HomeMy WebLinkAbout2022-04-22 ACHD
Mary May, President
Alexis Pickering, Vice-President
nd
Jim D. Hansen, 2 Vice President
Kent Goldthorpe, Commissioner
Dave McKinney, Commissioner
April 22, 2022
Caleb Hood (via e-mail)
RE: Black Cat Industrial Park
Caleb,
As you are aware, we have had several inquiries from developers in Meridian, reaching out to ACHD with
concerns about transportation related conditions being contemplated by the City, such as widening arterial
roadways and intersections.
ACHD has had great success with improvements being constructed through Cooperative Development
Agreements (CDAs), and Meridian has benefitted greatly from these projects over the last two decades. These
types of agreements are used on a limited basis, and only along a corridor or intersection where the developer
owns/controls all of the parcels. ACHD cannot condemn right-of-way for improvements constructed through a
CDA, and we do not allow construction of a partial mile, such as a 2-lane road transitioning to a 5-lane road and
then back to a 2-lane road all within one mile. Similarly, you can’t improve only a portion of an intersection.
Even if there is sufficient right-of-way, there are also budgetary and staffing constraints. Advancing projects
takes dollars out of the budget which could take away from already programmed capital projects in Meridian.
Additionally, we do not have staff dedicated solely to CDA projects. Our priority in Development Services is the
review and approval of development applications and associated civil drawings and plats. CDA projects require a
lot of work and oversight by both our office and field personnel, so the project also needs to “make sense” in
regard to the overall roadway network. The Integrated Five Year Work Plan that was adopted in January, reflects
the City’s priorities (attached). We are unable to move up or prioritize projects in Meridian that are not in the
IFWYP, that was adopted in January.
ACHD can only require what is allowed by Policy Section 7200, and anything more is only an “ask”. The biggest
benefit of development for future roadway improvements is that we purchase right-of-way on the arterial roads
ahead of the capital project which will help keep the programmed projects on track, in line with the IFYWP. The
construction of turn lanes at subdivision entrances is also a huge benefit. ACHD policies address when turn lanes
should be required.
This applicant does not have the ability to obtain the necessary right-of-way to make full roadway improvements
to Franklin Road or Black Cat Road, or intersections along those roadways. The applicant will be required to
construct center turn lanes and deceleration lanes where warranted and feasible. The applicant will also be
required to pay ACHD impact fees. Impact fees are collected for roadway and intersection improvements
included in the 20 year Capital Improvement Plan.
Sincerely,
Christy Little
Development Services Manager
___________________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208 387-6100 • FX 345-7650 • www.achdidaho.org
City of Meridian 2021 Prioritization Requests - Project Update
Updates include 'revised'draft FY2022-2026 IFYWA Programming status is subject to change.
2021 Current IFYWP Programming Status
Priority I Construction
Ranking Agency Project Name Agency Project Description Design YR I ROW YR YR ACHD Response A CHD Implementation Project Name
Roads & Intersections
Project added to IFYWP for discussion purposes.
Widen Linder Rd to 5 lanes and construct a new 4-lane 1-84 overpass, including curb, gutter, ACHD to coordinate with ITD on request. Project
sidewalk,and bike lanes in accordance with the 2016 CIP.Project would be a joint project between to move forward when funding partnership is
1 Linder Rd, Overland Rd/Franklin Rd ACHD and ITD 2022 Future Future possible. Linder Rd,Overland Rd/Franklin Rd
Widen Locust Grove Rd to 5 lanes with curb,gutter,sidewalk and bike lanes in accordance with the
2 Locust Grove Rd,Victor Rd/Overland Rd 2016 CIP. 2019 2020-2021 2023 Project programmed to be constructed in 2023. Locust Grove Rd, Victory Rd/Overland Rd
Widen Locust Grove Rd to 3 or 5 lanes with curb, gutter, sidewalk, and bike lanes in accordance Locust Grove Corridor B:Locust Grove Rd,
3 Locust Grove Rd, Fairview Ave/Ustick Rd with the 2016 CIP. 2026 Future Future Project programmed to be designed in 2026. Fairview Ave/Ustick Rd
Widen intersection to 9 lanes on Fairview Ave and 7 lanes on Locust Grove Rd, including curb,
4 Fairview Ave and Locust Grove Rd gutter,sidewalk,and bike lanes in accordance with the 2016 CIP. 2020-2021 2022-2023 2025 Project programmed to be constructed in 2025. Fairview Ave and Locust Grove Rd
Widen Ten Mile Rd to 5 lanes with curb, gutter, sidewalk, and bike lanes in accordance with the Project programmed to be constructed in 2022-
5 Ten Mile Rd,Victory Rd/Overland Rd 2016 CIP. 2019 2020-2021 2022-2023 2023. Ten Mile Rd, Victory Rd/Overland Rd
Widen Victory Rd to 3 lanes with curb,gutter,sidewalk,and bike lanes in accordance with the 2016 Victory Corridor A:Victory Rd,Locust Grove
6 Victory Rd, Locust Grove Rd/Eagle Rd CIP. 2025 2026 Future Project programmed to be designed in 2025. Rd/Eagle Rd
Widen Ustick Rd to 5 lanes with curb,gutter,sidewalk,and bike lanes in accordance with the 2016 Project programmed to be constructed in 2024.
7 Ustick Rd,Ten Mile Rd/Linder Rd CIP. 2022 2023 2024 Concept Study in 2021. Ustick Rd,Ten Mile Rd/Linder Rd
Project programmed to be designed in 2025. North Meridian Improvements A:Linder Rd,
8 Linder Rd, Cher Ln/Ustick Rd Widen Linder Rd to 3 lanes with curb,gutter,sidewalk,and bike lanes in accordance with 2016 CIP. 2025 2026-2027 Future Concept Study in 2022. Cherry Ln/Ustick Rd
Locust Grove Corridor B:Locust Grove Rd,
9 Locust Grove Rd,Amity Rd/Victory Rd Widen Locust Grove Rd to 5 lanes with curb,gutter,and pedestrian and bike facilities. 2026 Future Future Project programmed to be designed in 2026. Amity Rd/Victory Rd
Widen Victory Rd to 3 lanes with curb,gutter,sidewalk,and bike lanes in accordance with the 2016 Victory Corridor A:Victory Rd,SH 69
10 Victory Rd, Meridian Rd/ Locust Grove Rd CIP. 2025 2026 Future Project programmed to be designed in 2025. (Meridian Rd)/Locust Grove Rd
Not Not Not To be evaluated and prioritized for possible North Meridian Improvements B:Cherry Ln
11 Ten Mile Rd/Cherry Ln Intersection improvements to include dual left turn lanes. Programmed Programmed Programmed inclusion into future IFYWP updates. and Ten Mile Rd
South Meridian Improvements B:Overland Rd
12 1 Eagle Rd /Overland Rd Intersection improvements to include dual left turn lanes. Future Future Future Concept Study in 2023. and Eagle Rd
Not Not Not To be evaluated and prioritized for possible McMillan Rd,SH 69(Meridian Rd)/Locust
13 McMillan Rd, Meridian Rd/Locust Grove Rd Widen McMillan Rd to 3 lanes with curb,gutter,sidewalk,and bike lanes. Programmed Programmed Programmed inclusion into future IFYWP updates. Grove Rd
Not Not Not To be evaluated and prioritized for possible
14 McMillan Rd, Linder Rd/ Meridian Rd Widen McMillan Rd to 3 lanes with curb,gutter,sidewalk,and bike lanes. L6.Proqrammed Pro rammed Programmed inclusion into future IFYWP updates. McMillan Rd,Linder Rd/SH 69(Meridian Rd)
Construct a multi-lane roundabout with 2 lanes on Locust Grove legs and 1 lane on Victory legs in
15 Victory Rd and Locust Grove Rd Roundabout accordance with the 2016 CIP. 2019-2020 2020-2021 2023 Project programmed to be constructed in 2023. Victory Rd and Locust Grove Rd Roundabout
Widen Locust Grove Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes in accordance with
16 Locust Grove Rd, Ustick Rd / McMillan Rd the 2016 CIP. 2025 2026 Future Project programmed to be designed in 2025. Locust Grove Rd, Ustick Rd/McMillan Rd
Widen Meridian Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes in accordance with the
17 Meridian Rd, Ustick Rd/McMillan Rd 2016 CIP. 2025 2026 Future Project programmed to be designed in 2025. Meridian Rd,Ustick Rd/McMillan Rd
18 Ustick Rd and Black Cat Rd Construct a dual lane roundabout in accordance with the 2016 CIP. N/A N/A 2021 Project programmed to be constructed in 2021. Ustick Rd and Black Cat Rd Interim Signal
18 Ustick Rd and Black Cat Rd Construct a dual lane roundabout in accordance with the 2016 CIP. 2022 2023 2024 Project programmed to be constructed in 2024. Ustick Rd and Black Cat Rd
19 Ustick, Black Cat to Ten Mile Widen to 5 lanes with curb,gutter,sidewalk,and bike lanes. 2022 2023 2024 1 Project programmed to be constructed in 2024. Ustick Rd,Black Cat Rd/Ten Mile Rd
NEW REQUEST.To be evaluated and prioritized
Widen and improve pedestrian facilities. Some segments are already planned for improvement; for possible inclusion into future IFYWP updates.
having the full block complete would provide better connections to adjacent development and Not Not Not Part of this will be built out as a Coperative
20* Lake Hazel, Locust Grove to Eagle amenities. Programmed Programmed Programmed Development Agreement(CDA). Lake Hazel Rd,Locust Grove Rd/Eagle Rd
Widen Meridian Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes in accordance with the Meridian Rd,McMillan Rd/US20126
21 Meridian Rd, McMillan Rd/Chinden Blvd 2016 CIP. 2025 2026 Future Project programmed to be designed in 2025. (Chinden Blvd)
Widen and signalize intersection to 4/5 lanes on Eagle and 315 lanes on Lake in accordance with
22 Lake Hazel Rd and Eagle Rd the 2016 CIP. 2020 2022-2023 2024 Project programmed to be constructed in 2024. Lake Hazel Rd and Eagle Rd
Widen and signalize intersection to 5 lanes on Linder Rd and 6 lanes on Overland Rd in
23 Overland Rd and Linder Rd accordance with the 2016 CIP. 2021 2021 2022 Project programmed to be constructed in 2022. Overland Rd and Linder Rd
Victory Corridor D:Victory Rd,Linder Rd/SH
24 Victory, Linder to Meridian Widen to 3 lanes with curb,gutter,sidewalk,and bike lanes. 2026 Future Future Project programmed to be designed in 2026. 69(Meridian Rd)
Franklin Corridor A:Franklin Rd,McDermott
25 Franklin Rd, McDermott Rd/Black Cat Rd Widen Franklin Rd to 5 lanes with curb,gutter,sidewalk,and bike lanes. 2026 Future Future Project programmed to be designed in 2026. Rd/Black Cat Rd
Not Not _mmwmmof Please provide description of requested
26 Eagle Rd /Franklin Rd Not provided Programmed Programmed Programmed improvements. Eagle Rd and Franklin Rd
Widen intersection to 4 lanes Linder Rd and 5/6 lanes on Cherry Ln in accordance with the 2016 Not Not Not To be evaluated and prioritized for possible
27 Cherry Ln and Linder Rd CIP. Programmed Programmed Programmed inclusion into future IFYWP updates. CherryLn and Linder Rd
Widen intersection to 5/6 lanes on Black Cat Rd and 5 lanes on Cherry Ln in accordance with the Not Not Not Defer. Operating at a LOS D or better.
28 Cherry Ln and Black Cat Rd 2016 CIP. Programmed Programmed Programmed Reevaluate as conditions change. Cherry Ln and Black Cat Rd
Fairview Ave, SH 55(Eagle Rd)/Cloverdale Widen Fairview Ave to 7 lanes with curb, gutter, sidewalk, and bike lanes in accordance with the Not Not Not Defer. Operating at a LOS D or better. Fairview Ave,SH 55(Eagle Rd)/Cloverdale
29 Rd 2016 CIP. Programmed Programmed Programmed Reevaluate as conditions change. Rd
Linder Rd, Chinden Blvd (US 20/26)/SH 44 Widen Linder Rd in accordance with the 2016 CIP. Cross section to be determined through Project programmed to be designed in 2024- Linder Rd,Chinden Blvd(US 20/26)/SH 44
30 (State St) concept design.Project includes bridges#1078,#2033,#2034,#2035,and#2036. 2024-2025 2026 Future 2025. (State St)
Fairview Ave, Locust Grove Rd/SH 55 Widen Fairview Ave to 7 lanes with curb, gutter, sidewalk, and bike lanes in accordance with the Fairview Ave,Locust Grove Rd/SH 55(Eagle
31 (Eagle Rd) 2016 CIP. 2020-2021 2022-2023 2025 Project programmed to be constructed in 2025. Rd)
Widen Fairview Ave to 7 lanes with curb, gutter, sidewalk, and bike lanes in accordance with the Not Not Not Defer. Operating at a LOS D or better.
32 Fairview Ave, Meridian Rd/Locust Grove Rd 2016 CIP. Programmed Programmed Programmed Reevaluate as conditions change. Fairview Ave,Meridian Rd/Locust Grove Rd
Not Not Not Defer. Operating at a LOS D or better. Not a
33 Cherry Ln, Linder Rd/Meridian Rd Widen Cherry Ln to 5 lanes with curb,gutter,sidewalk,and bike lanes. Programmed Programmed Programmed 2020 CIP project. Cherry Ln,Linder Rd/Meridian Rd
Project to be implemented through
Improve safety and traffic operations along Fairview Ave in accordance with the Fairview Avenue I development. ACHD and Meridian to coordinate
Fairview Ave Corridor Management, Linder Corridor Management Strategy. Project may include bicycle and pedestrian facilities and other Not Not Not implementation as development applications are Fairview Ave Corridor Management Linder
34 Rd /Orchard St access management treatments. Programmed Programmed Programmed processed. I Rd/Orchard St
Widen intersection or add roundabout in accordance with the Master Street Map.Traffic analysis Project programmed to be constructed in 2022-
35 Ten Mile Rd and Victory Rd should determine the ultimate lane configuration based on above projects in the area. 2019-2020 2020-2021 2022-2023 2023. Ten Mile Rd and Victory Rd
36 Ten Mile Rd and Amity Rd Construct a roundabout.Project includes bridge#205AX. 2018 2019-2020 2021 Project programmed to be constructed in 2021. Ten Mile Rd and Amity Rd
Not Not Not Defer. Operating at a LOS D or better.
37 Ten Mile Rd,AmityRd/Victo Rd Widen Ten Mile Rd to 5 lanes with curb,gutter,sidewalk,and bike lanes. Programmed Programmed Programmed Reevaluate as conditions change. Ten Mile Rd,Amity Rd/Victory Rd
Extend roadway and construct streetscape improvements, including curb, gutter, sidewalk, and
East 03rd St Extension, Carlton St/Fairview improved UPRR crossing, from Carlton Ave to Fairview Ave in accordance with the Downtown Ex Not Not Not Defer until completion of Phase 1 (Franklin to East 03rd St tension,Carlton St/Fairview
38 Ave(Phase 2) Meridian Neighborhood Plan. Programmed Programmed Programmed Carlton). Ave
Broadway Ave/Idaho Ave Extension, East Extend roadway from its current terminus at NE 6th Street to Stonehenge Way/Commercial Drive Not Not Not Defer. To be considered as properties Broadway Ave/Idaho Ave Extension,06th St/
39 06th St/ Locust Grove Rd and construct streetscape improvements,including curb,gutter,sidewalk. rogrammed Programmed Programmed redevelopment. Locust Grove Rd
i Project programmed to be designed in 2021-
40 McMillan Rd and Black Cat Rd Construct a multi-lane roundabout in accordance with the 2016 CIP. 1 2021-2022 2022 Future 2022. McMillan Rd and Black Cat Rd
Widen intersection to 3/4 lanes on Amity and 314 lanes on Black Cat in accordance with the 201E rNot Not Not Defer. Operating at a LOS D or better.
41 Amity Rd and Black Cat Rd CIP. Programmed Programmed Programmed Reevaluate as conditions change. Amity Rd and Black Cat Rd
Not Not Not Defer. Operating at a LOS D or better.
42 McMillan Rd and Star Rd Construct a multi-lane roundabout in accordance with the 2016 CIP. Programmed Programmed Programmed Reevaluate as conditions change. McMillan Rd and Star Rd
Not Not Not Defer. Operating at a LOS D or better.
43 AmityRd and Linder Rd Construct a single-lane roundabout in accordance with the 2016 CIP. Programmed Programmed Programmed Reevaluate as conditions change. Amity Rd and Linder Rd
Not Not Not Defer. Operating at a LOS D or better. Not a
44 Cher Ln and McDermott Rd Widen intersection to 3 lanes on McDermott and 5 lanes on Cherry. Programmed Programmed Programmed 2020 CIP project. Cherry Ln and McDermott Rd
Project programmed to be constructed in the North Meridian Improvements B:Franklin Rd
45 Franklin Rd and McDermott Rd Construct a single-lane roundabout in accordance with the 2016 CIP. Future Future Future Future. and McDermott Rd
Widen intersection to 3 lanes on McDermott and 4 lanes on Ustick in accordance with the 2016
46 Ustick Rd and McDermott Rd CIP. 2026 Future Future Project programmed to be designed in 2026. Ustick Rd and McDermott Rd
Widen and signalize intersection to 3/4 lanes on McDermott and 3 lanes on in accordance with the Not Not Not Defer. Operating at a LOS D or better.
47 McMillan Rd and McDermott Rd 2016 CIP. Programmed Programmed Programmed Reevaluate as conditions change. McMillan Rd and McDermott Rd
Not Not Not Defer. Operating at a LOS D or better.
48 Ustick Rd and Star Rd Construct a single-lane roundabout in accordance with the 2016 CIP. Programmed Programmed Programmed Reevaluate as conditions change. Ustick Rd and Star Rd
Not Not Not I Does not currently meet warrants. ACHD to
49 Ten Mile Rd and Chateau Dr Signalize intersection. Programmed Programmed Programmed reevaluate as development occurs in the area. Ten Mile Rd and Chateau Dr
Not Not Not Project to be built through a Cooperative
50 Lake Hazel Rd and Locust Grove Rd Construct a single-lane roundabout in accordance with the 2016 CIP. Programmed Programmed Programmed 1 Development Agreement(CDA). Lake Hazel Rd and Locust Grove Rd
Widen and signalize intersection to 3/4 lanes on Locust Grove and 5/6 lanes on Amity in
51 Amity Rd and Locust Grove Rd accordance with the 2016 CIP. 2021-2025 2022 2025 Project programmed to be constructed in 2025. Amity Rd and Locust Grove Rd
Not Not Not Defer. Operating at a LOS D or better.
52 Victory Rd and Linder Rd Construct a single-lane roundabout in accordance with the 2016 CIP. Programmed Programmed Programmed Reevaluate as conditions change. Victory Rd and Linder Rd
Locust Grove Rd, McMillan Rd/Chinden Widen Locust Grove Rd to 3 lanes with curb, gutter, sidewalk, and bike lanes in accordance with Locust Grove Corridor A:Locust Grove Rd,
53 Blvd (US 20/26) the 2016 CIP. 2025 2026 Future 1Project programmed to be designed in 2025. McMillan Rd/US 20126(Chinden Blvd)
54 Ustick Rd, McDermott Rd / Black Cat Rd Widen Ustick Rd to 5 lanes with curb,gutter,sidewalk,and bike lanes. 2026 Future Future Project programmed to be designed in 2026. Ustick Rd,McDermott Rd/Black Cat Rd
Project would require the removal of on-street
parking for existing homes. To be evaluated
Not Not Not and prioritized for possible inclusion into future
55 Pine, Linder to Meridian Widen to 3 lanes with curb,gutter,sidewalks and/or multi-use or mixed-use bikeway. Programmed Programmed Programmed IFYWP updates. Pine Ave,Linder Rd/Meridian Rd
Not Not Not Please provide description of requested
56 Eagle Rd /Fairview Ave Not provided Programmed Programmed Programmed improvements. Eagle Rd and Fairview Ave
Not Not Not To be evaluated and prioritized for possible
57 Lake Hazel /Discovery Park Intersection improvements requested at entrance to Discovery Park. PrograrlKd Programmed Programmed inclusion into future IFYWP updates. Lake Hazel Rd and Discovery Park
Amity Corridor B:Amity Rd,Eagle Rd/
58 Amit , Ea le to Cloverdale Widen to 5 lanes with curb,gutter,sidewalk,and bike lanes.TBD 2026 Future Future Project programmed to be designed in 2026. Cloverdale Rd.
Amity Corridor B:Amity Rd,Locust Grove Rd/
59 _Amity, Locust Grove to Eagle Widen to 5 lanes with curb,gutter,sidewalk and pedestrian and bike facilities. 2026 Future Future Project programmed to be designed in 2026. Eagle Rd
Not Not Not To be evaluated and prioritized for possible
60 Victory,Ten Mile to Linder Widen to 3 lanes with curb,gutter,and pedestrian and bike facilities. Programmed Programmed Programme inclusion into future IFYWP updates. Victory Rd,Ten Mile Rd/Linder Rd
Not Not Not To be evaluated and prioritized for possible
61 Black Cat, Cherry to Ustick Widen black Cat to 5 lanes with curb,gutter,and pedestrian and bike facilities. Programmed Programmed Programmed inclusion into future IFYWP updates. Blact Cat Rd,Cherry Ln/Ustick Rd
Not Not Not To be evaluated and prioritized for possible
62 Black Cat, Franklin to Cherry Widen black Cat to 5 lanes with curb,gutter,and pedestrian and bike facilities. Programmed Programmed Programmed inclusion into future IFYWP updates. Blact Cat Rd,Franklin Rd/Cherry Ln
Not Not Not To be evaluated and prioritized for possible
63 Black Cat, Ustick to McMillan Widen black Cat to 5 lanes with curb,gutter,and pedestrian and bike facilities. Programmed Programmed Programmed inclusion into future IFYWP updates. Black Cat Rd,Ustick Rd/McMillan Rd
Not Not Not To be evaluated and prioritized for possible Black Cat Rd,McMillan Rd/US 20/26
64 Black Cat, McMillan to Chinden Widen black Cat to 5 lanes with curb,gutter,and pedestrian and bike facilities. Programmed Programmed Programmed inclusion into future IFYWP updates. (Chinden Blvd)
Not Not Not To be evaluated and prioritized for possible
65 McMillan, Black Cat to Ten Mile Widen to 3 lanes Programmed Programmed Programmed inclusion into future IFYWP updates. McMillan Rd,Black Cat Rd/Ten Mile Rd
Not Not Not To be evaluated and prioritized for possible
66 McMillan, Ten Mile to Linder Widen to 3 lanes with curb,gutter,and pedestrian and bike facilities. Programmed Programmed Programmed inclusion into future IFYWP updates. McMillan Rd,Ten Mile Rd/Linder Rd
67 Eagle, Lake Hazel to Amity TBD 2021 2022-2023 2024 Project programmed to be constructed in 2024. Eagle Rd,Lake Hazel Rd/Amity Rd
No Not Not To be evaluated and prioritized for possible
68 Locust Grove, Lake Hazel to Amity Widen Locust Grove to 5 lanes with curb,gutter,and pedestrian and bike facilities. LProgrammed Programmed Programmed inclusion into future IFYWP updates. Locust Grove Rd,Lake Hazel Rd/Amity Rd
Eagle Rd and Amity Rd Roundabout(Dual Widen roundabout to a dual lane roundabout,with curb,gutter,sidewalk,and bike lanes. Project Eagle Rd and Amity Rd Roundabout(Dual
69 Lane) to be constructed concurrently with Eagle Rd,Amity Rd/Victory Rd. 2020 2020 2021-2022 Project programmed to be constructed in 2022. Lane)
Widen Eagle Rd to 5 lanes with curb, gutter,sidewalk and bike lanes in accordance with the 2016 Project programmed to be constructed in 2021-
70 Eagle Rd, Amity Rd/Victory Rd CIP. 2018 2019-2020 2021-2022 2022. Eagle Rd,Amity Rd/Victory Rd
Community • •
Remove mid-block cross-walk by Hillsdale and add enhanced cross-walks at Lachlan and near Not Not Not To be evaluated and prioritized for possible Hillsdale Elementary Pedestrian Crossings
1 Stockenham Enhanced Cross-walks Rockhampton/Hill Park St.Update school zone signs and flashers. Programmed Programmed Programmed inclusion into future IFYWP updates. and School Zone
Reconstruct Stoddard Rd, between Victory Rd and Overland Rd to 3-lanes, 7' attached sidewalks
and bike lanes. Project includes bridge #2085 and an enhanced pedestrian crossing (pedestrian
Stoddard Rd,Victory Rd/Overland Rd hybrid beacon)at Victory and Stoddard(CM214-27).Bike lanes may be replaced by a pathway per South Meridian Improvements A:Stoddard
2 (Stoddard Rd,Victory Rd/Kodiak Dr) the Bike Master Plan Update. 2022 2023 Future Project programmed to be designed in 2022. Rd,Victory Rd/Overland Rd
Construct streetscape improvements, including curb, gutter, sidewalk, and improved UPRR
East 03rd St, Franklin Rd/Carlton Ave crossing, from Franklin Rd to Carlton Ave in accordance with the Downtown Meridian Meridian Downtown Improvements A:East
3 (Phase 1) Neighborhood Plan. 2024 2025 Future Project programmed to be designed in 2024. 03rd St,Franklin Rd/Carlton St
Extend roadway and construct streetscape improvements, including curb, gutter, sidewalk, and
improved UPRR crossing, from Carlton Ave to Fairview Ave in accordance with the Downtown Not Not Not Defer until completion of Phase 1 (Franklin to East 03rd St tension,Carlton St/Fairview
4 E. 3rd Carlton to Fairview Meridian Neighborhood Plan. Programmed Programmed Programmed Car Ex
lton). Ave
Not Not Not To be evaluated and prioritized for possible Meridian Downtown Improvements B:
5 Washington St,W. 07th St/ Main St Complete sidewalk on Washington St,between W.07th Stand Main St. Programmed Programmed Programmed inclusion into future IFYWP updates. Washington St,07th St/Main St
Meridian Downtown Improvements A:
6 — BroadwayAve,West 07th St/West 04th St Complete sidewalks on the south side of Broadway Ave,between West 07th St and West 04th St. 2026 Future Future Project programmed to be designed in 2026. Broadway Ave,West 08th St/West 04th St
Install extruded curb pathway on north side of McMillan Rd between Cortona Way and Goddard
Creek Way and detached concrete sidewalk with curbing between Goddard Creek Way and Wild North Meridian Improvements A:McMillan
7 McMillan Rd,Ten Mile Rd/Linder Rd Goose Way. 1 2025 2026 Future 1 Project programmed to be designed in 2025. Rd,Cortona Way/Goddard Creek Way
Meridian Downtown Improvements A:02nd
8 East 2 1/2 St, Carlton Ave/ Fairview Ave Install sidewalk on the west and/or east side. 2024 2025 Future Project programmed to be designed in 2024. 1/2 St,Carlton Ave /Fairview Ave
Meridian Downtown Improvements A:Main St
9 Main St and King Street Pedestrian Crossing Install an enhanced pedestrian crossing of Main St at King Street. 2024 N/A 2026 Project programmed to be constructed in 2026. and King St Pedestrian Crossing
Amity Corridor B:Amity Rd,Eagle Rd/
10 JAmity, Eagle to Hillsdale Pedestrian improvements on Amity to the YMCA and City Park. 2026 1 Future Future I Project programmed to be designed in 2026. Cloverdale Rd.
Not Not Not NEW REQUEST.To be evaluated and prioritized Amity Rd,SH 69(Meridian Rd)/Locust Grove
11* Amity, Meridian to Locust Grove pedestrian improvements Programmed Programmed Programmed for possible inclusion into future IFYWP updates. Rd
Complete sidewalks and add wayfinding signage on Bower St, between Meridian Rd and E.03rd Not Not Not To be evaluated and prioritized for possible North Boise Improvements C:Bower St,
12 Bower St, Meridian Rd/E. 03rd St St. Programmed Programmed Programmed inclusion into future IFYWP updates. Meridian Rd/03rd St
Victory Corridor A:Victory Rd,SH 69
13 Victory Rd, Glacier BayWay/ Mesa Way Complete sidewalk on the south side adjacent to county parcel. 2025 2026 Future Project programmed to be designed in 2025. (Meridian Rd)/Locust Grove Rd
Not Not Not To be evaluated and prioritized for possible Capulet Way Pedestrian Crossing(S/O Falcon
14 Capulet Way at Siena Elementary Install crosswalk of Capulet Way on the west side of Siena Elementary school micro path. Programmed Programmed Programmed inclusion into future IFYWP updates. Dr)
Not Not Not To be evaluated and prioritized for possible
15 Taormina Drive at Maesaia Way Install sidewalk on south side of Taormina Drive near Maesaia Way. Programmed Programmed Programmed inclusion into future IFYWP updates. Taormina Drat Maesaia Way
Not Not Not To be evaluated and prioritized for possible Taconic Dr and Pioneer Trail Ave Pedestrian
16 Taconic Dr/Pioneer Install crosswalk at intersection of Taconic and Pioneer(Hillsdale Subdivision). Programmed Programmed Programme inclusion into future IFYWP updates. Crossing
Complete the pedestrian improvements along the full mile. Some segments are already planned Not Not Not Project to be built through a Cooperative
17* Lake Hazel Rd, Locust Grove to Eagle for improvement,but when they are complete there will still be gaps to the north and south. Programmed Programmed Programmed Development Agreement(CDA). Lake Hazel Rd,Locust Grove Rd/Eagle Rd
Construct a detached asphalt or concrete pathway on east side of Locust Grove between Puffin
18 Locust Grove Rd, Overland Rd/Puffin St Stand Overland Rd. 2019 2020-2021 2023 Project programmed to be constructed in 2023. Locust Grove Rd, Victory Rd/Overland Rd
Install an enhanced pedestrian crossing(rectangular rapid flashing beacon)on Pine Ave at W 01st Meridian Downtown Improvements A:Pine
19 Pine Ave and W. 1 st St Pedestrian Crossinq St to improve access to Meridian Elementary School. 2024 2025 Future Project programmed to be designed in 2024. Ave and 01st St Pedestrian Crossing
McMillan Rd, Locust Grove Rd /Red Horse Complete sidewalk on the north side of McMillan Rd, between Locust Grove Rd and Red Horse North Meridian Improvements A:McMillan
20 Way Way. 2024 2025 2026 Project programmed to be constructed in 2026. Rd,Red Horse Way/Locust Grove Rd
Not Not Not Complete pedestrian facilities existing in this
21 Linder Rd,Washington St/Maple St Complete sidewalk on the west side of Linder Rd,between Washington St and Maple St. Programmed Programmed Programmed Esection. Linder Rd,Washington St/Maple St
Locust Grove Rd and Palermo Dr Pedestrian South Meridian ImprovmentsA:Locust Grove
22 Signal Install an enhanced pedestrian signal and lighting on the north side of Palermo at Locust Grove. 2022 2023 Future Project programmed to be designed in 2022. Rd and Palermo Dr Pedestrian Crossing
Install an enhanced pedestrian crossing of Meridian Rd at/near Settlers Park entrance and Meridian Corridor -Meridian Rd,Ustick Rd/
23 Meridian, north of Ustick Sundance Subdivision micropath. 2025 2026 Future Project programmed to be designed in 2025. McMillan Rd
Locust Grove Rd and Time Zone Dr Locust Grove Rd, Victory Rd/Overland Rd-
24 Pedestrian Crossing Install an enhanced pedestrian crossing of Locust Grove Rd at Time Zone Dr. 2019 2020-2021 2023 Project programmed to be constructed in 2023. Time Zone Dr Pedestrian Crossing
Ustick Corridor -Ustick Rd,Ten Mile Rd/
25 Brid etower Pedestrian Signal Pedestrian signal on Ustick Road at Bridgetower(Towerbridge?)Drive. 2022 2023 2024 Project programmed to be constructed in 2024. Linder Rd
Black Cat-Ten Mile Bikeway, Cherry Lane/ Not Not Not NEW REQUEST.To be evaluated and prioritized Black Cat-Ten Mile Bikeway(Phase 1),Cherry
26* Ustick Road Install Level 1 bike facilities along the Black Cat-Ten Mike Bikeway mmed ammed amme for possible inclusion into future IFYWP updates. Ln/Ustick Rd
Central Meridian Bikeway, Blue Heron Street Install Level 1 bike facilities along the Central Meridian Bikeway from Blue Heron Street to Chinden
27* /Chinden Boulevard Boulevard N/A N/A 2026 Project programmed to be constructed in 2026. Bikeway Signage(2026)
Chinden-McMillan Bikeway, Ten Mile Road / Install Level 1 and Level 3 bike facilities along the Chinden-McMillan Bikeway from Ten Mile Road
28* Sedona Drive to Sedona Drive N/A N/A 2026 Project programmed to be constructed in 2026. Bikeway Signage(2026)
Gondola-Malta Bikeway, Black Cat Road / Not Not Not NEW REQUEST.To be evaluated and prioritized Gondola-Malta Bikeway,W/O Black Cat Rd/
29* Goddard Creek Way Install Level 1 and Level 3 bike facilities Programmed Programmed Programmed for possible inclusion into future IFYWP updates. Goddard Creek Way
Granger Avenue Bikeway, Records Avenue/ Granger Ave Bikeway,Records Ave/
g y Shamrock Ave(Bikeway Signage Program-
30* Cloverdale Road Install Level 1 bike facilities N/A N/A 2024 Project programmed to be constructed in 2024. 2024)
No Not To be evaluated and prioritized for possible
31* Linder Road, Maple Avenue/CherryLane Install Level bike facilities Programmed Programmed Programmed inclusion into future IFYWP updates. Linder Rd Bikeway,Maple Ave/Cherry Ln
Linder-Meridian Bikeway, Cherry Lane/ North Meridian Improvements A:Linder-
32* Chinden Boulevard Install Level 1 and Level 3 bike facilities 2024 2025 Future Project programmed to be designed in 2024. Meridian Bikeway,Pine Ave/Temple Dr
Locust Grove Road, Leighfield Drive to Star Connect gap from existing sidewalk on west side of Locust Grove Road, along with improving Locust Grove Corridor A:Locust Grove Rd,
33* Lane narrow sidewalk on east side of roadway. 2025 2026 Future Project programmed to be designed in 2025. Ustick Rd/McMillan Rd
Locust Grove-Eagle Bikeway, Pine Avenue/ Not Not Not NEW REQUEST.To be evaluated and prioritized Locust Grove-Eagle Bikeway,Pine Ave/
34* McMillan Road llnstall Level 1 and Level 3 bike facilities Programmed Programmed Programmed for possible inclusion into future IFYWP updates. Chinden Blvd
Install an enhanced crossing (pedestrian hybrid beacon) on Locust Grove Road at Heritage Park Locust Grove Corridor -Locust Grove Rd,
35* Locust Grove Road and Heritage Park Street Street,access for Meridian Technical Charter High School 2025 2026 Future Project programmed to be designed in 2025. Ustick Rd/McMillan Rd
Locust Grove Rd, Paradise Ln/Grand Locust Grove Corridor A:Locust Grove Rd,
36* Canyon Dr Install sidewalks on the east side of Locust Grove Rd to connect with an existing path to the school. 2025 2026 Future Project programmed to be designed in 2025. Ustick Rd/McMillan Rd
McMillan-Ustick Bikeway, Cool River Avenue Nofw Not No NEW REQUEST.To be evaluated and prioritized McMillan-Ustick Bikeway(Phase 3),Linder Rd
37* /Eagle Road Install Level 1 bike facilities Programmed Programmed Programmed for possible inclusion into future IFYWP updates. /Eagle Rd)
Records Avenue, Florence Drive/Fairview Not Not Not NEW REQUEST.To be evaluated and prioritized Records Way Bikeway,Pine Ave/Chinden
38* Avenue Install Level 2 bike facilities with construction of improved roadway Programmed Programmed Programmed for possible inclusion into future IFYWP updates. (BikewaySignage Program-2024)
Install Level 1 bike facilities along the Records Way Bikeway from Pine Avenue to Florence Drive,
Records Way Bikeway, Pine Avenue/ Level 2 bike facilities from to Ustick Road to Baldcypress Street, and Level 1 bike facilities from Not Not Not NEW REQUEST.To be evaluated and prioritized Records Way Bikeway,Pine Ave/Chinden
39* Fernside Drive Baldcypress Street to Wainwright Drive Programmed Programmed Programmed for possible inclusion into future IFYWP updates. (BikewaySignage Program-2024)
Ten Mile-Linder Bikeway, Linder Road/ Not Not Not NEW REQUEST.To be evaluated and prioritized Ten Mile-Linder Bikeway,W 08th St/Chinden
40* Chinden Boulevard Install signing and pavement marking to existing Level 1 and Level 3 bike facilities Programmed Programmed Programmed Ifor possible inclusion into future IFYWP updates. Blvd
Ustick-Cherry Bikeway, Black Cat Road / Not Not Not NEW REQUEST.To be evaluated and prioritized Ustick-Cherry Bikeway,Black Cat Rd/Hickory
41* Chateau Drive Install Level 1 bike facilities I Programmed Programmed Programmed for possible inclusion into future IFYWP updates. Way
Not Not Not NEW REQUEST.To be evaluated and prioritized
42* Ustick Road and Venable Lane Install an enhanced crossing(pedestrian hybrid beacon) Programmed Programmed Programmed for possible inclusion into future IFYWP updates. Ustick Rd and Venable Ln Pedestrian Crossing
McMillan Rd and Palantine Way Pedestrian North Meridian Improvements A:McMillan Rd
43 Crossinq Install an enhanced pedestrian crossing and curb ramps on McMillan Rd at Palantine Way. 2024 2025 Future Project programmed to be designed in 2024. and Palantine Way Pedestrian Crossing
III
On"
No Not Not ACHD to prioritize and scope arterial crossings
44 Meridian Rail-with-Trail Multi-use pathway along rail road tracks. Programmed Programmed Programmed when City moves pathway project forward. Meridian Rail-with-Trail
Meridian Downtown Improvements A:Locust
Locust Grove Rd and Woodbridge Dr Grove Rd and Woodbridge Dr Pedestrian
45 Pedestrian Crossing Install an enhanced pedestrian crossing of Locust Grove Rd at Woodbridge Dr or Watertower St. 2024 2025 Future Project programmed to be designed in 2024. Crossing
Not Not Not
46 Eagle Rd, River Valle St/Ustick Rd Complete sidewalks on Eagle Rd,between River Valley Stand Ustick Rd. Programmed Programmed Programme ITD facility. ACHD to share request with ITD. Eagle Rd,River Valley St/Ustick Rd
completed fall 2016 shows existing
Washington Stand W 1 st St Pedestrian Not Not Not ]Evaluation
crossing meet needs of current users. ACHD to Washington St and 01st St Pedestrian
47 Crossin Pedestrian crossing near Meridian Elementary School. Programmed Programmed Pro rammereevaluate as conditions change. Crossing
W 08th St and Meridian Middle School Enhanced School Crossings-Meridian Middle
48 Pedestrian Crossing Install an enhanced pedestrian crossing on 8th St at Meridian Middle School. 2020 2020 2021 COMPLETE School and Capital High School
Not Not Not
49 Chinden Blvd, east of Ten Mile Rd Complete sidewalks on Chinden Blvd,east of Ten Mile Rd. Programmed Programmed Programmed ITD facility. ACHD to share request with ITD. Chinden Blvd,E/O Ten Mile Rd
Not Not Not ACHD to evaluate as part of future budgeting
50 Woodbrid e Neighborhood Bike Study Study the connectivity and bikeability of the Woodbridge neighborhood. Programmed Programmed Programmed efforts. Woodbridge Neighborhood Bike Study
ACHD Traffic Engineering does not recommend
Not Not Not installation. Crossing activity is caused by parent Watertower St and Rebound School
51 Watertower St at Rebound School Install a painted crosswalk on Watertower St at Rebound School. Programmed Programmed Programmed drop off. Pedestrian Crossing
Linder Rd, Chateau Dr/Barbara Morgan Not Not Not ACHD Traffic believes current signage is
52 STEM Way finding signage on Linder. Programmed Programmed Programmed adequate. No additional signage recommended. Linder Rd,Chateau Dr/Barber Morgan STEM
Not Not Not To be evaluated and prioritized for possible Meridian Rd and Producer Dr Pedestrian
53 St. Ignatius School Pedestrian Signal Pedestrian signal on Meridian Road at Producer. Programmed Programmed Programmed inclusion into future IFYWP updates. Crossing
Pedestrian connection (sidewalk) between Barbara Drive in Fairview Terrace Park to E. Not Not Not ACHD to support City led effort. Coonection
54 Fairview Terrace to Chief Joseph Willowbrook Drive and Chief Joseph Elementary on Chateau Drive. Programmed Programmed Programmed would be located on private property. Barbara Dr Pedestrian Connection
Complete sidewalk on both sides of West 02nd, between the Union Pacific Railroad and Broadway Not Not Not Sidewalk scoped "No Go"in 2015. Agencies to
55 West 02nd St, UPRR/ Broadway Ave Ave to address parking concerns in this area. Programmed Programmed Programmed coordinate if other solutions identified. West 02nd, UPRR/Broadway Ave
Scoped "Go-Defer"in 2015. Sidewalk exists on
TKentucky Ridge Way, Riodosa Dr/Victory Not Not Not the east side. ACHD to reevaluate if existing
56 Rd Sidewalk on the west side of Kentucky Ridge Way,between Victory and Riodosa. Programmed Programmed Programmed sidewalk does not meet needs in area. Kentucky Way,Riodosa Dr/Victory Rd
Scoped "No Go"in 2015. This section has
Not Not Not connectivity already on the south side and the
57 State Ave, East 2nd St/Cathy Ln ISidewalk repair.Requested by land owner in this area. Programmed Programmed Programmed original requestor no longer owns the property. State Ave,2nd St/CathyLn
Scoped "No Go"in 2018 as issues are caused by
Nola Rd and Crossroads Middle School Not Not Not drop-off activities.Encourage school to work with Nola Rd and Crossroads Middle School
58 Pedestrian Crossing Install a painted crosswalk on Nola Rd at Crossroads Middle School. Programmed Programmed Programmed parents. Pedestrian Crossing
Not Not Not Scoped "No Go"in 2018.Sidewalk on east side
59 Nola Rd, south of Pine Ave Middle School Construct sidewalk on the east side of Nola Rd from Pine Ave to Crossroads. Programmed Programmed Programmed to be built through development. Nola Rd,Pine Ave/Crossroads Middle School
McDermott Road, Ustick Road to McMillan Install sidewalk on the west side of McDermott Road connecting to sidewalk on Ustick Road and Not Not Not NEW REQUEST.To be evaluated and prioritized McDermott Rd Pedestrian Facilities,Ustick Rd
60* Road McMillan Road for connectivity to Owyhee High School Programmed Programmed Programmed for possible inclusion into future IFYWP updates. /McMillan Rd
* NEW Project Request