Loading...
HomeMy WebLinkAboutPre-app Notes V1CUEIDR IAy APPROVED one 04/20/22 EIIE NUMBER: H-zo21-1 IDIAN =-- IDAHO Planning Division PREAPPLICATION MEETING Type of Review Requested Pre -Application Request File number: PREAPP-2021-0053 Assigned Planner: Sonya Allen Scheduled Date: 05/25/2021 Scheduled Time: 9:30 AM Applicant Information Name: JOHN WARDLE, BRIGHTON CORPORATION Address: 12601 W. EXPLORER DRIVE SUITE 200 83713 Phone: 208-287-0518 Email: jwardle@brightoncorp.com Additional Attendee(s Name: Michael Wardle Business Name: Brighton Development Address: 2929 W Navigator Dr Meridian, Idaho 83642 Phone: 208-378-4000 Email: mwardle@brightoncorp.com Name: Josh Beach Business Name: Brighton Development Address: 2929 West Navigator Drive, Ste. 400 MERIDIAN, ID 83642 Phone. Email: jbeach@brightoncorp.com Subject Property Information Location/street address: Assessor's parcel number S1131417210 (s): Township, range, section: 3N1E31 Project Description Project/Application Name: APEX West Description of Work: Preliminary Plat 46.31 Acres lication Information APPLICATION TYPES Preliminary Plat - PP: PLATS ONLY Number of Building Lots: PROJECT INFORMATION CHECKED 132 Gross Density: 2.85 33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642 Phone: (208)884-5533 • Facsimile: (208) 888-6854 • Website: www.meridaincity.org 1 ER IDIAN,-- I �� eighborhood meeting is required prior to APPROVED ittal: 1 04/20/22 -app notes are good for 4 months: DATE - FILE NUMBER H-zo21-1 t a Site Plan will be uploaded in the attachment In Reclaimed Water Buffer: Irrigation District: Number of Residential Units: Percentage of Site Devoted to Landscaping: Primary Irrigation Source: Secondary Irrigation Source: Who will own and Maintain the Pressurized Irrigation System in this Development: PROPERTY INFORMATION Prior Approvals (File Numbers): TYPE OF USE PROPOSED Residential: Single -Family Detached: ZONING DISTRICT(S) R-2: R-8: CHECKED CHECKED CHECKED No Boise Kuna 132 16% surface well HOA H-2015-0019 (South Meridian AZ); H-2020-0056 (PP) CHECKED CHECKED CHECKED CHECKED Review Type Reviewer Review Notes Addressing Plan Review Notes Terri Ricks No comments at this time. TLR Building Plan Review Notes Bret Caulder Proposed structures to comply with the 2018 Building Codes MFD Plan Review Notes Joe Bongiorno There will need to be secondary access provided after the first 30 building lots, or everything in this phase will have fire sprinklers installed. A detailed phasing plan will be required. Parks Plan Review Notes Kimberly Warren Multi -use pathways required: one north -south connection along the Watkins drain, or along the midmile collector. one pathway along the length of the Pipeline easement through the site. Connect the first pathway to the pipeline. Dedicate easements for both. 33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642 Phone: (208)884-5533 • Facsimile: (208) 888-6854 • Website: www.meridaincity.org 2 CUEIDR IAy APPROVED DATE 04/20/22 FILE NUMBER: H-2D21-DW1 Wastewater Plan Review Notes Sonya Allen * Annexation of Parcel #R7824220042 will need to be finalized before submittal of preliminary plat application (Shafer View AZ). * Comply with the terms of the existing Development Agreement(s); or apply for a modification. * Preliminary plat to subdivide property - comply with subdivision design & improvement standards in UDC 11- 6C-3 & dimensional standards in UDC Table 11-2A-6 for the R-8 district - ALL of the parcels need to be included in the boundary of the plat, remnant portions can't be left out. * Submit phasing plan * Construct collector street consistent with Master Street Map. * Extend stub streets & provide stub streets to adjacent properties. * Extend collector street along west boundary to connect to Quartz Creek. * Provide qualified open space & site amenities per the standards in UDC 11-3G-3. * The McBirney Lateral crosses this site; comply with the standards in UDC 11-3A-6. * Comply with Williams Pipeline development standards. see comments Tyson Glock • Why are they not bring the sewer to the east through one of the roads? • Flow is committed -Ensure no sewer services cross infiltration trenches • Ensure no permanent structures (trees, bushes, buildings, carports, trash receptacle walls, fences, infiltration trenches, light poles, etc.) are built within the utility easement. Water Plan Review Notes Kyle Radek Offsite water main will be required to make second water connection to E Quartz Creek St to NW. Some water mains will need to be upsized to 12 inch to build 1/2 mile grid. 33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642 Phone: (208)884-5533 • Facsimile: (208) 888-6854 • Website: www.meridaincity.org 3 (E IDIAN - APPROVED DATE: 04/20/22 FILE NUMBER: H-2D2,-DWl FUMFIE DMLDPMENT PX d W fl H V O ~ J ]] y FUTURE ` F flURE DEVELOPMENT .• 57GfI00L ,law I — t - 1 I 1 I 3 C 1 I M I + I, t I t C I r' I 4 I I C I I I 'I I C. I C I I I --------------.-- Jim, l ti l FUTURE I G aOPMENT I I Page is too large to OCR. Page is too large to OCR. CUEIDR IAy APPROVED DATE 04/20/22 Bill Parsons <bparsons@meridiancity.org> Friday, October 8, 2021 1:19 PM FILE NUMBER: H- 21- 1 I Joshua Beach ubject: RE: pre-app notes System has been updated. Bill Parsons, AICP I Planning Supervisor City of Meridian I Community Development Dept. 33 E. Broadway Ave., Ste. 102, Meridian, Idaho 83642 Phone: 208-884-5533 1 Direct: 208-489-0571 + ' E IL}F� Built for Business, Designed for Living All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho low, in regards to both release and retention, and may be released upon request, unless exempt from disclosure by law. From: Joshua Beach <JBeach@brightoncorp.com> Sent: Friday, October 8, 2021 1:15 PM To: Bill Parsons <bparsons@meridiancity.org> Subject: Re: pre-app notes External Sender - Please use caution with links or attachments. Will do. Thank, Bill. Josh Beach On Oct 8, 2021, at 1:14 PM, Bill Parsons <bparsons@meridiancity.org> wrote: Good Afternoon Josh, If nothing has changed I don't see a need to meet again. With our new process, pre -application meeting notes are no longer required to be submitted with your application. Once you are ready to submit your application, please insert today's date as the date that you held your pre -application meeting and I will change the date in our system. Take Care, Bill Parsons, AICP I Planning Supervisor City of Meridian I Community Development Dept. 33 E. Broadway Ave., Ste. 102, Meridian, Idaho 83642 Phone: 208-884-5533 1 Direct: 208-489-0571 <image001.gif> 1 L (E IDIAN> �usiness, Designed for Living APPROVED essages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law, o both release and retention, and may be released upon request, unless exempt from disclosure by law. DATE: 04/20/22 f I!E HUMBF N'-zozvoon7 hua Beach <JBeach@brightoncorp.com> Sent: Friday, October 8, 2021 9:30 AM To: Bill Parsons <bparsons@meridiancity.org> Cc: Alan Tiefenbach <atiefenbach@meridiancity.org>; Sonya Allen <sallen@meridiancity.org>; Joseph Dodson <Idodson@meridiancity.org> Subject: pre-app notes External Sender - Please use caution with links or attachments. Bill, I'm prepping to submit two applications and it appears that the pre-app notes for both projects (Apex West and Quartet South) are over the 4 month limit. Nothing about the projects has changed since the pre-app meetings. Can I still use the attached pre-app notes for my submittal? Josh Beach I Assistant Project Manager -Entitlement BRIGHTON CORPORATION Brighton — Creating Great Places 2929 W. Navigator Dr., Suite 400, Meridian, ID 83642 Mobile 208.871.3812 brightoncorp.com