HomeMy WebLinkAboutACHD Email V1CUEIDR IAy
APPROVED
Jon Wardle
WE 04/25/22
Tuesday, January 11, 2022 1:47 PM
iIIfNUMBER: H- 22-° Joshua Beach; John Ringert
u ject: Fwd: Brighton Village at Meridian Multi -Family Residential
Yes. Seethe note below.
Jon Wardle, President Brighton Development, Inc.
Brighton Corporation I www.brightoncorp.com
2929 W. Navigator Drive, Ste. 400, Meridian, ID 83642
Office 208.378.4000 1 Direct 208.287.0518 1 Cell 208.871.9361
Email jwardle@brightoncorp.com
Begin forwarded message:
From: John Ringert <JRINGERT@kittelson.com>
Date: December 15, 2021 at 5:47:54 PM MST
To: Paige Bankhead <pbankhead@achdidaho.org>, Mindy Wallace <Mwallace@achdidaho.org>
Cc: Jon Wardle <jwardle@brightoncorp.com>, John Gabrielsen <John@brightoncorp.com>
Subject: RE: Brighton Village at Meridian Multi -Family Residential
Thanks, Paige!
John F. Ringert, P.E.
Senior Principal Engineer
Kittelson & Associates, Inc.
101 South Capitol Boulevard, Suite 600
Boise, Idaho 83702
www.ki on.com
irinaert ekittelson.com
208.472.9802 (direct)
208.863.0201 (cell)
208.338.2685 (fax)
From: Paige Bankhead <pbankhead@achdidaho.org>
Sent: Wednesday, December 15, 2021 4:14 PM
To: John Ringert <JRINGERT@kittelson.com>; Mindy Wallace <Mwallace@achdidaho.org>
Cc: Jon Wardle <jwardle@brightoncorp.com>; John Gabrielsen <John@brightoncorp.com>
Subject: RE: Brighton Village at Meridian Multi -Family Residential
Hi John,
Thank you. The analysis is acceptable.
Paige Bankhead, E.I.
Assistant Traffic Engineer
Ada County Highway District
Development Services
1301 N. Orchard St. Ste. 200
Phone: (208) 387-6293
CUEIDR IAy
APPROVED
DATE 04/25/22
.4kt.,
ice
FILE NUMBER: H 22 o 08
are emporarily down one person in our group and have a high volume of development applications
that are under review. Thank you in advance for your patience.
From: John Ringert <JRINGERT@kittelson.com>
Sent: Wednesday, December 1, 2021 10:01 AM
To: Mindy Wallace <Mwallace@achdidaho.org>
Cc: Paige Bankhead <pbankhead@achdidaho.org>; Jon Wardle <jwardle@brightoncorp.com>; John
Gabrielsen <John@brightoncorp.com>
Subject: RE: Brighton Village at Meridian Multi -Family Residential
CAUTION: This email originated from outside your organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
Hi Mindy,
Attached is an abbreviated traffic analysis for the Brighton Meridian Village Multi -Family Development
for your review.
I hope we captured what ACHD needs with respect to the traffic operations at the driveways. But don't
hesitate to call or email me if you have any questions or need any additional information.
Thanks,
John
John F. Ringert, P.E.
Senior Principal Engineer
Kittelson & Associates, Inc.
101 South Capitol Boulevard, Suite 600
Boise, Idaho 83702
www.kittelson.com
irinaert _kittelson.com
208.472.9802 (direct)
208.863.0201 (cell)
208.338.2685 (fax)
From: Mindy Wallace <Mwallace@achdidaho.org>
Sent: Thursday, October 14, 2021 8:17 AM
To: John Ringert <JRINGERT@kittelson.com>
Subject: RE: Brighton Village at Meridian Multi -Family Residential
Hi John,
You have captured what I had in mind. A COMPASS model run won't be necessary.
Please let me know if you have any questions.
�E IDIAN>
APPROVED lent
llace, AICP
eview Supervisor
DATE: 04/25/22
Services
i I NUMBER: H- 22-o 16178
From: John Ringert <JRINGERT@kittelson.com>
Sent: Wednesday, October 13, 20214:21 PM
To: Mindy Wallace <Mwallace@achdidaho.org>
Subject: Brighton Village at Meridian Multi -Family Residential
CAUTION: This email originated from outside your organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
Hi Mindy,
Jon Wardle mentioned that he talked to you about their project at the NE corner of Fairview/River
Valley and scope for a TIS. It is a relatively large development with 472 units planned, but the roadway
system is pretty much built -out.
I was thinking we would want to analyze the right -in, right -out driveway on Records as well as evaluate
the need for a right -turn lane at that driveway and should also analyze the driveway at Elden Gray St
even though I don't think there will be any issues. I am also not sure if doing the COMPASS area of
influence modeling is necessary.
What are your thoughts about scope for the TIS?
Thanks,
John
�'' f { a
7
APPROVED
. - .� �.
- _: •�
04/25/22
DATE -
FILE eutileta:
'
f i
}a
Y} 7h
-d-
�.
—
O'1!JL4Jl+i'G'8?�3
�i4rJfr�l�1 +
John F. Ringert, P.E.
Senior Principal Engineer
Kittelson & Associates, Inc.
101 South Capitol Boulevard, Suite 600
Boise, Idaho 83702
www.kittelson.com
i rinaertft_kittelson.com
208.472.9802 (direct)
208.863.0201 (cell)
208.338.2685 (fax)
a: ti:U.,.�l..'
4