Loading...
L2.0_Landscape V1A C E F G H K L N e 29' E1s,IDIANg- APPROVED o�1E oanzrzz EBB NUMBER:^-�°'� 1 3 4 5 7 1.1 LL9 lil 12 WHEN PRESENT: BUD POINT (A MINOR CROOK ROOT FLARE/COLLAR (SWELLING AT SOIL IN THE TRUNK JUST LINE WHERE STEM TISSUE TRANSITIONS ABOVE THE SOIL LINE) INT O ROOT TISSUE) TO BEAT SOIL LINE. TO BE APPROXIMATELY 1 Y2" ABOVE THE SOIL LINE PREVAILING WIND DIRECTION ROOT PROBE SOIL LINE iv 4 REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF 1 ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. DO NOT REMOVE MAIN HIGHEST ROOT SHALL BE 2" MAXIMUM BELOW SOIL LEADER! LINE. UTILIZE SOIL/ROOT 4I PROBE AROUND TRUNK (APPROX 1%2" AWAY RUBBER CINCH TIE FROM TRUNK) TO �, 2"x 2" WOOD STAKE (LENGTH AS LOCATE HIGHEST yy REQUIRED) -DO NOT PENETRATE ROOTBALL. ROOTS. I \y/ SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. i REMOVE TREE WRAP TRUNK PROTECTION, AFTER INSTALLATION REMOVE BURLAP, TWINE, t CONSTRUCT 2" EARTH BERM AT EDGE OF AND WIRE BASKET FROM - �,`" i I ROOTBALL, FILL TREE RING W/ MULCH, AS TOP % OF ROOTBALL, t. R SPECIFIED. REMOVE ALL NAILS, TIES, w -� AND PLASTIC FROM _ p v_ U �� y 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY ROOTBALL. IF N w O \ FROM TRUNK. SYNTHETIC BURLAP IS O UTILIZED TO WRAP THE p J m Jv FINISH GRADE ROOTBALL, IT SHALL BE uJ rn\// COMMERCIAL SLOW RELEASE FERTILIZER COMPLETELY REMOVED. ONLY BIODEGRADABLE ¢ a/j\\//j��// //�\\/j\�/j) `;, \\\//\\ // ///\\///\\// TABLETS \ \\ BURLAP SHALL BE LEFT m - SIDES OF HOLE ROUGH &UNEVEN ON THE BOTTOM OF THE ROOTBALL. \ \ l l BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED. III BACKFILL IN 6" LIFTS, WATER EACH LAYER, WIDTH WIDTH WIDTH WIDTH WIDTH TAMP LIGHTLY AS REQUIRED, BACKFILL OF BALL OF BALL OF BALL OF BALL OF BALL SOIL EVEN W/ TOP OF ROOTBALL, DO NOT OVER COMPACTII T MIN. DIA. TREE NG SET ROOTBALL ON NATIVE, UNDISTURBED NOTES: SOIL 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION WHICH EVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. CONIFEROUS TREE PLANTING WHEN PRESENT: BUD — POINT (A MINOR CROOK IN THE TRUNK JUST ABOVE THE SOIL LINE) TO BE APPROXIMATELY 1 Yz" ABOVE THE SOIL LINE NOT TO SCALE ROOT FLARE/COLLAR (SWELLING AT SOIL LINE WHERE STEM TISSUE TRANSITIONS INTO ROOT TISSUE) TO BE AT SOIL LINE. e° ROOT PROBE °r- PREVAILING WIND DIRECTION a o SOIL LINE a iv REMOVE DEAD/DAMAGED BRANCHES AND ° O PRUNE TO INTERNATIONAL SOCIETY OF 9 ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE d LANDSCAPE ARCHITECT) SHALL BE REMOVED ° AND REPLACED. DO NOT REMOVE MAIN HIGHEST ROOT SHALL BE o o LEADERII 2" MAXIMUM BELOW SOIL LINE. UTILIZE SOIL/ROOT o0 PROBE AROUND TRUNK RUBBER CINCH TIE (APPROX 1"-2" AWAY o° o ° FROM TRUNK) TO REQUIRED) -DO E 2" WOOD STAKE (LENGTH AS LOCATE HIGHEST ° REQUIRED 1. SNOT PENETRATE ROOTBALL. ROOTS. SEE NOTE 1. SET STAKES PARALLELLELTO o °o o PREVAILING WIND. O REMOVE TREE WRAP TRUNK PROTECTION, °o AFTER INSTALLATION 0 0 ° CONSTRUCT 2" EARTH BERM AT EDGE OF ROOTBALL, FILL TREE RING W/ MULCH, AS Z Q Q p SPECIFIED. - w COX o U O , 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY I-O FROM TRUNK. REMOVE BURLAP, TWINE, AND WIRE BASKET FROM FINISH GRADE TOP w OF ROOTBALL, /\/ REMOVE ALL NAILS, TIES,w " \\//\\//\\// /\\// \ //\\ //\// // / / COMMERCIAL SLOW RELEASE FERTILIZER AND PLASTIC FROM ¢ w /\\�/j /\�/\ /j //\// ///\/jj TABLETS ROOTBALL. IF a. SYNTHETIC BURLAP IS \ _\ \ \\ \\ // /\\/\\ \ \ \ SIDES OF HOLE ROUGH &UNEVEN UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE — BACKFILL WITH APPROVED TOPSOIL AND —III III —III SOIL AMENDMENTS AS SPECIFIED. COMPLETELY REMOVED. -I 11=III=III= BACKFILL IN 6" LIFTS, WATER EACH LAYER, ONLY BIODEGRADABLE —I _ (— BURLAP SHALL BE LEFT WIDTH WIDTH WIDTH WIDTH WIDTH TAMP LIGHTLY AS REQUIRED, BACKFILL ON THE BOTTOM OF THE 1, OF BALL 1, OF BALL 1, OF BALL OF BALL SOIL EVEN W/ TOP OF ROOTBALL, ROOTBALL. T MIN. DIA. DO NOT OVER COMPACTII TREE RING SET ROOTBALL ON NATIVE, UNDISTURBED NOTES: SOIL 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. 7. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. EXTEND ROOT BARRIER TO 80% OF MATURE TREE CANOPY. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. DECIDUOUS TREE PLANTING NOT TO SCALE i n L�r muwn r� i rwry E cr< APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED FINISH GRADE, PER PLANS CUT EDGE PLANTER BED CUT EDGE (TYPICAL AT TREES IN TURF AREAS) NOT TO SCALE KEEP GROUND LINE SAME AS NURSERY LINE ° o REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT o p ROOT GROWTH CONSTRUCT 2" EARTH BERM TO FORM A WATER o °O� RETENTION BASIN, FILL BERM WITH MULCH, AS o s o SPECIFIED MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER CROWNS OF PLANTS III=III=1I III PROVIDE DEWITT PRO 5 WEED BARRIER FABRIC OR APPROVED EQUAL II II IIIFBI III—� PROVIDE COMMERCIAL FERTILIZER TABLETS AND BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB IIIIII� III,,,III,IIII,;,III" �� WIDTH OF BACKFILL WITH APPROVED TOPSOIL AND SOIL 6" ROOTBALL 6" AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS, WATER EACH LAYER, DO NOT TAMP OR OVER COMPACT. NOTE: CONSTRUCT 6" MOUND OF TOPSOIL 1. WATER SHRUB TWICE WITHIN FIRST 24 HOURS. 2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER BEDS. SHRUB PLANTING NOT TO SCALE A = LENGTH, AS SPECIFIED m OR PER PLANT SCHEDULE 9- P B=85% OF'A' PLAN VIEW FINISH GRADE PER PLANS EDGING, PER PLANS AND DETAILS GROUNDCOVER PLANTING PER PLANTING PLAN ° 6 ° E6 d6 MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER CROWNS OF PLANTS SPLIT ALL ROOT BOUND ROOTS WITH 3 EQUAL — X, X,,,j SPACED VERTICAL CUTS. TILL SOIL TO A DEPTH OF 12", BACKFILL WITH III —III—III— — APPROVED TOPSOIL AND SOIL AMENDMENTS, AS IIIIII III=III=1=111= SPECIFIED. DEWITT Il—lip SECTION APPROVEDOEQUAL D BARRIER FABRIC OR NOTES: SUBGRADE 1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. 2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER BEDS. PERENNIAL & GROUNDCOVER PLANTING NOT TO SCALE VARY HEIGHTS OF BOULDERS. 18" - 36" DIAMETER BOULDER, AS SPECIFIED, LOCATE PER PLANS 30" - 60" DIAMETER BOULDER, AS SPECIFIED, 1/3 of COMPACT SUBGRADE UNDER BOULDER AS REQUIRED NOTE: FINISH GRADE PER PLANS — 1. NOTIFY LANDSCAPE ARCHITECT WHEN PLACING BOULDERS FOR APPROVAL. 2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION. 3. CLEAN BOULDERS OF SOIL AND LOOSE DEBRIS. 4. WHEN PLACING BOULDERS, BURY a TO i OF BOULDER BELOW FINISH GRADE. 5. DO NOT SCAR OR DAMAGE BOULDERS. 6. WHEN GROUPING BOULDERS, DISTRIBUTE SIZES EVENLY (I.E., IN A GROUP OF (6), (2) WILL BE LARGE, (2) WILL BE MEDIUM, AND (2) WILL BE SMALL). BOULDER INSTALLATION 1 2 3 4 5 6 7 9 m m NOT TO SCALE 12 O P STAMP:......... OF S D. CT SoQ�y � h L- 1027 4 /22 DATE: 04/18/2022 >tmw y CC°4 °W y Wo�o�j Ir— ��,11F.WmQLL°°I� COI7 mSa' CWW (7 �o°QgiE u ' v U OE E y >o��a 0 0 0 C V 5 Q li v a o cc3 G u ldca O /0 i a m r a MIN � o Copyright © 2022 II nga reservetl. Rep n a� krm« Mam nreare wimp" pf So LaMs W NCM1imd re P C Dba �SoNM1 BeQ 8 Beitl Lentlsrape ArcN'M�9,re P C. is unlaxtpl antl sWje]m rnminal pmseoNon. REVISIONS: No. Date Description a W CO w°A A 0 Z W O w a z rH 11111114 Vi N A � W Aar a DRAWN BY: JRS CHECKED BY: JCS PROJECT NUMBER 22-146 SHEET: L2.0 W_ W w Z LU A ■ E F G J K L M