roofs; c) two (2) or more roof planes; d) varying parapet heights; and e) cormces, c) Mechanical equipment: All ground-level and rooftop mechanical equipment shall be screened to the height of the unit as viewed fÌ'om the property line. d) Color and Materials: Exterior building walls shall demonstrate the appearance of high- quality materials of stone, brick, wood or other native materials. Smooth~faced concrete block, tilt-up concrete panels, or prefabricated steel panels are prohibited except as accent materials. Refuse/Service Area Screen: Neither the Site Plan or Landscape Plan call-out how or if the refuse/service area on the east side of the buildings will be screened, UDC 11-3 A -12 requires the visual and acoustic impacts of these functions are fully contained and out of view from adjacent properties and public streets. The applicant's CZC application must clearly demonstrate how this standard is met. Cross Access: The property to the south is dependent on access for interconnectivity and is directly tied with the existing Development Agreement for providing a frontage road to Ustick Road. The applicant has provided a design not showing any points of access within the immediate vicinity. These points of access are paramount on the success of the general area and staff feels a minimum of three points of cross access shall be provided to the east and one point of access to the south, which shall all be designed to private street standards for pedestrian and vehicular traffic circulation, Strip Development: The purpose statement ofthe General Commercial District specifically reads, "shall not constitute strip commercial development and encourage clustering of commercial development." The comprehensive plan policies further reads, "Use the comprehensive plan, subdivision regulations, and zoning to discourage strip development, and encourage clustered, landscaped business or residential development on entryway corridors." The applicant has revised the plans to address this concern. Changes to the original design include moving access points away fÌ'om Ustick to allow for better stacking, this also eliminated the small lots along the ustick frontage and replaced them with more retail/restaurant uses on larger pad style uses. These pad uses also incorporated additionallandscapeing screening and redirection of traffic/pedestrian movement along Ustick The applicant also removed one large Gateway Marketplace Subdivision PP-O6-002 page 11 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3116/2006 box user pad and moved it to a pad in a centrallocation, shown on the redesign as lot 11. The applicant has revised the landscape plan and has included six landscape strips with internal sidewalks to break the parking lot into smaller sections. Staff would find that the redesign of the project would not constitute strip development as shown on the design revised March 10, 2006. 9b. Staff Recommendation: Based on the above analysis, staff finds the revised Preliminary Plat applications conforms to the adopted DA, Comprehensive Plan policies and UDC standards. As noted under staff analysis we recommend the building elevations be submitted in compliance with the entryway corridor standards, the access point to Eagle Road be eliminated and redesigned. We recommend approval of the application subject to the conditions of approval shown in Exhibit B. 10. EXHIBITS A. Drawings 1. Preliminary Plat (by The Land Group, Revised March 10, 2006) 2. Landscape Plan (by The Land Group, dated March 7, 2006) B. Legal Description C. Conditions of Approval 1. Planning Department 2. Public Works 3. Fire Department 4. Police Department 5. Parks Department 6. Sanitary Services 7. ACHD D. Required Findings from UDC 1. Preliminary Plat-Pending Gateway Marketplace Subdivision PP-O6-002 page 12 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 .- ..--...-.-.-.. Exhibit AI: Preliminary Plat PP-l(The Land Group) Revised March 10,2006 11111°1 Ifllii!! U;llä, I!!! . I J :1"jUi'j~ If p. s I I ~ ~ .. '.1.. ....~ ~~~~~ ~~~~~ ¡;¡ ~~II ~i!1 0 11m, it J ~ ~:, ~ ~ . lIP J ~f' i j .....m i Hili III ~ fill I II! 1111111, . <;, : j ~ 9. .. S 0 :f~jj ~ ~j~n -< ~ h~,~ ~.~ ~ ~~~ ~ -< ~~~ ~ ~ f¡'¡ tIJ .1 Hilil .~Ü,. '11.,lltl". 'ii i¡'I I i J IE' ~ ! i ß ,,1-" . III- a ~ ) I, .. ~ ~. ,<' \ , ' ~, fi ft ! :1 ¿'~\""- \ ~ I II II ~II I B fJ~~ <1. ~ 0' f I -I ",' I ~~~,' I J. H ~ ! I ¡ ~r-- ,,' , ,,~~: I' \).'" . Pi:i:;q ":iJi~~. II.... I GA TEWA Y MARKETPLACE SUBDIVISION Preliminary Plat Meridian, Idaho Gateway Marketplace Subdivision Exhibit A Page I mn~81 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 Exhibit A2: Landscape Plan L1.1(The Land Group) Dated March 7, 2006 ,n . II< Irs, Gateway Marketplace Subdivision Exhibit A Page 2 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3116/2006 Exhibit B: Legal Description claiborn... waite consultingJ..Jk engineers 8, surveyors 120 N. Curtis Rd~ Boise, Idaho 83706 (208) 376-8555 Fax (208) 429-9862 P.N. 2279 October 20, 2005 PARCEL "A" VSTlCK PROPERlY REMAINDER PARCEL DESCRIPTION A parcel of land lying in the Northwest 1/4 of Section 4, T.3N., RIB., H.M., Ada County, Idaho, and being more particularly described as follows: Commencing at the Northwest comer of said Section 4, thence S 89 49'08" E along the North boundary of said Section 4 and the centerline of Us tick Road for a distance of 97.62' feet; thence leaving said North boundary and centerline S or 50'52" W for a distance of 77.96 feet to a point on the South right-of-way line ofUstick Road, being the REAL POINT OF BEGINNING; thence along said South right-of-way line for the following 13 courses: N 44" 02'14" E for a distance of47.06 feet; thence S 89 49'08" E for a distance of262.81 feet; thence S 47 51'21" E for a distance of41.18 feet; thence N 87 17'10" E for a distance of29.03 feet; thence N 47 43'35" E for a distance of 40.57 feet; :kill,,::Q,:; :;5'~5--I:iv¡..¡j;"1¡.. ",,(J¡ j),¿JICta, thence N 89' 13'34" E for a distance of 179.28 feet (formerly described as 179,20 feet); thence S 89 49'08" E for a distance of 10,00 feet; 'I~n(""r':iil' ;"":- r" ¡"¡:ÜIS¡¡;',u:ut¡~.4i eel. C:\PmjCl:tsIUstickLLA (2279)lDocumcnts\Parce1 A.de» I - Gateway Marketplace Subdivision Exhibit B Page I CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 claiborn'" waite consu'ting~ engineers & surveyors 120 N, Curtis Rd, Boise. Idaho 83706 (208) 376-8555 Fax (208) 429-9862 P.N. 2279 October 20, 2005 PARCEL "8" USTICK PROPERTY 5.51 ACRE SPLIT A parcel of land lying in the Northwest )/4 of Section 4, T.3N., RlE" B.M" Ada County, Idaho, and being more particularly described as follows: Commencing at the Northwest comer of said Section 4, thence S 89' 49'08" E along the North boundaJy of said Section 4 and the centerline ofUsûck Road for a distance of 97,62' feet; thence leaving said North boundary and centerline S or 50'52" W for a distance 0£17.96 feet to a point on the East righto()f~way line of Eagle Road: thence along said East ri8ht-of~way line S or 50'52" W for a distance of JO38.43 feet to the REAL POINT OF BEGINNING; thence continuing along said East right*Of-way line S 0 r SO' 52" W for a distance of 154.90 feet; thence S OCT 36' 13" W along said East right-of~way line for a distance of 114.17 feet; thence leaving said East right-of-way line S 89' 51 '00" E for a distance of 700.02 feet; thence N 00' 36' 13" E for a distance of 93.77 feet to the South boundary of Government Lot 4 of said Section 4; thence S 89 5) '00" E along said South boundary for a distance of 6) .35 feet; th~ry"f' "'!"-'h'W ;~¡~ ~,"'t:.I; 1;;)¡';jr!::r:'l" ON ""1'1')('," r f",' c' ,L¡¡,¡a\.. L';-~-'.-i '-.:¡ ft:.:t, thence N 89' 5) '00" W for 8 distance of363,OO feet; tl,'IL;, .: (1(1 "!"no' IV ;:;t " ..:Ii,c,¡¡¡,.. ( lIf C (¡(I h:,'1. C:\ProjecJs\UslickLLA (2279)\Documents\Parccl B.doc- 1 . Gateway Marketplace Subdivision Exhibit B Page 3 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 thence N Sg 5 1'00" W for a distance of 17'1.00 feet; thence S 0(1 09'00" W for a distance of 34.50 feet; thence N 89" 51 '00" W for a distance of2JS.67 feet to the REAL POINT OF BEGINNING; containing 5.51 acres of land, more or less. Prepared by: Todd R Waite PL.S. C:\Projects\UstickLLA (2279)\Documents\ParceIA.doc- 2 - CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3116/2006 C. Conditions of Approval 1. Planning Department SITE SPECIFIC REQUIREMENTS- (Gateway Marketplace) 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.1.8 1.1.9 1.1.10 The preliminary plat labeled as PP-l prepared by The Land Group, Revised March 10, 2006, shall is approved, with the conditions listed herein. All comments/conditions of the accompanying Annexation and Zoning (AZ-03-018) Development Agreement shall also be considered conditions of the Preliminary Plat. UDC 11-3C~8 requires off~street loading spaces for commercial uses. The Certificate of Zoning Compliance (CZC) application for this project shall clearly demonstrate that adequate parking is available on site, located near the refuse/service area designed at the building. Graphically depict on the face of the plat, the required 35-foot wide landscape buffer along Ustick Road and Eagle Road. The applicant shall consider the landscape plan approved as submitted with the following Individual lot landscaping considerations, the final plans shall significantly confonn to the submitted plan which shows: . Pad spaces with landscaping, patio, and cooperative outdoor user space. Lots 1, 3, 4, 5, 17, and 18 . Perimeter landscaping- 20' along the eastern perimeter . Roadway landscaping- 20' with an internal sidewalk along the southern perimeter and a minimum of Y:z of a 42' road section. . Internal sidewalks/landscaping planters- these planters shall have a minimum of one tree per 35' and an 8' wide sidewalk. No direct lot access to Ustick Road or Eagle Road will be allowed. The existing driveways to Eagle Road may be for construction purposes if approved by lTD. At such time, access to Eagle Road shall be prohibited unless specifically granted through variance. That prior to signature of the city engineer cross access to parcels east and south of the site be granted. The applicant shall provide commercial cross access drives to the properties east of the site as shown on the revised plans. These access roadways shall be designed according to private street standards as listed in UDC 11.3F, with a minimum of 24' travel way, no parking or backing on to the service drive, a one side five foot detached sidewalk with a 5' landscape buffer. The commercial cross access drive is to provide connection from the future Public Roadway (Ally Street) east of the site, through the Una Mas Annexation site, and provide the most direct vehicular traffic flow to a public road system. The applicant shall work with ACHD to detennine if a public frontage road shall be provided at the southern boundary of the site. One half of a 42' public roadway design for a frontagelbackage road shall be reserved at this site until such a time as ACHD staff provides a written statement refusing the reserved area. Maintenance of all common areas shall be the responsibility of the Gateway Marketplace Subdivision Business' Owners Association(s) The applicant shall submit from the County Surveyors Office the appropriate documentation showing that usage of Gateway Marketplace as an approved subdivision name. Gateway Marketplace Subdivision Exhibit C Page 1 1.1.19 1.1.20 1.1.21 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 1.1.11 Any roof~mounted mechanical equipment will be screened from view from any public right-of- way. The applicant shall submit drawings at the time of CZC submission that demonstrate this condition is complied with. 1.1.12 1.1.13 The applicant shall comply with the outdoor lighting standards shown in UDC 11-3A~II. All structures within Gateway Marketplace Subdivision shall submit a design review application at the time of Certificate of Zoning Compliance application. Comply with UDC 11-3A-12 regarding a screen for the refuse/service area. No irrigation pump station or facility is shown on the Site Plan. However, if one is proposed for the site, it must be located outside of any required street buffer. Impervious surfaces are prohibited in said buffers. Prior to the City Engineer's signature of the final plat, all existing structures shall be removed from the site. 1.1.14 1.1.15 1.1.16 1.1.17 Provide internal cross access/cross parking agreement(s) for all lots in Gateway Marketplace Subdivision. All cross access drive aisles shall only approach the ACHD approved points of access to the public street system. Maintenance of the aisle and parking areas shall be provided for in a note on the face of the final plat, AND/OR in a document such as CCR's. Other than the points of access approved by ACHD, direct lot access to Ustick Road and Eagle Road is prohibited. A note shall be placed on the final plat restricting access to Eagle Road and Ustick Road. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. Applicant shall be responsible for application and compliance with and NPDES Permitting that may be required by the Environmental Protection Agency. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 1.1.18 1.1.1 GENERAL REQUIREMENTS-PRELIMINARY PLAT 1.1.2 1.1.3 Sidewalks shall be installed within the subdivision and on the perimeter of the subdivision pursuant to City Code. All areas approved as open space shall be free of wet ponds or other such nuisances. All stOmlwater detention facilities incorporated into the approved open space are subject to UDC ll~ 3A-18 and shall be fully vegetated with grass and trees. Sand, gravel or other non~vegetated surface materials shall not be used in open space lots, except as permitted underUDC 11-3A- 18. Where the applicant has submitted a preliminary landscape plan and where staff has reviewed such plan, the landscaping shall be consistent with the preliminary plan with modifications as proposed by staff. If the stOmlwater detention facility cannot be incorporated into the approved open space and still meet the standards of UDC 11-3A-18, then the applicant shall relocate the facility. This may require losing a developable lot or developable area. It is the responsibility of the developer to comply with ACHD, City of Meridian and all other regulatory requirements at the time of final construction. The applicant shall submit a detailed fencing plan with the final plat application for the subdivision. If pemlanent fencing is not provided, temporary construction fencing to contain debris must be installed around the perimeter prior to issuance of a building permit. All fencing should be installed in accordance with City Code. Gateway Marketplace Subdivision Exhibit C Page 2 2.2 2.3 2.4 2.5 2.6 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 1.1.4 Any tree over 4" in caliper that is removed from the property shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were removed. Required landscaping trees will not be considered as replacement trees for those trees that have to be mitigated. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11 ~3A-6, unless otherwise approved by the Irrigation District(s). Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department. If lateral users association approval can not be obtained, alternate plans will be reviewed and approved by the City Engineer prior to final plat signature. Staffs failure to cite specific ordinance provisions or terms of the approved Preliminary Plat does not relieve the applicant of responsibility for compliance. Preliminary plat approval shall be subject to the expiration provisions set forth in UDC 11-6A. 1.1.5 1.1.6 1.1.7 2. Public Works Department 2.1 Sanitary sewer service to this development is being proposed via extension of mains in Ustick Road. The applicant shall install all mains necessary to provide service; applicant shall coordinate main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. Water service to this site is being proposed via extension of mains in Ustick Road. The applicant shall be responsible to install water mains to and through this development, coordinate main size and routing with Public Works. Due to the commercial uses on this project, a connection to the water main in Eagle Road shall be required to guarantee adequate fire flow. Coordinate main size and routing with the Public Works Department. The applicant shall provide a 20-foot easement for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easements shall not be dedicated via the plat. The description shall be consistent with the graphically depicted easements on the plat but be recorded as a separate document using the City of Meridian's standard forms. Submit an executed easement (supplied by Public Works), a legal description, which must include the area of the easement (marked EXHffiIT A) and an 81/2" xII" map with bearings and distances (marked EXHIDIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. The applicant has indicated the pressure irrigation system in this development is to be maintained as a private system, therefore plans and specifications will be reviewed by the Public Works Department as part of the construction plan review. A "draft copy" of the operations and maintenance manual will be required prior to plan approval with the "final draft" being required prior to final plat signature on the last phase ofthis project. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (UDC 11-3A-6). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single-point Gateway Marketplace Subdivision Exhibit C Page 3 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 2.7 2.8 connection to the culinary water system shall be required. If a single-point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to signature on the [mal plat by the City Engineer. All existing structures shall be removed prior to signature on the final plat by the City Engineer. Any existing domestic wells and/or septic systems within this project shall be removed from domestic service per City Ordinance Section 9-1 ~4 and 9-4-8. Wells may be used for non- domestic purposes such as landscape irrigation. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11-3A-6. Plans shall be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department. If lateral users association approval can't be obtained, alternate plans shall be reviewed and approved by the Meridian City Engineer prior to final plat signature. A drainage plan designed by a State of Idaho licensed architect or engineer is required and shall be submitted to the City Engineer (Ord. 557,10-1-91) for all off-street parking areas. Storm water treatment and disposal shall be designed in accordance with Department of Environmental Quality 1997 publication Catalog of Storm Water Best Management Practices for Idaho Cities and Counties and City of Meridian standards and policies. Off-site disposal into surface water is prohibited unless the jurisdiction which has authority over the receiving stream provides written authorization prior to development plan approval. The applicant is responsible for filing all necessary applications with the Idaho Department of Water Resources regarding Shallow Injection Wells. Street signs are to be in place, water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved and the Final Plat for this subdivision shall be recorded, prior to applying for building pennits. A letter of credit or cash surety in the amount of 110% will be required for all uncompleted fencing, landscaping, amenities, pressurized irrigation, sanitary sewer, water, etc., prior to signature on the final plat. 2.9 2.10 2.11 All development improvements, including but not limited to sewer, fencing, micro-paths, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as detennined during the plan review process, prior to signature on the final plat per Resolution 02-374. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. Applicant shall be responsible for application and compliance with and NPDES Pennitting that may be required by the Environmental Protection Agency. Applicant shall be responsible for application and compliance with any Section 404 Pennitting that may be required by the Army Corps of Engineers. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3~feet above the highest established peak groundwater elevation. Gateway Marketplace Subdivision Exhibit C Page 4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3116/2006 3. Meridian Fire Department 3.1 Acceptance of the water supply for fire protection will be by the Meridian Fire Department and water quality by the Meridian Water Department for bacteria testing. 3.2 Final Approval of the fire hydrant locations shall be by the Meridian Fire Department. a. Fire Hydrants shall have the 4 W' outlet face the main street or parking lot aisle. b. The Fire hydrant shall not face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works specifications. d. Fire Hydrants shall be placed on comers when spacing pennits. e. Fire hydrants shall not have any vertical obstructions to outlets within 10'. f. Fire hydrants shall be place 18" above finish grade. g. Fire hydrants shall be provided to meet the requirements of the IFC Section 509.5. h. Show all proposed or existing hydrants for all new construction or additions to existing buildings within 1,000 feet of the project. 3.3 All entrance and internal roads and alleys shall have a turning radius of 28' inside and 48' outside radius. 3.4 Provide a 20-foot wide Fire Lane for all internal roadways all roadways shall be marked in accordance with Appendix D Section D1O3.6 Signs. Operational fire hydrants, temporary or permanent street signs and access roads with an all weather surface are required before combustible construction is brought on site. Commercial and office occupancies will require a fIfe-flow consistent with the International Fire Code to service the proposed project. Fire hydrants shall be placed per Appendix D. The 23 oillcelcommerciallots lot will have an unknown transient population and will have an unknown impact on Meridian Fire Department call volumes. The Meridian Fire Department has experienced 2612 responses in the year 2004. According to a report completed by Fire & Emergency Services Consulting Group our requests for service are projected to reach 2800 in the year 2005 and 3800 by the year 2010. Maintain a separation of 5' from the building to the dumpster enclosure. Provide a Knox box entry system for the complex prior to occupancy. The applicant shall work with Planning Department staff to provide an address identification plan and a sign which meets the requirements of the City of Meridian sign ordinance at the required intersection(s ). The Fire Dept. has concerns about the ability to address the project and have the addresses visible from the street which the project is addressed off of Please contact Vicki Heugly at 898-5500 to address this concern prior to the public hearing. All aspects of the building systems (including exiting systems), processes & storage practices shall be required to comply with the International Fire Code. Provide exterior egress lighting as required by the International Building & Fire Codes. Gateway Marketplace Subdivision Exhibit C Page 5 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 3.14 \ Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet (122 m) from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the code official. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2 the distance requirement shall be 600 feet (183). i. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). ii. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet (183 m). 3.15 There shall be a fIre hydrant within 100' of all Fire Department connections. 3.16 Buildings over 30' in height are required to have access roads in accordance with Appendix D Section D1O5. 3.17 Side yard fences shall not be allowed. 3.18 Buildings or facilities having a gross building area of more than 62,000 square feet (5760 m2) shall be provided with two separate and approved fire apparatus access roads. Exception: Projects having a gross building area of up to 124,000 square feet (11520 m2) that have a single approved fIfe apparatus access road when all buildings are equipped throughout with approved automatic sprinkler systems. (Remoteness Required) 4. Police Department 4.1 The police department supports the requirement for a frontage road as the length and bulk of the proposed buildings impedes serviceability to all sides of the project. 5. Parks Department 5.1 Standard for Mitigation oftrees: The standard established in the City of Meridian Landscape Ordinance 11-3B will be followed. 5.2 5.3 6. 6.1 7. Standard Plan for Protection of Existing Trees during Construction: The standard established in the City of Meridian Landscape Ordinance Tree Grate and Tree Box standard: The proposed tree grate shall be a 6 foot by 6 foot, cast iron, French pattern tree grate. This grate shall be placed in a 6 foot by 6 foot inside diameter tree box with a steel grate frame set in concrete. Prior to CZC approval, contact Meridian Parks and Recreation Department for specifications and tree box construction drawings. Sanitary Service Company Please contact Bill Gregory at SSC (888.3999) for detailed review of your proposal and submit stamped (approved) plans with your certificate of zoning compliance application. Ada County Highway District Site Specific Conditions of Approval Gateway Marketplace Subdivision Exhibit C Page 6 7.10 7.11 7.12 7.13 7.14 7.15 CITY OF MERIDIAN PLANNING DEPARTMENT STAff REPORT FOR THE HEARING DATE OF 3116/2006 7.1 Re-construct the northern driveway, on the adjacent flag lot, as a curb return driveway with minimum 15-foot curb radii. This driveway shall be no wider than 30-feet. 7.2 Construct one new curb return driveway with minimum 15-foot curb radii located approximately 120-feet north of the south property line as proposed on the revised site plan. This driveway shall be no wider than 30-feet. 7.3 Close the existing curb cut driveway located approximately 96-feet south of the north property line with curb, gutter, and sidewalk to match existing improvements. 7.4 Comply with all Standard Conditions of Approval. Standard Conditions of Approval 7.5 Any existing irrigation facilities shall be relocated outside of the right-of-way. 7.6 Private sewer or water systems are prohibited ftom being located within any ACHD roadway or right-of-way. 7.7 All utility relocation costs associated with improving street ftontages abutting the site shall be borne by the developer. 7.8 Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387~6280 (with file number) for details. 7.9 Comply with the District's Tree Planter Width Interim Policy. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State ofIdaho shall prepare and certify all improvement plans. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Road hnpact Fee Ordinance. It is the responsibility of the applicant to verify all existing utilities within the right~of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1 ~800~342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Gateway Marketplace Subdivision Exhibit C Page 7 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3/16/2006 Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 7.16 No change in the tenus and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confinuation of any change from the Ada County Highway District. 7.17 Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. Gateway Marketplace Subdivision Exhibit C Page 8 CITY OF MERIDIAN PLANNING DEPARTMENT STAff REPORT FOR THE HEARING DATE OF 3/16/2006 Exhibit D. Required Findings from Unified Development Code Preliminary Plat Findings (UDC 11-6B-6): In determining the acceptance of a proposed subdivision, the Conunission and Council shall consider the objectives of this Title and at least the following: A. The conformance of the subdivision with the Comprehensive Development Plan; In Chapter vn of the Comprehensive Plan, 'Mixed Use Regional' is defined as areas including commercial and residential development consistent with auto and service oriented uses. Staff fmds that the requested General Commercial (C-G) zoning designation is in accord with the Comprehensive Plan's Future Land Use Map, which delineates the subject property as "Mixed Use- Regional". The purpose of the C-G district is "to provide for a review of the impact of proposed commercial uses which are auto and service oriented and are located in close proximity to major highway or arterial streets; to fulfill the need of travel-related services as well as retail sales for the transient and permanent motoring public." Staff fmds that the proposed zoning is in general conformance with the comprehensive plan (please see Section 7 of the Staff Report for detailed analysis of specific comprehensive plan action items that apply to this development). B. The availability of public services to accommodate the proposed development; The site is intended for commercial uses which, based on the Comprehensive Plan description, will have such uses as retail, wholesale, service and office uses, as well as appropriate public uses such as government offices. The applicant will be responsible for the extension of all utilities necessary to serve this proposed development. Permanent sanitary sewer service to this development is to be provided by the extension of sewer in Ustick Road and extended south through the site to be looped with extensions in Eagle Road. The applicant will be responsible for the extension of utilities to and through this proposed development. Sizing and routing shall be coordinated with the Public Works Department. Other urban services, such as water, are near to this site and the applicant should be able to extend such services to the site. The applicant and/or future property owners will be required to pay park and highway impact fees. ACHD has submitted a staff report with site specific and standard conditions which will is attached as Exhibit C. On December 28, 2005, a joint agency/department comments meeting was held with representatives of key service providers to this property. Based on the joint agency/department meeting and other comments received from agencies/departments, staff fmds that except for sanitary sewer, the public services listed above can be made available to accommodate the proposed development. The Conunission and Council should reference any written and/or verbal testimony submitted by any public service provider, regarding their ability to adequately service this project. If approved, the developer will be financing the extension of sewer, water, local street infrastructure, utilities and irrigation services to serve the project. The primary public costs to serve the future residents will be fire, police and school facilities and services. Staff finds there will not be excessive additional requirements at public cost and that the proposed zoning and subsequent development will not be detrimental to the community's economic welfare. C. The continuity of the proposed development with the capital improvement program; Gateway Marketplace Subdivision Exhibit F Page 1 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 3116/2006 Because the developer is installing sewer, water, and utilities for the development at their cost, the subdivision will not require the expenditure of capital improvement funds. D. The public financial capability of supporting services for the proposed development; Please see Exhibit B for comments and conditions from other agencies and departments. E. The other health, safety or environmental problems that may be brought to the Commission's attention. Staff is not aware of any health, safety or general welfare problems associated with the development of this subdivision that should be brought to the Councilor Commission's attention. ACHD considers road safety issues in their analysis. Staff recommends that the Commission and Council reference any public testimony that may be presented to determine whether or not the proposed subdivision may cause health, safety or environmental problems of which staff is unaware. F. The development preserves significant natural, scenic or historic features. Staff is not aware of any natural, scenic or historic features which require preservation. The applicant will be required to maintain, fence, and improve the waterways which are existing on this site. Gateway Marketplace Subdivision Exhibit F Page 2 """""""""..TI.""-,....",,,. .,...~ ~~c......" 0"'" ,~,,-,,~., """,,'n"'~'rl,"~"""""""'" .. "'::~-"'1'=;'u.~:.:'U:"'.". . :,' ') em At:t. .'1 r- ~ ~I ~. WI( In~lj 1 Mlt} I;... ~ ~. UBI Uli, II'in¡ ![. Gateway Marketplace PRELIMINARY PLAT LANDSCAPE PLAN MERIDIAN, IDAHO ..... , r 1111 ~~'~I I Uli ;; ~ , ~. , " ( """M/O""""""'" :::.. ~ . :;."';:,=:, =..-: ::" ~~ """"- ~ ..........._, -.....- ~ ~Œ~~~ ~.._, _~_-r .... --....... m~_'" -- .............. ~ ~~œu" -- NcrTES: ~ ~~~~~ . ::EE;~.=z'"~='='~-- CDCONIFEROUS TREE PlANTIN~~- ~ ð . ~ ~ @SHRUB PLANTING -»- a-:~.:;:"'-=Œ ....-m e_- "'--- ~~----, --~= NOTES: :: ::=::...-::::=.-:"-=- ~ ~ r i ;; ~PERENNIAL & GROUNDCOVER PLANTING -~- ( ~--- ="'--==" ~~";'".... _'M"""'~" ="-~"". r«JJES; : ~æf:..::":::""..=:-==~== . :-"_ø._-_ø~--_..-.~-';"" : ~~;:€f:~~==..==-- @DECIDUOUS TREE PLANTING_»- 0PLANTER BED CUT EDGE ~~ LV ;~ "..' ,,~. w..c ::~ ~.. ::~ -"" ...."'" æ- NOTE: =:....-=:.=---:.:'" @TYPICAL PLANT SPACING "':ro- . ............... .(t) :.~"'.U:T~.: -..... ~ ...,.. - , . MATERIAL LEGEND z ~ a.. w a.. « ~() men Q.CO -Z::I: ~~~ ::::i!:!-'-Z »« ~. m...J- 3:a..D:: Q) W <ûii:=:æ: C>« Z ~ ...J W 0::: a.. - -..-- PROJECT CALCULATIONS , =-~-:æ::.~.!.:.:-- '=~ . =~~~--- ._- .'ff- .------- ..- lANDSCAPE & IRRIGATION NOTES: , ------------~--- ----- . --------- . ----____'_œ~ ---~-- -~------..--- . _____MU . . ~---_._---~----_.- -..-.---- . . ---~-_._...-..--- --- ,. ----~-_._--_._--~- --------.-------- . :::"::::::"------.---;""- . ,.------,,'-'-.___._ð__- --.--- -----.--- . c _._------~~ ~ --___._.œ.____-._.~- -------.----------. ---"...-___T__- . ~ _____œ______-- -------.-------- ------___.._0- .- -----~----- ------------ ---------...-- ------ -----.--------- ----...------....-- ---.-.-------- ._-------~_.__. ~ -- --..------.-- .-:_--~------ ----_._-----~ --------~_.._-- A ="----=-------. - .. K ---------- ------------- A --------- . ----.----.-------- ". --~.-.._--------_. ----.-- A =------~---~. ---- -------- ~----- ------- . . --------------- ---.-- . __4______--- a ---------------- --- ft ---~_._---_._- --- A --.....--.-..-- -..-- -- II. .-::;." 1BB !:'.!!t... GIDŒ' ._- ~'=' ::::. ~ -,- ...--- _":..-- --- ...-- - -- = -~ - -- - - -;¡¡- .. ... ~. """-"'_-II' II .- L LANDSCAPE PlAN ! L1.011 DEVEWPMENT CONTAcrs """"""" ........... DE\ÐŒoENr -. LC~ ,... 1W/I(I, ..y ""'" ~..", PH"""--. ""'..cr,r-LTHOIPSON ""'-" THE lNO"""'. "" "'L_"'.IIIIIE'" L<ŒE. ...... .,." =",¡"Pm. ':.ü.'"" .......,.., """""""-_L1.C ..., ....... A'L .......... ""'" ..... :;::?h~":;;,.- PROPOSED ZONING SETBACKS """" 'FT. ..... """""""" ...... ..... ....,. L<IÐOtAP[ ...... 0"'. O" OR UICAL auEcrtIO """"" ~y ........ ""'!kIIO .....,. 10FT. .." .. FT. .. FT. .. n. " . 1 [ . ¡ k ! r 1 II J f i ~ ! i i i DEVELOPMENT DATA lOr"- """"""....... ...... AC "'""" ~ lOr"- LO11t ,.""" -LOr""'........ -LOr""'..._.. ..... """"" ""!D1O/AC =-""""'<>-<> """"'IIIIE 0-0 PRELIMINARY PLAT FOR GA TEW A Y MARKETPLACE A COMMERCIAL DEVELOPMENT LOCATED WITIllN A PORTION OF SECTION 4, TOWNSHIP 3 NORm. RANGE] EAST BOISE MERIDIAN, ADA COUNTY, MERIDIAN, IDAHO \/'~""'~ \ of .'" Hi /). ',<;, _NARY ø . °, ... ........".. '-"',,"'" _~.œ- -~-==- ....,..... z 0 (f) 5> ëi aJ ::J (f)- W~O Ua...r::: :S ~~ a.~¿ I- .- œ W E:a ~ .-'- a::~~ «a. ~ ~ s: W I- « C> ~ '#'2 .. .-.::::;" >DB LIND <II<U ,-- '-=.':C:' -.~ -- -,- ---- .... ":.."'i.. ----, 10_- -- -- =0- ~ =0, = ~ ""'-"T'.'" P..';minary - ~"'j. c~..p '\ .. rO.,/ '('~. ~~. (f> ?~:t..' rá. ~ ~~~ %. V ~~ ~ NOTES: ~ s ""'"'" TO ~ """..... """ """'" >HOOII.........,......- USE. . "" ~ "'... ""'SHAIJ. """y~... NPUCI&E....., 1lEQM1\ON!IOO """" AT"'- aFÐ.III:N!IIIN. ~ -- £IIIAØO! """-- TO ""........... IOINC"""""" a... 1m <1"""""" ".... ,... """"""" OF'- ÆIUJ. ~ JL!. LOll ...... ... """""" OI!.L BE ......... ~ - ""'" """"'" ... ... aN a.......... - ......... "110 ..... SHAIJ. BE """"""" TO ........ mY '" """"" .."" -- '" """"'" SEINŒ '" -- . AU. LOll ..... ... .......... .... .. - ~ """"'" ...... ........ BY - 1m '" """""'- .... ......... ...... ..... ....... .. OC>NCJEI> .. "'""'" mY Of """"" IEJOR ..... TO -- EIMŒ TO !>E- o AU. ...... ...... - .."" ..... ....... .. .....,.. TAl .........,. AS ........ BY THE my '" """""'- 7, "'-LOII"""""-"'""""""",,- """""""'......... """"".........- - .....1111 ... 1IIE ...... ....... -- 0 ..... .."" ....... .... .. CIIWCIID - IIEWED .......... 0 JL!.LØJ!i.'" ŒV!lØ'IÐIJ """"""AN -"""'- AIOEEIIE>/7. SYMBOL LEGEND ---?-. ---- -......... -- .... .... -- - ...... -- .... ....... --"'.. ---- ---....... . e .. . VICINITY MAP iiã PP-1 Meridian Planning & Zoning Commission Meeting February 1 G, 200G Page 53 of95 Moe: Second. Rohm: It's been moved and seconded that the Public Hearing on CUP 06-001 be closed. All those in favor say aye. Opposed same sign? Motion carries. MOTION CARRIED: ALL AYES. Zaremba: Mr. Chairman, I move we -- let's see. I should look at it. It's not a recommendation. This is actual. Okay. I move to approve file number CUP 06-001 as presented in the staff report for the hearing date of February 16th, 2006, and the site landscape plan dated August 8, 2005, with no modifications and ask staff to prepare the findings with one change to those. Page two of the findings, paragraph B, paragraph one, third sentence for conditions, the word should be conditional. End of motion. Moe: Second. Rohm: It's been moved and seconded that we approve CUP 06-001. All those in favor say aye. Opposed same sign? Motion carries. Thank you. MOTION CARRIED: ALL AYES. Item 15: Public Hearing: PP 06-002 Request for Preliminary Plat approval for 23 commercial lots on 22.85 acres in a C-G zone for Gateway Marketplace Subdivision by Landmark Development - southeast corner of Ustick Road and Eagle Road: Rohm: At this time I'd like to open the Public Hearing on PP 06-002. This request is related to Gateway Marketplace Subdivision and begin with the staff report. Guenther: Thank you, Mr. Chairman, Members of the Commission. This is a request for a preliminary plat. The preliminary plat is tied down to this site as a portion of a development agreement. The plat is on the 22.85 acres in the southeast corner of Ustick and Eagle Road. We have already had some discussion on this area. This also -- this outline should include this slight piece right there, which would be next to where -- this is the Una Mas and the ACHD property that were recommended for approval for the annexation earlier tonight. With this site currently there is the lateral that crosses I believe it's the Milk Lateral, which will be relocated on site, as well as the site is presently vacant. There are a couple of field drive access points to Eagle Road, which staff anticipates changing significantly. The development agreement that is tied in with this site is primarily commercial. The higher the density, the higher intensity of the use for commercial is -- was encouraged at the time. As you can see, it's high intensity commercial in the corner, commercial office, as well as a transitional use, which would be the north-south type of a collector system. But this was done prior to the ACHD roadway system collector being proposed between Ustick and Fairview. With this the applicant's use request for a plat for commercial is consistent, but there is several things outlined in the staff report that staff would like to see changed. One of those would be -- Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 54 of95 I'll start at the southern portion. Cross-access to the south needs to be issued with this plat. With that, the other recommendations on the development agreement for ACHD and Una Mas were to provide from the southerly portions of these properties to approximately where this property turns south, this little jog out would reserved for ACHD to propose a future public street. That public street would be either a jog to the south to access this property and provide multiple points for public access to property or to also facilitate large vehicular traffic to the light, which would be at Allys Way and Ustick. As you can see this site is proposing some larger boxes, larger box products, with loading docks in the rear. Right now this design does not facilitate east-west traffic, which is the main concern with the design of this plat, as well as it overloads the access points on Ustick. ACHD has met and this is a right-in, right-out access point approximately -- I believe it was 400 feet from the Ustick-Eagle Road intersection, as well as there is another access point at approximately -- I want to say 750 feet, but it's getting late and my memory is failing me. This would also -- this one here, the full access point, staff wishes to see a design that would not accommodate large truck traffic making a left onto Ustick across what is going to be a turning lane and two lanes of eastbound traffic, which is why the public road section in this location -- at least designed to public road standards would be something that would be most desirable, as well as to allow the large truck traffic to access the point in this location and be able to exit in a different location. Having that traffic not as a signalized intersection is not in the city's best interest. This application is proposing two access points to Eagle Road. One access point would be a right-in, right-out -- I'm out of light. In approximately this location and the second one would be a full access point at the southern boundary of this location. This access would be a full access, but currently the Eagle Road corridor study does have a median in the middle of Eagle Road, which is also the same thing we had discussion on with the Bienville project to the west of this site across Eagle Road. With this staff is looking for a redesign mainly to address two issues. This application would not meet the standards of the Unified Development Code as more than 70 percent of the Eagle Road frontage would be parking lot, as well as the Ustick Road frontage would be looking at over 1,350 feet of the 1,380 feet of the site as being a parking lot, which staff can site as same issues as what Meridian Crossroads has. The recommendation is to bring back a redesign. I think the applicant has already submitted to us late today a redesign that is already a proposal, but I think that this Commission needs to give the applicant better direction as to what you would foresee in relation to staff's comments in the report. There are not findings for approval. Everything would need to come back to you, as well as this design just does not work with the development agreement requirement for the access frontage road to facilitate that traffic. I know that in the past -- I was not here when this was annexed, but there was significant discussion about the large vehicular traffic accessing Ustick Road and the frontage road being essential to that success of not having the large trucks cross many lanes of traffic without a signal. With that the staff report does outline many changes that we would like to see to reflect some of the concerns that we have had with this design. With that the Una Mas annexation report does have the two points of cross- access. One would be approximately at the center of the project and the other one at the southern portion, as well as they would get their immediate cross-access into the front lot of their site. And, again, this site -- or this access point to Ustick Road is off site Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 55 of95 from their project and so cross-access in this location would be essential. Also talking about the cross-access here, the -- ACHD has made comment that they need additional right of way here for stacking lanes that they would anticipate with this size of a development. The design that I have seen already indicates that there will be a drive aisle of approximately 300 feet in this location and a redesign in order to facilitate traffic accessing that stacking lane, essentially, going both to the east and west, which is something we also need to see in a better scale and more format in order to bring back a better recommendation to this Commission. But, again, tonight staff is recommending continuance of this, so that the applicant can address the design of the plat in relation to the comments and concerns of staff, but I also encourage this Commission to give as much direction to the redesign as possible. Or there is the other option which has the findings for denial already incorporated into the staff report. Staff does not foresee that a denial would be conducive to this application, but a redesign would definitely -- is definitely a practical option. And at that I will stand. Rohm: Thank you, Joe. Any questions of staff before we ask the applicant to come forward? Borup: Just one, Mr. Chairman. You made reference to the frontage road, but I don't know if there was a lot of staff comments on that. Are you anticipating that there would be a frontage road along Eagle? I think that was part of the Eagle Road corridor study. Guenther: Yes. Borup: And it was discussed at the time of annexation. Guenther: Yes. The discussion on the frontage road has also shifted significantly with the incorporation of the ACHD collector road east of this site. Borup: That's that I was wondering. Guenther: Which is why the -- and, originally, the development agreement indicated that this transitional use would be, essentially, the frontage road for the entire area, but that was -- this was done prior to ACHD making any type of condemnation or purchase of that property east of the site, as they anticipated the collector road system to be at approximately the quarter mile and that's a third of a mile. So, what staff has taken the liberties of is to ask for a redesign in order to accommodate north-south vehicular traffic as a commercial collector, which wouldn't have parking on it in this type of a location, which would not be a public road system or, essentially, a backage road and to provide the east-west connection to what the ACHD collector road system would provide, which would be that backage road and the light to Ustick Road. Borup: So, you're saying with that design you would not require a frontage road? Guenther: With the conditions outlined as for redesign, we feel that the backage- frontage road can be accommodated. Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 56 of 95 Borup: Okay. Thank you. Zaremba: Mr. Chairman? Rohm: Commissioner Zaremba. Zaremba: Would you -- let's see. For a visual -- yes, that one is fine. The aerial. Perfect. A couple of questions. Orient for me the -- Una Mas property is not as long north and south as this property? Is it shorter? Guenther: Yes. The Una Mas property comes right to that point, as well as the ACHD property. This one incorporates -- it appears to be about 80 feet more to the south, which is why staff would foresee that a public street in that area could cul-de-sac or come into some sort of approved ACHD turn around, because of that type of development, and the discrepancies in the property descriptions. As well as we don't foresee public road access to Eagle Road. So, if off of ACHD's new collector, as we have asked Una Mas to leave a right of way space at their southern portion, the continuation of that would not, actually, be along the southern portion of this one, right? It would be up just a little bit? Guenther: It would be -- and, again, this portion is missing a piece, which would be this long skinny one, which would be a portion of their southern border and, then, this jog to the south. I would -- keep in mind that the conditions listed in the report are recommendations -- they are not conditions, they are recommendations for redesign. They are listed as conditions, but they are not -- typically they are conditions of approval. This is conditions for redesign or denial. So, they are still very much open for conditions or revision. Zaremba: What you just said about the narrow strip -- clarify for me again -- does Una Mas and this property share a common border or is there a little strip in between. Guenther: Yes. There is a common border. Zaremba: Okay. Guenther: And it would be, again, this little strip right here. Zaremba: Yeah. Okay. Thank you. Newton.Huckabay: Are you just trying to determine if a road can go through to Eagle? Zaremba: Well, you're anticipating where I'm going. It makes sense to me if Bienville has a road that comes out there, that this road from ACHD's collector ought to tome out and there should be a signalized full access intersection there that serves all properties on both sides. It completes my bypass idea. We already have the bypass up here. I'm Meridian Planning & Zoning Commission Meeting February 16,2006 Page 57 of95 sure we will have a bypass there. This isn't as neat, but it's somewhat of a bypass. This would make a bypass on this side. And it would be signalized here and here. I would like to see it signalized there. And it requires this one to focus their traffic there as well to meet that warrant, I would believe. Both sides have to be feeding into it. But it appears that what staff is asking for could lead to that, as long as it wasn't cul-de- sac'd. Guenther: Well, typically, ACHO is going to look for a full road section. The Bienville section is not a full road section, that is, actually, only a commercial drive access to Eagle Road, which isn't going to facilitate a light, even if it has the vehicular traffic. ACHO has specifically said on both of these sides they don't want any public roads within a quarter mile of Eagle Road. And this is approximately a quarter mile and when it was talking about the ACHO representative, he says absolutely no closer to Eagle Road than that. And again -- Zaremba: But it would be right on the margin of the quarter mile; right? Guenther: It would be -- no. No. No. I'm talking quarter east-west of Eagle Road, not a quarter mile south of Ustick. Zaremba: Okay. Guenther: They want to maintain no public roads within a quarter mile of Eagle Road, which means that when Sadie Creek came through here, their public road ends about in the middle of their project, where this one the public road would end in the middle of the project. It would not approach Eagle Road. The Eagle Road access points would be commercial access points. Apparently Eagle Road is planned for a full median at the quarter mile, with an allowance for a u-turn design. When I met with Wade Christensen from ITO, their district engineer, on Tuesday, that was the design he was recommending at a minimum -- or at a maximum in these two locations they may get right-in, right-out, but they would not foresee ITO giving access permits for full access points, as well as it would be a miracle if ITO gave a light and it would have to have a very strong recommendation from our City Council to have that light, as well as ACHO would have to accommodate a public street to that point and ACHO specifically has said they will not. So, I'm sorry, I've gone off of track here again. Newton-Huckabay: With that said, that it validates, basically, statements that were made on the other one. I think that we -- if we move forward, our recommendation should be just as we have done on the west side of Eagle Road, on the east of Eagle Road that we push for a full access to Eagle Road, because the properties to the north on the corner have got it already. If I remember right, you can get -- or you will have it eventually. Yeah. Because you can go back behind Lowe's and out beside the church and out and if I remember right from our hearing on the Kohl's, you're going to go up behind Kohl's and meander around and out to the street and if I remember right there was talk of a light. Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 58 of 95 Moe: I don't remember the light discussion. Newton-Huckabay: It seems to me like there was -- there was no commitment there, but I think there was a desire. Rohm: Yeah. I think at this time it's appropriate to have the applicant come forward, please. Thompson: Mr. Chairman, Members of the Commission -- Joe, if I could have you cue up my presentation. My name is Tamara Thompson, I'm with landmark Development Group, 1882 Taluka Way in Boise, Idaho. The site is located at the southeast corner of Ustick and Eagle, which -- Guenther: Is this your development? Thompson: No. Guenther: Which disk did your have? I haven't seen a disk. Did you hand it to somebody else? Thompson: No, I handed it to you. Guenther: You didn't give it to me. Thompson: Maybe I thought I did. Guenther: Is it this blue disk? Thompson: No. It's this one. These later hours you get all rummy. Anyway, we can go forward. We have 23 acres on the southeast corner of Ustick and Eagle and we are proposing to develop a commercial, retail, restaurant, and office development. The exact mix will depend on the conditions at the time of development. With our site plan -- Guenther: We got a new computer and it doesn't appear to be the fastest one in the building. Thompson: We have complied with all of the necessary landscaping easements and setbacks, so we have the 35 feet along Ustick and Eagle Road. The property was annexed and rezoned in early 2004, I believe it was April of 2004 that everything was finalized, so we are just coming back for the preliminary plat at this point. At that time of the annexation and rezone a development agreement was entered into with the city and the property owners have relied on its content, including the concept plan, which I understand you didn't necessarily get to see before City Council approved it. So, this is the site plan as we submitted it and from what -- the aerial that we were looking at just a few minutes ago, it, actually had the notch coming out like this and it, actually, cuts into Meridian Planning & Zoning Commission Meeting February 16,2006 Page 59 of95 the property, instead of out of the property. So, this line right here is where the Una Mas southern property line lines up. Back in October of 'OS we held a neighborhood meeting and the Una Mas folks to our east were pretty much the only ones that had any comments at that time and due to the sensitivity of the new office uses that they are proposing, we have worked with them to come up with some mitigations for their concerns. Along our truck docks, which -- let me -- can you go to the next one, please? This is the revised site plan that we just submitted today based on our meeting that we had with ACHD and Una Mas yesterday. It shows some -- ACHD wanted a longer throat here on our -- the last one we -- basically, you came in and you could go east or west. This one they wanted a longer throat of at least 200 feet. It worked best with the Una Mas site plan, if we can get that back to 350 feet, and that's from center line to center line. So, we have pulled that down and we got rid of the large mass in here and put a cluster of pad buildings at that point. In order to mitigate their concerns with the truck dock areas, we have agreed that along the edges of -- if these, in fact, are recessed truck docks, we don't have -- we are currently marketing to high quality national tenants that some do have recessed truck docks, some don't. Some just -- you know, somebody like Pier One, for instance, just has a roll up door at grade level and they don't get the big tractor trailer trucks. But somebody like Michael's, for instance, does the recessed truck dock. So, we are showing worst case here where every single one does, but depending on how the tenant mix comes out, they mayor may not have them. So, anyway, for the ones that do have the -- have the truck docks, we have -- we have agreed to a solid wing wall that comes out to help mitigate the sound and the visual, you know, so you're not hearing the backup buzzers from the little forklifts and that kind of stuff. We have also talked to them about the -- the backs of the buildings, making sure that those have some sort of architectural elements on them, as well as color bands or a split face block band or something like that, so that they are not just a plain back of the building, but they are -- the people that are in there, those office complexes, actually, are looking at something other than just a plain back of the building. Although, it will be a back of a building where we are not proposing carrying rock and towers and that kind of stuff along the back, but definitely giving them some interest with color. The landscaping along the property line -- we have put two cross- accesses that work for both their site plan and our site plan across here. City staff is asking for a third one down here, which is not a problem. That one can be added also. As far as the landscaping along here, we have talked to them about putting a three foot berm with some ten foot trees at the time of planting on that, so that there is some height there, so that they can -- to give some blockage. Let's see what else we had. And, then, the other one is in the staff report already, where we have to -- any dumpsters have to be confined to trash enclosures. We did meet and so I think we have accomplished what staff wanted for the cross-access. Like I said, we have got -- we have got two here, we can add this third one here, and, then, we have another one to the south at this location. The report still has in it the frontage and backage road, which at the time -- well, from the first time we talked to ACHD they asked us to .. to use their road, instead of adding another road at this location. Also, with that concept plan -- I was not involved in it at that point, but I have talked to the -- to the team members that were and they don't remember that being basically a road that went through there. The north-south access could meander through parking lots, which this one definitely did, Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 60 of 95 where you can meander through the parking lot to get -- to get down here. That transitional use, as people remember it, was, basically, because this was residential up until earlier tonight and so that transitional use was meant for a buffer against -- against that use. But, in any event, that staff report as it references frontage or a backage road, I believe that both ACHO and city staff now have confirmed for us that that is to move to the Allys Way, so that the reference to that in the staff report should be eliminated or changed. That was one of the big issues. I think the second big issue is the language in the staff report where it calls out the clustered retail. With national retail tenants that we are -- that we are looking for, the high quality tenants that we are looking for here, we have looked -- we have looked at how we could -- I mean what staff is recommending is, basically, pulling these buildings folWard to here where you would have parking on both the front and the back side have access on the back side and the front side. Essentially, what that does is it eliminates these pads and you still have all that parking along here, but you don't have -- have the break that the pads allow and -- I mean retail tenants right now are -- are being extremely picky. They have a 25 page list of what their site criteria is and I can tell you we are not going to get the quality tenants that we would like to get if -- if we have got to go to something outside the box, if you will. There is issues with loading, how you load those types of buildings. Basically, what -~ how I envision it is it would, basically, be something like the Boise Town Square Mall where you have got loading areas on different sides of it, but we don't have the sides that accommodates that, so I don't know how you have loading areas anywhere and, then, you know, trying to get pedestrian customers through there, just isn't a safe situation. I don't know how well this shows up, but this is our vision for how the front of those major tenants would look, where we have got some -- some nice pedestrian areas with some outdoor seating areas and, you know, with different facades and tower elements and, you know, you can make that so -- in my opinion this isn't a strip retail. Strip retail to me is something that looks all the same across and, then, you have got different tenants that go in it, but you can't necessarily tell where one building starts and stops, where these look like little townhouses, if you will, where they are all different colors and architectural styles and architectural elements where they flow together, but they are not necessarily the exact same. So, anyway, this is -- this is what we have put together as an architectural vision and we have always added architectural guidelines to our application -- or we submitted that at the time, so that there is clear materials and that type of stuff that we would like to be used. So, I believe we have addressed staff's concerns. We can revise the preliminary plat and landscaping plan according to -- to the new plan that we have. Mr. Kissler, who is going to -- he owns all of the property at this point and my client is looking at buying the northern 17 acres from him that -- Mr. Kissler is ready to go. He's outgrown his Norco building on Fairview and needs to build another one here and he's -- he's ready to go. So, he's in a little bit of a hurry. So, we would -- we would like to just add conditions, basically, to take care of any concerns that you have and be sent onto City Council with your recommendation. But if we can't do that, then, being continued is the next best thing. So, with that I'll conclude. Actually, can I see one more slide? Here is -- this is the staff report and I'm sure we are going to get into traffic, so maybe I'll just talk about it real quick. Back in 2004 -- and you probably can't read this -- but the B -- or the A down here -- it says ACHD approved accesses. The B says ITO approved accesses. And so we have got A's here and here Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 61 of95 and we have got B's here and here. And the property owners always thought that this was approved and so, you know, come -- now that we have the new ordinance and everything -- and Mr. Kissler actually does have letters from ITO that -- back in 2004 -- October of 2004 granting him the two accesses at the locations that we are showing on the site plan. We have formally submitted to them for right of way application and I should know tomorrow. They had their executive permits committee today. So, I should know tomorrow how that all went. One more. And this one you really can't see, but this is -- I had our traffic engineer do half -- this is Eagle Road and I had him go a half mile in each direction to show what currently is approved on the north side and what's being proposed on the south side and from the intersection going north at 700 there is right-in, right-outs for both the east and west sides. At the quarter mile mark there is a full access point for both east and west and, then, at the 1,700 feet, which approximately is 400 feet from that one, another right-in, right-out was given to the west side. And, then, eventually, where this new light is going right here, which your memory does serve you correctly, it does connect down through here, which, hopefully, eventually, will come through. This -- this road -- Mr. Moore is -- I think his property only goes to about here at this point, so he can't make that full connection, but he will be building that road. And, then, on the south side, at approximately 700 feet, which is consistent with here, is a right-in, right-out. This one on this side has been pulled back a little bit further to 860 feet, just because there is -- just to accommodate for the extra stacking here, so that it, actually, wouldn't just completely stack up. And, then, this and the -- what Bienville is proposing do line up at the quarter mile mark. And, then, like you said, you can't get to the half mile point on the east -- I'm sorry, the west side here. And, then, this is the new Allys Way, which I believe is scheduled to hook up to the half mile point here and, then, eventually, they like to get it down to Fairview. So, just to kind of show you how the entire system should work. With that I will be quiet and answer any questions that you'd like. Rohm: I think you have made a very nice presentation and I think that everything that you have said is in line with working with staff to move forward with a project that could gain approval by the Commission or a recommendation for approval, but the bottom line is we don't have a staff report to support things that have been presented tonight and I don't think that we want to write a staff report tonight. Thompson: And that's fine. But we would like some solid direction, if that's -- Rohm: And I think that maybe after having heard your testimony we might be able to have discussion amongst the Commission and provide some kickback to staff in terms of some of your comments and give the staff some direction, but I really think that -- that before we can act on this, it will have to go back to the staff level and be given due consideration with a staff report that we can hang our teeth on. And so I seriously -- I think you did a great job, but, I'll tell you, without having polled the balance of the Commission, I think that we are going to have to at least kick it back to them for a complete staff report and if there is some comments from the Commission to help direct that, they will be coming. But thank you for your testimony. Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 62 of95 Moe: Mr. Chairman -- don't go anywhere yet. Thompson: Okay. Moe: It's now question time. Thompson: Okay. Moe: In regards to the -- the roadway on the south side. Go back to the -- Thompson: You want the aerial or the site plan? Borup: That's good enough. Moe: Right there. I just kind of want to make sure in regards to the roadway on the south, would it be your intent, then, it will line up with Una Mas, even though they are a little farther to the north and, then, just on the boundary would you be doing the sweep up and into their property? Thompson: Well, what staff has explained to me is they are looking for half of a 42-foot right of way. So, on this bottom portion they are looking for 22 feet that just trims this corner, basically, and that's it. Borup: Where is the other 21 feet coming from? Guenther: The Red Feather future -- the future Red Feather Estates development. Thompson: Yeah. There is another third party in this that -- Guenther: Yes. That is true. There is -- the portion that is south of this property -- get back to my staff report. This property right here is all zoned C-G, but we don't anticipate that all coming in for general commercial or office and, therefore, multiple access points for residential developments would be preferred. So, if they are proposing some sort of residential development here, they would need access not to a collector road system in only one location, but multiple locations to facilitate north and south direction -- directed traffic, as well as into their commercial projects. Borup: So, Una Mas was also a 21-foot-- Guenther: Yes. It was half of a 42-foot wide -- Borup: But going right down that line there. Guenther: Right. And right into that -- that kind of angle that she showed you just now. Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 63 of95 Thompson: Yeah. And, like I said, that doesn't bump out, it comes in this way. It's not exactly -- Borup: No. It comes out over here and right down this property line, I believe. Thompson: Right. But I'm saying that that corner isn't part of our property. Ours has a little notch out of it, not added to it. Borup: I think it does. Your property comes clear to here. Thompson: Oh. Yeah. Zaremba: That is not in the right place. Thompson: Yeah. here. You're right. This line isn't in the right place. It is, actually, over Borup: Yes. Thompson: Sorry for that confusion. Zaremba: Well, staff's last explanation about Red Feather -- is that what it is? Guenther: It was annexed as Red Feather. Zaremba: It's even stronger that this ought to be a real road that comes across there. Borup: Your point was that it needed to be residential access -- Guenther: Yes. Borup: -- coming from a non-public road, then, according to ACHD. Guenther: It would be a residential collector accessing a public road. Borup: But you said they didn't want a public road accessing Eagle. Guenther: They don't want a public road accessing Eagle anywhere within a quarter mile. The quarter mile would start here and move to the east as a public road. Borup: Okay. Just traffic to Allys or whatever it's going to be called. Guenther: Yes. Yes. Facilitating public road access to Allys Way or Allys Street or whatever ACHD is calling that. Newton-Huckabay: So, if they turn left, they are turning into the parking lot. Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 64 of 95 Guenther: Yes. Newton-Huckabay: They need to have a road there. Because they are going to use it as a road. Borup: It's already been approved two years ago as a road. Guenther: I know. If I may -- Borup: On the other three corners. Guenther: The problem with it is that ACHO had brought to us a recommendation that we could do a public street. The applicant is showing here correctly that Mr. Moore, his development here, has -- this is a public road. ACHO allowed this access point and light to be a public road. If this Commission so chooses to have another quarter mile public road, they should petition ACHO to have them connect that road. Currently, as staff we are getting everything from ACHO saying they don't want any public road connection to Eagle Road. And ITO keeps telling us they don't want any -- any access to Eagle Road in that location either. So, we are, as staff, very much torn between what we are getting from other agencies and what the Commission is telling us, which is why I would really like more direction from the Commission as to what they want to forward onto the Council, who is also getting ITO and ACHO-- Zaremba: My comment would be that I agree with both of them everywhere except here. I don't want to say I'm generally in favor of accesses all over the place, I agree with them that there should be a median down the middle of Eagle and that there should be very limited accesses. This one intersection has the potential to be far more heavily used than even Fairview and Eagle is right now and I think the need to have some kind of a bypass system -- and I appreciate this drawing, because it's an illustration of what I was trying to say in words before. There is a way around here. This is going to be signalized. Newton-Huckabay: It is signalized. Zaremba: This is -- yeah, it is now, as a matter of fact. This is going to be signalized. And I agree, I think Winston Moore is going to connect across here and that justifies this being signalized. I would, actually, have rather seen this be a continuous connection and a public road, but I think the same thing needs to happen on this side. There needs to be -- it's not circular, but there needs to be this whole bypass concept in that area around this intersection and in spite of what ACHO and ITO are saying about this one spot -- I have to say, I design transportation systems -- I have done so in every major city and run transportation systems and managed transportation systems, I work with their infrastructures, I have seen good ones and bad ones. I have been doing it for 30 years. I do not have a professional engineering degree, but it's a side line of what I have to do to get transportation systems going and this intersection needs a complete Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 65 of95 bypass all the way around it. That's my personal opinion based on 30 years of doing that kind of work as a necessary component of my real work. Borup: Mr. Chairman? Rohm: Commissioner Borup. Borup: I think the other important point is if this -- when this annexation took place and access points were approved by ITO -- and I don't know if ACHO was involved in the same -- well, they were for Ustick. That was in 2004 and I think the owner of this property had the expectation that what was approved then is what was going to be approved now and went ahead with the design with that expectation. I don't know how they can do a complete turn around in that length of time. It just doesn't seem fair to the property owners to me. Hood: Mr. Chair, Members of the Commission, if I may just real quick. I remember this project when I was at ACHO on staff and ACHO does not comment on annexation applications as there is no development associated with them. So, the access points to Ustick Road were never reviewed or approved by ACHO when this came through for just annexation. So, when a development comes that's when they will approve access points. The other point is they can only comment on ITO roadway. They aren't going to say that a public street can or can't enter Eagle Road at a certain distance, because it's not their roadway. If someone constructs a roadway to meet their standards, that's all they can do, and ITO is the one that actually gives the permit to access the highway. So, it truly is up to ITO and respecting Commissioner Zaremba's take on this, also respecting our code, newly adopted code, but the spacing of that, just getting a signal and working with ITO for several years myself -- not 30, but just that quarter mile and, then, the speed limit of that, the spacing and the timing of those lights on a highway where they are trying to keep the speed limit 50 miles an hour or thereabouts, I just know they are not real keen on that. Now, that's different than -- being a full access is one thing. Being a signalized access is something different. But I just wanted to clarify that ACHO has not approved any access points for this project when it was annexed back a couple of years ago anyways. Borup: And I may have misspoke. I think the applicant said ITO's approval, but -- and I'd like to see that letter. Guenther: In 2003 the applicant made -- Mr. Kissler, actually, was the person who signed the application to ITO for all three access points. The report that I have received on Tuesday from ITO's district engineer was that they did not approve them at that time and the letter you have dated February 6 from ITO also indicates that any desired access still requires a permit. That has not been issued. So, every indication from ITO that I have says that even though they have put it on their site plan to the City of Meridian, that it was not approved at the time of the annexation. Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 66 of95 Borup: So, that approval letter would have been a good thing to submit with the application. Guenther: Well, they should have had -- there should be an access permit with their application. Newton-Huckabay: Mr. Chair? Rohm: Even with that -- excuse me. Even with that being said, I think that it's this Commission's position that there be access to complete that loop, regardless of what the applicant's existing rights are anyway and so, if fact, this Commission wants to make recommendation to ITO or ACHO to have access, that's what we are here for. So, that, notwithstanding, I think we can make those kind of recommendations and see where it goes from there. So, that's just my thoughts on the roadway. So, with that being said, Commissioner Newton-Huckabay. Newton-Huckabay: I was just going to recommend that we just wrap up this conversation and to make those decisions -- Rohm: That's kind of where I was going with that. Newton-Huckabay: Clarify what the applicant needs to bring back and -- Rohm: I want to go to another subject for a moment here. Newton-Huckabay: conversation. But that's not in line with my suggestion to wrap up the Rohm: Well -- and you're not running this. Newton-Huckabay: I will be. Rohm: Not for awhile. Okay. With that being said -- Moe: When did we go to a dictatorship? Rohm: The applicant has asked that we consider their proposal to have their commercial building pushed back away from the roadway and indicated that staff report had asked that they be pulled out more into the middle. Just to find out where we settle on that, how do you feel about the applicant's comments about reasoning for pushing it back? Is that something that you can live with? Guenther: I still don't believe that it addresses the gateway corridor standards of the ordinance, which says that no more than certain portions of that area must -- may be allowed as parking lot, essentially. It's not the City Council's intention when they adopted those standards to have nothing but a few trees and, then, see parking lot Meridian Planning & Zoning Commission Meeting February 16,2006 Page 67 of95 again. And that's where they were going when they adopted those gateway corridor standards. Rohm: And I agree with what you're saying and I'm kind of thinking that these pads that are out along the roadway break that up somewhat and that kind of mitigates the concerns about the main building being pushed back to the back lot line. And I only throw that out as a comment, not as a conclusion. How do you feel about that? Guenther: Again, until I see some calculations that show how that actually relates to our ordinance, I have to speculate that it -- this is what I see. Their new site design appears to have better accommodated that, but, again, I haven't fully reviewed it, I haven't even seen it in a large scale format. Rohm: And that's exactly why we are going to continue this, so that the applicant can make their changes to accommodate the gateway concerns in the UDC and work with staff to something that is acceptable or can be forwarded onto the Commission with recommendations for approval and I think that that's enough said about that. Borup: Aren't we looking for recommendations? Rohm: I think that -- Borup: Do the rest of us get to make them, too? Rohm: Oh, absolutely. Borup: Okay. Baird: Mr. Chair? Borup: Do we have public testimony? Baird: That's exactly where I was going. Rohm: We can go there next. At this point in time -- let's see. Newton-Huckabay: Where would we be without Mr. Baird? Rohm: Jon Rosin. Rosin: Jon Rosin with Hansen Rice representing Una Mas. 1717 Chisholm Drive in Nampa. It's getting late. Commissioner and Commission, we'd like to just make a couple of brief comments. We have been working with the applicant on this and we agree with pretty much everything that they have said, as far as the larger trees in the landscape buffer between the two, kind of giving us a visual barrier between the back of their building and our office space. The screen wall hiding the trucks, we are in Meridian Planning & Zoning Cormnission Meeting February 16,2006 Page 68 of95 agreement with that. They have said that they were going to have -- you know, carry the -- you know, some type of an architectural element or the colors, mosaic block, whatever it might be, to come around again to kind of dress up the back of the building. The only other thing that we would like to see or have as part of their development application is some type of CC&Rs or something that addresses that if the back of the building is a truck dock, if any of you have ever driven behind the back of truck docks, they are not sightly, typically, trash, cardboard, and whatever stacked on the back. We realize that there is code enforcement in place that can be -- you know, can help with that, but we'd like to see something more formalized between our -- between their development and our development, so that we have something a little bit more stringent for us as a mechanism to keep that looking as nice as possible. And those are the only comments that we have at this time. Thank you. Rohm: Thank you. Is there anybody else that would like to testify in this application? Strite: Mr. Chair, Members of the Commission, Billy Ray Strite, 1010 Allante, Boise, Idaho. First of all, thank you very much for taking the time here. As you probably know, we were the culprit that developed the original annexation plan and concept plan. I spoke to Mr. Kissler today and, obviously, he has concerns with moving ahead. We are presently working on his office retail section on the southerly five acres that he would retain after the sale. I'd like to make a point to Mr. Zaremba. And I think it was an excellent one. It kind of draws me back to Bridgetower and the way that they circulated their roads around the backside of the Bridgetower and it's exactly the same situation here. If we are able to pick up this southerly portion -- and, once again, I think only having seen this tonight, I think the dynamics have changed dramatically based on what you have approved tonight west of this site and east of this site. In my mind, if we could all get together here -- and it sounds like Mr. Zaremba is on track -- certainly I feel the same way and be able to take a connected road off of Eagle -- which, incidentally, Mr. Kissler believes is deeded and I'm trusting I can find that letter, because I know that Commissioner Borup was here at that time. Having said that, if we could continue that to the east, tie that into that road that's going to go north, I think it's case closed. What I think should happen tonight -- and I think the chairman has made it rather apparent -- that this be deferred. However, in doing so, can you defer this with a condition that perhaps we pursue a potential loop road, if you will, or whatever semantics you'd like to use and give us some direction in that respect, and, then, they, in turn, can sit down with the adjacent neighbors to the east and I think come up with a plan that would satisfy everybody. And that's alii have. Rohm: Any questions? Borup: Yes, Mr. Chairman. Mr. Strite? Strite: Yes, sir. Borup: I assume you're talking about this is the building you're working with? Meridian Planning & Zoning Commission Meeting February] 6, 2006 Page 69 of95 Strite: Mr. Chairman, Commissioner Borup, that is absolutely correct. That's a Kissler building. It's a five and a half acre site. Borup: Now, the road -- the proposed roadway, then, would parallel this line right here. Straddle it I mean. Straddle this line here and, then, out to Eagle, Are you looking at a new site design to accommodate that of some type? Strite: Mr. Chair, Commissioner Borup, yeah, I think that -- and that's the reasoning for the deferral. I think we might want to go back to the drawing board, reconsider the configuration of his building that would still allow that access. In the development agreement you probably will recall that the backage road system was designated either private and/or public. So, I'm not all that certain that the road that's going to be eastbound, if you will, that would connect to that connecting road, would necessarily have to be an ACHD approved right of way, at least as I remember the development agreement. If I would have been asked to show up here tonight at 5:00 o'clock tonight, I would have that development agreement with me, but I'm almost certain that the verbiage was private or public. Borup: I think that's probably correct. But now we have got that road kind of into three - - three properties, four if you count the ACHD. Strite: Well, I'm not certain that we are concerned so much with -- with the right of way, quite frankly, and I'm not all that certain we couldn't live with a public road there. I'm just suggesting that my recollection of that development agreement gave us the option to be either private or public. Borup: Yeah. That makes sense. Strite: And if you would just allow us that opportunity to really explore that, I'm sure that Tamara, as the representative with Mr. Kissler's, could come back, along with the neighbors to the east, with a plan that I think would be acceptable, Zaremba: Well, I certainly -- Mr. Chairman -- certainly would say that I think the ACHD proposed new collector on the east end satisfies the backage road requirement. Strite: Absolutely. Zaremba: I felt that that was an important requirement, but I think here we have a step up from that. We have a collector proposed, which would be on the back end of these collective properties, I just want to see a connection east and west. Strite: Mr. Chair, Commissioner Zaremba, I -- again, I think the total dynamics have changed from what we have seen tonight. I'm even including the west side, since we are able to align this with Bienville. Zaremba: Yes. Meridian Planning & Zoning Commission Meeting February 16,2006 Page 70 of95 Strite: And would ask that that be thrown on the table. Moe: Mr. Chairman? Rohm: Commissioner Moe. Moe: In regards to the Una Mas property and some of their concerns tonight when we discussed it, if we do continue this, are there materials that you will be bringing forward as far as what will be the screening and whatnot around the back side of the other buildings? Strite: Mr. Chairman, Commissioner Moe, that's not from me. I'm not involved in this project, only as representing Mr. Kissler. Moe: Okay. Strite: But I would suspect that Tamara would, absolutely. Rohm: What a guy. Moe: Thank you. Strite: Thank you. Mae: Mr. Chairman. Tamara, if you would, please. Newton-Huckabay: Is there anybody else? Moe: Pardon me? Newton-Huckabay: Is there any other public testimony? Rohm: Before we ask you to come forward, is there anybody else that would like to testify on this application? Okay. Mae: I knew I was right. Rohm: Okay. You're on. Moe: Again, same question as far as either materials or basically are there going to be any renderings or anything that -- to look at at all, other than what you propose tonight on the front side, I mean as far as type of materials and whatnot you're going to put on the back with the screen walls and whatnot in the truck dock areas? Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 71 of95 Thompson: Mr. Chairman, Mr. -- I'm sorry, Commissioner Mae, we haven't designed the buildings at this point, because the site plan is conceptual in nature. I could bring back something for you as far as what we think, you know, will happen on the buildings, but, typically, major tenants are block buildings with stucco and different types of brick and that kind of stuff and so on the back what I would propose is that it be a -- an integral color, split face block, that -- I don't know how high we would need to go. It depends on if it's recessed or not, but is it -- yeah, 12, 15 feet. Yeah. Probably an integral color, just because if they get tagged at all, you want to be able to sandblast them and not have to keep painting them and that kind of stuff. Moe: Well, you had made a comment earlier in your presentation that you were going to be doing something to the back side of those to take care of the office area -- Thompson: We definitely are. Moe: -- along with the landscaping changes for the larger trees and whatnot back there. I just want to make sure that, indeed, the office project would not be just looking at the back side of ordinary buildings and trash. Thompson: Yeah. That's our intent. But, you know, at this time we have not designed the buildings and -- but they probably will be some sort of block building with stucco and brick added. I did want to add I do have the development agreement and it does say private or -- it says a private -- public or private backage street is what it calls for. Moe: Again, you said that they are meeting tomorrow, so I would anticipate -- Thompson: No. They met today. And I tried to no end to get ahold of them, but they did tell me they thought that they would go into the evening hours and so I should know tomorrow. But I will get you the 2004 letter. Rohm: Thank you. Zaremba: Mr. Chairman, I would comment to Ms. Thompson, if I may. The drawing or sketch or -- not really true elevations, but the front of the big boxes, I very much liked the village look to it is what I would probably call it, where it's not all the same thing all across. I thought that was great. I probably would suggest, if it were to work out, that what's displayed up there is not your newest one, I don't think, but -- Thompson: No, it's not. Zaremba: But you did have -- let's say these five are probably fairly similar. Thompson: He's going to cue it up. Zaremba: What I would suggest -- are you changing it? Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 72 of95 Thompson: Yeah. He's going to get that up there for us. Zaremba: Back one. There. That perhaps another 20 feet be added, so that -- you would lose a few parking spaces, so that this roadway is not absolutely straight, it comes out a little bit, goes back a little bit, but that this center space sticks out like another 20 feet. I mean in some of -- Thompson: And add more hardscape out there? Is that what you're looking at? Zaremba: Well, just make the building a few square feet bigger. Borup: Or the plaza effect like you were showing -- Thompson: Yes. Borup: -- would do the same thing. Thompson: Yeah. That's what I was thinking, that you add more sidewalk-- Zaremba: Oh, yeah, more sidewalk with tables and stuff. Thompson: -- so you can have more plaza area. Okay. Zaremba: Just something so that it's not -- I think the fear of the strip mall is that it -- from one end it looks like it's straight across and I would just show some variation to that. Guenther: Chairman Zaremba, like I say, most of the site design considerations in the staff report are reflective of the old design. What I was anticipating incorporating into this one would be more -- of a future staff report would be more of the design criteria of the buildings that you haven't seen yet, which would be mostly reflective of the same thing as you saw off the Kohl's site development. So, you will most likely see more of those conditions in a future staff report from staff. So, I think maybe this discussion would be a little more premature and best saved for the next time we hear the application. Zaremba: That's fine with me. We are just trying to focus on what needs to change between now and then. Guenther: And I think that mostly we are looking at the site instead of building design at this time. Zaremba: Okay. Newton-Huckabay: Wouldn't it -- can I just make one comment that if there was less parking spaces against the street. I think that's visually unappealing to me is if you have Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 73 of95 a pad with a bunch of parking places and that kind of what -- I think that's what I think the parking could be more internal to the project. Zaremba: Let me visualize on that same subject. The northern boundary of Crossroads Center, I think it is -- in other words, the Fairview side, as I drive along there I'm not aware of as much parking as there really is against Fairview, because I think there is a pretty good line of screening shrubbery. I'm more aware of it as I drive north on Eagle, that there isn't as much screening. And I am aware of the parking that's there, But I suspect that along Fairview there is the same amount of parking, but it's screened somehow in a different manner. Either that or I'm just forgetting what I see, but -- Thompson: Well, along Eagle on the Crossroads, they have used their 35 feet as a big detention-retention area. Zaremba: Oh, yeah. Thompson: You know, so -- and we are not -- we are not proposing that. We are proposing underground kind of French drain type thing. So, we are not going to have areas -- you know, so we can actually have landscaping in that area instead. I think what you're seeing is they just -- they do have kind of a blank area where they just kind of have a swale in there without -- without a lot of landscaping in there. Ours shouldn't look like that. Zaremba: Yeah. That's-- Thompson: Especially when you have a big 35-foot landscape area. Borup: Mr. Chairman? Rohm: Commissioner Borup. Borup: I did have one design comment. I think it's been addressed a little bit, but that's, again, Eagle Road, to get -- I think to get aways -- the parking lot and the percentage that staff was talking about in the report, I'd like to see another building along there. Perhaps make these buildings not as deep and a little bit wider, just spread them out this way and maybe get another building in there and I think that would -- that would serve a lot of the purpose, I think, with -- I assume that's what Joe was talking about, to get -- Guenther: That is correct. If not, some sort of a corner L-shaped building in here in the intersection that would be possibly multi-tenant or something along that line. Something that could provide an intersection type of screening to the commercial development. Borup: I mean -- and they have done -- they have accomplished that up here -- Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 74 of95 Guenther: And as I said, this site plan I didn't have until 4:00 o'clock today, so -- Borup: Right. Yeah. But the same idea down along here. Guenther: At this point -- Borup: So, that would be my recommendation for the new design. Guenther: It might be at this level to continue it at this time and give me a shot at that. Borup: Well, hopefully, it will be in the design for you to look at. Guenther: Yeah. Rohm: Before we take a motion to continue this, I'd like to go down the row and have each Commissioner, if there is anything specific that you would like to have the applicant and staff consider, this is your opportunity for -- to bring up your points of interest. Commissioner Zaremba. Zaremba: Mr. Chairman, I may have failed to mention this before, but I certainly would like to see a roadway connection along the -- Rohm: Thank you. I appreciate your comments. Commissioner Borup. Borup: I think everything has been stated that I was concerned about. Rohm: Okay. Commissioner Newton-Huckabay. Newton-Huckabay: I have nothing more to say on this application at this time. Rohm: Commissioner Moe. Moe: Well, let's see -- no, I have nothing more to add. Rohm: Okay. Borup: Other than is there any input from the applicant on how much time they would need on a redesign? Guenther: Mr. Chairman, I would also like to take an opportunity to present this Commission's concerns to ITO and ACHO in order to -- because they -- ACHD still has not made a comment on this application, which I have only gotten brief staff comments. If I can bring this recommendation that Chairman Zaremba has as a Commission recommendation, I will present that to the ACHO and ITO staff that I have been in contact with and get their comments for you specifically related to that item. Meridian Planning & Zoning Commission Meeting February] 6, 2006 Page 75 of 95 Borup: I think if you could present the engineer study -- or the traffic engineering study that was presented, that would help in making that presentation I would think. Rohm: Okay. All right. Zaremba: Mr. Chairman, if it would be appropriate to make a motion within the discussion of this, I would move that we direct staff to move ahead with presenting our concerns to ACHD and ITD if necessary. Rohm: Yeah. I think that's appropriate. Zaremba: That was a motion. Borup: Second. Newton-Huckabay: Second. Rohm: Okay. Moe: We haven't set a date for a hearing or anything. Borup: No. He's doing a different motion. Moe: Oh, we are going to do that. Rohm: It's been moved and seconded that we direct staff to work with ITD and ACHD on the interconnectivity -- Zaremba: Traffic and interconnectivity concerns. Rohm: -- concerns and -- Zaremba: And the need for a bypass for this intersection on all four corners. Rohm: With our desires to see that interconnectivity. All those in favor say aye. Oppose same sign? Motion carried. MOTION CARRIED: ALL AYES. Guenther: Mr. Chair, you might also ask that we forward that recommendation for consideration to the City Council, since they are the deciding body. And we will have the director present, along with ITD and ACHD recommendations. Borup: That's what he meant. He was intending that. Zaremba: That's included in the motion. Meridian Planning & Zoning Commission Meeting February 16, 2006 Page 76 of95 Newton-Huckabay: Second. Rohm: Okay. Zaremba: So, are we ready to continue this one? Rohm: Yeah, I think -- Zaremba: I think the interests are known. Rohm: I think that the date that the staff would like to see this continued to would be the March 16th date. So, if someone would like to make a motion to that effect. Just first that -- do you think that you can work with staff and get a -- Thompson: I can get things turned around fairly quickly. That's much more time than I need, but I don't know what staff needs. Rohm: I think that -- Borup: They need ten days. Guenther: We are looking at -- from March I'm looking at least another seven projects and I had six tonight and one continued, so if you want a sane staff member, you should probably at least give me a month. Rohm: Okay. Zaremba: Well -- and you would need to have it ten days before the next hearing, because if it's that far revised it needs to go out for comment again from the other agencies. Guenther: That is correct. Rohm: I'd entertain a motion. Zaremba: Mr. Chairman, I move we continue the Public Hearing on PP 06-002 related to Gateway Marketplace, to our regularly scheduled meeting of March 16th, 2006. Moe: Second. Rohm: It's been moved and seconded that we continue the Public Hearing on PP 06- 002 for the regularly scheduled meeting of March 16th, 2006. All those in favor say aye. Opposed same sign? Motion carries. MOTION CARRIED: ALL AYES. CITY OF MERIDIAN PUBLIC HEARING SIGN-UP SHEET DATE March 16,2006 ITEM # 6 PROJECT NUMBER PP 06-002 PROJECT NAME Gateway Marketplace Subdivision NAME (PLEASE PRINT) FOR AGAINST NEUTRAL - , ~ Page 1 of 1 file:1 IS: \P%20& %20Z\Barb \Maps\ V icinity%20Maps\Gateway%20rnarketplacejpg --- 1/20/2006 I"!p.ression antibou.r.ra~ et à séchage rapide 1!Jt'mM!z Ie gaba.rit 516pge 1 of 1 BOTTLES MARK K & BOTTLES GERI C 5418 NEAGLE RD STE 180 BOISE, ID X3713-0000 GILBERT CARL 0 & GILBERT M PATRICIA 3475 E USTlCK RD MERIDIAN, ID 83642-0000 JAMES A KISSLER LLC 1125 W AMITYRD BOISE, ID 83705-5494 SARAY CO 1500 ELDORADO ST STE 4 BOISE, ID 83704-8565 USTlCK MARKETPLACE LLC 1260 J W EXPLORER DR STE 200 BOISE, ID 83713-0000 @O9~5 @AHaAV \!l\ - www.avery,com 1-800-GO-AVERY - BRYSON BARTL 2600 NEAGLE RD MERIDIAN, ID 83642-0000 INTERMOUNTAIN GAS COMPANY PO BOX 7608 BOISE, ID 83707-1608 MOORE WINSTON H PO BOX 8204 BOISE, ID 83707.2204 SCHEERER ADAM 3154 E LESLIE DR MERIDIAN, ID 83642-0000 WILLIAMS WALTER C & ROBERTAJ 3104 LESLIE DR MERIDIAN, ID 83642-5714 AH3A'd-O9-00S-1. WO).AleAe'MMM ;;;;; GúAt~Vl~ L/ ~ AVERV@ 5160@ EAGY GREGORY L & EAGY CHANDRA.T 13000 W VENTANADR BOISE, TD 83713-0000 JAMES A KISSLER LLC 1591 E SENDERO DR BOISE, TD 83712-0000 SADIE CIŒEK LLC 2076 SEAGLE RD MERIDIAN, ID 83642-0000 SLAGEL EDWARD 2700 NEAGLE RD MERIDIAN, ID 83642-0000 9v\f' O/D~ I/O 11 ì 1"4 @O9~S UVldWU @AAaA'd esn fiU!: 'U!.!d ee.!:! e6pnws pue wer CITY OF MERIDIAN NOTICE OF HEARING NOTICE IS HEREBY GIVEN pursuant to the Ordinances of the City of Meridian and the Laws of the State of Idaho, that the Meridian Planning and Zoning Commission of the City of Meridian will hold a public hearing at the Meridian City Hall, 33 East Idaho Avenue, Meridian, Idaho, at the hour of 7:00 p.m. on Thursday, February 16, 2006, for the purpose of reviewing and considering the application PP 06-002 of Landmark Development for Preliminary Plat approval for 23 commercial lots on 22.85 acres in a C-G zone for Gateway Marketplace Subdivision generally located on the southeast comer of Ustick Road and Eagle Road. A more particular description of the above property is on file in the Planning Department, 660 E. Watertower Lane Suite 202, and is available for inspection during regular business hours, Monday through Friday, from 8:00 a.m. to 5:00 p.m. You may contact the Planning Department at (208) 884-5533 during regular business hours. A copy of the application is available to review upon request. Any and all interested persons shall be heard at said public hearing, and the public is welcome and invited to submit testimony. Oral testimony may be limited to three (3) minutes per person. Written materials should be submitted to the Planning Department no later than seven (7) days prior to the above hearing date so that all interested parties may examine them prior to the hearing. All materials presented at public meetings shall become property of the City of Meridian. Anyone desiring accommodation for disabilities related to documents and/or hearings, please contact the City Clerk's Office at (208) 8884433 at least 72 hours prior to the public meeting. The Ada County Highway District may also conduct public meetings regarding this application. If you have questions about the traffic that this development may generate or the impact of that traffic on streets in the area, please contact the Ada County Highway District at \ \ ",II I ""'" \\\\ ' "i¡, (208) 387-6170. "",~~ Of ~:'¿;¡!:~>'" ~ ð, """""'Þ \"'1t' -':;.- $" '.tcnn.-, "",}.t-, ,,' -:::. .. <::() \, -' ~ \ ~ ~ \ ~ ~, DATED 10th of January, 2006 CITY OF MERIDIAN PUBLIC HEARING SIGN-UP SHEET DATE February 16, 2006 ITEM # 15 PROJECT NUMBER PP 06-002 PROJECT NAME Gateway Marketplace Subdivision NAME (PLEASE PRINT) FOR AGAINST NEUTRAL \o~ ß.. ~ ê) çJ+. ,-' ". , ,- , RE'CEIVED- FEE: "~Dn~ . , " C' . , . ": ""',,u," "~'I,te "":,,P,la, n, : CC;f;Y of Meridian . lty Clerk Office "" ---'-~~:""""',:. .' ." ..." .' ....." . .. ' ., ." .' .. , ". :,.I's.: :ml':': Rev Ise\.J """"Iteranl . J::\.:~¿" ) i -~".._.._----,--,.,_/ "- "..-".d ." ~r , ~ ""jIIIIOI". I ,I O""/~"'OO.' I : '[:" '______lULllJJILQ IJ_llllllilli'lIIIIII.lI:\ ::..><, '~:;~ ','C m~ I 1:/1 I I 1--i--~--(fiJ O'fllWnmrmmmu .,,)' ,<~?~<' }Ÿì., ~~"/ !ï! I , ' ~" I t:ru.wllJ1LLCi [mttttttt{}ttH-mHH.~ ,.~,,<~. dmTíTt" _I /~rl ,,~t '~"~, [II ~(~I~~~ ~,~ (í------=---~ ' ~ ~" < ¡ . I ;., i . ~-":_::,::: = LrrmTTTTTU1Tímmnili I ~ ¡ /// , . I I I ~ '1/ ' :i' "n~~ ~. .,,' ¡ I:,:! Ù1tt~~I~ii::::::~ '1-]------- ~i? f~ I ¡ I II~ lHttttH'HI'~ IJTITTTTTmJ III îTï1Tllll L I . / / : \ I ' ~" " _to-H!t11H - , ~ J 'I,:¡: I~-J~ i_~~~i7 :) I I W ~fH1!Htj{}jH¡ttitIIH~ I -~ I I. I ~~~---,. (lllillilliml'i""""Q ~ì :/: ~-I~~llffiT;~mITm' ~ --____I_I.:L_-__-~-" .I~~,~~: L~ L~"____~') , ¡ ,1~ f .JTTITrmm-:j ( ----1+111: i ì I"JlnTlTlHUïTm_/ l- - , I '! : ~ i1!-LI-~JiHf{\ \J~!~ [Lillil I.ul /lW~~OJJL!JWI (1 .1:, IE"-III,jn---:j';-~I---il" I ,Iii 'I I i ~ ----~ ì utH,+rI-. Jttttttttt{J I: II ..'/ ;, I }=fl ~~~~It+:l: ~~:.:_~, ' ~ , I J'" . I fJ =I~I-- lJìTTTl.IUllllllilli -,I ) ,'" . . : ~ ? II ~E ITf!lliWUlHLllLlfi ::= J . ;'1; /," I + 1_- (__n_------) lffi[JTTffiJTTTTTTTTllJ \ I .cc.- I / I ¡ ...-...-- "~JI!!TTTTTTTTL/ , , =====".=======þ-=---::::ll1J1Wlj-(LWlWl ~~ I ~ I~ i ~-::'-=::;.;-:=--:=n::::::::~:J + ' ~ ,..,.,., ...",-- . ., , . ., ... . . ,.. .. """... : : n': ' ::' I: , ' Arc-- it ect LJ na ... ...Vis i an , , -,.. ",.", .i PARCEL ANN[XAT/~N LSKETC'I I .I'~ -~! & IRU I: ' A t A- '" II .~.- ¥" '*' Rool~ " ' _"M' u..t ~ fa -- , ' -- "" ""...." ~"."""iõJ'""' ""=, --" --- ,,' , ,," ", 't I ÇLQ '-~" -", ,- 'I '~otAPart I IlL II ,,' m..J --- .1.- I , :: "~" CA J ~'.. ~: "'~..~ ~ ì"'" -__~ll ~I:' . I ci.A ~---"" ---" I ( ...- r..... III,' , '--;'1 :c...ï-- .." , .' [I I I' l' ~... - (:A -- ~-::::.-;: J .. r.... ,I it IRUt ~"~" ,," I .' :( III II, ~~ ,," CA I It ¡. : :~:!" ' ". .._~-~, ~ ~: ¡~ :::~1 ".~I, ,001'- "',, ----- I I c ~::rll': : I II "II """"," ,II ;"""".'-", "". "--"111 : ~Il - I~~~,-___:~-.... ----~--- "_.~~t' ."" . II~' ": ". I ..--- ",,'---'-"-,,---', ,l I I ' ",,- ",,-' , ,,"',,- I 1_....1 L.8i5nc); - CA , -c eo. , ~~ ¡ : a~lu.- a "I II ÇIIð~..j 1Cfh_... i ,~' 'I WLHI 1)O~,IMw, Ø~,*I-1 ,,-:t I ~~~I"\ , ""II"" ==;;";""...===--' TAI_Trøl\lø.iIll.iMI,u"do(¡lIpolIOc=ft:t/ll'illl1 1 - -I -~-" m_- w..__.",-~'- " ~'~......... --~,-'!"' . -'--- , , 8.J10 Appt~ Aœ-' ".~ , ~CN!W"';"'~.I ~" CONCII"TU!iRIII...-..- ' - "I .N!ttIi , ' - ~ ~~=-- . RoL' UNa. .,.. ..... ~-_.... "'.LIIØ I.Ø"" , "'...-d ...".......-~e~'IIOINAt.IJIIII,...~ "~~"'~""'¡:',,WJ:'P~ .' ,,' -- ' d,,_,," : !2004DACencejptPlan "-.r--c--.-._-."-""""'_-'-"'-'--" " " ,,': - ,,' "" , , , ,,-" , '" , "" , , , , , , ' , , "" , " , ' '" , , -" , ' : ' -", ".-"- -.-'-" -,,-._-,,_u- " --" i i i ~ : .:, '... " , ,., '., , ,.. '. ".'iTraffic ..' apPirovEe ct. .'and . P ro-pose-d - - : _: . - : --------:---;--:----- -. .---- --------"--""""",, """"""",-",--,,--"--- i i - I I I i I I I I r.::.. / '" ",- - " ---------------------"-"'--' " "-"--------------------------"-,-,-"",,,,,,, - .""""""",,--,,--------------------------- ~t Ace;; otrendl~n'ti~ "\ TRANSMITTALS TO AGENCIES FOR COMMENTS ON IO'\ -IO ,,:. DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN tC;'",""T,,""~~EP~~omments and recommendations will be considered by M ;{ì3 if,~~rl 7t and Zoning Commission please submit your AYOR Tammy de Weerd JAN 1 f!'1me n recommendtions to the City of Meridian C 1'Þ'1~ i[JDS CITY COUNCIL MEMBERS W.:4,r:ttrf: ~fiR~artment, by: February 9,2006 Keith Bird ~~:R~ 10, 2006 File No.: PP 06-002 Joseph w. Borton Hearing Dafe~1l ~ 16 2006 Charles M. Rountree ' Shaun Wardle Request: Public Heari 9 - Preliminary Plat approval for 23 commercial lots on 22.85 acres in a C-G zone for Gateway Marketplace Subdivision -. ,: CITY DEPARTMENTS City Attorney/HR 703 Main Street 898-5506 (Cily Attorney) 898-5503 (HR) Fax 884-8723 By: landmark Development Location of Property or Project: southeast corner of Ustick Road and Eagle Road Fire 540 E. Franklin Road 888-1234/ fax 895-0390 Parks & Recreation 11 W. Bower Street 888-3579/ fax 898-5501 - David Zaremba (no FP) - David Moe (no FP) - Wendy Newton-Huckabay (No FP) - Michael Rohm (No FP) - Keith Borup (No FP) - Tammy de Weerd, Mayor - Charlie Rountree, CIC - Christine Donnell, CIC - Keith Bird, CIC Shaun Wardle, CIC - ~ater Department V"Sewer Department = Sanitary Services(No VAR, VAG, FP) - Building Department - Fire Department - Police Department City Attorney = City Engineer - City Planner - Parks Department Planning 660 E. Watertower Lane Suite 202 884-5533 / fax 888-6844 Police 1401 E. Watertower Lane 888-6678 / fax 846-7366 Public Works 660 E. Watertower Lane Suite 200 898-5500 / fax 895-9551 Building 660 E. Walertower Lane Suite 150 887-2211 / fax 887-1297 - Wastewater 3401 N. Ten Mile Road 888-2Í91 / fax 884-0744 Your Concise Remarks: - Waler 2235 N.W. 8th Street 888-5242/ fax 884-1159 Meridian School District (No FP) Meridian Post Office(FPIPP only) - Ada County Highway District - Ada County Development Services Central District Health - Nampa Meridian Irrig. District Settlers Irrig. District == Idaho Power CO. (FP,PP,CUP) - Qwest (FP/PP only) Intermountain Gas (FPIPP only) - Bureau of Reclamation (FPIPP only) == Idaho Transportation Dept. (No Fp) - Ada County Ass. Land Records Meridian Development Corp. - Historical Preservation Comm. JAN 1 9 2006 CI1ì' HALL 33 EAST IDAHO AVENUE MERIDIAN, IDAHO 83642 (208) 8,Cj.._~~QfeMrkenO.diffi.ane CITY CLERK - FAX 888.4218 FINANCE & UTILITY BILLING - FAX 887-4813 MAYOR'S OFFICE - FAX 884~,e~ c Printed on recycled paper PP 06-002 MERIDIAN PLANNING & ZONING MEETING APPLICANT landmark Development February 16, 2006 ITEM NO. 15 REQUEST Preliminary Plat approval for 23 commercial lots on 22.85 acres in a C-G zone for Gateway Marketplace Subdivision - southeast corner of Ustick Road and Eagle Road AGENCY COMMENTS CITY CLERK: CITY ENGINEER: CITY PLANNING DIRECTOR: CITY SEWER DEPT: CITY PARKS DEPT: No Comment ( \J (\\\ Î\ \I V \\~ '¥) y\ 'J fJ\1, l,\1Ù CITY ATTORNEY CITY POLICE DEPT: CITY FIRE DEPT: CITY BUILDING DEPT: CITY WATER DEPT: MERIDIAN SCHOOL DISTRICT: SANITARY SERVICES: ADA COUNTY HIGHWAY DISTRICT: See attached Draft ACHD Report See attached Comments CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: SETTLERS'IRRIGATION: See attached Comments IDAHO POWER: INTERMOUNTAIN GAS: OTH ER: contacte~ OV fA1J; 0 ~ Dotel-( {/ -{) (~ Emailed: Staff Initials: Phone: 3 'I~ -If $Jl¡ u{fv Materials presented at public meetings shall become property of the City of Meridian. Right-of~ Way & Development Department Planning Review Division RECEIVEIf-- ~~"" -------- FER ( 9 2006 ~ CITY OF MERIDIAN CITY GLE-RK ClcÄ-LÇ.~-,,-,,---,,"----__--_---=~ffiIn~tte~_~ ---- u_---------"- ProjectlFile: -"""" ---.-. .,-,--_._, """'----"""""'-'------'-""'-.-----"" ----" "'--""" '-'----" ".---." .._------, - -----"'-"_._--"""",_._-"", Gateway Marketplace-MPP-O6-002 Lead Agency: Site address: Staff Level Approval: Applicant: Owner: Staff Contact: Tech Review: City of Meridian [ID m & [p U Southeast corner of Ustick Road & SH-55 x Landmark Development Group LLC 1882 Toluka Way Boise, 10 83712 James A. Kissler 1125 W. Amity Road Boise, 10 83705 Christy Richardson Phone: 387 ~6178 E-mail: crichardson@achd.ada.id.us February 3, 2006 Application Information: Acreage: 22.85-acres Current Zoning: C-G Proposal: 23 commercial lot subdivision A. Findings of Fact Existing Conditions 1. Site Information: The site is currently vacant. 2. Description of Adjacent Surrounding Area: Direction North South East West 1 Zonin C-G C~G RUT C-G recess to C-G 2. 2 Development Impacts 3. Trip Generation: This development is estimated to generate x additional vehicle trips per day (0 existing) based on the submitted traffic impact study. 4. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 5. Traffic Impact Study: summary is noted below. A traffic impact study was required with this application and the 6. ted R d Roadway Frontage Functional Traffic Count Speed Classification Limit Ustick Road None Minor Arterial 10,833 on 8-5-3 w/o 40 MPH Eagle Road Eagle Road Principal 41,939 on 1-6-05 n/o 995' Arterial/State 50 MPH (SH-55) Highway Fairview Avenue *Acceptable level of service for a two lane collector roadway is "0" (9,500 VTD). 7. Other Development in Area/Miscellaneous . ACHD reviewed this site as part of a rezone and annexation application, MAZ03~0018. . ACHD has reviewed and approved MCUP05-0048, the application for the Kohl's Department Store at the northwest corner of Ustick Road and SH-55. . ACHD has received an application for Bienville Square at the southwest corner of Ustick Road and SH-55, a mixed-use development. That application is on hold while the applicant revises the site plan. 8. Findings for Consideration 1. Ustick Road Ustick Road, from Leslie Drive to Ally Street, including the Eagle Road intersection, has just been widened and improved to 5-lanes. Sidewalks were not constructed with the roadway improvement project, but are required to be constructed as development occurs on the undeveloped properties. The intersection was widened to include dual left turning lanes. This project was a public/private partnership that involved other land owners and developers in the area. The applicant should be required to construct a 5-foot wide detached concrete sidewalk on Ustick Road. Provide a sidewalk easement for sidewalk located outside of the right-ot-way. Ustick Road Driveways Offset Policy: . District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 40 to align or offset a minimum of 185~feet from any existing or proposed driveway. . District policy requires driveways to be located a minimum of 440-teet from signalized intersections for full access, and 220~feet trom signalized intersections for restricted right-in/right- out access. 2. 3. 3 Width Policy: District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 35-feet. Most commercial driveways will be constructed as curb-cut type facilities if located on local streets. Curb return type driveways with 15-foot radii will be required for driveways accessing collector and arterial roadways. Paving Policy: Graveled driveways abutting public streets create maintenance problems due to grave/ being tracked onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be required to pave the driveway its full width and at least 3D-feet into the site beyond the edge of pavement of the roadway. Applicant Proposal . The applicant is proposing to construct a right~in/right-out driveway on Ustick Road located approximately 350-feet east of SH-55. There is a median in the center of the roadway to restrict the access. . The applicant is proposing to construct a full access driveway on Ustick Road located approximately 700-feet east of SH-55. Staff CommenURecommendation . The driveways should be approved as proposed, in accordance with District policy. 3. Cross Access The applicant is not proposing to provide any cross access to the parcel to the east. That parcel is currently under consideration for annexation and rezone to the City of Meridian, and has only 330- feet of frontage (Una Mas parcel). Further to the east is a 5-acre parcel owned by ACHD and also currently under consideration for annexation and rezone to the City of Meridian. ACHD acquired that property with the intent that a north-south roadway would be constructed in the future at the signalized intersection with Ally Way. In December 2005, the ACHD Commission approved the designation of that roadway as a collector from Ustick Road to Fairview Avenue, along with an east~ west mid-mile collector to connect to SH-55. (See map.) This site could have access to a signalized roadway (Ally Way) if sufficient cross access is provided between property owners. Cross access should also be considered to the parcel to the south. 4. Eagle Road Right-at-Way, Improvements and Access The City of Meridian, applicant and ITD should work together to determine if additional right-of-way or improvements are necessary on Eagle Road (SH-55). Access points should be approved in accordance with the Eagle Road Corridor Study. C. Site Specific Conditions Of A~roval 1. Re-construct the northern driveway, on the adjacent flag lot, as a curb return driveway with minimum 15-foot curb radii. This driveway shall be no wider than 30-feet. Construct one new curb return driveway with minimum 15~foot curb radii located approximately 120- feet north of the south property line as proposed on the revised site plan. This driveway shall be no wider than 30~feet. Close the existing curb cut driveway located approximately 96-feet south of the north property line with curb, gutter, and sidewalk to match existing improvements. 13. 4 4. Comply with all Standard Conditions of Approval. D. Standard Conditions of A¡mroval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACHD roadway or right~of-way. 3. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. Comply with the District's Tree Planter Width Interim Policy. 6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 9. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 10. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Road Impact Fee Ordinance. 11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of~way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 12. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Appeal Guidelines or Request for Reconsideration Guidelines 4. Development Process Checklist 5 9 Request for Reconsideration of Commission Action 1. Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD staff or any other person objecting to any final action taken by the Commission may request reconsideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. 8. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 3:00 p.m. on the day prior to the Commission's next scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be placed on the agenda for that next scheduled regular Commission meeting. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d. If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originally. It will normally be returned to ACHD staff for further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e. At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACHD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commission deems advisable. f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission. Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. 7 b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, Wllich must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply, and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. I Development Process Checkl ist II [8JSubmit a development application to a City or to the County [8JThe City or the County will transmit the development application to ACHD C2,'JThe ACHD Planning Review Division will receive the development application to review C2,'JThe Planning Review Division will do one of the following: OSend a "No Review" letter to the applicant stating that there are no site specific requirements at this time. 8 DSend a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ØWrite a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. DWrite a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. DThe Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. DFor ALL development applications, including those receiving a "No Review" or "Comply With" letter: . The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) . The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches. street improvements and utility cuts. DPay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) 0 Driveway or Property Approach(s) . Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. 0 Working in the ACHD Right-ot-Way . Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction - Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) 0 Sediment & Erosion Submittal . At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage Division. 0 Idaho Power Company . Vie Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. 0 Final Approval from Development Services ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con. 9 -~~~ ~ Gee g~~TTR~~ CENTRAL DISTRICT HEALTH DEPARTMENT ~HEALTH Environmental Health Division DEPARTMENT Rezone # - Conditional Use # Preliminary / Final/Short Plat G~f-e,wo..1- '",1, pp O~ - OOJ..- VVI~yk(;.J-f lAc- ~ 5"""b t6lo1';S:; 0 '^ , . ¡,'-, c ~ i:,\.il.ï\J Return to: 0 Boise 0 Eagle 0 Garden City .3:Meridian 0 Kuna OACZ 0 Star " ::', 0 1. We have No Objections to this Proposal. 0 2. We recommend Denial of this Proposal. 0.3.. - ~pec.ifiQ knowledge as to !he ex~ct type of use must be provicjed before we can comment on this Proposal. 0 4. We will require more data concerning soil conditions on this Proposal before we can comment. 0 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: 0 high seasonal ground water 0 waste flow characteristics 0 or bedrock from original grade 0 other 0 6. This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or surface waters. 0 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. de. After written approval from appropriate entities are submitted, we can approve this proposal for: H central sewage 0 community sewage system 0 community water well 0 interim sewage ~entral water 0 individual sewage 0 individual water ~ The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare, Division of Environmental Quality: J8::Central sewage 0 community sewage system 0 community water 0 sewage dry lines ~ntral water J8f1 O. Run-off is not to create a mosquito breeding problem. 0 11. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. 0 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ~3. We will r~e plans be submitted for a plan review for any: ...esL food establishment 0 swimming pools or spas 0 beverage establishment 0 grocery store 0 child care center 0 14. Please see attached stormwater management recommendations 015. Reviewed By: -. :2D O, / 15726.001 EHO904 Review Sheet ~ & ~ 1~ 'Dé4t/Ua 1503 FIRST STREET SOUTH NAMPA, IDAHO 836-5; -4395 ,,- FAX # 208.463-0092 ,'-" "'--. Phones: Area Code 208 OFFICE: Nompo 466-7861 SHOP: Nampa 466-0663 ,. .. 1 February 2006 Planning Department City of Meridian - - 660E. ~aJ:~rtower l-:!ne Suite202 -" Meridian, ill 83642 -- - - - -- --- ----- ---- -- -- - -- - - --- - - -- - --. -- - - --- -,,- -- - --- - RE: PP 06-002/Gateway Marketplace Subdivision Dear Anna: Nampa & Meridian Irrigation District requires that a Land Use Change Application be filed, for review, prior to final platting. Please contact Donna Moore at 466-7861 for further information. All laterals and waste ways must be protected. The District's Milks Lateral courses through the southern portion of this proposed project. This easement must be protected and any encroachment without a signed License Agreement and approved plan, before any construction is started, is unacceptable. All municipal surface drainage must be retained on site. If any municipal surface drainage leaves the site, the Nampa & Meridian lITigation District must review drainage plans. The developer must comply with Idaho Code 31-3805. It is recommended that irrigation water be made available to all developments within the Nampa & Meridian lITigation District. ALL WORK WITIDN NAMP A & MERIDIAN IRRIGATION DISTRICT FACILITIES MUST BFCOMPLETEO BY MARCH 1~, 2006. Sincerely, 13t/!J¡J~ Bill Henson, Asst. Water Superintendent Nampa & Meridian Irrigation District BH/dbg C: Crew Foreman File - Office/Shop APPROXIMATE IRRIGABlE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS. 40,000 ~ & ~ ~~~Ue 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 2 February 2006 phones: Area Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 Tamara Thompson Landmark Development Group, LLC 1882 Toluka Way Boise, ID 83712 -- -- _n______-- -- ------------,----_..--,----~-~--..-'---'-"-------- --- -..- -------------,,- -- _n .. RE: Land Use Change Application - Gatewav MarketDlace Subdivision Please note the District now reQuires three (3) sets of Dlans Dear Ms. Thompson: Enclosed please find a Land Use Change Application for your use to file with the Irrigation District for its review on the above-referenced development. If this development is under a "rush" to be finalized, I would recommend that you submit a cashier's check, money order or cash as payment of the fees in order to speed the process up. If you submit a company or personal check, it must clear the bank before processing the application. Should this development be planning a pressure urban irrigation system that will be owned, operated and maintained by the Irrigation District, I strongly urge you to coordinate with John P. Anderson, Water Superintendent for the Irrigation District, concerning the installation of the pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate the process of contractual agreements between the owner or developer and the Irrigation District for the ownership, operation and maintenance of the pressure urban irrigation system. If you have any questions concerning this matter, please feel free to call on me at the District's office, or John P. Anderson, at the District's shop. Sincerely, Dictated by Ms. Moore and mailed without signature In her absence to avoid delay Donna N. Moore, Asst. SecretarylTreasurer NAMPA & MERIDIAN IRRIGATION DISTRICT DNM/smc cc: File Water Superintendent Meridian City Planning Department James A. Kissler, 1125 W. Amity Road, Boise, ID 83705 enc. APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS. 23,000 BOISEPROJEG RIGHTS. 40,000 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE Of 2/16/2006 STAF}' REPORT Planning & Zoning Commission Hearing Date: February 16, 2006 cM'eri d i 1A \ IlJ.\HO f~ .~ )? \~["~'1:-1" f~~"t~_\/"-!!!--'::': TO: FROM: SUBJECT: P&Z Commission Joseph Guenther, Associate Planner Gateway Marketplace PP-06-002 -.. Preliminary plat for 23 lots on 22.85 acres for Gateway Marketplace by Landmark Development Group, LLC. 1. SUMMARY DESCRIPTION OF APPLICANT'S REQUEST The applicant, Landmark Development Group, LLC, is requesting approval of a Preliminary Plat with a Variance to Chapter 3 Article H of UDC to construct up to 250,000 square feet of retail and restaurant uses on approximately 22.85 acres within the Gateway Marketplace development at the Southeast comer of Us tick Road and Eagle Road/SH-55. This is the second application and would be the second commercial project constructed within the Kissler aImexation project AZ-03-0 18. The 36.33-acre site was approved for annexation with a Development Agreement (DA) in April 2004 under the name Kissler Annexation (see File No. AZ-03-018). The DA (Instrument No. 104107406) requires that any future use be consistent with the approved plans for the annexation. A concept plan for the overall site was submitted with the preliminary plat application showing building layouts and drive aisles. The Commission should note that a variance application, submitted concurrently with this preliminary plat application will be before the City Council at a date to be detennined, the variance request proposes two new approach to N. Eagle Road/State Highway 55, one for right-inlright-out access driveway and one planned for a full access point. The Idaho Transportation Department (ITD) has not approved any approach pennits on this site and has made comment that this site does not qualify for access by standard district policy. The overall design ofthe site is paramount on the approval ofthe Eagle Road approaches. If the City Council denies the approaches, Stafffeels the design of the plat does not adequately provide a frontage connection from U stick Road, the future collector road west of the site, or south to the future signalized intersection with River Valley Drive. The Development Agreement for the 22.85 acres does sufficiently address the interconnectivity of the site as a public street access to Ustick Road and two approved approaches have been provided for by ACHD as well as a frontage road was required for tIns site by the Development Agreement. 2. SUMMARY RECOMMENDATION Staff is recommending continuance of the subject application (PP-06~002). Staff is recommending that the Commission require the applicant to re-submit an amended plat which: 1) provides more articulation to the building design and does not constitute a strip development, 2) provides a frontagelbackage road east/west and connects with a private or limited access commercial street to Ustick, and 3) provides a better design for cross access to the parcels east and south ofthe site. The ACHD staff report suPports the requirements of cross access to adjacent parcels and compliance with the Eagle Road Corridor Study. PROPOSED MOTIONS (to be considered after the public hearing) Recommend Denial I move to recommend denial of File Number PP-06-002 for the following reasons: (you should state specific reasons for denial. You should address how the applicant might re-do the application to gain your recommendation for approval.) Gateway Marketplace Subdivision PP-O6-002 RE C E I'VE.D rEB -1 3 2006 CITY OF MERIDIAN pagel (~ITY CLER( C':-::-IC',F CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 Recommend Continuance (Recommend Approval) I move to continue File Numbers PP~06-002 for the hearing date of February 16, 2006, to -' 2006, For approval: and direct staff to draft findings and conditions for approval to (date ceI1ain) and in addition to staff's comments, direct the applicant to make the following changes: (insert comments here) 3. APPLICATION AND PROPERTY FACTS a. Site Address/Location: SE corner of Us tick Road and Eagle Road/SH55 Township 3N, Range 1 E, Section 4 b. Owner James Kissler 1125 W. Amity Boise Id 83705 c. Applicant: Landmark Development Group, LLC Tamara Thompson 1882 Toluka Way Boise ill 83702 d. Representative: e. Present Zoning: Tamara Thompson, Landmark General Retail and Commercial (C-G) (AZ-03-018 f. Present Comprehensive Plan Designation: Mixed Use-Regional- 2002 Comprehensive Future Land Use Map g. Description of Applicant's Request: 1. See Exhibit A (prepared by Landmark Development Group LLC) for a copy of the detailed site plan which depicts the lot layout, building, parking and access locations. Exhibit B shows the proposed landscape plan. h. Applicant's Statement/Justification: The application notes that the mixed use regional designation provides for the overall site to be developed with a I11Îxture of RetaillRestaurant /Drive thru and other Commercial uses oriented around automobile traffic. The applicant notes that the site is an ideal location for a retail complex and will provide the additional landscaping along drive aisles, the design review for structures along the gateway corridor. 4. PROCESS FACTS a. The subject applications will in fact constitute preliminary plats as determined by City Ordinance. By reason ofthe provisions of the Unified Development Code Title 11 Chapter 6, a public hearing is required before the City Council on this matter. Newspaper notifications published on: 13th of February and 30th of January, 2006 (for Planning & Zoning Commission) Radius notices mailed to properties within 300 feet on: January 20, 2006 (for Planning & Zoning Commission) Applicant posted notice on site by: February 6,2006 (for Planning & Zoning Commission). b. c. d. 5. LAND USE a. Existing Land Use(s): Bare land, single faI11Îly residence Gateway Marketplace Subdivision PP-O6-002 pagc 2 CITY OF MERIDIAN PLANNING DEPARTMENT STAff REPORT FOR THE HEARING DATE OF 2/16/2006 b. Description of Character of Surrounding Area: Large lot residential, highway-oriented services, rapidly urbanizing. c. Adjacent Land Use and Zoning 1. North: Future pad sites within Schmitchger Subdivision, Lowe's site zoned C-G. 2. West: Sadie Creek Promenade Subdivision, Bienville Subdivision proposals, zoned CRG, Rl, and RUT 3. South: undeveloped parcels zoned C-G with Redfeather Annexation. 4. East: Una Mas conceptual project and ACHD future right of way, zoned RUT- proposed zone C~G d. History of Previous Actions: In April 2004, the owners and City entered into a Development Agreement for various High Density Commercial, Multi-family Residential, transitional, and office uses under File AZ.03~018. Some property was annexed and zoned to General Retail and Commercial (C-G) with a Development Agreement while other portions of the property (on the west side of Eagle Road) were not included in the annexation leaving out parcels which were addressed with the original conceptual plan. e. Existing Constraints and Opportunities 1. Public Works Location of sewer: Location of water: Extension of mains in U stick Road Extension of mains in Ustick Road Issues or concerns: Water main connection in Eagle Road is required. 2. Vegetation: Agricultural/Irrigated 3. Flood plain: N/A 4. Canals/Ditches Irrigation: The Milk Lateral bisects the property 5. Hazards: None identified 6. Size of Property: 22.85 acres 7. Description of Use: Up to 250,000 square feet of Retail, Commercial, and Restaurant uses and associated parking and landscape improvements. f. Subdivision Plat Inforrnation- The submitted plat contains 23 lots in a C-G proposed zone with commercial uses. Commercial uses are shown to be a mix of restaurantlretail spaces with six approximate 30,000 square foot buildings and 8 approximate 3,000 to 6,000 square foot buildings and 8 approximate 2,000 square foot attached buildings, and one approximate 40,000 square foot officelretail building. g. Landscaping - 1. Width of street buffer(s): Per the Future Land Use Map, both Ustick Road and Eagle Road are designated as "Entryway Corridors." As such, the UDC (Table 11-2B-3) requires a 35-foot wide street buffer adjacent to both roadways. The landscape plan (Sheet Ll.l) proposes a 35-foot wide buffer along both Ustick and Eagle Roads. Ifthe applicant proposes to construct the "Entryway Corridor" buffers in easements they must meet the landscaping standards required in the ODe. Gateway Marketplace Subdivision PP-O6-002 page 3 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 2. Percentage of site as open space: The UDC does not require open space or site amenities for cOlmnercial uses. 4. Other landscaping standards: The landscape butTer along Ustick Road should be constructed in accordance with ODC Chapter 3, Article B. h. Planned Development Characteristics - N/ A i. Conditional OseJnformation: 1. Non-residential square footage: 250,000 2. Proposed building height: 65 feet 3. Percentage of site devoted to building coverage: 25% 4. Percentage of site devoted to landscaping: Not defined 5. Percentage of site devoted to paving: Not defined 6. Percentage of site devoted to other uses: N/ A 7. Number of Residential units: N/A j. Amenities - The applicant is not required to provide an amenity k. Off-Street Parking (residential uses) - N/A 1. Proposed and Required Residential Standards - N/ A m. Proposed and Required Non-Residential Parking - One off-street parking space required for every 500 square feet of gross floor area. Also, one Type A and one Type B parking space required for the loading area (per UDC 11-3C-8). The proposed total building floor area is 250,000 s.f., which requires 500 parking spaces. There are no Type A or Type B spaces shown, and the total number of parking spaces has not been calculated. This may be addressed during detailed CUP review, CZC review, and/or building design review but the design appears to meet the minimum standards of the UDC parking requirements. n. Summary of Proposed Streets and/or Access (private, public, common drive, etc.): . The applicant is proposing two new access points to Eagle Road/SH55 to serve the Gateway Marketplace project at approximately 700 feet and 1200 feet south of the U stick/Eagle Intersection. As noted above, lTD must issue a right-inlright-out permit and a full access permit for this site, and the access is fl.lrther contingent on the Meridian City Council granting a variance to UDC 11-3H. At this time the policy in place would be for backage roads to serve this site and provide connection to the 'l2 mile and the collector road systems. lTD has submitted a letter indicating that they will not make a decision on approving access to Eagle Road until such a time as the Meridian City Council has formally acted on the Variance request. City staff does not support any access to Eagle Road in this location. In addition, the recorded DA between the applicant and the City requires either a public or private street be constructed parallel to Eagle Road/SH55 that may connect to the north boundary and may also connect to Eagle Road, if allowed by lTD at a point to be determined by ACHD. AClID has stated that the applicant shall provide cross access south and east to connect to the future collector roadway east of the site and the connection to the signalized access proposed south of the site at River Valley Drive. This project along with the Una Mas Project east of the site will connect with Ally Street, a proposed public street serving as a collector roadway to the entire area. Gateway Marketplace Subdivision PP-O6-002 page 4 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 In addition, the applicant is proposing two new access points to Ustick Road at the following locations: . Driveway # 1 - 350 feet east of Eagle (right-inlright-out with center median) . Driveway #2 - 700 feet cast of Eagle (full access) Ustick Road, from Leslie Drive to Ally Street (on the east side of Eagle Road), including the Eagle Road intersection, has just been widened and improved to five lanes. The intersection was widened to include dual left turn lanes. The applicant's preliminary plan does not show a new public, cross access, or commercial street extending south of Us tick Road for future connection to the east and south. The preliminary plat (Sheet PP-l) shows a loading road as an approximate 40- foot street section from the full access on Ustick, continuing as a commercial service drive to the end of the southern boundary of the site where one east-west break is proposed. The area (Kissler Annexation site) concept plan shows the road connecting to the properties south and east of the site with a frontagelbackage road system. The area plan (Una Mas Annexation) shows private, internal driveways connecting to the future public street; such driveways run mostly east/west connecting the Kissler site to Ally Street and ultimately Ustick Road. For a detailed report on both ITD's and ACHD's actions and comments, please see the letters/reports submitted with the application. 6. AGENCY COMMENTS MEETING On December 28th 2005, staff held an agency comments meeting. The agencies and departments present included: Meridian Fire Department, Meridian Meridian Public Works Department, and the Sanitary Services Company. Staff will included all comments and recommended actions as Conditions of Approval if the Meridian Planning Commission requests approval of the design as presented. If the Meridian Plal1llÎng Commission agrees with the staff analysis that a redraw of the plat will be required of the site then staff will provide comments at such time as a new proposal is ready for Commission review. 7. COMPREHENSIVE PLAN POLICIES AND GOALS The subject site is designated 'Mixed Use~Regional' on the Future Land Use Map. In Chapter VII of the Comprehensive Plan, this designation is defined in part as an area that is situated in highly visible or transitioning parts of the City where innovative and flexible design opportunities are encouraged. The MU-R has no upper limit on the square footage of non-residential uses and is intended to allow a broad range of uses. Staff finds the following Comprehensive Plan policies to be applicable to this property and apply to the proposed development (staff analysis in italics below policy): . Require that development projects have planned for the provision of all public services. (Chapter VII, Goal III, Objective A, Action 1) When the City established its Area of City Impact. it planned to provide City services to the su~ject property. The City of Meridian plans to provide municipal services to the lands proposed to be annexed in the following manner: . The subject lands currently lie within thejurisdiction of the Meridian Rural Fire District. Once annexed the lands will be under the jurisdiction of the Meridian City Fire Department, who currently shares resource and personnel with the Meridian Rural Fire Department. Gateway Marketplace Subdivision PP-O6-002 page 5 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/I 6/2006 . The subject lands currently lie within the jurisdiction of the Ada County Sheriff's Office. Once annexed the lands will be serviced by the Meridian Police Department (MPD). The roadways adjacent to the subject lands are currently owned and maintained by the Ada County Highway District (ACHD). This service will not change. The subject lands are currently senJiced by the Meridian School District #2. This service will not change. The suQject lands are currently serviced by the Meridian Librmy District. This service will not change and the Meridian Library District should suffer no revenue loss as a result of the subject annexation. . . . . Municipal, fee-supported, services will be provided by the Meridian Building Department; the Meridian Public Works Department, the Meridian Water Department, the Meridian Wastewater Department, the Meridian Planning Department, Meridian Utility Billing Services, and Sanitary Services Company. Chapter VII, Goal I, Objective B: Plan for a variety of commercial and retail opportunities within the Impact Area. Stafffinds that the site is designatedfor MU-R on the Comprehensive Plan Future Land Use Map. Although strictly commercial uses have not been !'pecifically plannedfor this property on the Comprehensive Plan Future Land Use Map the Development Agreementfrom the annexation shows this portion as commercial and consistent with the overall site plan when combined with the proposed Bienville Subdivision, and Sadie Creek Promenade Subdivision which are all bound by the same development agreement. The bulk proposal of uses would also meet the general classifications for mixed use regional. . Chapter VII, Goal I, Objective B, ActionS: Locate new community commercial areas on arterials or collectors near residential areas in such a way as to complement with adjoining residential areas. Ustick Road is classified as an arterial roadway. The applicant is not proposing access from the adjoining commercial areas by way of cross access, sidewalks or shared streets which will provide future connection to residential areas east of the site along Ustick Road. Staff believes that the commercial areas proposed compliment the existing and planned residential areas in the vicinity but better connection must be planned tofacilitate non-arterial commercial collector connection to the site . Chapter VII, Goal IV, Objective D: Encourage appropriate land uses along transportation corridors. Staff believes that the proposed land uses are appropriate along the adjoining transportation corridors (Ustick Road and Eagle Road). Staff supports the proposed uses at this site as they are consistent with the Mixed use regional district and the approved development agreement. . Chapter VII, Goal IV, Objective D, Action 2: Restrict curb cuts and access points on collectors and arterial streets. The ACHD evaluates access points in their analysis; no direct lot access is allowed to any of the arterial/collector roadways. The proposed access points to the arterial streets generally comply with ACHD 's standards as detailed in the staff report. Please see the ACHD staff report contained in the/ìle. ITD has indicated that they will not act on the proposed access points to Eagle Road until Gateway Marketplace Subdivision PP-O6-002 page 6 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 such a time as the Meridian City Council acts on the variance requests- The Idaho Transportation Department (ITD) has a policy./òr access to a Type IV Principal Arterial will be at intersections only, and spaced at one-ha(fmile intervals in urban areas. ITD allows approaches (other than intersections) in !!ipecial cases and on a temporary basis. The Eagle Road access shall be eliminatedfYom this project. . Chapter VII, Goal IV, Objective D, Action 5: Require appropriate landscape and buffers along transportation corridor (setback, vegetation, low walls, bemIs, etc.). The applicant is proposing to construct appropriate buffers along all of the adjacent arterial streets. By Ordinance, a minimum 35:foot wide landscape buffer to Gateway Corridors. The landscape plan shows the appropriate landscape buffers. Staff also finds the following 2002 Comprehensive Plan text policies to be applicable to this application: . "Require all new parking lots to provide landscaping in internal islands." (Chapter V, Goal III, Obj. D, #3, page 43) "Eagle Road is the major north-south arterial in Ada County. The capacity of this arterial should be protected by minimizing the number and location of private driveway access connections to this important roadway. The City should recognize, adopt, and help implement the Eagle Road Access Control Study, prepared by ACHD in 1997." (Chapter VI, page 71) "The capacity of arterial. . .roadways can be greatly diminished by excessive driveway connections to the roadways. The City should cooperate with ACHD to minimize access points on arterial. . .roadways as development applications are reviewed." (Chapter VI, page 72) "Develop methods, such as cross-access agreements, frontage roads, to reduce the number of existing access points on to arterial streets." (Chapter VI, Goal II, Obj. A, #12, page 79). "Identify transitional zones to buffer commercial and residential uses, to allow uses such as offices and other low intensity uses." (Chapter VII, Goal I, Obj. B, #7, page 102) "Restrict curb cuts and access points on. . . arterial streets." (Chapter VII, Goal IV, Obj. D, #5, page 107) . . . . . 8. UNIFIED DEVELOPMENT CODE a. Allowed Uses in the Commercial Districts: UDC Table 11~2B-2lists retail store/restaurant/drive thrul office/ financial institute uses as pennitted uses in the C-G zoning district. b. Purpose Statement of Zone: The purpose of the Commercial Districts is to provide for the retail and service needs of the community in accord with the Meridian Comprehensive Plan. Four Districts are designated which ditler in the size and scale of commercial structures accommodated in the district, the scale and mix of allowed commercial uses, and the location of the district in proximity to streets and highways. C-G General Retail And Service Commercial District: The purpose ofthe C-G district is to provide for commercial uses which are customarily operated entirely or almost entirely within a building; to provide for a review ofthe impact of proposed commercial uses which are auto and service oriented and are located in close proximity to major highway or arterial streets; to fulfill the need oftravel-related services as well as retail sales for the transient and permanent motoring public. All such districts shall be connected to the municipal water and sewer systems of the city, and shall not constitute strip commercial development and encourage clustering of commercial development. Gateway Marketplace Subdivision PP-O6-002 page 7 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 c. General Off-Street Parking Standards (from UDC 11~3C-5): The following standards shall apply for off-street vehicle parking for nonresidential uses: In all Commercial Districts the requirement shall be one (1) space for everv five hundred (500) square feet of gross floor area. d. Structures Subject to Design Standards (ll-3A-19B5): All structures on property adjacent to an entryway corridor (UstickiEagle Roads) are subject to the design standards listed in this section. e. Outdoor storage/refuse areas (11-3A-12): Outdoor utility meters, HV AC equipment, trash dumpsters, trash compaction and other service functions shall be incorporated into the overall design of buildings and landscaping so that the visual and acoustic impacts of these functions are fully contained and out of view from adjacent properties and public streets. f. Development along State and Federal Highways (11-3H-4B2): If an applicant proposes a change or increase in intensity of use, the owner shall develop or otherwise acquire access to a street other than the state highway. The use of the existing approach shall cease and the approach shall be abandoned and removed. a. No new approaches directly accessing a state highway shall be allowed. b. Public street connections to the state highway shall only be allowed at: 1. the section line road; and ii. the half-mile mark between section line roads. These half-mile connecting streets shall be collector roads. Section 11-3H -3: The applicant shall construct a street, generally paralleling the state highway, be designed to accommodate future connectivity and access to all properties fronting the state highway that lie between the applicant's property and the nearest section line road and/or half mile collector road. The intent is to provide jor future connectivity and access to all properties fronting the state highway that lie between the applicant's property and the nearest section line road and/or half-mile collector road. The street shall be designed to collect and distribute traffic (emphasis added). 9. ANALYSIS 9a. Analysis of Facts Leading to Staff Recommendation The PP application does not substantially comply with the Unified Development Code. However, there are several areas of clarification and some modifications required to both the site plan and plat layout in order for staff to recommend full approval of the application. Below are several special considerations for the P&Z Commission to review at the public hearing: Analysis of Facts Leading to Staff Recommendation PP Application (PP~06-002): The proposed preliminary plat can be conditioned to comply with the Unified Development Code. Gateway Marketplace Subdivision PP-O6-00Z page 8 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2116/2006 Based on the policies and goals contained in the Comprehensive Plan and the general compliance of the proposed development with the Unified Development Code, Staff believes that tIlis is a good location for the proposed development. Please see Exhibit D for detailed analysis of the required facts and findings for a Zoning Amendment. Non-Residential Buildings: The applicant has requested a maximum of 250,000 square feet of retail/restaurant/office spaces. Staff does not propose to limit the applicant to their request as this area is designated as commercial, is surrounded by other commercial uses and is a prime location for intense commercial uses designed in a clustered fashion. Drive Thru Separation: The applicant has requested several lots to be drive thru retail uses which have a spacing requirement of 300'. Since the site plan is conceptual in nature staff feels that the applicant shall design the site to meet the 300' standard separation for drive thm uses with this application. If a drive~thru use is proposed within 300' of another drive thru then, a conditional use application must be approved. Access to SR 55/ Eagle Road: The applicant has requested an access point to Eagle Road. According to ITD records, the applicant has subnlitted a request for access permit but is not vested with an access point for this location as the change in use is the deciding factor as to when an access point be granted. Currently the site has no access to Eagle Road and the use is agricultural/residential where the plat will change the use to commercial and is subject to the design requirements of UDC 11-3R. UDC requires that all access for Gateway Marketplace Subdivision shall be taken from Ustick Road at points determined by ACHD. Uses: All other lots shall be limited to Office/Retail/Restaurant/Drive tbru uses and General Commercial uses listed as permitted in UDC Table 11-2B-2. Any uses (excepting Drive thru) not listed as permitted shall be subject to conditional approval. Sidewalks: The applicant is not proposing to construct internal sidewalks on some of the internal streets/drive aisles. The design does show the incorporation of the eight-foot walkway which is directed to the main access to the commercial building. When and if the plat is resubmitted as recommended, the applicant shall provide a more defined pedestrian access corridor showing collector designed roadways with a detached sidewalk on one side, designed in compliance with the Private Street standards listed in UDC 11-3F. Since the applicant has submitted a plan which is conceptual in nature staff feels the sidewalk locations shall be made consistent with the UDC including drive aisles which shall include a detached sidewalk. The second drive aisle access point to Ustick Road shall be designed with the private street sections as listed in UDC 11-3F and subject to including sidewalks. Landscape Street Buffers: Arterials: UDC 11-2B requires a 35-foot wide street buffer along classified arterial roadways and entryway corridors. Eagle Road and Ustick Road are classified as Arterial Roads. On the submitted landscape plan, the applicant is proposing to construct a 35-foot wide street buffer along Ustick Road and Eagle Road. The applicant should be required to depict the required street buffers on the face of the final plat in an easement or place the required buffers in common lots as per ODC Ilh3B. See Exhibit B below. Commercial Streets: UDC 11-2B requires a lO-foot wide street buffer along commercial roadways. The submitted plat does not include commercial cross access east and south. Staff feels that a designed commercial cross access street shall be provided and subject to the landscape standards for commercial street buffers. Within the 10-foot street buffer, a detached sidewalk shall be provided. Ditches. Laterals. and Canals: There are several irrigation laterals that bisect this parcel. Per ODC Gateway Marketplace Subdivision PP-O6-002 page 9 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR HIE HEARING DATE OF 2/16/2006 ll-3A~6, all irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled. The applicant is proposing to tile al1 of the irrigation facilities located on site. See Exhibit B below. Pressure Irrie:ation: The City of Meridian requires that pressurized irrigation systems be supplied by a yeaHound source of water (UDC 11-3A-15). The applicant should be required to utilize any existing surface or well water for the primary source. If a surface or well source is not available, a single-point connection to the culinary water system shall be required. If a single-point connection is used, the developer will be responsible for the payment of assessments for the common areas prior to signature on the final plat by the City Engineer. An underground, pressurized irrigation system should be installed to all landscape areas per the approved specifications and in accordance with City Code. See Site Exhibit B below. Fencing: The applicant is not showing any fencing on any of the submitted plans. A detailed fencing plan should be submitted upon application of the final plat (UDC 11-3A- 7). If permanent fencing is not provided, temporary construction fencing to contain debris must be installed around the perimeter prior to issuance of a building permit. All fencing should be installed in accordance with City Code. See Exhibit B below. Cross-access h1temal: There are some commercial lots that do not have frontage on a public street. Instead the applicant is proposing to provide cross-access easements to the lots that do not have public street frontage. Because several of the proposed lots do not have ftontage on a public street, the applicant should provide a cross parking/cross access agreement for all of the lots within the retail and other commercial portions of the subdivision to use the driveways and parking aisles. The site should be redesigned to provide a backage road on Eagle Road. Access to Eagle road shall be determined by the Meridian City Council and at least the non-signalized access point to Ustick Road shall be designed to serve as a commercial collector for intercol1l1ectivity to the south and vehicular movement in the north/south direction in cooperation with the parcel east of the site. Maintenance of the drive aisles and parking areas should be provided for in a note on the face of the final plat, AND/OR in a document such as CCRs. See Exhibit B below. Cross-access South: The applicant shall be required to provide cross access to the parcels south of the site. The project is a portion of a larger site project (Kissler Annexation) and the sites shall maintain consistent traffic flow for the entire site. Eae:le Road Access: The Idaho Transportation Department (ITD) has a policy for access to a Type IV Principal Arterial will be at intersections only, and spaced at one-half mile intervals in urban areas. ITD allows approaches (other than intersections) in special cases and on a temporary basis. The access points shown at approximately 700 feet south and 1,200 feet south of the Ustick Eagle Road intersection shall be eliminated as it does not meet criteria of either ITD or the Meridian Comprehensive Plan. Loading Space Parking: UDC 11-3C-8 requires off-street loading spaces for commercial uses. The Certificate of Zoning Compliance (CZC) application shall clearly demonstrate that both a Type A and Type B space are available on site, located near the refuse/service area behind the building. Elevations: The applicant has not submitted building elevations of the proposed structures. The application lists the proposed building materials, including stone, brick, stucco and timber to be accented with chrome, aluminum and gloss painted trims. UDC 11-3A-19 requires all structures on property adjacent to an entryway corridor to comply with the design standards listed in this section. Staffs interpretation of the UDC is that the applicant may choose to place the "primary Gateway Marketplace Subdivision PP-O6-002 page 10 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 entrance" on an elevation other than the public street side. However, the public street elevations (Ustick Road and Eagle Road) must still meet the other standards listed in 11-3A-19 (except for the primary entrance standards). The elevations will need to be reviewed prior to issuance of CZC to comply with the following ordinance standards: a) Facades: Facades visible from a public street shall incorporate modulations in the façade, roof line recesses, and projections along a minimum of twenty percent (20%) of the length of the facade. b) Roof lines: Roof design shall demonstrate two or more of the following: a) overhanging eaves, b) sloped roofs; c) two (2) or more roof planes; d) varying parapet heights; and e) corruces. c) Mechanical equipment: All ground-level and rooftop mechanical equipment shall be screened to the height of the unit as viewed from the property line. d) Color and Materials: Exterior building walls shall demonstrate the appearance of high- quality materials of stone, brick, wood or other native materials. Smooth-faced concrete block, tilt-up concrete panels, or prefabricated steel panels are prohibited except as accent materials. Refuse/Service Area Screen: Neither the Site Plan or Landscape Plan call-out how or ifthe refuse/service area on the east side of the buildings will be screened. UDC 11-3A-12 requires the visual and acoustic impacts of these functions are fully contained and out of view from adjacent properties and public streets. The applicant's CZC application must clearly demonstrate how this standard is met. Cross Access: The property to the south is dependent on access for intercol1l1ectivity and is directly tied with the existing Development Agreement for providing a frontage road to Ustick Road. The applicant has provided a design not showing any points of access within the immediate vicinity. These points of access are paramount on the success of the general area and staff feels a minimum of three points of cross access shall be provided to the east and one point of access to the south, which shall all be designed to private street standards for pedestrian and vehicular traffic circulation. Strip Development: The purpose statement of the General Commercial District specifically reads, "shall not constitute strip commercial development and encourage clustering of commercial development." The comprehensive plan policies further reads, "Use the comprehensive plan, subdivision regulations, and zoning to discourage strip development, and encourage clustered, landscaped business or residential development on entryway corridors." There are six larger scale buildings and eight small scale buildings all attached on one or two walls. The overall length of the building is approximately 880 feet long of the approximately 1,330 feet of the entire length of the site which is over 2/3rds of the site. Adding on the approximate 230 feet of the building shown on lot 18 and the retail buildings fronting Us tick Road and the overall length of buildings approaches 1,200 feet and approximately 90 percent of the face of the site would be developed. Furthermore, the overall length of the parking lot would only exclude the 35' landscape buffer to Ustick Road and become an overall length of98% of the site length as parking lot, approached in a north south direction. Furthennore, if the parcel south of the site is developed in a similar fashion the City of Meridian would be seeing a parking lot Gateway Marketplace Subdivision PP-O6-002 page 11 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 approaching ~ mile in length. This constitutes a strip development. Staffwollld recommend the applicant break the parcel into clusters of small/medium/larger sites which would be connected by a backage road north south with an east west connection. 9b. Staff Recommendation: Based on the above analysis, staff finds the Preliminary Plat applications needs to be revised to confonn to the adopted DA, Comprehensive Plan policies and ODC standards. As noted under staff analysis we recommend the building elevations be submitted in compliance with the enttyWay corridor standards, the access point to Eagle Road be eliminated and redesigned, and a private street section for cross access provided to the south be added to the preliminary plat in place of the proposed Eagle Road access, the site be redesigned as not to constitute a strip development and an internal backage road be designed to facilitate vehicular and pedestrian traffic to the full access provided on Ustick Road. We recommend continuance of the application for redesign in order to meet the concerns of staff as detailed in this report subject to revision of the preliminary conditions shown in Exhibit B or denial of the application. Staff has not provided findings with this staff report and will provide findings for approval or denial at the direction of the Commission. 10. EXHffiITS A. Drawings 1. Preliminary Plat (by The Land Group, dated November 15, 2005) 2. Landscape Plan (by The Land Group, dated September 15,2005) B. Legal Description C. Conditions of Approval 1. Planning Department 2. Public Works 3. Fire Department 4. Police Department 5. Parks Department 6. Sanitary Services 7. ACHD D. Required Findings from UDC 1. Preliminary Plat-Pending Gateway Marketplace Subdivision PP-O6-002 page 12 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2116/2006 Exhibit AI: Preliminary Plat PP-1(The Land Group) Dated November 15,2005 --.._--- --. - - ..----------", '-""-""-------.---.-----..,,- ---- -----~.._-_._..-.- -.- !~ -" .jJ :I~ :' ~ .'ic. IJ ¡: !~ h , ," I;, , -~~ i.' ¡'1 -,,: a "'" . ,- ,-' - i"...JI-C- --,' .' I I I' :t~-".L1.i:;----_..- _/ III .. '¡çJ; r~----. -,~b t.'.~,-~I-:ð1fr~~lj~ .:.i!I¡,--"",-,'+--":if>-j""'-r"";';'-Î,J':r-",."/'iL_-J'~- -I....;-:t;;~i;'/; '". I," -iF't",jJ:'O'-"..". "':I(,..' :,;¡.II"i'r.)i';'i,-;¡¡iI",.:~;,7i;.i. II'" :r:'~!XJ["J ~l :i~I~ '~! 'L,)'¡ I~i¡,fui. ' ':: ,i:'i' r ii I¡".>" r ;~~,Íj:~'-~I ""':".. I,: '---t~J,_w~'::'1 ¡, ':"-L'::' iJ" ~-{r----L-..-,~~ ---l ~ ~~\, 'f? '--_L- .-~r~_.._--__i_L~.~,.j.L~,J~" i- -. ii'.~Li'_:;'!': " 5 D ~ ;; 0 ~ -" cc !'" '-': ,-- "",,( Is i æ ;¡;W¡¡ ¡Ii ¡: i~ ,Ij .' .. . -.. ;¡ --,.. .. . " ""IY : J'"" r It" r_~~- r .C iI: - "8.j',;~~¡ (.;.ì!I::"\i\rr'.1/,f\I<I..'H'ìCl,:-;l.Lml\î::;!U.\j ]] T'^",2 ; ,'. "T.- :- ~_I:l~~-=--,:,~':~:::i~~:-_-=~n- -J;! Gateway Marketplace Subdivision Exhibit A Pagc 1 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 Exhibit A2: Landscape Plan L1.](The Land Group) Dated September ]5, 2005 .,- "", ,,- - ",- ¡¡¡Ii !~ . .; :~ IT! ~-- "'.~ , ~--f-"]___"~' i -:; ;; '! t.< I.!" -.- -~.,.(~I .. --- G~t~way M~~kelpl~~~'- ... . . .!L È: '= ".4 .Iie: ' ¡filii ~'(.It~ !PRELIMINARY PLAT LANDSCAPE F>LAN¡ :' :;; ~.S! .," _....':._---_...~"~=--l,--~~' ---, --'--"-'-=--- r,1[f\:!')-'~~~,;r;~\lI~)- ,. UH- . ,;:: I Gateway Marketplace Subdivision Exhibit A Page 2 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2116/2006 Exhibit B: Legal Description ~Iaiborn ... waite consultìf19¡...!I.<, engineers 8, surveyors 120 N. Curtis Rd. Boise, Idaho 83706 (208) 376-8555 Fax (208) 429-9862 P.N. 2279 October 20, 2005 PARCEL "A" US TICK PROPERTY REMAINDER PARCEL DESCRIPTION A parcel of land lying in the Northwest 1/4 of Section 4, T.3N., R.IE., H.M., Ada County, Idaho, and being more particularly described as follows: Commencing at the Northwest oomer of said Section 4, thence S 89" 49'08" E along the North boundary of said Section 4 and the centerline of Us tick Road for a distance of 97.62' feet; thence leaving said North boundary and centerline S or 50'52" W for a distance of77.96 feet to a point on the South right-of-way line of Us tick Road, being the REAL POINT OF BEGINNING; thence along said South right-of-way line for the following 13 courses: N 44' 02'14" E for a distance of47.06 feet; thence S 89' 49'08" E for a distance of 262.81 feet; thence S 4Z 51 '21" E for a distance of 41.18 feet; thence N 87 17'10" E for a distance of29.03 feet; thence N 4Z 43'35" E for a distance of40.57 feet; thence N 89" 13 '34" E for a distance of 179.28 feet (formerly described as 179.20 feet); :kiJL,,~'O:i :;S-:;::"¡:(u!..ci.,SI;';h--<..U; ;\.':'JWta, thence S 89" 49'08" E for a distance of 10.00 feet; ,I¡"IIc<.:I\i (, ;...'.:. t.. U';""~I:".C:l'l>r¡~4jleel. ClProjectslUstickLl.A (2279)lOocumentslParoel A.doc" I " Gateway Marketplace Subdivision Exhibit B Page 1 CITY OF MERIDIAN PLANNING DEPARTMENT STAFf REPORT fOR THE HEARING DATE OF 2/16/2006 daiborll 4. waite consulting~ engineers & surveyors 120 N. Curtis Rd. Boise, Idaho 83706 (208) 376---8555 Fax (208) 429-9862 P.N. 2279 October 20, 2005 PARCEL "B" USTICK PROPERTY 5.51 ACRE SPLIT A parcel of land lying in the Northwest ]/4 of Section 4, T.3N., RIE., B.M., Ada County, Idaho, and being more Particularly described as follows: Commencing at the Northwest comer of said Section 4, thence S 89' 49'08" E along the North boundary of said Section 4 and the centerline of Ustick Road for a distance of 97.62' feet; thence leaving said North boundary and centerline S or 50'52" W for a distance of 77.96 feet to a point on the East right-of-way line of Eagle Road; thence along said East right--of-way line S or 50'52" W for a distance of 1038.43 feet to the REAL POINT OF BEGINNING; thence continuing along said East right-of-way line S 0 r 50' 52" W for a distance of 154.90 feet; thence N 00' 36'13" E for a distance of93.77 feet to the South boundary of Government Lot 4 of said Section 4; thence leaving said East right-of-way line S 89' 51'00" E for a distance of 700.02 feet; thence S oa 36' 13" W along said East right-of-way line for a distance of I 14.17 feet; thence S 89 51 '00" E along said South boundary for a distance of 6 1,35 feet; thence N 89" 51 '00" W for 8 distance of363.00 feet; thf>!,,"""""'¡!"¡"' ~~H ">l:'h ":W:11!:;r:' 1" Drt" "'i"')O.' f f"_-,, ,Loii"'lI.. ....':-~:---i'-:-':¡ f~,~t. tI,'n::, '1>(1 !' r¡O'\V;~,;;,;Jj-,.I¡'i'\(\I{C. v) let.!. C:\Projec¡S\USlickLLA (2279)\Documenls\pan:e1 a.doc- I - Gateway Marketplace Subdivision Exhibit B Page 3 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 211612006 thence N 89" 51 '00" \"1 for a distance of} TrOD feet; thence S OU 09'00" W for it distance of 34.50 feet; thence N 89" 51 '00" W tor a distance of218.67 feet to the REAL POfNT OF BEGINNING; containing 5,51 acres of land, more or less. Prepared by; Todd R. Waite PL.S. C:\Projects\UstickLLA (2279)\IJocuments\ParœlA.doc- 2 - 1.1.4 1.1.5 1.1.6 1.1.7 ] .1.8 1.1.9 1.1.10 1.1.11 1.1.12 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 C. Conditions of Approval 1. Planning Department SITE SPECIFIC REQUlREMENTS- (Gateway Marketplace) 1.1.1 The preliminary plat labeled as PP-l prepared by The Land Group, dated November 15, 2005, shall be redesigned, with the conditions listed herein. All comments/conditions of the accompanying Annexation and Zoning (AZ-03~018) Development Agreement shall also be considered conditions of the Preliminary Plat. UDC 1] -3C-8 requires off~street loading spaces for commercial uses. The Certificate of Zoning Compliance (CZC) application for this project shall clearly demonstrate that adequate parking is available on site, located near the refuse/service area designed at the building. Graphically depict on the face of the plat, the required 35-foot wide landscape buffer along Ustick Road and Eagle Road. 1.1.2 1.1.3 No direct lot access to Ustick Road or Eagle Road will be allowed. The existing driveways to Eagle Road may be for construction purposes if approved by lTD. At such time, direct access to Eagle Road shall be prohibited. That prior to signature of the city engineer cross access to parcels east and south of the site be granted. The applicant shall provide at a minimum one commercial cross access drive to the properties east of the site which shall be designed according to private street standards as listed in UDC 11- 3F, with a minimum of 24' travel way, no parking backing on to the service drive, a one side five foot detached sidewalk with a 5' landscape buffer. The commercial cross access drive is to provide connection from the future Public Roadway (Ally Street) east of the site, through the Una Mas Annexation site, and provide the most direct vehicular traffic flow to a public road system. The applicant shall work with ACHD to detern1Ìne if a public frontage road shall be provided at the southern boundary of the site. One half of a 42' public roadway design for a frontage/backage road shall be reserved at this site until such a time as ACHD staff provides a written statement refusing the reserved area. Depict on the tàce of the final plat a 10-foot wide landscape buffer along a future commercial access roadway to be designed along the easterly most access point to Ustick Road. Said landscape buffers shall be in either a common lot or an easement adjacent to the rights of way. The landscape plan prepared by The Land Group, labeled Sheets LS 1.1, is not approved with these applications a landscape plan consistent with UDC 11 ~3B shall be submitted with the final plat which reflects any changes made to the preliminary plat to redesign the subdivision consistent with approved access points. Including but not limited to full landscaping along Eagle Road which currently shows two access points. With the final plat application, submitted revised copies of the landscape plan with the changes listed above. Maintenance of all common areas shall be the responsibility of the Gateway Marketplace Subdivision Business' Owners Association(s) The applicant shall submit from the COlUlty Surveyors Office the appropriate documentation showing that usage of Gateway Marketplace as an approved subdivision name. Gateway Marketplace Subdivision Exhibit C Page 1 1.1.18 1.1.19 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 1.1.13 Any roof-mounted mechanical equipment will be screened from view from any public right-of- way. The applicant shall submit drawings at the time of CZC submission that demonstrate this condition is complied with. 1.1.14 1.1.15 The applicant shall comply with the outdoor lighting standards shown in UDC 11-3A-11. The awnings on the west and north elevations shall extend at least 20 feet beyond the entry doors, measured from the building face to the outer edge of the awning for the retail buildings. The applicant shall submit a drawing at the time of CZC application submission to demonstrate compliance with this condition. Comply with UDC 11-3A-12 regarding a screen for the refuse/service area. No irrigation pump station or facility is shown on the Site Plan. However, if one is proposed for the site, it must be located outside of any required street buffer. Impervious surfaces are prohibited in said buffers. Prior to the City Engineer's signature of the final plat, all existing structures shall be removed from the site. 1.1.16 1.1.17 Provide internal cross access/cross parking agreement(s) for all lots in Gateway Marketplace Subdivision. All cross access drive aisles shall only approach the ACHD approved points of access to the public street system. Maintenance of the aisle and parking areas shall be provided for in a note on the face of the final plat, AND/OR in a document such as CCR's. Other than the points of access approved by ACHD, direct lot access to Dstick Road and Eagle Road is prohibited. A note shall be placed on the final plat restricting access to Eagle Road and Us tick Road. 1.1.21 It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 1.1.20 1.1.22 1.1.23 Applicant shall be responsible for application and compliance with and NPDES Permitting that may be required by the Environmental Protection Agency. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 1.1.1 GENERAL REQUIREMENTS-PRELIMINARY PLAT 1.1.2 1.1.3 Sidewalks shall be installed within the subdivision and on the perimeter of the subdivision pursuant to City Code. All areas approved as open space shall be free of wet ponds or other such nuisances. All stormwater detention facilities incorporated into the approved open space are subj ect to UDC 11- 3A-18 and shall be fully vegetated with grass and trees. Sand, gravel or other non-vegetated surface materials shall not be used in open space lots, except as permitted under UDC 11- 3A- 18. Where the applicant has submitted a preliminary landscape plan and where staff has reviewed such plan, the landscaping shall be consistent with the preliminary plan with modifications as proposed by staff. If the stormwater detention facility cannot be incorporated into the approved open space and still meet the standards of UDC 11-3A-18, then the applicant shall relocate the facility. This may require losing a developable lot or developable area. It is the responsibility of the developer to comply with ACHD, City of Meridian and all other regulatory requirements at the time of final construction. The applicant shall submit a detailed fencing plan with the final plat application for the subdivision. If permanent fencing is not provided, temporary construction fencing to contain Gateway Marketplace Subdivision Exhibit C Page 2 2.2 2.3 2.4 2.5 2.6 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARfNG DATE OF 2/1 6/2006 1.1.4 debris must be installed around the perimeter prior to issuance of a building permit. All fencing should be installed in accordance with City Code. Any tree over 4" in caliper that is removed from the property shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were removed. Required landscaping trees will not be considered as replacement trees for those trees that have to be mitigated. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per MCC 12-4-13, unless otherwise approved by the Irrigation District(s). Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or nonhapproval submitted to the Public Works Department. If lateral users association approval can not be obtained, alternate plans will be reviewed and approved by the City Engineer prior to final plat signature. 1.1.5 1.1.6 Staff's failure to cite specific ordinance provisions or terms of the approved Preliminary Plat does not relieve the applicant of responsibility for compliance. Preliminary plat approval shall be subject to the expiration provisions set forth in UDC 11-6A. 1.1.7 2. Public Works Department 2.1 Sanitary sewer service to this development is being proposed via extension of mains in Ustick Road. The applicant shall install all mains necessary to provide service; applicant shall coordinate main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in confonnance of City of Meridian Public Works Departments Standard Specifications. Water service to this site is being proposed via extension of mains in V stick Road. The applicant shall be responsible to install water mains to and through this development, coordinate main size and routing with Public Works. Due to the commercial uses on this project, a connection to the water main in Eagle Road shall be required to guarantee adequate fire flow. Coordinate main size and routing with the Public Works Department. The applicant shall provide a 20-foot easement for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easements shall not be dedicated via the plat. The description shall be consistent with the graphically depicted easements on the plat but be recorded as a separate document using the City of Meridian' s standard fonus. Submit an executed easement (supplied by Public Works), a legal description, which must include the area of the easement (marked EXHIBIT A) and an 81/2" x 11" map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. ' The applicant has indicated the pressure irrigation system in this development is to be maintained as a private system, therefore plans and specifications will be reviewed by the Public Works Department as part of the construction plan review. A "draft copy" of the operations and maintenance manual will be required prior to plan approval with the "final draft" being required prior to final plat signature on the last phase ofthis project. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round Gateway Marketplace Subdivision Exhibit C Page 3 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 CITY OF MERIDIAN PLANNING DEPARTMENT STAfF REPORT FOR THE HEARING DATE OF 2116/2006 2.7 2.8 source of water (UDC 11-3A-6). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single~point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to signature on the final plat by the City Engineer. AU existing structures shall be removed prior to signature on the final plat by the City Engineer. Any existing domestic wells and/or septic systems within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non- domestic purposes such as landscape irrigation. 2.9 All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11-3A-6. Plans shall be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department. If lateral users association approval can't be obtained, alternate plans shall be reviewed and approved by the Meridian City Engineer prior to final plat signature. A drainage plan designed by a State ofIdaho licensed architect or engineer is required and shall be submitted to the City Engineer (Ord. 557, 10-1 ~91) for all off~street parking areas. Stonn water treatment and disposal shall be designed in accordance with Department of Environmental Quality 1997 publication Catalog of Stonn Water Best Management Practices for Idaho Cities and Counties and City of Meridian standards and policies. Off-site disposal into surface water is prohibited unless the jurisdiction which has authority over the receiving streanl provides written authorization prior to development plan approval. The applicant is responsible for filing all necessary applications with the Idaho Department of Water Resources regarding Shallow Injection Wells. Street signs are to be in place, water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved and the Final Plat for this subdivision shall be recorded, prior to applying for building pern1Ïts. A letter of credit or cash surety in the amount of 110% will be required for all uncompleted fencing, landscaping, amenities, pressurized irrigation, sanitary sewer, water, etc., prior to signature on the final plat. All development improvements, including but not limited to sewer, fencing, micro-paths, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as detennined during the plan review process, prior to signature on the tìnal plat per Resolution 02-374. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. Applicant shall be responsible for application and compliance with and NPDES Pennitting that may be required by the Environmental Protection Agency. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Anny Corps of Engineers. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. The engineer shall be required to certify that the street centerline elevations are set a minimum of 2.10 2.11 Gateway Marketplace Subdivision Exhibit C Page 4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 211 6/2006 3-feet above the highest established peak groundwater elevation. 3. Meridian Fire Department 3.1 Acceptance of the water supply for fIre protection will be by the Meridian Fire Department and water quality by the Meridian Water Department for bacteria testing. 3.2 Final Approval of the fire hydrant locations shall be by the Meridian Fire Department. a. Fire Hydrants shall have the 4 W' outlet face the main street or parking lot aisle. b. The Fire hydrant shallnot face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works specifications. d. Fire Hydrants shall be placed on comers when spacing permits. e. Fire hydrants shall not have any vertical obstructions to outlets within 10'. f. Fire hydrants shall be place 18" above finish grade. g. Fire hydrants shall be provided to meet the requirements of the IFC Section 509.5. h. Show all proposed or existing hydrants for all new construction or additions to existing buildings within 1,000 feet ofthe project. 3.3 All entrance and internal roads and alleys shall have a turning radius of 28' inside and 48' outside radius. 3.4 Provide a 20~foot wide Fire Lane for all internal roadways all roadways shall be marked in accordance with Appendix D Section D 1 03.6 Signs. Operational fIfe hydrants, temporary or pennanent street signs and access roads with an all weather surface are required before combustible construction is brought on site. Commercial and office occupancies will require a fire-flow consistent with the International Fire Code to service the proposed project. Fire hydrants shall be placed per Appendix D. The 23 office/commercial lots lot will have an unknown transient population and will have an unknown impact on Meridian Fire Department call volumes. The Meridian Fire Department has experienced 2612 responses in the year 2004. According to a report completed by Fire & Emergency Services Consulting Group our requests for service are projected to reach 2800 in the year 2005 and 3800 by the year 2010. Maintain a separation of 5' from the building to the dumpster enclosure. Provide a Knox box entry system for the complex prior to occupancy. The applicant shall work with Planning Department staff to provide an address identification plan and a sign which meets the requirements of the City of Meridian sign ordinance at the required intersection(s ). The Fire Dept. has concerns about the ability to address the project and have the addresses visible from the street which the project is addressed off of. Please contact Vicki Heugly at 898-5500 to address this concern prior to the public hearing. Gateway Marketplace Subdivision Exhibit C Page 5 3.15 3.16 3.17 3.18 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2116/2006 3.12 All aspects of the building systems (including exiting systems), processes & storage practices shall be required to comply with the Intematiollal Fire Code. 3.13 Provide exterior egress lighting as required by the Intemational Building & Fire Codes. 3.14 \ Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet (122 m) from a hydrant on a fIfe apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the code official. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2 the distance requirement shall be 600 feet (183). i. For Group R~3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). ii. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet (183 m). There shall be a fire hydrant within 100' of all Fire Department connections. Buildings over 30' in height are required to have access roads in accordance with Appendix D Section D I 05. Side yard fences shall not be allowed. Buildings or facilities having a gross building area of more than 62,000 square feet (5760 m2) shall be provided with two separate and approved fire apparatus access roads. Exception: Projects having a gross building area of up to 124,000 square feet (11520 m2) that have a single approved fIre apparatus access road when all buildings are equipped throughout with approved automatic sprinkler systems. (Remoteness Required) 4. Police Department 4.1 The police department supports the requirement for a frontage road as the length and bulk of the proposed buildings impedes serviceability to all sides of the project. 5. Parks Department 5.1 Standard for Mitigation of trees: The standard established in the City of Meridian Landscape Ordinance 11-3B will be followed. 5.2 5.3 6. Standard Plan for Protection of Existing Trees during Construction: The standard established in the City of Meridian Landscape Ordinance Tree Grate and Tree Box standard: The proposed tree grate shall be a 6 foot by 6 foot, cast iron, French pattern tree grate. This grate shall be placed in a 6 foot by 6 foot inside diameter tree box with a steel grate frame set in concrete. Prior to CZC approval, contact Meridian Parks and Recreation Department for specifications and tree box construction drawings. Sanitary Service Company Gateway Marketplace Subdivision Exhibit C Page 6 7.6 7.7 7.8 7.9 7.10 7.11 7.12 7.13 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/1 6/2006 6.1 Please contact Bill Gregory at SSC (888-3999) for detailed review of your proposal and submit stamped (approved) plans with your certificate of zoning compliance application. Ada County Highway District 7. Site Specific Conditions of Approval 7.1 Re~construct the northern driveway, on the adjacent t1ag lot, as a curb return driveway with minimum15~foot curb radii. This driveway shall be no wider than 30-feet. 7.2 Construct one new curb return driveway with minimum 15-foot curb radii located approximately 120-feet north of the south property line as proposed on the revised site plan. This driveway shall be no wider than 30-feet. 7.3 Close the existing curb cut driveway located approximately 96-feet south ofthe north property line with curb, gutter, and sidewalk to match existing improvements. 7.4 Comply with all Standard Conditions of Approval. Standard Conditions of Approval 7.5 Any existing irrigation facilities shall be relocated outside of the right-of-way. Private sewer or water systems are prohibited from being located within any ACHD roadway or right-of-way. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. Comply with the District's Tree Planter Width Interim Policy. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file nW11bers) for details. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certifY all improvement plans. The applicant shall submit revised plans for staff approval, prior to issuance of building pennit (or other required permits), which incorporates any required design changes. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. Gateway Marketplace Subdivision Exhibit C Page 7 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 7.14 7.15 7.16 7.17 Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Road Impact Fee Ordinance. It is the responsibility of the applicant to verify aII existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subj ect property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. Exhibit D. Required Findings from Unified Development Code Preliminary Plat Findings (UDC 11-6B-6): In determining the acceptance of a proposed subdivision, the Commission and Council shall consider the objectives of this Title and at least the following: A. The conformance of the subdivision with the Comprehensive Development Plan; In Chapter VII of the Comprehensive Plan, 'Mixed Use Regional' is defined as areas including commercial and residential development consistent with auto and service oriented uses. Staff finds that the requested General Commercial (C-G) zoning designation is in accord with the Comprehensive Plan's Future Land Use Map, which delineates the subject property as "Mixed Use- Regional". The purpose of the C-G district is "to provide for a review of the impact of proposed commercial uses which are auto and service oriented and are located in close proximity to major highway or arterial streets; to fulfill the need of travel-related services as well as retail sales for the transient and permanent motoring public." Staff finds that the proposed zoning is in general confonnance with the comprehensive plan (please see Section 7 of the Staff Report for detailed analysis of specific comprehensive plan action items that apply to this development). The applicant wiII need to revise the site design and allow staff time to complete a detailed analysis in relation to the interconnectivity of the site, compliance with the Eagle Road corridor provisions, and general classification for the site layout ( not constituting a strip development) B. The availability of public services to accommodate the proposed development; The site is intended for commercial uses which, based on the Comprehensive Plan description, will have such uses as retail, wholesale, service and office uses, as well as appropriate public uses such as government offices. The applicant will be responsible for the extension of all utilities necessary to serve this proposed development. Pennanent sanitary sewer service to this development is to be Gateway Marketplace Subdivision Exhibit C Page 8 ~ CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT FOR THE HEARING DATE OF 2/16/2006 provided by the extension of sewer in Ustick Road and extended south through the site to be looped with extensions in Eagle Road. The applicant will be responsible for the extension of utilities to and through this proposed development. Sizing and routing shall be coordinated with the PubJic Works Department. Other urban services, such as water, are near to this site and the applicant should be able to extend such services to the site. The applicant and/or future property owners will be required to pay park and highway impact fees. ACHD has submitted a staff report with site specific and standard conditions which will is attached as Exhibit C. On December 28, 2005, a joint agency/department comments meeting was held with representatives of key service providers to this property. Based on the joint agency/department meeting and other comments received from agencies/departments, staff finds that except for sanitary sewer, the public services listed above can be made available to accommodate the proposed development. The Commission and Council should reference any written and/or verbal testimony submitted by any public service provider, regarding their ability to adequately service tIllS project. If approved, the developer will be financing the extension of sewer, water, local street infrastructure, utilities and irrigation services to serve the project. The primary public costs to serve the future residents will be fire, police and school facilities and services. Staff fmds there will not be excessive additional requirements at public cost and that the proposed zoning and subsequent development will not be detrimental to the community's economic welfare. C. The continuity of the proposed development with the capital improvement program; Because the developer is installing sewer, water, and utilities for the development at their cost, the subdivision will not require the expenditure of capital improvement funds. D. The public financial capability of supporting services for the proposed development; Please see Exhibit B for comments and conditions from other agencies and departments. E. The other health, safety or environmental problems that may be brought to the Commission's attention. Staff is not aware of any health, safety or general welfare problems associated with the development of this subdivision that should be brought to the Councilor Commission's attention. ACHD considers road safety issues in their analysis. Staff recommends that the Commission and Council reference any public testimony that may be presented to deternllne whether or not the proposed subdivision may cause health, safety or environmental problems of which staff is unaware. Staff would not find the existing design in the best interests of the City of Meridian due to the lack of intercol1l1ectivity to the surrounding properties. The lack of a frontage road isolates tIllS parcel as a strip development that does not provide the best product for future servicing of the site by fire, police and general citizens of the City of Meridian. Staff recommends redesign as detailed in this report. F. The development preserves significant natural, scenic or historic features. Staff is not aware of any natural, scenic or historic features which require preservation. The applicant will be required to maintain, fence, and improve the waterways which are existing on this site. Kohl's CUP Application Exhibit F Pagc 1 .-..----~ ~ -------