Construction Drawings V1CITY OF MERIDIAN GENERAL NOTES STANDARD NOTES FOR RESIDENTIAL/COMMERCIAL SUBDIVISIONS AND COMMERCIAL PROJECTS WITH PUBLIC MAINS GENERAL CONSTRUCTION 1. ALL CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT VERSION OF THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION ISPWC THE CITY OF MERIDIAN SUPPLEMENTAL SPECIFICATIONS TO THE ISPWC (AND ANY ADDENDUMS), MERIDIAN DESIGN STANDARDS, THE REQUIREMENTS OF THE ADA COUNTY HIGHWAY DISTRICT STRINGEN�AOFDANYN0 THESEOR STANDARDS REQUIREMENTS SHALL BE THIDAHO EE CONTROLLINGON STANDARDSORMENTSPECI SPECIFICATIONS. 2. THE MORE 2. THE CONTRACTOR SHALL HAVE A COPY OF THE LATEST CITY OF MERIDIAN STANDARD SPECIFICATIONS AND DRAWINGS ON SITE OR READILY ACCESSIBLE AT ALL TIMES DURING CONSTRUCTION (AVAILABLE ON THE WEBSITE). FAILURE TO HAVE ACCESS TO A CURRENT COPY OF THE STANDARD SPECIFICATIONS ON SITE COULD BE GROUNDS FOR A STOP WORK ORDER UNTIL THE SITUATION IS RESOLVED. 3. THE CONTRACTOR SHALL HAVE PLANS STAMPED "APPROVED FOR CONSTRUCTION" BY THE CITY OF MERIDIAN ON SITE AT ALL TIMES. 4. ALL CONTRACTORS, SUBCONTRACTORS, AND UTILITY CONTRACTORS SHALL ATTEND A PRE -CONSTRUCTION CONFERENCE PRIOR TO START OF WORK. 5. CONTRACTORS SHALL NOTIFY THE APPROPRIATE AGENCY WHEN MATERIALS ARE ON SITE OR INSPECTION OF THE WORK IS REQUIRED. NO WORK MAY BEGIN ON ANY PROJECT WITHOUT TWENTY FOUR (24) HOUR PRIOR NOTICE. 6. CONTACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR 48 HOURS PRIOR TO THE REQUIRED TESTING. THE CONTRACTOR MAY NOT OPEN OR CLOSE WATER VALVES. 7. ALL MATERIAL FURNISHED ON, OR FOR THE PROJECT MUST MEET THE MINIMUM REQUIREMENTS OF THE APPROVING AGENCIES. AT THE REQUEST OF THE APPROVING AGENCY OR THE DESIGN ENGINEER, CONTRACTORS SHALL FURNISH PROOF THAT ALL MATERIALS INSTALLED ON THIS PROJECT MEET THE SPECIFICATION REQUIREMENTS SET FORTH IN GENERAL CONSTRUCTION NOTE NO. 1. S. WORK SUBJECT TO APPROVAL BY ANY GOVERNMENTAL AGENCY MUST BE APPROVED PRIOR TO (A) BACKFILLING TRENCHES FOR PIPE; (B) PLACING OF AGGREGATE BASE; (C) PLACING OF CONCRETE; (D) PLACING OF ASPHALT PAVING. 9. INSPECTION, APPROVAL AND FINAL ACCEPTANCE OF ALL WATER AND SEWER CONSTRUCTION SHALL BE BY THE PUBLIC WORKS DEPARTMENT, AND THEIR DECISION SHALL BE FINAL. SUCH INSPECTIONS SHALL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF PERFORMING THE WORK IN AN ACCEPTABLE MANNER IN ACCORDANCE WITH THE DEQ/QLPE APPROVED CONSTRUCTION PLANS. 10. ANY DEVIATION FROM THE APPROVED PLANS AND SPECIFICATIONS MUST HAVE THE APPLICABLE AGENCY APPROVAL IN WRITING PRIOR TO CONSTRUCTION. 11. PRIOR TO BEGINNING INSTALLATION OF STREET LIGHTS, THE ELECTRICAL CONTRACTOR SHALL OBTAIN AN ELECTRICAL PERMIT FROM THE BUILDING DIVISION OF THE MERIDIAN PUBLIC WORKS DEPARTMENT. ANY DEVIATION IN STREET LIGHT LOCATIONS FROM THE APPROVED PLANS MUST BE APPROVED IN WRITING FROM THE CITY ENGINEER. ROADWAY 1. ALL CONTRACTORS WORKING WITHIN THE PUBLIC ROAD RIGHT-OF-WAY ARE REQUIRED TO SECURE A RIGHT-OF-WAY CONSTRUCTION PERMIT FROM ACHD OR ITO AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION. 2. ACHD OR ITD WILL INSPECT ALL WORK WITHIN THE PUBLIC RIGHTS -OF -WAY TO INCLUDE UTILITY TRENCHES ABOVE THE PIPE ZONE. WATER 1. CONSTRUCTION OF THE WATER SYSTEM SHALL CONFORM TO THE STANDARDS IN THE "IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08)" AS WELL AS THE STANDARDS AND SPECIFICATIONS REFERRED TO IN GENERAL CONSTRUCTION NOTE NO. 1. 2. THE HORIZONTAL SEPARATION OF POTABLE WATER MAINS AND NON -POTABLE WATER MAINS (SANITARY SEWER, STORM DRAIN, AND IRRIGATION) SHALL BE A MINIMUM OF TEN (10) FEET. WHERE IT IS NECESSARY FOR A POTABLE WATER MAIN AND NON -POTABLE WATER MAIN TO CROSS WITH LESS THAN EIGHTEEN 18) INCHES OF VERTICAL SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 542.07 OF THE IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08) AND SECTION 430.02 OF THE WASTEWATER RULES (IDAPA 58.01.16). 3. THE HORIZONTAL SEPARATION OF NON -POTABLE SERVICES AND POTABLE WATER SERVICES OR POTABLE WATER MAINS SHALL BE A MINIMUM OF SIX (6) FEET. WHERE IT IS NECESSARY FOR A POTABLE WATER MAIN AND NON -POTABLE WATER MAIN TO CROSS WITH LESS THAN EIGHTEEN 18) INCHES OF VERTICAL SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 542.07 OF THE IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08) AND SECTION 430.02 OF THE WASTEWATER RULES (IDAPA 58.01.16). 4. PLACE WATER SERVICE LINES IN A TWO (2) INCH DIAMETER PIPE SLEEVE WHEREVER THE SERVICE LINE CROSSES A STORM WATER TREATMENT FACILITY (I.E. SEEPAGE BEDS, DRAINAGE SWALES). 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONTINUOUS WATER SERVICE TO ALL EXISTING WATER USERS AFFECTED BY CONSTRUCTION. IF WATER SERVICE MUST BE INTERRUPTED, THE CONTRACTOR SHALL COORDINATE WITH THE PUBLIC WORKS INSPECTOR. SEWER 1. CONSTRUCTION OF THE SEWER SYSTEM SHALL CONFORM TO THE STANDARDS IN THE WASTEWATER RULES (IDAPA 58.1.16) AS WELL AS THE STANDARDS AND SPECIFICATIONS REFERRED TO IN GENERAL CONSTRUCTION NOTE NO. 1. 2. THE HORIZONTAL SEPARATION OF POTABLE WATER MAINS AND NON -POTABLE WATER MAINS (SANITARY SEWER, STORM DRAIN, AND IRRIGATION) SHALL BE A MINIMUM OF TEN (10) FEET. WHERE IT IS NECESSARY FOR A POTABLE WATER MAIN AND NON -POTABLE WATER MAIN TO CROSS WITH LESS THAN EIGHTEEN 18) INCHES OF VERTICAL SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 542.07 OF THE IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08) AND SECTION 430.02 OF THE WASTEWATER RULES (IDAPA 58.01.16). 3. THE HORIZONTAL SEPARATION OF NON -POTABLE SERVICES AND POTABLE WATER SERVICES OR POTABLE WATER MAINS SHALL BE A MINIMUM OF SIX (6) FEET. WHERE IT IS NECESSARY FOR A POTABLE WATER MAIN AND NON -POTABLE WATER MAIN TO CROSS WITH LESS THAN EIGHTEEN 18) INCHES OF VERTICAL SEPARATION, THE CROSSING SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 542.07 OF THE IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEMS (IDAPA 58.01.08) AND SECTION 430.02 OF THE WASTEWATER RULES (IDAPA 58.01.16). 4. PLACE SEWER SERVICE LINES IN A SIX (6) INCH DIAMETER WATER CLASS PIPE SLEEVE WHEREVER THE SERVICE LINE CROSSES A STORM WATER TREATMENT FACILITY (I.E., SEEPAGE BEDS, DRAINAGE SWALES). 1. THE PRESSURIZED IRRIGATION SYSTEM MUST BE BUILT TO THE STANDARDS OF THE IRRIGATION DISTRICT IN WHICH IT IS BEING CONSTRUCTED. 2. INSTALL A REDUCED PRESSURE BACKFLOW PREVENTER IN ANY CONNECTION BETWEEN THE POTABLE WATER SYSTEM AND THE PRESSURE IRRIGATION SYSTEM. THE DEVICE MUST BE APPROVED BY THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) AND THE CITY OF MERIDIAN WATER DEPARTMENT. DRAINAGE 1. FOR ANY DRAINAGE FACILITIES WITHIN A PUBLIC RIGHT OF WAY, ACHD OR ITD SHALL BE RESPONSIBLE FOR INSPECTION. FOR ANY PRIVATE DRAINAGE FACILITIES THE PROJECT ENGINEER OR ARCHITECT SHALL BE RESPONSIBLE FOR INSPECTION AND CERTIFICATION OF DRAINAGE FACILITIES; HOWEVER ANY ROOF DRAINAGE AND PIPING TO THE DRAINAGE FACILITIES WILL BE INSPECTED BY THE MERIDIAN PLUMBING OFFICIAL UNDER THE APPROPRIATE PERMIT. ACRONYMS CL - CENTERLINE N - NORTHING CO - CLEANOUT CHIP - OVERHEAD POWER E - FASTING PC - POINT OF CURVATURE ELEV - ELEVATION PI - PRESSURE IRRIGATION EP - EDGE OF PAVEMENT PS - PRESSURE SEWER FL - FLOW LINE PT - POINT OF TANGENCY FLG - FLANGE R - STATION OFFSET RIGHT GI - GRAVITY IRRIGATION RIM - RIM OF STRUCTURE HP - HIGH POINT SD - STORM DRAIN INV - INVERT SDMH - STORM DRAIN MANHOLE ISPWC - IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION SG - SAND AND GREASE TRAP L - STATION OFFSET LEFT SS - SANITARY SEWER LF - LINEAR FOOT SSMH - SEWER MANHOLE LIP - LIP OF GUTTER STA - ROADWAY STATION FROM CENTERLINE MA - MATCH EXISTING SW - SIDEWALK MJ - MECHANICAL JOINT TBC - TOP BACK OF CURB MW - MONITORING WELL TOG - TOP OF CONCRETE UTILITY NOTES 1. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BY CALLING DIGLINE AT PHONE # (800P 342-1585 BEFORE COMMENCING WORK. THE CONTRACTOR IS FULLY RESPONSIBLE FOR ANY AND ALL AMAG S TO EXISTING UNDERGROUND UTILITIES. 2. ALL WELL ABANDONMENT SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE IDAHO DEPARTMENT OF WATER RESOURCES (IDWR) AND IDAHO CODE. THE CONTRACTOR SHALL RETAIN A LICENSED WELL DRILLER FOR ABANDONMENT. COORDINATE WITH ROB WHITNEY AT IDWR WESTERN REGION (334-2190). 3. EXISTING OVERHEAD POWERLINES SHALL BE RETAINED AND PROTECTED AS NEEDED TO MAINTAIN SERVICE TO ADJACENT PROPERTIES. THE CONTRACTOR SHALL COORDINATE WITH IDAHO POWER COMPANY TO ABANDON OR RELOCATE ALL OTHER OVERHEAD POWER LINES AND POLES AS REQUIRED. 4. EXISTING SEPTIC SYSTEMS ASSOCIATED WITH ANY ABANDONED BUILDINGS ON THE SITE SHALL BE ABANDONED ACCORDING TO THE REQUIREMENTS OF THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY TECHNICAL GUIDANCE MANUAL. THE CONTRACTOR SHALL VERIFY THE LOCATION OF THE SEPTIC TANK, DRAINFIELD AND ALL APPURTENANCES. ALL INLET AND OUTLET PIPING SHALL BE DISCONNECTED FROM THE SEPTIC TANK. ALL BURIED PIPING SHALL BE EXCAVATED AND TRACED FROM THE SEPTIC TANK TO THE DRAIN FIELD TO THE FULL EXTENTS. THE CONTRACTOR SHALL VERIFY THE EXISTENCE OF A DRAINFIELD AND SHALL EXCAVATE THE DRAINFIELD SOILS TO AT LEAST THE MINIMUM GROUNDWATER LEVEL OR AS DIRECTED BY THE GEOTECHNICAL ENGINEER AFTER FIELD SITE INSPECTION OF THE DRAINFIELD AREA. THE DRAINFIELD SOILS SHALL BE DISPOSED OF OFF SITE OR MIXED WITH THE WETLAND STRIPPINGS IF AUTHORIZED BY THE ENGINEER. AFTER INSPECTION OF EXCAVATED SOILS, THE CONTRACTOR SHALL BACKFILL THE DRAINFIELD AREA WITH STRUCTURAL FILL. PROJECT GENERAL NOTES 1. THE CONTOURS AND BENCHMARK ELEVATION ARE BASED ON THE NAVD 88 VERTICAL DATUM. HORIZONTAL COORDINATES ARE BASED OFF OF THE NAD83 IDAHO STATE PLANE WEST COORDINATE SYSTEM. 2. PROJECT BENCHMARKS SHALL BE ESTABLISHED THROUGHOUT THE SITE BY THE SURVEYOR AND WILL BE PROVIDED TO THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 3. THE CONTRACTOR SHALL PROTECT ALL SURVEY MONUMENTS AND BENCHMARKS FROM DISTURBANCE THROUGHOUT CONSTRUCTION. DAMAGED BENCHMARKS WILL BE REPLACED BY THE PROJECT SURVEYOR AT THE CONTRACTOR'S EXPENSE. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE SAFETY REQUIREMENTS OF ANY JURISDICTIONAL BODY. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL BARRICADES, SAFETY DEVICES AND TRAFFIC CONTROL WITHIN AND AROUND THE CONSTRUCTION AREA. 5. ALL WORK SHALL BE DONE IN COMPLIANCE WITH THE APPROVED PLANS, SPECIFICATIONS, SOILS REPORT AND APPENDIX CHAPTER 33 OF THE UNIFORM BUILDING CODE. 6. WHERE NOTED, EXISTING TEST PITS/MONITORING WELLS SHALL BE RETAINED AND PROTECTED DURING CONSTRUCTION. 7. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE SPECIFICATIONS ANDVOR REQUIREMENTS OF THE CITY OF MERIDIAN, ADA COUNTY HIGHWAY DISTRICT, AND THE IDAHO DEPARTMENT 0 ENVIRONMENTAL QUALITY. 8. A PRE CONSTRUCTION CONFERENCE SHALL BE HELD A MINIMUM OF THREE (3) WORKING DAYS PRIOR TO START OF WORK. ALL CONTRACTORS, SUBCONTRACTORS AND/OR UTILITY CONTRACTORS SHALL BE PRESENT. 9. THE CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE FACILITIES WITHIN THE CONSTRUCTION AREA UNTIL THE PROPOSED DRAINAGE IMPROVEMENTS ARE IN PLACE AND FUNCTIONING. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE STORM WATER POLLUTION PREVENTION PLAN AND THE ROUGH GRADING PLAN. 10. ALL CONTRACTORS WORKING WITHIN THE PROJECT BOUNDARIES ARE RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE SAFETY LAWS OF ANY JURISDICTIONAL BODY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BARRICADES, SAFETY DEVICES AND CONTROL OF TRAFFIC WITHIN AND AROUND THE CONSTRUCTION AREA. 11. WORK SUBJECT TO APPROVAL BY ANYPOLITICAL SUBDIVISION OR AGASEE(NCY MUST BE APPROVED PRIOR TO (A) ASPHALT BACKFIPAVING..NWORKFDONEOR PIPE WITHOUT ()WITHOUTPLACUCIHGAPPROVAOF LESHALLGATE BNOT RELI ECTHE ING CCONTRACTOREFROM PLACING OF RESPONSIBILITY OF PERFORMING THE WORK IN AN ACCEPTABLE MANNER. 12. ALL CONTRACTORS WORKING WITHIN EXISTING PUBLIC ROAD RIGHT-OF-WAY ARE REQUIRED TO SECURE A RIGHT-OF-WAY CONSTRUCTION PERMIT FROM ADA COUNTY HIGHWAY DISTRICT AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION. 13. THE CONTRACTOR SHALL CONSTRUCT ALL IMPROVEMENTS IN ACCORDANCE WITH THE PLANS STAMPED "APPROVED FOR CONSTRUCTION" BY THE VARIOUS GOVERNING AGENCIES. THESE PLANS WILL BE PROVIDED TO THE CONTRACTOR BY THE ENGINEER PRIOR TO CONSTRUCTION. WORK SHALL NOT BE DONE WITHOUT THE CURRENT SET OF APPROVED PLANS. 14. ALL LOT LINE AND EASEMENT INFORMATION SHALL BE TAKEN FROM BOUNTIFUL COMMONS SUBDIVISION NO. 1 PLAT. 15. THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACCESS TO THE OWNER APPROVED ACCESS POINTS. 16. IF THE CONTRACTOR HAS ANY QUESTIONS CONCERNING THE PROJECT SPECIFICATIONS, HE/SHE SHALL CONTACT THE ENGINEER FOR DIRECTION. WHEN DISCREPANCIES OCCUR BETWEEN THE PLANS AND SPECIFICATIONS THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER. UNTIMELY NOTIFICATIONS MAY NEGATE ANY CONTRACTORS CLAIM FOR ADDITIONAL COMPENSATION. 17. ALL COSTS INCURRED IN CORRECTING DEFICIENT WORK SHALL BE CHARGED TO THE CONTRACTOR. FAILURE TO CORRECT SUCH WORK WILL BE CAUSE FOR A STOP WORK ORDER AND POSSIBLE TERMINATION. 18. ABANDONED BUILDINGS, TEST PITS OR WATERWAYS LOCATED WITHIN CURRENT OR FUTURE RIGHT-OF-WAY SHALL BE RE -EXCAVATED TO NATIVE SOIL AND BACKFILLED WITH STRUCTURAL FILL PER ISPWC SPECIFICATIONS. PROVIDE SOILS DATA TO VERIFY MATERIAL MEETS THE REQUIREMENTS FOR ENGINEERED FILL PER ISPWC SPECIFICATIONS AND COPY OF THE COMPACTION TESTS. 19. SUBGRADE SHALL BE INSPECTED BY THE GEOTECHNICAL CONSULTANT RESPONSIBLE FOR THE GEOTECHNICAL ASPECTS OF THE PROJECT. 20. FINAL GRADING SHALL BE INSPECTED BY THE PROJECT ENGINEER. 21. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE MOST CURRENT EDITION OF THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC) AND THE PROJECT STANDARDS AND SPECIFICATIONS. NO EXCEPTIONS WILL BE ALLOWED UNLESS SPECIFICALLY AND PREVIOUSLY APPROVED IN WRITING BY ALL APPROPRIATE ENTITIES. 22. ONLY PLAN SETS STAMPED "APPROVED FOR CONSTRUCTION" AND SIGNED BY AN AUTHORIZED REPRESENTATIVE OF THE CONTROLLING GOVERNMENTAL AGENCY SHALL BE USED BY THE PROJECT CONTRACTOR(S). 23. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE ONLY APPROXIMATE. THE CONTRACTOR SHALL COMPLY WITH IDAHO CODE REGARDING UNDERGROUND FACILITIES DAMAGE PREVENTION. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED AS A RESULT OF FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL CONTACT DIGLINE (342-1585) FOR UTILITY LOCATIONS A MINIMUM OF 48 HOURS PRIOR TO DIGGING. 24. ALL NATURAL SLOPES SHALL BE A MAXIMUM OF 2:1, UNLESS OTHERWISE STATED ON THIS PLAN. ASPHALT MINIMUM GRADE IS 1%. CONCRETE MINIMUM GRADE IS 0.4%. FINISH GRADE SHALL SLOPE AWAY FROM ALL BUILDINGS. 25. REMOVE AND DISPOSE OFF -SITE AT AN APPROVED LOCATION ANY AND ALL EXCESS MATERIALS. GRADING NOTES 1. ALL EARTHWORK INCLUDING CLEARING, GRUBBING, EXCAVATION, EMBANKMENT, BACKFILL, DEWATERING, AND EROSION CONTROL SHALL MEET THE SPECIFICATIONS OF SECTION 200 OF THE ISPWC AS WELL AS THE SPECIFICATIONS AND RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEERING REPORT. 2. THE CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE FACILITIES WITH THE CONSTRUCTION AREA UNTIL TEMPORARY AND/OR PERMANENT DRAINAGE IMPROVEMENTS ARE IN PLACE AND FUNCTIONING. 3. IF REQUIRED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A SHORT TERM ACTIVITY EXEMPTION PERMIT FROM THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ). CONTACT CRAIG SHEPHARD AT THE SOUTHWEST REGIONAL DEQ OFFICE (373-0557) . THE CONTRACTOR SHALL SUBMIT TO DE A DEWATERING PLAN WHICH OUTLINES THE LOCATION OF PROPOSEDBMPS AND THE SEQUENCING OF THE DEWATERING ACTIVITIES. ALL CONSTRUCTION WATER GENERATED FROM EXCAVATION SHALL BE FREE OF SEDIMENT AND DEBRIS BEFORE IT LEAVES THE SITE. 4. PRIOR TO PLACEMENT OF FILL MATERIAL, THE CONTRACTOR SHALL CLEAR THE SITE OF ALL WASTE MATERIALS AND VEGETATION AND PREPARE THE SUBGRADE AS RECOMMENDED IN THE GEOTECHNICAL REPORT. ALL WASTE MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE REGULATIONS. THE SITE SHALL BE PROOF -ROLLED PRIOR TO PLACEMENT OF FILL MATERIAL TO ENSURE STABILITY OF SUBGRADE. A REPRESENTATIVE OF GEOTECHNICAL CONSULTANT SHALL REMAIN ON SITE TO ENSURE PROPER PLACEMENT AND COMPACTION OF STRUCTURAL FILL. 5. NO WORK SHALL BE DONE WITHIN JURISDICTIONAL WETLAND AREAS UNTIL A 404 PERMIT HAS BEEN ISSUED BY THE US ARMY CORPS OF ENGINEERS. ALL WORK WITHIN WETLAND AREAS SHALL ADHERE TO THE REQUIREMENTS OF THE 404 PERMIT. 6. STRIP AND STOCKPILE TOPSOIL AND DISPOSE OF DEBRIS OFF -SITE. THE DEPTH OF STRIPPING COULD VARY IN THE FIELD DEPENDING ON THE DEPTH OF THE ROOT ZONE, SOIL COMPOSITION INCLUDING SOIL TYPE, MOISTURE CONTENT AND STABILITY AND THE WEATHER CONDITIONS DURING CONSTRUCTION. STRIPPING DEPTHS SHALL BE DIRECTED BY THE ONSITE GEOTECHNICAL CONSULTANT. LOCATION OF STOCKPILED MATERIAL SHALL BE COORDINATED WITH THE OWNER AND ENGINEER PRIOR TO PLACEMENT. 7. TESTING SHALL BE PERFORMED PER THE RECOMMENDATIONS OF THE GEOTECHNICAL REPORT. FILL MATERIAL WITHIN THE LOT AREAS SHALL BE COMPACTED TO 95% MODIFIED PROCTOR PER THE REQUIREMENTS OF ASTM D 1557. TESTING FREQUENCY SHALL ALLOW FOR A MINIMUM OF ONE COMPACTION TEST PER LIFT PER LOT. THE COMPACTION TESTS ON THE FINAL LIFT FOR EACH LOT SHALL BE SUPPLIED TO THE PROJECT ENGINEER AT THE COMPLETION OF THE PROJECT. B. THE SUBGRADE WITHIN THE ROAD RIGHT-OF-WAYS SHALL BE STRIPPED, COMPACTED, INSPECTED AND PROOF ROLLED WITH A HEAVY RUBBER -TIRED FULL LOADED TANDEM AXLE OR EQUIVALENT PRIOR TO PLACEMENT OF FILL. FILL WITHIN THE ROADWAY AREAS SHALL BE COMPACTED TO NOT LESS THAN 95% OF THE MAXIMUM DRY DENSITY OF THE SOIL AS INDICATED BY ASTM D698 IN FLEXIBLE PAVEMENT AREAS. 9. STRUCTURAL FILL IS DEFINED BY THE GEOTECHNICAL CONSULTANT. SEE GEOTECHNICAL REPORT FOR ADDITIONAL INFORMATION. 10. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER TO DETERMINE WHICH TREES WITHIN THE PROJECT LIMITS ARE TO REMAIN AND WHICH ARE TO BE REMOVED. 11. TOPSOIL AND OTHER STOCKPILE AREAS TO BE COORDINATED BETWEEN CONTRACTOR AND OWNER BEFORE THE START OF CONSTRUCTION. 12. NO GRADING WORK SHALL OCCUR UNTIL THE OWNER HAS FILED A NOTICE OF INTENT FOR CONSTRUCTION ACTIVITY WITH THE EPA. 13. ALL MATERIAL FURNISHED ON OR FOR THE PROJECT MUST MEET THE MINIMUM REQUIREMENTS OF THE APPROVING AGENCIES OR AS SET FORTH HEREIN, WHICHEVER IS MORE RESTRICTIVE. CONTRACTORS MUST FURNISH PROOF THAT ALL MATERIALS INSTALLED ON THIS PROJECT MEET THE REQUIREMENTS AT THE REQUEST OF THE AGENCY AND/OR THE ENGINEER. TRAFFIC CONTROL NOTES 1. ALL WORK SHALL CONFORM TO THE LATEST EDITION OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" FOR STREETS AND HIGHWAYS. 2. ALL WARNING FLAGS AND FLASHERS SHALL BE CONSIDERED INCIDENTAL TO THE TRAFFIC CONTROL BID ITEMS. 3. THE FLAGGERS SHALL BE EQUIPPED WITH TWO WAY RADIOS CAPABLE OF TRANSMITTING A DISTANCE OF 2 MILES AND BATTERIES TO LAST THROUGH EACH DAY OF OPERATION. 4. SIGNS AND SIGN STANDS NOT IN USE SHALL BE REMOVED OR LAID DOWN AT LEAST 15 FEET FROM THE EDGE OF THE TRAVEL WAY. 5. ONE LANE OF TRAFFIC SHALL BE OPEN TO LOCAL TRAFFIC AT ALL TIMES. 6. CONTRACTOR SHALL PROVIDE ALL SIGNAGE NECESSARY TO ALERT THE SURROUNDING PUBLIC OF THE CONSTRUCTION TAKING PLACE. THE CONTRACTOR ASSUMES RESPONSIBILITY FOR THE SIGNS NEEDED FOR PUBLIC SAFETY. 7. ALL CONTRACTORS WORKING WITH THE PUBLIC ROAD RIGHT-OF-WAY ARE REQUIRED TO SECURE A RIGHT-OF-WAY CONSTRUCTION PERMIT FROM ACHD AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION. B. CONTRACTOR SHALL PROVIDE A DETAILED TRAFFIC CONTROL PLAN TO ACHD FOR APPROVAL PRIOR TO ANY CONSTRUCTION. BOUNTIFUL COMMONS SUBDIVISI MERIDIAN, IDAHO CONSTRUCTION PLANS DULY, 2018 SIMPSON LATERAL 0 or Cr Uj Z J In IRRIGATION NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE MOST CURRENT EDITION OF THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC). 2. THE HORIZONTAL AND VERTICAL SEPARATION OF THE POTABLE WATER AND NON -POTABLE PIPELINES (SEWER, STORMDRAIN, IRRIGATION, AMENITY, ETC.) SHALL COMPLY WITH THE MOST CURRENT EDITION OF THE IRPDWS AND AS DETAILED IN SECTION 405 - NON -POTABLE WATER LINE SEPARATION AND ISPWC STANDARD DRAWING SD-407. IN CASE OF A DISCREPANCY, THE IRPDWS SHALL GOVERN. 3. GROUNDWATER LEVELS SHALL BE MAINTAINED BELOW THE BOTTOM OF THE TRENCH DURING THE PIPE LAYING AND PIPE JOINING OPERATIONS. CONTRACTOR SHALL OBTAIN A SHORT TERM ACTIVITY EXEMPTION FROM DEQ PRIOR TO ANY DEWATERING. 4. ALL PRESSURE IRRIGATION AND AMENITY LINES SHALL BE PLACED IN THE GROUND WITH THE PIPE INVERT BEING AT OR ABOVE THE ESTIMATED HIGH GROUNDWATER ELEVATION. FINISHED GRADE COVER OVER PRESSURE IRRIGATION AND AMENITY LINES SHALL BE A MINIMUM OF 30". 5. PIPE TRENCHING WILL OCCUR IN ACCORDANCE WITH THE ISPWC, INSTALLATION OF PIPE BEDDING SHALL 6. APPROXIMATE PIPE LENGTHS SHOWN ARE FROM CENTER OF ELBOW/TEE TO CENTER OF ELBOW/TEE. 7. RECORD INFORMATION SHALL BE ACCURATELY RECORDED BY THE CONTRACTOR AND SUPPLIED TO THE OWNER FOR FUTURE USE AND REFERENCE. SUBMITTAL OF RECORD INFORMATION IS A CONDITION OF FINAL ACCEPTANCE. B. ALL IRRIGATION MAINS AND SERVICES SHALL BE PRESSURE TESTED IN ACCORDANCE WITH ISPWC SECTION 400. TEST PRESSURE SHALL BE 150 PSI. 9. ALL IRRIGATION MAINS WITHIN FUTURE RIGHT OF WAY OR UNDER PAVEMENT OR SIDEWALKS SHALL BE SLEEVED IN ACCORDANCE WITH THE DETAIL ON SHEET C4.0. 12. CONTRACTOR MAY ELECT TO ELIMINATE ELBOWS WITH ANGLES LESS THAN 45' PROVIDED THE PIPE BARREL DEFLECTION IS WITHIN MANUFACTURER'S LIMITS. NO JOINT DEFLECTION IS ALLOWED. 13. ALL ISOLATION VALVES SHALL BE PRESSURE TESTED IN THE CLOSED POSITION. 14. ALL IRRIGATION MAINS SHALL BE INSTALLED WITH TRENCH TAPE 12" ABOVE PIPE CROWN. TRENCH TAPE SHALL BE 2" WIDE PURPLE COLORED PLASTIC TAPE PRINTED WITH "CAUTION - BURIED IRRIGATION WATER LINE" IN 1-1/2" LETTERS. ALL IRRIGATION MAINS SHALL BE INSTALLED WITH INSULATED 12 GAUGE SOLID COPPER LOCATOR WIRE THAT IS U.L. RATED FOR DIRECT BURIAL. PIPE MATERIALS 2 INCH AND SMALLER ARE SPECIFIED ON DETAILS. 15. ALL PIPE, FITTINGS, THRUST BLOCKING, IDENTIFYING TAPE, FINDER WIRE, COUPLERS, AND OTHER APPURTENANCES SHALL CONFORM TO SECTION 901 OF THE LATEST EDITION OF THE ISPWC. 16. CONTRACTOR SHALL COORDINATE INSPECTION AND TESTING WITH THE PROJECT ENGINEER PRIOR TO CONSTRUCTION. 17. PRESSURE IRRIGATION SHALL CONNECT TO EXISTING PARAMOUNT SUBDIVISION PRESSURE IRRIGATION MAIN LOCATED ON EAST BOUNDARY OF PROJECT. CONTACT INFORMATION ENGINEER KM ENGINEERING, LLP 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE: (208) 639-6939 FAX: (208) 639-6930 CONTACT: KELLY KEHRER, P.E. EMAIL: kelly®kmengllp.com DIGLINE DIGLINE, Inc. 50 S. COLE RD. BOISE, IDAHO 83709 PHONE: 811 BENCHMARK POINT NUMBER POINT STYLE EASTING NORTHING 4 2449094.566 726870.633 DEVELOPER TMEG PROPERTIES, LLC 74 EAST 500 SOUTH, STE. 200 BOUNTIFUL, UTAH 84010 PHONE: (801) 292-5000 CONTACT: TREVOR GASSER EMAIL: trevorOtgirealestate.com ON No. 1 VICINITY MAP MAP NOT TO SCALE lip 0 50 100 200 300 Scale: 1" = 100 FEET SHEETINDEX CO.0 COVER & NOTES C0.1 DETAILS C1.1 SITE PLAN C1.2 DEMOLITION PLAN C2.0-2.1 SEWER PLAN C3.0 WATER PLAN C4.0 IRRIGATION PLAN C5.0-5.1 GRADING PLAN IR1.0 - IR2.0 PRESSURE IRRIGATION PLANS ESC1.0 SWPPP PLAN LEGEND FOUND BRASS CAP ® FOUND ALUMINUM CAP 00 FOUND 518 INCH REBAR O FOUND 1/2 INCH REBAR Q CALCULATED POINT SIGN BOUNDARY LINE INTERIOR PARCEL LINE ADJACENT PROPERTY LINE ROAD CENTERLINE SECTION LINE - - - - - - - - - - - EASEMENT LINE S S S SANITARY SEWER LINE so so STORM DRAIN LINE W W WATER LINE cl cl GRAVITY IRRIGATION LINE P P P UNDERGROUND POWER LINE OP 0P OVERHEAD POWER LINE -13-13-13- GAS LINE T T T TELEPHONE/FIBER OPTIC LINE PI PI PRESSURE IRRIGATION EP EP EDGE OF PAVEMENT EG EG EDGE OF GRAVEL -% % %- FENCE LINE CONCRETE ASPHALT PAVEMENT MERIDIAN STD DRAWINGS AND SPECIFICATIONS VERTICAL DATUM 1. CONTRACTOR SHALL, AT ALL TIMES, HAVE ON -SITE, A 1. VERTICAL DATUM IS NAVD 88 COPY OF THE MOST -CURRENT EDITION OF THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC). 2. THE SUPPLEMENTAL SPECIFICATIONS THAT GOVERN THE PROJECT WILL BE THE MERIDIAN SUPPLEMENTAL CONDITIONS IN AFFECT ON THE DATE THE PLANS WERE APPROVED FOR CONSTRUCTION. 3. ADDENDUMS TO THE SPECIFICATIONS ARE AVAILABLE ON THE CITY'S WEB SITE www.meNdiancity.org �APPROVED FOR 4. ALL ADDENDUMS IN EFFECT AT THE TIMES THE l� E IDIAN=- ions; CONSTRUCTION PLANS ARE APPROVED MUST ALSO BE ADHERED TO. These plans and/or speciflca, ., have been rev ­ For compliance 5. IF THE CONTRACTOR DOES NOT HAVE A COPY OF with INeddian city standar�, a, ,pecificarioi,s. , , ,e,ievu does not THE CITY'S SUPPLEMENTAL SPECIFICATION ON THE �'�" """"� y "" "" "'"­ °Je' JOB SITE, IT COULD BE GROUNDS FORA STOP a a e'�'�" a WORK" ORDER UNTIL THE SITUATION IS RESOLVED. ADA NOTES must be Subn,„e��eea� 1. ALL SIDEWALKS AND ACCESSIBLE ROUTES SHALL MEET Standardsano THE FOLLOWING SLOPE REQUIREMENTS LIST BELOW. Name Amanda McNutt CONTRACTOR WILL BE REQUIRED TO REPLACE/REAPIAR Date Sep 202018 ANY IMPROVEMENTS NOT MEETING THESE CRITERIA AT HIS OWN COST. SIDEWALKS AND ACCESSIBLE ROUTES -2% MAXIMUM CROSS SLOPE -5% MAXIMUM RUNNING SLOPE ADA PARKING AREAS AND LANDINGS -2% MAXIMUM SLOPE ANY DIRECTION RAMPS -2% MAXIMUM CROSS SLOPE -8.33% (1:12) MAXIMUM RUNNING SLOPE 2. TRUNCATED DOMES SHALL BE CAST INTO CONCRETE ASTAMPED CONCRETE AND ADHESIVE MATS NOT LLOWED) AND SHALL BE COLORED TRAFFIC YELLOW. ELEVATION DESCRIPTION 3. ALL ADA SIGNAGE AND STRIPING SHALL MEET THE 2575.55 5/8-INCH REBAR MINIMUM REQUIREMENTS OF THE MOST CURRENT EDITIONS OF THE ADA, MUTCD, AND THE ISPWC. PAVING AND CURB NOTES 1. CONTRACTOR IS RESPONSIBLE FOR PROPER TRANSITIONS BETWEEN THE VARIOUS CURB TYPES AND AS NECESSARY TO MAINTAIN ADA COMPLIANCE FOR ALL PEDESTRIAN RAMPS. �7 F � IOAUNO� 1Nbeb Dep�rhneert Daslpn & Conetruodon luppkmuntaf Epeoigaedone [oil �1I in ❑ ■' . i■ ❑? • (N O z z Vf LU 00 K - U a do (J c-I O z z O m Q 0 zz OQ 20_ 2i = Ow U J IL z O m N LU O z Q LJ O U RAWING STATUS: APPROVED FOR CONSTRUCTION ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: 1DP DRAWN BY: 1DP CHECKED BY: KSK DATE: 8/21/2018 PROJECT: 18-055 SHEET NO. C0.0 z O U I) z O O LL 0 LU Q In-ieation District \ SUPPORT VALVE BOItw/12 DNCIXIM IN ROAOWAYa \ FINISH GRADE GRADE ^,. O SID TABLE HEIGHT OR EQUAL L ADJUSTABLE MATCO 100 FIT GASKETED DEEP SOCKET VALVE - 'r IF JM OJO -RFS-RAIN- ISOLATION VALVE DETAIL NTS SETTLERS IRRIGATION-�- DWG NO. DISTRICT PRESSURIZED ISOLATION M" T3`�'i",�Ii�, � PIRRO3004 IRRIGATION STANDARD 15 4- SERVICE MARKER (TYP.) r� o «I M m _. rt m Insert plug q 24"a ove grade 10 3/41' 160 PSI 3408 PE t 7 G' to 9' RNO VAL E BOX ro G' RISER WITH SLOTS SERVI E LINE �` LLOVER NO 3/4' - RB STOP 3/4'X6' BRA S NIPPLE ELVES (TYP. ALL RVICES) PACKED JT. CPLG FUR PE PIPE SADDLE TEE WITH / SECTION VIEW WIDE BAHO SS TRAP SET OUTLET TO HORIZONTAL SIQE PROP. LINE IRRIGATION MAIN SIDE PROP. LINE 0 V 10, r- F--I m �SERVICE MARKER(TYP) 10' C PLAN VIEW Settlers Irrigation Lot Irrigation Service District Pressurized Hookup Detail PIRRO 005 Irrigation Standard REV. MAY 201; Notes: 1. Locate drains at all low areas in the mainline. 2. Locate valves on as -built drawings for Settlers Irrigation Records. 3. Brass and Stainless Steel material shall be used with adaptors and drain valve. 4. Leemco ductile iron saddle tee with hinged strap and single tightening bolt. 9" Rnd.V.B. Ground level 6" cl. 100 PVC access tube StopIRRIGATION rRoofUric MAINing Paper er Rotate Saddle Tee 45 Deg - Downqt�E__ ° ] )O O 0 V Brass nipples tljZ ° ° Rotate St. ELL �U Drain Valve a �° ° ° ° ° into Gravel Sump J O O OO )O 2 cU., t. of ) O O o Si Gravel )° 0 0 0 Locate drain on ° opposite side of telephone cable. Mainline Drain Detail SETTLERS IRRIGATION DISTRICT PRESSURIZED Mainline Drain Detail DWG.NO. PIRRO3001 IRRIGATION STANDARD Settlers Irrigation Pi *, ThrusL Mocking Inal_rucl.ions 1. Provide thrust blocks at all changes in sae or direcbon. Bends, reducers, plugs, and the opposite side of tee branches all requira thrust blocks. 2. The sizes of the block is determined by the working pressure, the sae and type of fitting, and soil Conditions at the job site. To calculate the area of Contact with the soil, follow these steps: Calculate the thrust by selecting thrust / 100 by sae and type of fitting from Table 1 and multiplying thrust / 100 by system pressure divided by 101 3. Divide the total thrust by bearing Capacity of the soil in excavation (from Table 2) to determine the area (in square feet) of thrust block required to be in Contact with the undisturbed soil. 'fable I Tam. By 4S n 5• Plan. eam. earas a.rae 2 363 513 259 141 212 531 751 379 201 III t a ]� 1.114 562 17 1,1 F[ 4 1.302 1,928 508 L10t IVW s 2622 3,990 990 2,012 'Z 506 4]83 8,]63 3,410 1,865 Hd5 7,430 10,5.297 2.898 ' - 10 "'2 14,ne 7,452 4,0]6 For Reducers subtract small opening plug thrust from large R1 opening plug thrust to Calculate thrust 1100. Table 2 SAFE LBS PBEARING LOAD II( I',y I `` SOIL TYPE IES F'P III II Soft Clay In � II sand z,o0o )IYllt;jll;:il it _I /III "II["IIY;7 :{ _rl'lb:l,I' Send &Gravel 3,000 Sand S Gravel cemented wlCley 10,000 000 II I1 ��J Hard Pan The erg na" is responsible for determining safe bearing loads 'ailr4d"m�M1h bLllf l ? nd'4d9d'Sii iu'"id ' " and when d-bl exists, loll healing teat Should be specified. The bearing loads given are for horizontal thnuMs when depth of cover exceeds 2 ft. SETTT LFRSIRKIcn;l()\ I'1111'ti'I' HLOCK DETAIL DISTRICT PRL.;tPIZI/Lu AND t.\�IiliJCTIONS - ,joIGAtION STANDARD - Cfl wo m rn v Settlers Irrimation District J a LOT" LINE 1 AS REQ'D BY ACHD II 00 O1 FIN GRADE _ V.—ST 62l SERIESwl— 6 LID - AOJUSTABIE HEIGHT OR EOIML FJ�TENo FROM CURB TO CURB '•, ,1 -� GF, a.CK OF S ALK TO .BAC OFSOEW r= I N MIN. DEPTH OF SLEEVE SHALL BE 3P FROM TOP OF - j YYYY SLEEVE TO FINISHED GRADE S ROAD CENTER LINE. LEEMCO JOINT RESTRAINT , Z O z z yy��✓✓ ((__� - MATCO 100RT GASKETED I?�4r N �_ DEEP SOCKET VALVE it Lu o 0 or U a U t7 r CONDUIT . .; )AI DESIGN R_OADBASE AND SURFACE ' COMPACTED SELECT BACKFLL _ -BAND PIPE BEDI_" SEITI.rRs IR X-SECTION �- DWG. NO. DISTRICT PR PIRR0301n IRRIGATION STANDAR 5 ' ROAD CROSSING 20 ..:..::: .. .... ::.:.::..-4" OF 3/4" MINUS GRAVEL BASE COURSE (NO SLAG) 12" OF STRUCTURAL SUBBASE IMPORT BACK FILL 0 R APPROVED —NATIVE MATERIAL. OCOMPACT AND PROOF ROLL SUBGRADE. (950 MIN PROCTOR COMPACTION) GRAVEL DRIVEWAY SECTION NTS 2' 2' SHOULDER SHOULDER 5' 12.5 12.5' 5' BORROW CENTER —TO—EP I CENTER—TO—EP BORROW VARIES VARIES VARIES 0 14" OF 6"-MINUS PIT -RUN SUBBASE. TYPICAL DRIVE SECTION NTS Ci 3" OF PLANT MIX PAVEMENT (CLASS III) 6" OF 3/4"-MINUS CRUSHED AGGREGATE BASE. REFER TO GEOTECHNICAL REPORT BY MTI DATED MAY 10, 2018 FOR FULL PAVEMENT ANALYSIS. O z z O m = � Q zz O Q 20 2i= O L" U J LL z O m J LJ 0 RAWING STATUS: APPROVED FOR CONSTRUCTION ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: 1DP DRAWN BY: 1DP CHECKED BY: KSK DATE: 8/21/2018 PROJECT: 18-055 SHEET NO. Co.1 Z O U Ln Z O O LL 0 LU d d Q I 120.00' TEMPORARY TURN AROUND ---- ---- ---- ---- a— — -- — — — — — — — — ---- --- ---- ----- — 1I I I ��a----� 4 `� J� PERMANENT SLOPE I I I EASEMENT I I I rye. o I I I I 35.00' — — — — ° I CITY OF MERIDIAN OF BUFFER BLOCK 1 r— — BLOCK 1 I I I LOT 2 I-- — _j LOT 1 j I II I I I 3 30.00' I I 110.00' CITY OF MERIDIAN I I J SEWER AND WATER EASEMENT I I 5 I 25.00' 30.00' CROSS CITY OF MERIDIAN I I ACCESS EASEMENT LANDSCAPE BUFFER II - II I III I II I IROAD AND PATHWAY I IMBY 00 HERNS S II I II I III I III BLOCK I I I LOT 3 II I II I II I II III I III I Res —I----------- __ 'O— 15.00' - 30.00' PAVEMENT SECTION NOT A PART ROAD AND PATHWAY IMPROVEMENTS BY OTHERS I APPROACH AND POWER POLE RELOCATION I I TO BE CONSTRUCTED IN SPRING OF 2019 BY ADA COUNTY HIGHWAY DISTRICT 1 I Z vJ & V) l—_I N I I o Q I I o I 1 O O I n Q� ow rM wm o:2but Owa SOU / SFiy� of o0 / �SFMFM ��FR R�7s °0 BLOCK 1 LOT 4 0 0 -- _ -- I -. c��o---ce Lrtl— --EO fB ES c'S�EB EB EB - I rn_ , -- --L __ 6 / 8.00, I I 15.00' I I I _ BLOCK 1 LOT S I 33 I I I� I I I I I I I I I I I I I I I 30.00' I CITY OF MERIDIAN SEWER AND WATER EASEMENT I I I I I I I I __ I I 10.00' I 5 BLOCK 1 I LOT 6 I I 5 —�j 10.00' I� II � � I J I JI 0 5 0 I I I I I I I I I I I I I I I 5 I I 0 20 40 80 120 Scale: 1" = 40 Feet KEYNOTES 1. VERTICAL CURB AND GUTTER PER ISPWC SD-701. 2. 4' VALLEY GUTTER PER ISPWC SD-708. 3. ASPHALT PAVEMENT SECTION - SEE SHEET COA 4. EMERGENCY VEHICLE TURN -AROUND PER CITY OF MERIDIAN - SEE DETAIL ON SHEET C0.1. 5. 10' CITY OF MERIDIAN PUBLIC UTILITY, PROPERTY DRAINAGE, PROPERTY IRRIGATION AND LANDSCAPE EASEMENT. 6. GRAVEL ACCESS DRIVE PER DETAIL SHEET C0.1. APPROVED FOR CONSTRUCTION These plans and/or specifications have been reviewed for compliance with Meridian Cily Standards and Specifications. This review does not relieve the owner, engineer, or contractor of the responsibility to design and/or construct those facilities in compliance with all current applicable federal, state, and local laws, rules, regulations, ordinances, development agreements, specifications, orders of approvals, all of which the City retains the right to enforce. Inconsistencies not noted by City staff shall not be construed as approved unless specifically addressed m writing by the Cily. Any proposed revision to these plans must be submitted for review and compliance with the Meridian City Standards and Specifications before said revision Is constructed. Name Amanda McNutt Date Sep 20 2018 t O Z O O m Q Z Z oQ CG �_ G cc O w U 2 J LL H Z O [o Z Q J d LU Ln APPROVED FOR CONSTRUCTION ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: JDP DRAWN BY: JDP CHECKED BY: KSK DATE: 8/21/2018 PROJECT: 18-055 SHEET NO. CIA Z O U Ln Z O O LL 0 L.0 O a a Q ,,—PROTECT AND PRESERVE FENCE PROPERTY OWNER PRIOR TO ANY WORK ON NEIGHBORING PROPERTY. DEMOLITION NOTES 1. COORDINATE GRAVITY IRRIGATION DITCH AND STRUCTURE REMOVAL WITH LOCAL IRRIGATION DISTRICT PRIOR TO COMMENCING CONSTRUCTION. 2. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE SPECIFICATIONS AND/OR REQUIREMENTS OF THE CITY OF BOISE, ADA COUNTY HIGHWAY DISTRICT, THE LATEST EDITION OF THE IDAHO STANDARDS FOR PUBLIC WORKS nI IV CONSTRUCTION (ISPWC), AND THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY. NO EXCEPTIONS WILL BE ALLOWED UNLESS SPECIFICALLY AND PREVIOUSLY APPROVED IN WRITING BY ALL APPROPRIATE ENTITIES. 3. THE LOCATION OF EXISTING UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL COMPLY WITH IDAHO CODE, CHAPTER 22, TITLE 55 REGARDING UNDERGROUND FACILITIES DAMAGE PREVENTION. THE CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY COMPANIES OR DIGLINE (1-800-342-1585) FOR EXACT LOCATION A MINIMUM OF 48 HOURS PRIOR TO DIGGING. 0 20 40 80 120 4. UTILITIES ON THIS PLAN ARE BASED UPON A SURVEY BY OTHERS, RECORD DRAWINGS, AND FACILITY Scale: 1" = 40 Feet MAPS. KM ENGINEERING MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. FURTHER, KM ENGINEERING DOES NOT DEMOLITION LEGEND WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED AND HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO PROJECT SITE DEMOLITION PRESERVE AND PROTECT EXISTING FACILITIES NOT SCHEDULED FOR REMOVAL AND COORDINATE WITH THE PROJECT ENGINEER IF UNEXPECTED FACILITIES ARE — — BOUNDARY LINE ENCOUNTERED. 5. PRESERVE AND PROTECT ALL SIDEWALK AND — ROAD CENTER LINE PEDESTRIAN RAMPS IN ACHD RIGHT—OF—WAY UNLESS OTHERWISE NOTED. BOUNDARY ADJACENT LINE 6. PROTECT AND PRESERVE ALL PRESSURE IRRIGATION FACILITIES. — SAW CUT LINE 7. SEE SITE AND GRADING PLANS FOR EXTENT OF ASPHALT AND CURB DEMOLITION AT EXISTING SITE APPROACHES. EP EP EDGE OF PAVEMENT 8. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING DEMOLITION WITH THE APPROPRIATE PHASE OF CONSTRUCTION. Ec Ec EDGE OF GRAVEL 9. ALL DEMOLISHED DEBRIS MUST BE COMPLETELY REMOVED FROM THE SITE. REMOVAL OF EXISTING s s SEWER LINE CONSTRUCTION DEBRIS MUST CONTINUE TO EXPOSE NATIVE, UNDISTURBED GRANULAR SOILS. SUITABLE NATIVE SOILS INCLUDE GW, GP, GM, SW, SP, SM IN _GI_GI_ GRAVITY IRRIGATION LINE ACCORDANCE WITH THE UNIFIED SOIL CLASSIFICATION SYSTEM (USCS). CONTRACTOR SHALL COMPLY WITH ALL RECOMMENDED CONSTRUCTION CONSIDERATIONS, AS CONTOUR LINE CONTAINED IN THE PROJECT GEOTECHNICAL 25�5 ENGINEERING REPORT, PREPARED BY MATERIALS TESTING AND INSPECTION, INC. —op—op— OVERHEAD POWER LINE 10. AFTER REMOVAL OF ALL DEBRIS, THE EXPOSED, EXCAVATED AREA SHALL BE INSPECTED BY THE MATERIALS TESTING & INSPECTION CONSULTANT TO c c GAS LINE VERIFY SUITABILITY OF SUBGRADE FOR PLACEMENT OF STRUCTURAL FILL. THE EXPOSED SUBGRADE MUST BE IN A COMPACT, FIRM AND STABLE CONDITION PRIOR TO W W WATER LINE FILL PLACEMENT. THIS WILL BE CONFIRMED BY PROOF —ROLLING THE SUBGRADE IN A MANNER ACCEPTABLE TO THE TESTING AND INSPECTION CONSULTANT. x x FENCE 11. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSING OF ALL DEMOLISHED MATERIALS AT AN APPROVED S SEWER MANHOLE OFF —SITE LOCATION. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THESE MATERIALS AFTER REMOVAL FROM THE SITE. POWER POLE 12. CONTRACTOR IS RESPONSIBLE FOR SECURING AND PAYING FOR ALL PERMITS REQUIRED BY ANY POLITICAL LIGHT POLE SUBDIVISION OR AGENCY. 13. CONTRACTOR SHALL BE REQUIRED TO PROVIDE A ELECTRIC PEDESTAL WATER TRUCK, AS NECESSARY, FOR DUST ABATEMENT DURING DEMOLITION AND REMOVAL OPERATIONS. ® AIR CONDITIONING UNIT 14. CONTRACTOR SHALL CONDUCT CONSTRUCTION OPERATIONS TO PREVENT ANY SOIL OR OBJECTIONABLE MATERIAL RUNOFF FROM LEAVING THE SITE, OR cM GAS METER ENTERING THE PUBLIC RIGHTS —OF —WAY. 15. CONTRACTOR SHALL REMOVE ORGANIC OR DISTURBED SOILS WITHIN CLEARING LIMITS SHOWN ON THE ® WATER METER CONSTRUCTION PLANS, AND WASTED OR STOCKPILED FOR LATER USE. ADDITIONAL DEPTHS MAY BE NECESSARY TO OBTAIN SUITABLE SUBGRADE IR IRRIGATION BOX MATERIALS AS DETERMINED BY THE GEOTECHNICAL CONSULTANT. ❑T TELEPHONE PEDESTAL 16. CONTRACTOR SHALL CLEAR AND GRUB ALL EXISTING UNSUITABLE TOPSOIL AND VEGETATION WHERE STRUCTURAL FILL IS TO BE PLACED. CONTRACTOR SHALL STOCKPILE MATERIAL IN DESIGNATED ON —SITE SPOIL PILE LOCATION FOR LANDSCAPING. MATERIAL IN EXCESS OF THE LANDSCAPING NEEDS SHALL BE DISPOSED OF IN AN APPROVED OFF —SITE LOCATION. 17. ITEMS SHOWN ON THIS SHEET REPRESENT THE EXISTING CONDITIONS OF THE SITE PRIOR TO CONSTRUCTION. 18. OVER —EXCAVATION, IN AREAS WHERE EXISTING GRAVITY IRRIGATION IS PROPOSED TO BE TILED AND/OR REMOVED, IS ANTICIPATED IN ORDER TO REMOVE SOFT SUBGRADE SOILS. THE CONTRACTOR SHALL COMPLY WITH THE RECOMMENDATIONS OF THE PRIOR REFERENCED GEOTECHNICAL ENGINEERING REPORT, BY MATERIALS TESTING AND INSPECTION, FOR DITCH EXCAVATIONS AND SHALL HAVE ALL EXCAVATED DITCH SUBGRADE INSPECTED BY A TESTING COMPANY OR THE GEOTECHNICAL ENGINEER, PRIOR TO PLACEMENT OF PIPE AND/OR BACKFILL OF THE DITCHES. 19. SHOULD AN EXISTING SEPTIC SYSTEM BE LOCATED DURING CONSTRUCTION, THE CONTRACTOR SHALL REMOVE ACCORDING TO THE REQUIREMENTS OF THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY TECHNICAL GUIDANCE MANUAL AND CENTRAL DISTRICT HEALTH REQUIREMENTS. THE CONTRACTOR SHALL VERIFY THE LOCATION OF THE SEPTIC TANK. ALL BURIED PIPING SHALL BE EXCAVATED AND TRACED FROM THE SEPTIC TANKS TO THE DRAINFIELD TO THE FULL EXTENTS. THE CONTRACTOR SHALL VERIFY THE EXISTENCE OF THE DRAINFIELD AND SHALL EXCAVATE THE DRAINFIELD SOILS TO AT LEAST THE GROUNDWATER LEVEL OR AS DIRECTED BY THE GEOTECHNICAL ENGINEER AFTER FIELD SITE INSPECTION OF THE DRAINFIELD AREA. THE DRAINFIELD SOILS SHALL BE DISPOSED OF OFF SITE. NOTE TO CONTRACTOR 1. REFER TO MITIGATION PLAN FOR DEMOLITION AND REMOVAL OF TREES — SEE LANDSCAPE PLAN. /� - 10 P- I o rn D SDI;w 4 m APPROVED FOR CONSTRUCTION ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: JDP DRAWN BY: JDP CHECKED BY: KSK DATE: 8/21/2018 PROJECT: 18-055 SHEET NO. C1.2 z 0 U Ln z O U O LL_ 0 Lu O d d Q EXISTING MANHOLE STA: 0+50.01 OFFSET: 0.00' N: 725625.45, E: 2448989.86 .97. 1+00 8S BS�BS —t w w w LU LU U Uj N Q U PROPOSED MANHOLE #: PROPOSED MANHOLE #6 STA: 6+28.34 OFFSET: —0.01 STA: 3+50.85 OFFSET: 0.00' N: 726203.71, E: 2448999.1: 300' of 8" PVC ® 0.40% 275' of 8" PVC ® 0.40% 2+00 3+00 4+00 5+00 6+00 B S e S _ e_--= 8'S _8'r�=8"S �� S S--=---+8 5 w w w w w w w 180" w w w w w w w w w w 9 w ASPHALT REPAIR — MATCH EXISTING SECTION AND ELEVATIONS N. LINDER ROAD w F w 30.00' CITY OF MERIDIAN - SEWER & WATER EASEMENT � 10' MINIMUM F9— SEPERATION - — — — — — — — — — — — — — — — - MATCH LINE SEE SHEET C2.1 PIPE DIMENSION IS PROFILE SCALE MEASURED FROM HORIZ: 1" f = 40 CENTER MANHOLE VERT: 1" = 4' N o TO MANHOLE � tnNX a W x X of w w l ad W J O J W v v�v J ([) O ZO . . . . . . . . . . . . . . . . J .. a `--� N N N N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Z¢ J �. p .Z.i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 . . . . .W^..v do oo m . . . . . . . . . . 2580 :::: I 00 @Ili to 2580 W cD V7 cO N . . . . . . . . . O do � . c' M N o . . .0 n an di r0 u7 N N N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . �r0^ �. wcoN o N ^NNHNH Z Z Z OW^dr0 poO u7 N O+ifN7. a- to Z O . . . . . . . . Fz+to . . . . . . . . . . . . . . . . . . . . . . . . . . po . . . . . . . . d us r7 N — o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a co z z . . . . . . . . . w o' z z z z z EXISTING GROUND ......... ......... ......... ......... ...... ...... ......... ......... ......... ......... ......... ........ m ...... Fr Z. —..... ......... ......... ......... ......... ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : FINISHED GROUND . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8" WATER MAIN 2570 2570 ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... .. ...... ::::::.. ........ ......... ......... ......... ......... ...... : ........ ......... ......... ......... ......... .... :: ::: UNDERGROUND GAS LINE 2565 ....... ......... ......... ........ ......... ........ ......... ......... ........ ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......� ......r-.. ......... ...... ......... ......... ......... ........ ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ...... ......... .... ......... ......... ......... . 2565 . . . . . . . : . . . CORE AND GROUT EXISTING MANHOLE . . . . . . . AND CONTINUE AS SHOWN HEREON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . RE —CHANNEL MANHOLE AS NECESSARY. : : : : . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : 2560 . . . . . . . . .. . . . . . . . . . . . . . ..275' of 8" e ® 0.40 .. 2560 . . ......... . . . . . . . . . . . . . ......... . . . . . . . . . ......... . . . . . . . . . ......... . 300' of 8" PVC a 0.40%. ......... ...... . . . . . . . . ... . . . . . . . . . . . . . . ..... ........ . 2555 ..... E ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... 2555 ......... ......... ......... ......... ......... ......... ......... ...... -7 ....... ......... ......... ......... ...... . ......... . . . . . . . . . . . . . . . . ......... . . . . . . . . . ......... . . . . . . . . . ......... . . . . . . . . . ......... . . . . . ......... . . . EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT ......... ........ ........ ......... ......... ...... I I I r FINISHED GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2550 2550 N M O ui 0r ui O m r r N ad,_ O 0 t t t r0 r r0 r0 ui N ^ ui n ui r N ^ �j ^ N 7 n r r0 N r0 N N N N N N r0 N N r0 N N r0 N N N N N r0 N N N N N N r0 N N N r0 N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 0 20 40 80 120 Scale: 1" = 40 FEET SHEET NOTES 1. SEE SHEET CO.0 FOR CITY OF MERIDIAN STANDARD SEWER NOTES AND GENERAL NOTES. 2. STATIONING BASED ON SEWER ALIGNMENT CENTERLINE. 3. 8" GRAVITY SEWER MAIN SHALL BE PVC SDR-35, ASTM D-3034. REFER TO SHEET CO.0. 4. SANITARY SEWER PIPE DIMENSION IN PLAN VIEW ARE FROM INSIDE EDGES OF SSMH. 5. SEWER SERVICES OVER 100' IN LENGTH WILL HAVE A 4" CLEAN —OUT INSTALLED EVERY 100. CLEAN —OUTS INSTALLED IN DRIVING SURFACES WILL BE TRAFFIC RATED PER ISPWC—SD 506A. 6. CONTRACTOR TO VERIFY ELEVATION OF EXISTING SEWER MAIN PRIOR TO BEGINNING CONSTRUCTION OF ANY PHASE OF SEWER MAIN. NOTIFY DESIGN ENGINEER IF ELEVATIONS DIFFER FROM CONSTRUCTION PLANS. 7. ALL SEWER SERVICES TO MAINTAIN 5' MINIMUM OF SEPARATION FROM MANHOLES AND ADJACENT SEWER SERVICES. 8. ALL SEWER SERVICES TO BE CAPPED AND MARKED PER ISPWC SD-511A. 9. MAINTAIN 18" VERTICAL SEPARATION BETWEEN POTABLE/NON—POTABLE MAINS AND SERVICES PER DEQ AND CITY OF MERIDIAN STANDARDS. tE jp _ APPROVED FOR `\��'�7 CONSTRUCTION These plans and/or specifications have been reviewed for compliance with Meridian City Standards and Specifications. This review does not ve the owner, engineer, or contractor of the responsibility to design andlor construct those facilities in compliance with all current applicable federal, state, and local laws, rules, regulations, ordinances, development agreements, specifications, orders of approvals, all of which the Clty retains the right to enforce. Inconsistencies not noted by City staff shall not be construed as approved unless specifically addressed in writing by the Cl y Any proposed revision to these plans must be submitted for review and corpliancs with the Meridian City Standards and Specifications before said revision Is constructed. Name Amanda McNutt t Date Seo 20 2018 10 I W o rn m 0 Z Z 00 M0 0 W Q Z Z 0Q CG G 0 LU U 2 J LL H Z 0 m APPROVED FOR CONSTRUCTION ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: JDP DRAWN BY: JDP CHECKED BY: KSK DATE: 8/21/2018 PROJECT: 18-055 SHEET NO. C2.0 Z 0 H U I.J. I— N Z 0 0 LL 0 LU 0 MATCH LINE THIS SHEET ------------ �IL 31 I � 3 40 LF 4" PVC SEWER ® 2.0% STA:9+50.10 IE 2562.25 �o �! 9+00 9 (n 1 I w a m 1 oN I m W� d3 d3 d3 d3 n 8' o N m l - m 2 1_ 7+00 8+00 W r 1= e s a s 815 B-S s �{ N m 1 I I Q w 230' of 8" PVC 0 0.40% 1 J W w PROPOSED MANHOLE #4 1 wSTA: 8+59.73 OFFSET: 0.00' 11, w 726201.41, E: 2449230.53 W o� U ad O K 0 03 nN PROFILE SCALE PIPE DIMENSION IS MEASURED FROM HORIZ: 1" = 40' CENTER MANHOLE VERT: 1" = 4' 2585 TO MANHOLE 2585 . . J O Z . Z O �o 2580 o 2580 O opo . . 0 d + N Z M N - O . GROUND > > zZ2575 zFINISHED 2575 ... ......... ......... . .. ..:. ......... ......... EXISTING GROUND 8" WATER MAIN 2570 ......... ......... ......... ..:...... .......:. ......... 2570 ......... ......... ......... ......... ......... ......... ......... ......... ......... :::...... ......... ......... 2" WATER SERVICE ......... ......... ......... 6" FIRE SERVICE ......... ......... ......... 2565 2565 4" SEWER SERVICE . 1-EAST 230 of BJ' PVC 0 0.4 % 315 of 8' PVC 0 0.40% 2560 2560 ......... ......... ......... ......... ...... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... 2555 ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... 2555 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT . III. . FINISHED GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2550 2550 0 7 O O N r'7 a _ 1)'� .0 N � N M n N 1) n 'n r 'n N N N N N N N N N N N N N N 7+00 7+50 8+00 8+50 9+00 9+50 10+00 20 LF 6" PVC SEWER 0 2.0% STA:10+84.38 IE 2562.38 t, 315' of 8" PVC 0 0.40% 10100 p N D � 1 1 {as -. d3 - s asas 1 4-w- r 1 EEP rp z 1 M 1 LJ m �4 40 LF 4" PVC SEWER 0 2.0% STA:11+10.66 IE 2562.89 (A mo m0 �o R o D M m0m m N � 1 +00 3 O mZ z 8•s s eQ LJ \ 135' of 8" PVC 0 0.4 II �I I I 'OPOSED MANHOLE #3 A: 11+75.02 OFFSET: -0.01' 726516.66, E: 2449235.60 20 LF 4" PVC SEWER 0 2.0% STA•12+94.28 IE 2563.32 h \ I 3ij00 77 20 LF 4" PVC SEWER 0 2 \ STA:13+90.52 IE 2562 \ r� 146", 9 \ 8"s 8"s \ a 90' 8" PVC 0 9 Ep f 8'V #2 Qi o C 0.00' 2.60 V �3 -1 ,50 " POG 40 LF 4" PVC SEWER 0 2. STA:13+06.51 IE 2563. PROPOSED MANHOLE STA: 13+11.76 OFFSET: N: 726629.66, E: 244931 rn co ph SEE VIEWPORT FOR ORIENTATION � o a 0 20 40 80 120 Scale: 1" = 40 FEET PROPOSE MANHOLE #1 SHEET NOTES STA: 14+02.58 OFFSET: 0.05' N: 726720.47, E: 2449313.13 1. SEE SHEET CO.0 FOR CITY OF MERIDIAN STANDARD SEWER NOTES AND GENERAL NOTES. V1 ~ o O_ w z 2. STATIONING BASED ON SEWER ALIGNMENT CENTERLINE. N 3. 8" GRAVITY SEWER MAIN SHALL BE PVC SDR-35, ASTM LU o o r -1 D-3034. REFER TO SHEET CO.0, SEWER NOTE 13. F d 3 14+00 I I 4. SANITARY SEWER PIPE DIMENSION IN PLAN VIEW ARE FROM INSIDE EDGES OF SSMH. i 5. SEWER SERVICES OVER 100' IN LENGTH WILL HAVE A 4" CLEAN -OUT INSTALLED EVERY 100. CLEAN -OUTS 14+13 I INSTALLED IN DRIVING SURFACES WILL BE TRAFFIC RATED 3 P �81 PER ISPWC-SD 506A. 6. CONTRACTOR TO VERIFY ELEVATION OF EXISTING SEWER L J I I L J MAIN PRIOR TO BEGINNING CONSTRUCTION OF ANY PHASE OF SEWER MAIN. NOTIFY DESIGN ENGINEER IF ELEVATIONS DIFFER FROM CONSTRUCTION PLANS. 7. ALL SEWER SERVICES TO MAINTAIN 5' MINIMUM OF 40 LF 4" PVC SEWER 0 2.0% PVC@ SEPARATION FROM MANHOLES AND ADJACENT SEWER STA:13+" IE 2ER SERVICES. 8. ALL SEWER SERVICES TO BE CAPPED AND MARKED PER ISPWC SD-511A. 9. MAINTAIN 18" VERTICAL SEPARATION BETWEEN POTABLE/NON-POTABLE MAINS AND SERVICES PER DEQ AND CITY OF MERIDIAN STANDARDS. PIPE DIMENSION IS PROFILE SCALE MEASURED FROM 11 1 HORIZ: 1 = 40 CENTER MANHOLE VERT: 1" = 4' 2585 TO MANHOLE 2585 . . . . . . . . . .. . . . . . . . M . O . . . O 1 zO Z . . . . . . . =O N . w M . . . . . ly . . . . . . . . . . . . . . . . . . . . @ p m . . . . . . . . . . . . . m O °MN . . . . . . . . O �. . 2580 wN P° ......... � ..... dD 2580 O O N m} N r N H ww O W N .. 4, NO + r N a N Z O O 7 t i 0 O . . . . . . . . . . . . . . . . . . . . . a N Z O o � m > > : : : FINISHED GROUND . O : oc Q E> > v~i 2 Z z . . . . . . . O . . of N z ......... ......... ... 0_(n w.zz .... .. ........ ...... ......... aN�-...... 2575 ......... ......... ......... ......... .... .... .... .... ......... .. ......... ......... .... ......... ......... .... ......... ......... ......... 2575 .. ........ ......... .... . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . ... EXISTING GROUND . . . . . . . ......... . . . . . . . . . .... . . . . . . . . 2570 2570 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2" WATER SERVICE 6" FIRE SERVICE . . . . . . . ::::::... ......... ... ... ......: 4" PRESSURE .: ...... ......... ........ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IRRIGATION LINE : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . :4" SEWER SERVICE 4" SEWER SERVICE . . . . . . . . 2565 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1- so. . . .r. 1 - EAST . . . . . . . . . . . . 2565 4" SEWER SERVICE . . . . . . . . . 4" SEWER SERVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 - WEST . . 1- EAST . . . . . . . . : 9Q' .of 8" VC 0 0.60% . . . . . . . . . . . . . . . . . 1.35' .ot 8": PVC 0: 0:.4D% . . . . . . . . . . . . . . . . . 4" SEWER SERVICE 4" SEWER SERVICE 2560 . . ......... . 315' of ": PVC 0:0.40% ......... ......... 1- NORTHWEST. . . . . . . . . . 1 - WEST 2560 ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... 2555 ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... 2555 ......... ....... EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT ........III........ ......... ......... . . . . . . . . . . . . : . . . . . FINISHED GROUND CENTERLINE OF SEWER PIPE ALIGNMENT . . . . . . . . . . . . . . . . . . . . . . . . . . 2550 ......... ......... ........ ......... ......... ......... ......... ......... 2550 N N m M m r N N N N N N N N N N N N 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 J APPROVED FO� tE ID_\ I`SN7- CONSTRUCTION These plans and/or s�pecific�ations have been reviewed for compliance with Meridian City Standards and Specifications. This review does not relieve the owner, engineer, or contractor of the responsibility to design and/or consh ct those facilities In compliance with all current applicable federal, stale, and local laws, rules, regulations, ordinances, development agreements, specifications, orders of approvals, all of which the City retains the right to enforce. Inconsistencies not noted by City staff shall not be construed as approved unless specifically addressed In writing by the City. Any proposed revision to these plans nusL be submitted for review and compliance with the Meridian City Standards and Specifications before said revision is constructed. Name Amanda McNutt Date Sep 20 2018 0 Z Z 0 M� O W 7 N 0 Q N Z Z 0a LU C �..0 C w (J 1 U C J G LL Z 0 m APPROVED FOR CONSTRUCTION h3n HIM =11,512111513 ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: JDP DRAWN BY: JDP CHECKED BY: KSK DATE: 8/21/2018 PROJECT: 18-055 SHEET NO. C2.1 Z 0 U I- Ln Z 0 O LL 0 L.0 0 a a Q 3 1W e' w 3 _ 30.00' CITY OF MERIDIAN SEWER & WATER EASMENT _ 30.00' CITY OF MERIDIAN SEWER & WATER EASMENT I I I I �12 I 10 I -- I I s I — I LOT 6 I 6 I � I 12 INSTALL 50 LF 8" C-900 WATER MAIN I _ a I �_JINSTALL 10 LF 8" C-900 WATER MAIN Id Id Id Id Id Id Id ----------------------- I I I I I I I I I I I I I I I I 0 20 40 80 120 1 Mimi Scale: 1" = 40 FEET I WATER KEYNOTES (#W) I 1. INSTALL 1 - 8" x 12" STAINLESS STEEL "HOT TAP" TAPPING SADDLE. 1 - 8" GATE VALVE 1 - THRUST BLOCK CONTRACTOR TO VERIFY SIZE AND LOCATION OF WATER MAIN PRIOR TO CONSTRUCTION. 2. INSTALL 1 - 8" 90' ELL 1 - THRUST BLOCK 3. INSTALL 1 - 8" 22.5' ELL 1 - THRUST BLOCK 4. INSTALL 1 - 2" WATER SERVICE CONNECTION WITH 2" METER AND 2" METER SETTER PER MERIDIAN SD-W4. 37 LF 2" SERVICE CONNECTION LINE 5. INSTALL 1 - 2" WATER SERVICE CONNECTION WITH 2" METER AND 2" METER SETTER PER MERIDIAN SD-W4. 17 LF 2" SERVICE CONNECTION LINE 6. MAINTAIN 18" VERTICAL SEPARATION BETWEEN POTABLE/NON-POTABLE MAINS AND SERVICES. CONTRACTOR TO INSTALL VERTICAL BENDS IN WATER MAIN IF NECESSARY. 7. INSTALL 1 - 8"x8"x6" TEE 1 - 6" GATE VALVE 7 LF 6" C-900 FIRE LINE 1 - FIRE HYDRANT PER MERIDIAN STANDARD DRAWING W7 AND W9. 1 - THRUST BLOCK 8. INSTALL 1 - 8"x8"x6" TEE 1 - 6" GATE VALVE 12 LF 6" C-900 FIRE LINE 1 - FIRE HYDRANT PER MERIDIAN STANDARD DRAWING W7 AND W9. 1 - THRUST BLOCK 9. INSTALL 1 - 2" BLOW -OFF ASSEMBLY FOR FUTURE WATER MAIN EXTENSION. REFER TO CITY OF MERIDIAN SUPPLEMENTAL SPECIFICATIONS SD-W13. 1 - THRUST BLOCK 10. INSTALL 1 - 8" MJ X 8" MJ X 6" FLG TEE 1 - 6" FLG X MJ GATE VALVE 17 LF 6" PVC 1 - 2" BLOW -OF ASSEMBLY 11. INSTALL 1 - 8" MJ X 8" MJ X 6" FLG TEE 1 - 6" FLG X MJ GATE VALVE 37 LF 6" PVC 1 - 2" BLOW -OF ASSEMBLY 12. MAINTAIN 18" MINIMUM HORIZONTAL SEPARATION BETWEEN TAPS. 13. INSTALL 1 - 2" WATER SERVICE CONNECTION (LANDSCAPE) WITH 2" METER AND 2" METER SETTER PER MERIDIAN SD-W4. 17 LF 2" SERVICE CONNECTION LINE. SEE SHEET IR2.0 FOR FOR BACK FLOW PREVENTION DETAIL. APPROVED FOR CONSTRUCTION These plans and/or specifications have been reviewed for compliance with Meridian City Standards and Specifications. This review does not ve the owner, engineer, or contractor of the responsibility to design and/or construct those facilities in compliance with all current applicable federal, slate, and local laws, rules, regulations, ordinances, development agreements, specifications, orders of approvals, all of which the City retains the right to enforce. Inconsistencies not noted by City staff shall not be construed as approved unless specifically addressed Iu writing by the City. Any proposed revision to these plans must be submitted for review and compliance with the Meridian City Standards and Specifications before said revision is constructed. Name Amanda McNutt Date Sep 20 2018 co 7 W m 0 o w v m off, F o o ca 0 Z Z 0 0 m z z oQ CG �_ G cc 0 w V J LL z 0 m I _Psi APPROVED FOR CONSTRUCTION ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: JDP DRAWN BY: JDP CHECKED BY: KSK DATE: 8/21/2018 PROJECT: 18-055 SHEET NO. C3.0 I 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 INSTALL 35 LF 10" PVC SLEEVE PER X—SECTION ROAD CROSSING DETAIL SHEET COA INSTALL 230 LF 4" PVC PRESSURE IRRIGATION MAIN 4PI r 'd— Id — — Id —Id — Id Id — — Id Id Id I I I 3PI I INSTALL 46 LF 4" PVC I I PRESSURE IRRIGATION MAIN 7 I I I I I LOT 2 I I I -- I I I I I I I I I I �— I I I I I I I I I I I I I I I I I I I I i 3PI � LOT 3 / I I INSTALL 65 LF 10" PVC I I SLEEVE R CROSSING DETAIL SHEET CO.1 II I lI PI PI PI —PI— PI / 3PI w° OxbPj ' to .a W N r o 2" LANDSCAPE WATER METER — SEE SHEET IR2.0 o FOR REDUCE PRESSURE BACKFLOW DEVICE. o � m 0 20 40 80 120 — — — — — — _ _ _ _ _ _ 2 P I Scale: 1" = 40 FEET #PI INSTALL 396 LF 4" PVC I W PRESSURE IRRIGATION MAIN I _ PRESSURE IRRIGATION KEYNOTES II t 1. INSTALL 3 , 1 — 4" TEE I a 1 — 4" ISOLATION VALVE PER SETTLERS IRRIGATION STANDARD DETAIL PIRRO3002 AND DETAIL SHEET CO.1 1 — THRUST BLOCK PER SETTLERS IRRIGATION STANDARD DETAIL PIRRO3006 AND DETAIL SHEET COA gad —� LOT 1 I l a l 2. INSTALL 1 — 4" 90' ELL I 1 — THRUST BLOCK PER SETTLERS IRRIGATION STANDARD DETAIL PIRRO3006 AND DETAIL SHEET COA I a 3. INSTALL 3/4" LOT IRRIGATION SERVICE HOOKUP PER J SETTLERS IRRIGATION STANDARD DETAIL PIRRO3005 AND I DETAIL SHEET CO.1 IaI 4. INSTALL 1 — 4" ISOLATION VALVE PER SETTLERS IRRIGATION s 3 I I STANDARD DETAIL PIRRO3002 AND DETAIL SHEET COA 1 — THRUST BLOCK PER SETTLERS IRRIGATION STANDARD DETAIL PIRRO3006 AND DETAIL SHEET COA 5. INSTALL MAINLINE DRAIN DETAIL PER SETTLERS 3 W i I IRRIGATION STANDARD DETAIL PIRRO3001 AND DETAIL SHEET COA. .14 — INSTALL 265 LF 4" PVC a I 6. RREOSSURE IRRIGATION PUMP STATION — SEE SHEET PRESSURE IRRIGATION MAIN , I Till I 7. INSTALL 4" TEE 1 — THRST BLOCK PER SETTLERS IRRIGATION STANDARD DETAIL PIRRO3006 AND DETAIL SHEET COA / LOT 4 I I / I dal / INSTALL E LF 4" PVC 2PI I i a PRESSURE IRRIGATION MAIN PRESSURE IRRIGATION NOTES INSTALL 19 LF 4" PVC I 1. THE PRESSURE IRRIGATION SYSTEM WILL BE OWNED BY PRESSURE IRRIGATION MAIN I THE BOUNTIFUL COMMONS HOMEOWNERS ASSOCIATION. 3PI 2PI 1 PI 2. CITY OF MERIDIAN POTABLE WATER WILL BE USED AS 7PI 6PI THE PRESSURE IRRIGATION BACKUP SOURCE. INSTALL 5 LF 4" PVC —EG _EG EG '.Pf PI EG G � ESSURE EBRIGATION MAIN I 3. COMMON LANDSCAPE AREA = 16,700 SF. - Ea EG'c^o FV PI PI Pi PI Pf PI T—pl PI PI PI PI - INSTALL 162 LF 4" PVC 4PI / `--' 3 I a INSTALL 413 LF 4" PVC PRESSURE IRRIGATION MAIN I PRESSURE IRRIGATION MAIN NOT A PART INSTALL 68 LF 4" PVC PRESSURE IRRIGATION MAIN I _ la I I I INSTALL 196 LF 4" PVC LOT 5 I I PRESSURE IRRIGATION MAIN la I I IaI � I I I —�R I I I I d3�d3d3 d3�3` — 'I 8"W 8"W 8•'W 8•'W 8"W "W —e"s e"S — e"S eS — — 8•S 55 — INSTALL 8 LF 12" PVC /E APPROVED FOR l •\���/� CONSTRUCTION These plans andior specifications have been reviewed for compliance with Meridian City Standards and Specifications_ This review does not relieve the owner, engineer, or contractor of the responsibility to design and/or construct those facilities In compliance with all current applicable federal, state, and local laws, rules, regulations, ordinances, development agreements, specifications, orders of approvals, all of which the City retains the right to enforce- Inconsistencies not noted by City staff shall not be construed as approved unless specifically addressed in writing by the City- Any proposed revision to these plans must be submitted for review and compliance with the Meridian City Standards and Specifications before said revision Is constructed. Name Amanda McNutt Date Sep 20 2018 APPROVED FOR CONSTRUCTION ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: JDP DRAWN BY: JDP CHECKED BY: KSK DATE: 8/21/2018 PROJECT: 18-055 SHEET NO. C4.0 Z O r U I.J. I— Ln Z O O LL 0 LU O a CL Q I � I ry�1 MATCH LINE SEE SHEET C5.1 NOT A PART ROAD AND PATHWAY IMPROVEMENTS BY OTHERS 7 / 6L •AEG - EG AEG EG. EG. iG 5.00 75 09 0 GB 5.29 rEG e---c CL 74.45 75.05 a" L 74.94 FL MA 74.30 4.89 .�74.40 I FL 9, FL / 2. y Q 74.84 W5.12 74.79 CL / IO �I 74..26 GB mld: o `� FLI v o I 74. FL 2.07 1 2.0% 74.10 /� - FL 4.94 174.6Q CL T II I ESQ LOT 5 75.3 75.03 74.49 CL 74.49 F FL fL m To . 2.0% 1 75.67I CL a 75.37 2.0% 2.0% s>4 i I f l LOT I 2 6 75.601 75.60 (1 75.06GB I \ FL 74.99 74.12 74'FL 2.1% 2.0% I �FL.06 2 S, EXISTING POWER POLE MA FL 73.92 73.75 73.68 4? 75,gp S TO BE RELOCATED �. 1 74.58 FIL FL-\\b FL�� CL a _ j 1.7 0.4% d 1 0.4� q -� 74.22 y n I °c I 74.74 GB �IP 74.90 N CL I CL W O 1.1 r•i 0.4% OR I1 0.4% 74.51 N 74.21 -73.51 1 _ CL 0.4% O 74.05 Y FL 74.57 �75-0 -8 4 - - - - - - 0 74.08 MA GB ri I 74.38 74.19 MA 74.58 MA 2575 ro a rI w a N o o rn �V? rl v N o� �oa 0 0 15 30 60 90 Scale: 1" = 30 FEET Z O N z Z LEGEND �75.43 cc o 0 FINISH GRADE ELEVATION F d u �y 1.50% FINISH GRADE SLOPE EXISTING GRADE CONTOUR 2574� FUTURE GRADE CONTOUR o z ti FLOWLINE GRADE BREAK SHEET NOTES 1. ALL SPOT ELEVATION ARE TO THE TOP OF ASPHALT UNLESS NOTED AS FOLLOWS: RIM = RIM OF STRUCTURE TA = TOP OF ASPHALT CON = TOP OF CONCRETE MA = MATCH EXISTING FL = FLOW LINE GB = GRADE BREAK SW = TOP OF SIDEWALK FG = FINISHED GRADE TW = TOP OF WALL TBC= TOP BACK OF CURB CL = ROAD CENTERLINE GENERAL NOTES 1. SEE SHEET C1.0 FOR PROJECT NOTES O z z O O m = z Q Q N � � Z z CD OQ z O w CD V J LL H Z Co APPROVED FOR CONSTRUCTION h3n I 11 rem M., W-1 b m, ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE' IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: JDP DRAWN BY: JDP CHECKED BY: KSK DATE: 8/21/2018 PROJECT: 18-055 SHEET NO. C5.0 .o 0 ro a r w a N o o rn �V? 1-H v N o� �oa 0 0 15 30 60 90 Scale: 1" = 30 FEET V) z O z Z LEGEND 0-155.43 L o 0 FINISH GRADE ELEVATION F d u �y 1.50% FINISH GRADE SLOPE EXISTING GRADE CONTOUR 2574� FUTURE GRADE CONTOUR o z ti FLOWLINE GRADE BREAK SHEET NOTES 1. ALL SPOT ELEVATION ARE TO THE TOP OF ASPHALT UNLESS NOTED AS FOLLOWS: RIM = RIM OF STRUCTURE TA = TOP OF ASPHALT CON = TOP OF CONCRETE MA = MATCH EXISTING FL = FLOW LINE GB = GRADE BREAK SW = TOP OF SIDEWALK FG = FINISHED GRADE TW = TOP OF WALL TBC= TOP BACK OF CURB CL = ROAD CENTERLINE I GENERAL NOTES 1. SEE SHEET C1.0 FOR PROJECT NOTES MATCH LINE SEE SHEET C5.0 O Z Z O O m = Z Q Q N � � Z Z CD OQ z �o 0 O Lu CD V J LL Z O Co APPROVED FOR CONSTRUCTION h3n ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: JDP DRAWN BY: JDP CHECKED BY: KSK DATE: 8/21/2018 PROJECT: 18-055 SHEET NO. C5.1 Z�9.5'x7'x6" CONCRETE PUMP PAD PREFABRICATED PUMP STATION. SEE PUMP STATION PLANS. �-48" DIA. CONCRETE WET WELL. CONCRETE PUMP PAD 4' CLEARANCE IN 6" DIA. C900 PVC. APPROX. 4' LENGTH 48" DIA. CONCRETE WET WELL. . SEE DETAIL THIS SHEET. FRONT OF PUMP coNTROL PANEL CLEMONS CW400 CLEARWATER SCREEN WITH 10 MESH 12.5' SCREEN, SEALED BEARINGS AND 6" GASKETED SLIP 3.0' A COUPLER. B B 9'5 CONCRETE WEIR BOX SEE DETAIL I I F THIS SHEET. 3.5' 8.0' PROPERTY LINE. 15' PE SCREEN RETURN LINE PLUMB TO CLEARWATER SCREEN, 7.3' 3.5 VALLVEON PTUMP STATION E AND PLUMB PORT/ELECTRIC PUMP EXISTING GRAVITY IRRIGATION PIPE. SAVE AND PROTECT. REMOVE PVC STATION. 1.5' ELBOW, CUT TO LENGTH AS CIPOLETTE WEIR. SEE DETAIL. 0' 5.0' REQUIRED. POLY COATED STEPS AT 12" QC' WEIR GAUGE. SET ZERO AT SAME ELEVATION AS WEIR EXISTING C-10 CANAL GATE. DIRECTLY UNDER WET WELL HATCH SAVE AND PROTECT. FOR ACCESS INTO/OUT OF WET CREST. INSTALL 18" UPSTREAM OF WEIR. SECURE TO WALL OF IRRIGATION BOX. 7�-�—SAVE EXISTING IRRIGATION BOX. WELL. EXTEND LENGTH OF WET AND PROTECT. WELL. EXISTING IRRIGATION PIPING. 3'-8" x 1'-Y x 3/16" DIAMOND SAVE AND PROTECT. PLATE COVER. SECURE TO WET EXISTING GRAVITY IRRIGATION PIPE. WELL AND PUMP PAD WITH (4) A SAVE AND PROTECT. INSTALL 5/16"x4" RED HEAD CONCRETE THROUGH KOR-N-SEAL BOOT AT ANCHOR BOLTS. CENTER OVER NEW IRRIGATION BOX. OPENING TO CLOSE ALL OPENINGS TO WET WELL. SITE PLAN ° 5 10 mmmr� WET WELL, PUMP PAD AND INTAKE BOX LAYOUT PLAN RIM EL: 76.8' ASSUMED SHALL MATCH RIM ELEVATION OF EXISTING A\\A\\ IRRIGATION BOX UPSTREAM. 3.0' EX. 12" INV.: 73.8' (BENCHMARK) TO' SUMP EL: 69,8' 4 Scale 1" = 54' 4.5' 4.3' 3.8' - QCf'Tln KI A A FINISH GRADE —WEIR CREST EL:74.3' —CONCRETE HEADWALLINV EL: 74.1 BEVEL HEADWALL OUTFALL AT 45' ANGLE TO ALLOW UNRESTRICTED CASCADE OF WATER OVER WEIR. 6" INTAKE INV EL: 71.6' MIN. 12" COMPACTED STRUCTURAL BASE OVER UNDISTURBED SOILS. NOTES: 1) ALL PIPE PENETRATIONS SHALL INCLUDE KOR-N-SEAL BOOT OR APPROVED EQUAL. 2) ELEVATIONS ARE BASED ON MINIMAL SURVEY INFORMATION. CONTRACTOR SHALL VERIFY ALL ELEVATIONS ON SITE. SEAL JOINT BETWEEN PUMP PAD AND WET WELL WITH SELF LEVELING SEALANT OR APPROVED EQUAL. 6" THICK CONCRETE PAD OVER 6" COMPACTED STRUCTURAL BASE SEAL JOINT BETWEEN PUMP PAD AND WET WELL WITH SELF LEVELING SEALANT OR APPROVED EQUAL. 0 5 10 STEEL WEIR PLATE. 12" WIDTH AT CREST. REDHEAD TO CONCRETE WALL. E(OF ID,� G4�G P. B9�' % 0 -_ r 'ViI D O _ 9.24.2018 ti wzJ�, LA-16635 e1 "4NDSiAY A\�� ' ^z BAERLu o-------- greg@baerdg.com Ph. 208.859.1980 1 CIPOLETTI WEIR PLATE NTS 0.5 3.5' 7 3.0' Scale 1" = 5'-0" 2 WEIR BOX o 2 4 Scale 1" = 2'-0" 1.5" PE SCREEN RETURN LINE. PLUMB TO PUMP STATION SCREEN RETURN VALVE. PENETRATE RRIGATION BOX ABOVE HIGH WATER LINE. CLEMONS CW400 CLEARWATER SCREEN WITH 10 MESH SCREEN, SEALED BEARINGS AND 6" GASKETED SLIP COUPLER. i WEIR BOX - SECTION A -A ° 2 4 (4� SECTION B-B ° 2 4 ( 5 ) LID - WEIR BOX STEEL HANDLE (TYP OF TWO) 1 REDHEAD BOLT (TYP OF SIX) EXPANDED STEEL LID WITH 2' FLAT IRON FRAME. TACK WELD EXPANDED STEEL TO BOTTOM SIDE OF FRAME. HINGES (TYP. OF THREE) SECURE TO EACH LID TO ALLOW ACCESS TO EITHER SIDE OF WEIR BOX. EXPANDED STEEL LID WITH 2" FLAT IRON FRAME TACK WELD EXPANDED STEEL TO BOTTOM SIDE OF FRAME, STEEL HANDLE (TYP OF TWO) CONCRETE WEIR BOX 0 2 4 Scale 1" = 2'-0" z 0 Ln > w x x x x x x x L r-I O Z Z O V) 0 O Co Z)a V� cn Z zQ O_ 2io 2i Or- o w U 2i J LL Z D O Co III 101Im,IIe\ton CONSTRUCTION SET binrd I rem MIT will 1.7 ME ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE' IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: GB DRAWN BY: GB CHECKED BY: GB DATE: AUGUST, 2018 PROJECT: 18-055 Scale 1" = 2'-0" Scale 1" = 2'-0" SHEET NO. IR1.0 PLAN VIEW FRONT VIEW 2" WILKINS 975 XL2 REDUCED PRESSURE BACKFLOW VALVE 2" 90' ELL (TYP)� 2" NIPPLES (TYP) - LENGTH AS RED 2%2"x2" TEE WITH 2" PLUG FOR SPRINKLER BLOWOUT WITH AIR COMPRESSOR. STRONG BOX SBBC-45CR 'NTH LOCKING KIT. 6" DIA. ROUND FINISH GRADE VALVE BOX 4" CONCRETE PAD, SIZE AS REQUIRED TO PROVIDE 3" ON ALL SIDES OF ENCLOSURE 6" PVC SLEEVE PVC LINE TO - SYSTEMS Y4"MANUAL DRAl VALVE 6" DIA. 12" DEEP DRAIN BED WITH 2" GRAVEL FOR DRAIN VALVE. WRAP WITH FILTER FABRIC FLOW is-o THRU HOLE PLATE COUP 10" PLAT 8" HOLE )UT DIA. DROP PIPE 1. ALL PIPES AND FITTINGS USED FOR BACK FLOW ASSEMBLY TO BE MADE OF RED BRASS OR SCH 40 STEEL. TI - 90' ELL (TYPICAL) J The pump shall be capable of full demand flow and filter and screen demand. LEFT SIDE VIEW RIGHT SIDE VIEW DESIGN SPECIFICATIONS Design Flow Rate: 70 GPM @ 80 PSI Duty Pump Details: 7.5 HP/Pump 110 GPM @ 195 TDH Jockey Pump Details: N/A HP/Pump N/A GPM @ N/A TDH Minimum Power: Volt / - Phase Model# V1S070X00070-O8OV2PBIMFINS BILL OF MATERIALS ITEM DESCRIPTION SIZE Count AR AIR RELIEF VALVE 3/4" 1 IC BFV BUTTERFLY VALVE, LID, GV 3" 1 13GL CHK CHECK VALVE, SILENT 3" 1 P3S EP ELECTRICAL PANEL (SIZE) 1 VAF1 - FILTER, VAF 3" 1 FL FLOW METER NMP 1 MTR HP SW HIGH PRESSURE SWITCH 1/4" 1 PG PRESSURE GAUGE 2 1/2" 2 PR PRESSURE SENSOR 1/4" 1 ST PSID PSID GAUGE 1 PMP1 PUMP, SUBMERSIBLE 5 HP 1 SKID SKID 48x33 1 REQUIRED ENCLOSURE 4&0" 33.1" a2.o° MINIMUM CLEARANCE FOR DOOR OPENING a FRONT VIEW RIGHT SIDE VIEW PUMP ENCLOSURE —2" CHECK VALVE AIR GAP BY WILKINS DRAIN LINE BY WILKINS -PROVIDE w HOLE IN a PAD FOR > DRAIN PIPE -10" PERFORATED PVC PIPE -FILTER FROM FABRIC P.O.C. REDUCED PRESSSURE BACKFLOW DEVICE NTS SCOPE OF WORK Packaged Pump Station supplier shall provide a variable speed submersible turbine pump station complete with pump, piping, valves, sensors, variable frequency drive (VFD), programmable logic controller (PLC), UL 508A listed control panel, and all appurtenances necessary for a complete and functioning pumping system. The station shall be mounted to press brake formed steel base and enclosed in a powder -coated marine grade aluminum enclosure. The pump station shall be manufactured by a UL QCZJ certified pump station manufacturer. Technical Service and Su000rt The manufacturer shall provide access 24/7 phone support with a factory certified technician. The technician shall have access to all relevant data specific to the pump station, including specifications, submittal, shop drawings, programming, and detailed photos of the system. Factory Testin The pump station shall undergo and pass all of the following system performance tests: Hydrostatic testing that meets Al specifications and standards; Flow testing that meets Al 14.6 specifications and standards; and Vibration testing that meets Al 9.6.4 Vibration Measurement and Allowable Values specifications and standards. The pumping system shall be flow tested as a complete unit, which shall include function testing of pumps, motors, instrumentation, appurtenances, and control panel. The results of all tests shall be available to the owner. PRODUCTS Piping The station piping shall be standard wall pipe with grooved connections. Flanged or welded connections shall not be acceptable. Threaded connections between the main piping sections other than at the pump volute shall not be acceptable. Valves Butterfly style isolation valves --with grooved connections --shall be included on station suction and discharge piping. Flanged or threaded connections shall not be accepted. A non -slam check valve shall be included on the discharge of each pump. An air release valve shall be included, located immediately after the pump check valve. Skid The pump skid shall be made of 1/4" press broke A36 steel. No welded bases or open rail systems shall be acceptable. Corrosion Protection The pump skid and appurtenances shall be cleaned to bare steel and coated with a baked on powder coating, all piping including elbows shall be coated inside and out. The pump station shall be pressure tested prior to coating. No welding shall be performed after the pump station is powder coated. Station Enclosure The pump station enclosure shall be constructed of marine grade aluminum modular panels to allow access to all pumps and components by simply removing any panel. The entire front of the enclosure shall consist of hinged doors. The enclosure shall be powder coated. The roof of the enclosure shall be easily displaced and replaced by one person for the purpose of servicing the pump station. The station enclosure shall include a ventilation fan (or fans) appropriately sized to adequately cool the enclosed equipment. Automatic Filter The pump station shall include an automatic screen filter. The filter shall use suction scanning devices to automatically remove debris from the filter element. The filter shall be VAF200 or approved equal. Control logic for filter flush shall be included as part of the main control panel PLC programming. Pump Control Svstem NEMA Rating The VFD, PLC, and associated electrical equipment shall be mounted in a NEMA 12 enclosure rated for indoor installation. To avoid potential water or rodent damage, VFD's mounted outside the main control panel are not acceptable. Control Panel Manufacturing & Testing The pump control panel shall be manufactured and listed by a UL508A Panel Shop. The panel shall be UL labeled as an "Enclosed Industrial Control Panel". The pump control panel shall be completely manufactured, tested and programmed prior to delivery to the job site. Documentation A color wiring schematic and pump nameplate information shall be permanently affixed to the inside of the control enclosure. All field terminal connections shall be numbered and labeled. Cooling Svstem The control panel cooling system shall be appropriately sized for the ambient conditions. The cooling system shall not allow dust, insects or rodents inside the pump control panel. Two sets of spare filters shall be included with the pumping system. Main Disconnect A service -entrance rated, non -fused disconnect shall be mounted in the pump control panel and shall isolate all power to the control panel. The disconnect shall include an operating handle mounted on the control panel enclosure door that is mechanically interlocked to prevent entry while the disconnect is in the ON position. To prevent damage from vandalism, a disconnect external to the pump station enclosure shall not be accepted. Overcurrent Protection The VFD bridge rectifiers shall be protected from over current by an appropriately sized circuit breaker. Fuses are not acceptable. Lightning & Surge Protection. The Pump Control Panel shall be equipped with transient voltage and surge arrestors. Variable Freauencv Drive (VFD The VFD shall be appropriately sized to meet the FLA (full load amps) required by the pump motor, as stated on the motor nameplate. The VFD shall be manufactured by ABB Industrial Systems, Mitsubishi, or approved equal. Initial start-up and calibration shall be performed by a factory certified technician, which shall extend the warranty on the control panel to a total of three (3) years. Programmable Logic Controller (PLC) The PLC shall be fully programmed prior to pump panel installation. The technician installing and programming the PLC is to be factory trained and certified by the PLC manufacturer. The PLC programming shall be non-proprietary, and the complete station programming shall be made available to the owner via a USB drive included with the station control panel. PLC Ooerator Interface The PLC shall be equipped with a 5.7" LCD color touchscreen. The operator interface shall allow the user to make adjustments to the PLC program locally without requiring any additional equipment such as a laptop computer. A VFD control keypad is not an acceptable substitution for the digital operator interface. The PLC shall have an Ethernet port to enable remote access. PLC Control Functions: 1. User settable Local or Remote control. 2. System Pressure Setpoint 3. Pump Sleep Settings, with two threshold modes: Sleep by Flow or Sleep by Frequency 4. System Protection Settings, including fault and warning parameters for low flow, high flow, low pressure, high pressure, restart trials and restart delay time. 5. Load Factory Default Settings, User Saved Default Settings. 6. Pre -Programmed Start -Up Routines to limit and/or delay starting and acceleration of the pump to eliminate excessive velocity and pressure. It shall also include initial start-up, mainline fill, power outage and automatic re -starts. PLC Monitoring Functions 1. Pump operating status, total pump run hours, motor frequency, motor amperage 2. System pressure, flow rate 3. Fault Log with time stamps and diagnostic utility. 4. Trend Data, with graphic display of system pressure, flow, motor frequency and amperage. Data shall be exportable to MS Excel. 5. USB port to upload, download of program, and data storage. Instrumentation. Pressure Gauges shall have a 304 stainless steel case, with bezel construction. Gauges shall have a 2.5" diameter and be liquid filled. Pressure Transmitter(s) shall be constructed of stainless steel and rated for the pump station discharge pressure. Flow Meter The station shall include a solid state insertion flow meter. Current and totalized flow shall be read at the pump control panel HMI. Paddle type insertion sensors shall not be accepted. Pump Protection Shrouds Each pump and motor shall be completely encased in a slotted PVC well casing. Both ends of the shall be thoroughly sealed to ensure that no water can enter at either end. Water shall only enter the casing through precision laser cut slots, which will not allow debris larger than can be passed entirely through the pump. All water entering the casing shall pass over, and cool the motor, prior to entering the pump. A/ J V � D O V /Z V BAER o greg@baerdg.com Ph. 208.859.1980 z O N > u u u u u u u L.J ~ r-I r•� Z Q Z J Ow H 0 Q Z N 0 H Z W LU z O OJ LL Q Q m CONSTRUCTION SET ENGINEERS. SURVEYORS. PLANNERS 9233 WEST STATE STREET BOISE, IDAHO 83714 PHONE (208) 639-6939 FAX (208) 639-6930 DESIGN BY: GB DRAWN BY: GB CHECKED BY: GB DATE: AUGUST, 2018 PROJECT: 18-055 I R2.0