HomeMy WebLinkAboutPre-app Notes V1CUEIDR IAy
APPROVED
one 04/20/22
EIIE NUMBER: H-zo21-1
IDIAN =--
IDAHO
Planning Division
PREAPPLICATION MEETING
Type of Review Requested
Pre -Application Request File number: PREAPP-2021-0053
Assigned Planner: Sonya Allen
Scheduled Date: 05/25/2021 Scheduled Time: 9:30 AM
Applicant Information
Name: JOHN WARDLE, BRIGHTON CORPORATION
Address: 12601 W. EXPLORER DRIVE SUITE 200 83713
Phone: 208-287-0518 Email: jwardle@brightoncorp.com
Additional Attendee(s
Name: Michael Wardle Business Name: Brighton Development
Address: 2929 W Navigator Dr Meridian, Idaho 83642
Phone: 208-378-4000 Email: mwardle@brightoncorp.com
Name: Josh Beach Business Name: Brighton Development
Address: 2929 West Navigator Drive, Ste. 400 MERIDIAN, ID 83642
Phone. Email: jbeach@brightoncorp.com
Subject Property Information
Location/street address:
Assessor's parcel number S1131417210
(s):
Township, range, section: 3N1E31
Project Description
Project/Application Name: APEX West
Description of Work: Preliminary Plat 46.31 Acres
lication Information
APPLICATION TYPES
Preliminary Plat - PP:
PLATS ONLY
Number of Building Lots:
PROJECT INFORMATION
CHECKED
132
Gross Density: 2.85
33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642
Phone: (208)884-5533 • Facsimile: (208) 888-6854 • Website: www.meridaincity.org
1
ER IDIAN,--
I �� eighborhood meeting is required prior to
APPROVED ittal:
1 04/20/22 -app notes are good for 4 months:
DATE -
FILE NUMBER H-zo21-1 t a Site Plan will be uploaded in the attachment
In Reclaimed Water Buffer:
Irrigation District:
Number of Residential Units:
Percentage of Site Devoted to Landscaping:
Primary Irrigation Source:
Secondary Irrigation Source:
Who will own and Maintain the Pressurized Irrigation System in this
Development:
PROPERTY INFORMATION
Prior Approvals (File Numbers):
TYPE OF USE PROPOSED
Residential:
Single -Family Detached:
ZONING DISTRICT(S)
R-2:
R-8:
CHECKED
CHECKED
CHECKED
No
Boise Kuna
132
16%
surface
well
HOA
H-2015-0019 (South Meridian AZ); H-2020-0056
(PP)
CHECKED
CHECKED
CHECKED
CHECKED
Review Type
Reviewer
Review Notes
Addressing Plan Review Notes
Terri Ricks
No comments at this time. TLR
Building Plan Review Notes
Bret Caulder
Proposed structures to comply with the 2018 Building Codes
MFD Plan Review Notes
Joe Bongiorno
There will need to be secondary access provided after the
first 30 building lots, or everything in this phase will have fire
sprinklers installed. A detailed phasing plan will be required.
Parks Plan Review Notes
Kimberly Warren
Multi -use pathways required: one north -south connection
along the Watkins drain, or along the midmile collector. one
pathway along the length of the Pipeline easement through
the site. Connect the first pathway to the pipeline. Dedicate
easements for both.
33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642
Phone: (208)884-5533 • Facsimile: (208) 888-6854 • Website: www.meridaincity.org
2
CUEIDR IAy
APPROVED
DATE 04/20/22
FILE NUMBER: H-2D21-DW1
Wastewater Plan Review Notes
Sonya Allen * Annexation of Parcel #R7824220042 will need to be
finalized before submittal of preliminary plat application
(Shafer View AZ).
* Comply with the terms of the existing Development
Agreement(s); or apply for a modification.
* Preliminary plat to subdivide property - comply with
subdivision design & improvement standards in UDC 11-
6C-3 & dimensional standards in UDC Table 11-2A-6 for the
R-8 district - ALL of the parcels need to be included in the
boundary of the plat, remnant portions can't be left out.
* Submit phasing plan
* Construct collector street consistent with Master Street
Map.
* Extend stub streets & provide stub streets to adjacent
properties.
* Extend collector street along west boundary to connect to
Quartz Creek.
* Provide qualified open space & site amenities per the
standards in UDC 11-3G-3.
* The McBirney Lateral crosses this site; comply with the
standards in UDC 11-3A-6.
* Comply with Williams Pipeline development standards.
see comments
Tyson Glock • Why are they not bring the sewer to the east through one of
the roads?
• Flow is committed
-Ensure no sewer services cross infiltration trenches
• Ensure no permanent structures (trees, bushes, buildings,
carports, trash receptacle walls, fences, infiltration trenches,
light poles, etc.) are built within the utility easement.
Water Plan Review Notes Kyle Radek
Offsite water main will be required to make second water
connection to E Quartz Creek St to NW. Some water mains
will need to be upsized to 12 inch to build 1/2 mile grid.
33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642
Phone: (208)884-5533 • Facsimile: (208) 888-6854 • Website: www.meridaincity.org
3
(E IDIAN -
APPROVED
DATE: 04/20/22
FILE NUMBER: H-2D2,-DWl
FUMFIE
DMLDPMENT
PX
d
W
fl
H
V
O
~ J ]]
y
FUTURE
` F flURE DEVELOPMENT
.• 57GfI00L
,law I
— t -
1 I
1 I
3 C
1 I
M I
+ I,
t I
t C
I
r' I
4 I
I C
I I
I 'I
I C.
I C
I I
I --------------.--
Jim,
l
ti
l
FUTURE I
G aOPMENT I
I
Page is too large to OCR.
Page is too large to OCR.
CUEIDR IAy
APPROVED
DATE 04/20/22
Bill Parsons <bparsons@meridiancity.org>
Friday, October 8, 2021 1:19 PM
FILE NUMBER: H- 21- 1 I Joshua Beach
ubject: RE: pre-app notes
System has been updated.
Bill Parsons, AICP I Planning Supervisor
City of Meridian I Community Development Dept.
33 E. Broadway Ave., Ste. 102, Meridian, Idaho 83642
Phone: 208-884-5533 1 Direct: 208-489-0571
+ ' E IL}F�
Built for Business, Designed for Living
All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho low,
in regards to both release and retention, and may be released upon request, unless exempt from disclosure by law.
From: Joshua Beach <JBeach@brightoncorp.com>
Sent: Friday, October 8, 2021 1:15 PM
To: Bill Parsons <bparsons@meridiancity.org>
Subject: Re: pre-app notes
External Sender - Please use caution with links or attachments.
Will do.
Thank, Bill.
Josh Beach
On Oct 8, 2021, at 1:14 PM, Bill Parsons <bparsons@meridiancity.org> wrote:
Good Afternoon Josh,
If nothing has changed I don't see a need to meet again. With our new process, pre -application meeting
notes are no longer required to be submitted with your application. Once you are ready to submit your
application, please insert today's date as the date that you held your pre -application meeting and I will
change the date in our system.
Take Care,
Bill Parsons, AICP I Planning Supervisor
City of Meridian I Community Development Dept.
33 E. Broadway Ave., Ste. 102, Meridian, Idaho 83642
Phone: 208-884-5533 1 Direct: 208-489-0571
<image001.gif>
1
L (E IDIAN> �usiness, Designed for Living
APPROVED essages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law,
o both release and retention, and may be released upon request, unless exempt from disclosure by law.
DATE: 04/20/22
f I!E HUMBF N'-zozvoon7
hua Beach <JBeach@brightoncorp.com>
Sent: Friday, October 8, 2021 9:30 AM
To: Bill Parsons <bparsons@meridiancity.org>
Cc: Alan Tiefenbach <atiefenbach@meridiancity.org>; Sonya Allen <sallen@meridiancity.org>; Joseph
Dodson <Idodson@meridiancity.org>
Subject: pre-app notes
External Sender - Please use caution with links or attachments.
Bill,
I'm prepping to submit two applications and it appears that the pre-app notes for both projects (Apex
West and Quartet South) are over the 4 month limit. Nothing about the projects has changed since the
pre-app meetings.
Can I still use the attached pre-app notes for my submittal?
Josh Beach I Assistant Project Manager -Entitlement
BRIGHTON CORPORATION
Brighton — Creating Great Places
2929 W. Navigator Dr., Suite 400, Meridian, ID 83642
Mobile 208.871.3812
brightoncorp.com