Loading...
4.8 SHEET STREET AND DRAINAGE DETAILS V1�I I I 00 M 0 I I. POND 1 PRIMARY V100: 7,456 FT"3 CAPACITY: 8,278 FT^3 to TOP OF BANK: 2537.28 100-YR HW LINE: 2536.78 b N SIDE SLOPES: 3H:1V BOTTOM OF POND: 2533.78 BSM LENS AREA: 1,690 FT"2 1 8 MAX WATER DEPTH: 3.0 FT D I HIGHEST GW: ±2530.78 - Im 19 410* 0 I II BERM: 2536.78 y 18 LF OF 12" SDR-35 00.28% 3 .03 FG START INV:2533.83 k a� END INV:2533.78 38. FG V I ISDMH 1 36.78 \ 37.28 FG J POND 1 FOREBAY -V100: 828 FT-3 . CAPACITY: 1,057 FT"3 TOP OF BANK: 2537.28 100-YR HW LINE: 2536.78 SIDE SLOPES: 3H:1V BOTTOM OF POND SLOPES: 2534.03-2533.83 MAX WATER DEPTH:2.95 FT HIGHEST GW: ±2530.78 0 STORM DRAIN POND #1 PLAN VIEW SCALE: 1 "=20' POND 2 V100: 3,745 FT"3 CAPACITY: 6,658 FT^3 TOP OF BANK: 2537.62 NJ 100-YR HW LINE 2537.12 SIDE SLOPES: 3H:1V POND TOE: 2535.72 BOTTOM OF POND/BSM LENS ELEVATION: 2535.62 BSM LENS AREA: 1,467 FT^2 MAX WATER DEPTH: 1.50 FT HIGHEST GW ELEV:2532.62 SDMH SDMH 2. RIM: 2538.12 INV IN: 2535.82 12"NE INV OUT:2535.82 12"SW SUMP: 2533.82 CONSTRUCT 4 LF -, 12" SDR 35 @ 2.50%. _ (FROM SDMH 2 TO POND 2) INV ® POND: 2535.72 - A STORM DRAIN POND #2 PLAN VIEW SCALE: 1 "=20' / *HYDROSEED PROVIDE INLET FINISH MIX TO BE ACCORDING TO EMBANKMENT AND DIVIDER PROTECTION APRON & RIP THE 'ACHD STORMWATER MANAGEMENT BASIN BERM MATERIAL PER SOILS RAP PER ACHD SD-628 REVEGETATION GUIDANCE MANUAL" (OCTOBER ENGINEER AND COMPACTION 0 POND INLETS 2017) IN APPENDIX D. BIORETENTION PLANTERS TO 95% REQUIRED (PER SHALL BE LANDSCAPED ACCORDING TO ACHD'S AASHTO T180). ARMORED SPILL CHANNEL. "PLANT MATERIALS FOR BIORETENTON FACILITITES FREEBOARD SEE DETAIL THIS SHEET. IN THE RIGHT-OF-WAY" _ ..- ... -... -... -... - ... -..-...- ... - ... - ... - ... 100 YEAR LEVEL (- I SIDE SLOPES AS -I SPECIFIED II *HYDROSEED FINISH I a -I EXCEPT FOR BSM I w LENS w INFLOW I- 3 a SLOPE 1% MIN (- LINE POND W/ 4" MIN TO BSM LENS TOP SOIL OR AMENDED - NATIVE MATERIAL MIN. 3' SEPARATION -III-III-III-III III -III FROM SEASONAL HIGH G.W. BOTTOM OF BSM = MAX. EXCAVATION DEPTH TYPICAL POND SECTION [POND 21 GROUNDWATER WAS ENCOUNTERED IN (INFILTRATION BASIN TEST EXCAVATIONS - SEE INDIVIDUAL POND DETAJ PER ACHD BMP 10) ELLEVATIONS.LS FOR EXPECTED HIGH GW -NTS- NOTE: 1. NOT USED. 2. GROUNDWATER WAS ENCOUNTERED IN TEST EXCAVATIONS ON THIS SITE. IF GROUNDWATER IS ENCOUNTERED HIGHER THAN INDICATED ON THE PLANS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY FOR REDESIGN TO PROVIDE 3' MINIMUM CLEARANCE BETWEEN GROUNDWATER AND THE BOTTOM OF THE DRAINAGE FACILITY. UNTIMELY NOTIFICATION OF THE ENGINEER MAY RESULT IN ADDITIONAL COSTS TO THE CONTRACTOR. REFER TO GEOTECHNICAL ENGINEERING REPORT BY SITE CONSULTING, LLC, DATED 06/04/2014 AND UPDATED GROUNDWATER MONITORING REPORT DATED 10/28/2019. 3. ALL MONITOR WELLS SHALL HAVE A CONCRETE APRON POURED AROUND THE CAP. 4. CONTRACTOR TO HAVE PERCOLATION TEST PERFORMED BY SOILS ENGINEER AFTER POND IS FULLY EXCAVATED. CONTRACTOR WILL NEED TO BLAST (OR BORE) TO CREATE CONDUIT FOR DRAINAGE TO OCCUR. THIS BLASTING (OR BORING) WILL BE REQUIRED TO ACHIEVE DESIGN INFILTRATION OF 5 IN/HR. IF THE PERCOLATION IS LESS THAN SPECIFIED BY THE SOILS REPORT AND ENGINEER (5"/HOUR) REDESIGN OF THE SYSTEM WILL BE REQUIRED. 5. COORDINATE W/ LANDSCAPE PLAN FOR VEGETATION. J CV 11 TII 38.02 FG 37.52 FG 13 �. z I POND 3 PRIMARY V100: 3,213 FT"3 CAPACITY: 5,298 FT^3 M TOP OF BANK: 2538.02 �N 100-YR HW LINE: 2537.52 SIDE SLOPES: 3H:1V BOTTOM OF POND: 2 O BSM LENS AREA: 1,475 475 FT"2 MAX WATER DEPTH: 1.90 FT CC 6+100\n cw HIGHEST GW: ±2532.62 - C / I'I 14 I I� rn 15 12" SDR-35 00.44% START INV:2535.67 M, END INV:2535.62 35. 7 FG N, BOTH SPUTTER MANHOLES ARE TO BE 48" ID PRECAST PER ISPWC SD-611 W/ 2' SUMP z1 1 KEYNOTES QQ Q1 PROVIDE METAL END SECTION WITH TRAS:RACK & RIP RAP AT THE POND INLET. z 0 a o VARIES z 0 w VARIES I 6'- m VARIES N 2" DRAIN ROCK COVER co 2i CONTT. SAND LENS ----- (ASTM C-33 ----- SAND REQUIRED) ----- EXCAVATE TO FREE DRAINING MATERIALS - - WHERE SAND LENS IS ----- SPECIFIED (LENS SHOWN IN PLAN VIEW THIS SHEET). BACKFILL WITH REJECT SAND OR -3/4" CRUSHED GRAVEL 24"- 3' MIN *3II�I&0I; _�IW111 DRAINAGE SDMH INV IN SDMH SDMH INV OUT PIPE LENGTH/SLOPE INV CAD FOREBAY INV OUT PIPE LENGTH/SLOPE INV 0 PRIMARY AREA RIM ELEV SUMP ELEV (TO FOREBAY) [SDMH TO FOREBAY] (TO PRIMARY) [SDMH TO PRIMARY] 1 2534.13 12" 2537.28 2532.13 2534.13 12" 12 LF 12" SDR-35 0 0.83% 2534.03 12" 2534.33 12" 20 LF 12" SDR-35 0 2.75% 2533.78 12" 3 2535.92 12" 2538.00 2533.92 2535.92 12" 6 LF 12" SDR-35 0 0.83% 2535.87 12" 2536.12 12" 14 LF 12" SDR-35 0 3.57% 2535.62 12" / WIDTH PER PLAN TOOLED JOINT 1" BATTER n 1.75% f.25% SLOPE 00 _�....# _ _ , _�.. _ =g . _� =v _ __ "� _ "4= •; 'S`%.= ; " �' _�" a ,. ASPHALT PAVEMENT �... .v SLOPE `m. MINUS �• CRUSHED GRAVEL • ; , NOTE:CROSS SLOPE SHALL NOT EXCEED THICKENED EDGE SIDEWALK DETAIL 2.00% AT ANY SIDEWALK, HANDICAP PARKING OR OTHER ACCESSIBLE ROUTE - -NTS- THERE IS NO TOLERANCE ALLOWED ABOVE 2.00% LINING TO EXTEND TO TOP OF BANK & CENTER OF BERM (MIN) o -I W.S. 100 YEAR LEVEL SOD FINISH EXCEPT I- -I FOR BSM LENS I Q z (BSM TO BE PRIMARY w 3 w HYDROSEEDED*) ¢ '�• =I ' 6" CLAY e 'ti• EMBANKMENT AND DIVIDER a > LINER BERM MATERIAL PER SOILS SLOPE 1% MIN PROVIDE METAL SEE CUT -THROUGH SLOPE 1% MIN III ENGINEER AND COMPACTION TO BSM LENS END SECTION W/ DETAIL THIS SHEET TO OUTLET TO 95% REQUIRED (PER -RACK-&- AASHTO T180TRASH ). RIP RAP AT INLET III -III -III -III -_-_-_- 1=I I I=I I I=I I I=I I I I I Ed I I=I I Ed I I CLAY LINER AS SPECIFIED - -I (FOREBAY ONLY) VARIES, EXTEND 2' INTO FREE DRAINING MATERIAL. HIGHEST RECORDED GW ELEVATION= VARIES EXCAVATION OF PONDS IS TO OCCUR WITH A QUALIFIED TYPICAL POND SECTION [PONDS 1 & 31,& GEOTECHNICAL ENGINEER AND/OR PROJECT ENGINEER (PER ACHD BMPS 10&11Z BIORETENTION SOIL MIX SPECIFICATIONS ON -SITE. -NTS- 60% SAND 20% SANDY LOAM (SILT, SAND, CLAY) 20% COMPOST zi WIDTH PER KEYNOTES 2' FLAT LANDING I GL PLACE 8" MIN. OF 3/4" MINUS CHRUSHED AGGREGATE COMPACTED TO 95% DRY DENSITY. OVER COMPACTED EQUALIZATION SUBGRADE. BASIN SLOPE SEE PUMP STATION PLANS Q GRAVEL ACCESS PAD TYPICAL SECTION NOT TO SCALE TOP OF BERM- ELEV PER PLAN 12" STAINLESS STEEL PIPE CAP WEDGE PRODUCT PART NUMBER 6015.S OR APPROVED EQUIVALENT. SECURELY ATTACH CAP TO PIPE. DO NOT GLUE. CUT OPENING A'. SHOWN IN END POND PRIMARY CAPS 1 �I SDR-35 OUTLET PIPE PRIMARY BOTTOM PIPE SIZE & FLOW SLOPE PER PLAN FOREBAY BOTTOM OPENING INV = PIPE It SLOPED 1% TO SLOPED 1% TO BSM INLET PROVIDE TRASH PROVIDE TRASH POND FOREBAY BSM LENS:i::2 RACK & RIP RACK 0 INLET RAP 0 OUTLET FOREBAY/PRIMARY CUT -THROUGH DETAIL z, -NTS- PL I CAPACITY OF SWALE AS SHOWN 3.0 ft^3/ft NO SOD OVER SAND LENS CREATE POSITIVE SLOPE OF 0.2% MIN TO SAND LENS FILTER FABRIC SIDES & TOP OF INFILTRATION WINDOW �o Z •wL� 3 W Z 3 = a W zw fY � W ~ w Z_ u' 'cc Z m W �o J N- /i w V w 5g\ONAL FNc O\STE,, o GF 2 03/11AA/2022 � H 2 F�TF OFF S. CRP CHECKED BY: DAVID A. BAILEY P.E. (N 0 0 0 a F a = r U N a N w 0 � w N a N 1 Ln p N > N 1 W O O M z%� • V / I/\ �i/ J U • Z Q W 0 Z Q 7 0 Z 2 1/2" ASPHALT 4" OF 3/4" MINUS CRUSHED AGGREGATE 12" OF 6" MINUS PIT RUN (PARKING) PARKING LOT SECTION NOT TO SCALE 20 0 10 20 40 SCALE IN FEET 1 "=20' W rW^ Z om 0 - W J1 Q W /�� V % W0 Y W 00 NW L.L Plans Are Accepted For Public W W 0 J Street Construction '013-024 SHEET U