In-N-Out Burger CZC, DES A-2022-0048 V2C+E IDIAN�- Planning Division
��,, Community Development Department
I D A H O 33 E. Broadway Avenue, Suite 102
APPROVED Meridian, Idaho 83642
DATE 04/14/22
FILE NUMBER A-zozz- M
CERTIFICATE OF ZONING COMPLIANCE REPORT
Project Number
A-2022-0048
Project Name
In-N-Out Burger Restaurant
Project Address
3520 E. Fairview Avenue
Project Description
Approval to construct a 3,879 square foot In-N-
Out Burger with drive -through located on 0.642
acres of land in the C-G zoning district.
Applicant
Jim Lockington,
Assigned Planner
Stacy Hersh
Expiration Date
April 14, 2023
Note: This is not a building permit.
Please contact Building Services at (208) 887-2211
to verify if you need a building permit and/or inspection. If you do need a building
permit, you must complete that process before you commence the use or construction.
Please contact Building Services for additional details about building permits and
inspections.
I. DECISION
The applicant's request for Certificate of Zoning Compliance and Design Review are approved
with the conditions listed below. The director determined that the proposed structural and/or site
designs conform to the standards and meet or exceed the intent of the "City of Meridian
Architectural Standards Manual".
Site Specific Conditions of Approval
1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC,
consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B.
2. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter
3 Article D and receive approval for such signs.
3. The applicant shall complete all improvements related to public life, safety, and health as set
forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in
accord with UDC 11-5C-3C.
4. Property Boundary Adjustment (PBA-2022-003) for Centercal Subdivision shall be
recorded prior to issuance of Certificate of Occupancy.
5. All mechanical equipment on the back of the building and outdoor service and
equipment areas should be incorporated into the overall design of buildings and
landscaping so that the visual and acoustic impacts of these functions are fully
contained and out of view from adjacent properties and public streets as set forth in
UDC 11-3A-12.
6. The trash enclosure plans/elevations and location shall be approved by Republic
Services prior to submitting for a building permit for the trash enclosure.
7. Upon installation of the landscaping and prior to inspection by Planning Division staff, the
applicant shall provide a written certificate of completion as set forth in UDC 11-313-14A.
11 Page
(E IDI� IAN,<-
APPROVED
DATE 04/14/22
FILE NUMBER A-zozz- M
11.
The approved site plan, landscape plan and/or elevations may not be altered without prior
written approval of the City of Meridian Planning Division.
The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
If any changes must be made to the site plan to accommodate ACHD requirements, the
applicant shall submit a new site plan to the City of Meridian Planning Division for approval
prior to issuance of the building permit.
The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building
Official has issued a Certificate of Occupancy.
General Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that
meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping
as set forth in UDC 11-313-5, UDC 11-313-13 and UDC 11-313-14.
2. The project is subject to all current City of Meridian ordinances and previous conditions of
approval associated with this site (AZ-07-012, DA Instrument #108131103; MDA-11-012 (1st
Addendum Inst. #111056292; 2T'd Addendum Inst. #112025435).
3. The issuance of this CZC does not release the applicant from any previous requirements of
the other permits issued for the site.
4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a
minimum height of six feet above the ground or sidewalk surface to afford greater visibility
of the area.
5. The applicant shall have an ongoing obligation to maintain all pathways.
6. The applicant has a continuing obligation to comply with the outdoor lighting provisions as
set forth in UDC I 1-3A-11.
7. The applicant and/or property owner shall have an ongoing obligation to maintain all
landscaping and constructed features within the clear vision triangle consistent with the
standards in UDC 11-3A-3.
8. The applicant and/or assigns shall have the continuing obligation to meet the specific
use standards for the proposed use as set forth in UDC 11-4-3-11 (drive -through
establishment) and 11-4-3-49 (restaurant).
IL CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the Director.
All requests for review shall be filed in writing with the Planning Division on or before April 29,
2022, within fifteen (15) days after the written decision is issued, and contain the information
listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a
final decision on a land use application. You have the right to request a regulatory taking analysis
under Idaho Code 67-8003.
2 1 P a g e